INTEGRATE DESIGN PROJECT II

Name/Student ID

: Adesh Ramharack
: Donothan Sookraj
: Kieron Ramlochan
: Imzaman John

/
/
/
/

52748
52682
52696
60690

Date

: 2014/07/18

PROGRAMME
STATUS
YEAR
SEMESTER #
CAMPUS

: BASc. Civil Engineering Systems


: Full Time
:2
:3
: SFTI

COURSE CODE

:STRU2011

COURSE LEADER

: Richard Flick

1
Integrated Design Project II

Table of Contents
1.0 Introduction .......................................................................................................................................................... 2
1.1. Project Definition ............................................................................................................................................ 2
1.2. Objectives ........................................................................................................................................................ 2
2.0 Discussion ............................................................................................................................................................ 3
2.1. Design Criteria ................................................................................................................................................ 3
2.1.1 Load Definition ......................................................................................................................................... 3
2.2. Codes, Standards and Literature ..................................................................................................................... 4
2.3 Concept Design ................................................................................................................................................ 5
3.0 Calculations .......................................................................................................................................................... 6
3.1 Floor Slab ......................................................................................................................................................... 6
3.2 Beam............................................................................................................................................................. 100
3.3 Column ......................................................................................................................................................... 133
3.4 Square Pad Footing ...................................................................................................................................... 155
4.0 Drawings ............................................................................................................................................................ 19
4.1 Designed Elements......................................................................................................................................... 20
4.2 Force Elements ............................................................................................................................................. 191
4.3 Floor Slab ..................................................................................................................................................... 192
4.4 Beam and Column Section .......................................................................................................................... 193
4.5 Beam and Column Front Elevation ............................................................................................................. 194
4.6 Beam and Column Side Elevation ............................................................................................................... 195
4.7 First Floor Entrance ..................................................................................................................................... 196
4.8 Pad Footing Entrance ................................................................................................................................... 197
4.9 Foundation Plan Entrance ............................................................................................................................ 198
4.10 First Floor Layout ........................................................................................................................................ 29
4.11 Second Floor Layout .................................................................................................................................... 30
4.12 Front Elevation of Office Building .............................................................................................................. 31
4.13 Rear Elevation of Office Building ............................................................................................................... 32
4.14 Side Elevation of Office Building ............................................................................................................... 33
5.0 Material List ..................................................................................................................................................... 344
6.0 Bills of Quantities ............................................................................................................................................ 366
7.0 Conclusion .......................................................................................................................................................... 39
8.0 References.........................................................................................................................................................39
9.0 Appendix...40
9.1 Appendix A...41
9.2 Appendix B...45
9.3 Appendix C...47

2014/07/18

2
Integrated Design Project II

1.0 Introduction

1.1. Project Definition


The purpose of this project was to design and produce
drawings along with estimates of an office building or
warehouse. Idea sketches with dimensions were provided
upon which we were to use to start our design. Loads acting
on the structure were to be chosen based on our concept
design and materials used (which includes the live loads and
dead loads (Appendix A). The most critical floor slab, beam,
column and footing were to be designed with the aid of
drawings, followed by producing a Bill of Quantities to
establish the amount of material needed and an estimate
costing of the structure.

1.2. Objectives
This project will be based on designing an office building and
the following objectives were undertaken during the course of
the project:

Determine the loads produced on the structure based


on materials chosen

Calculate and design the critical members of the


structure such as the floor slab, beam, column and
footing (Drawing 4.1)

Produce drawings of the building and critical


members using AutoCAD

Produce a Bill of Quantities based on the designs for


the structure

Produce a final cost estimate for the structure

2014/07/18

3
Integrated Design Project II

2.0 Discussion

2.1. Design Criteria


The office building had have a total dimension of twelve (12)
meters in width by fifty (50) meters in length. The building
was also designed to accommodate efficient office space,
storage and also a water closet amongst the two stores.
(Drawing 4.10 and 4.11)

2.1.1 Load Definition


As defined by the Building Code Requirements for Structural
Concrete (ACI 318-05) and Commentary, The terms dead
load and live load refer to the unfactored loads (service loads)
specified or defined by the general building code. For
designing the critical members of the building, the following
loads were considered (Drawing 4.2) :

Roof Dead Load 7.5 KN/m2


-Live Load 1.5 KN/m2

Slab Dead Load 0.5 KN/m2


-Live Load 3.0 KN/m2

Walls Dead Load 1.5 KN/m2

2014/07/18

4
Integrated Design Project II

2.2. Codes, Standards and Literature


The office building was designed in accordance to the
Building Code Requirements for Structural Concrete (ACI
318-05) and Commentary manual.
Description

ACI Code
9.2.1 (9-3)

Required strength
U=1.2D + 1.6(L or S or R) + (1.0L or 0.8W)

7.7.1

Concrete protection for reinforcement


(c) Concrete not exposed to weather or in contact
with ground: Slabs, walls, joists

7.6.1

Spacing limits for reinforcement


The minimum clear spacing between parallel
bars in a layer shall be db, but not less than 1 inch

10.2 & 10.3 Flexure and Axial Loads


Design assumptions (10.2)
General principles and requirements (10.3)

11.3.1.1

Shear strength provided by concrete for


nonprestressed members
For members subject to shear and flexure only

11.12.2.1(c) Special provisions for slabs and footings


For nonprestressed slabs and footings
11.12.2.1(b) Special provisions for slabs and footings
For nonprestressed slabs and footings

2014/07/18

5
Integrated Design Project II

2.3 Concept Design


The office building was to be made up of individual frames
twelve (12) meters in width and eight (8) meters in height.
This frame contained two stores, the first floor and the second
floor. The total length of the structure was to be fifty (50)
meters which needed eleven (11) frames spaced at five (5)
meters respectively.
The floor slab would be designed and calculated first taking
into consideration the loads being applied to the structure.
Wind loads and seismic loads were not considered in this
design. After the floor slab was determined, the critical beam
dimensions were calculated followed by the column and
footing for the structure.
After designs were established drawings were done using
AutoCAD software as well as estimates were done to produce
a Material List and also a Bill of Quantities showing the cost
to construct the office building.

2014/07/18

6
Integrated Design Project II

3.0 Calculations

3.1 Floor Slab

6m

5m

0.3m

Assumptions
Concrete fc = 4000 PSI
16mm Grade 60 main tension bars
12mm Grade 60 shrinkage bars
Concrete cover = (0.02m)
Concrete Density = 24 KN/m3
Live Load on Slab - 3 KN/m2
Dead Load on Slab - 0.5 KN/m2 (due to tiling finish)

Simply Supported One Way Slab Thickness =

0.25

Factored Uniform Load, Wu = 1.2 D.L. + 1.6 L.L.


= 1.2 (0.3m X 0.5 KN/m2 + 0.3m X 0.25m X 24 KN/m3) + 1.6 (0.3m X 3 KN/m2)
= 2.34 KN/m + 1.44 KN/m
= 3.78 KN/m
2014/07/18

7
Integrated Design Project II

Maximum Factored Moment, MMAX =

= 11.81 KNm

0.3m
0.25m

d = slab thickness concrete cover - Diameter of Reinforcement


(ACI 318-05 section 7.7.1)
= 0.25m 0.02m - (0.016m)
= 0.22m

.
. .

= 903.73 KN/m2

Corresponding from table A-13 = 0.0023

As = b d

(ACI 318-05 section 7.6.1)

= 0.0023 X 0.3m X 0.22m


= 0.000152 m2 per 0.3m width of slab

2014/07/18

8
Integrated Design Project II

Tension Bar Spacing

Tension bar spacing required for moment=

= 0.3m X

= 0.4m apart

MAXIMUM tension bar spacing requirements per ACI-318:

Maximum spacing between tension bars = smaller of

0.4m
= smaller of

3 X 025m
0.3m

USE 16mm Tension Bars @ 0.3m c/c

2014/07/18

9
Integrated Design Project II

Shrinkage Bar Spacing


Shrinkage bar requirements by analysis
As = 0.0020bh
= 0.0020 X 0.3m X 0.25m
= 0.00015 m2 per 0.3m width of slab

Tension bar spacing required for moment=

= 0.3m X

= 0.23m apart

Maximum shrinkage bar spacing requirements per ACI-318

Maximum spacing between shrinkage bars = smaller of

0.23m
= smaller of

3 X 0.25m
0.3m

USE 12mm Shrinkage Bars @ 0.23m c/c

2014/07/18

10
Integrated Design Project II

12m

3.2 Beam

SLAB

5m
BEAM

5m

5m

Assumptions

Wu

Concrete fc = 4000 PSI


R2

R1

R3

3- 29mm Grade 60 main bars


10mm Grade 60 stirrups
Concrete cover = 1 (38mm)

0.4l

0.4l

Mneg = -0.1wl2

Mpos = 0.08wl2

Concrete Density = 24 KN/m3

R1= 0.4wl

b=2h

R2= 1.1wl
R3= 0.4wl

Live Load - 3 KN/m2 (due to load on Floor Slab)


Dead Loads - 0.5 KN/m2 (due to tiling finish on Floor Slab)
- 24 KN/m3 X 0.25m = 6 KN/m2 (due to self weight of Floor Slab)
- 1.5 KN/m2 (due to Block work Partitions)

2014/07/18

11
Integrated Design Project II

Wu = 1.2 D.L. + 1.6 L.L. + Anticipated Beam Weight


= 1.2 (1.5 KN/m2 X 4m + 6.5 KN/m2 X 5m) + 1.6 (3 KN/m2 X 5m) + 6 KN/m
= 46.2 KN/m + 24 KN/m + 6 KN/m
= 76.2 KN/m

Minimum Suggested Thickness, h =

= 0.65m

(One end continuous)

b = X 0.65m =0.33m

0.35m

Mpos = 0.08wL2 = 0.08 X 76.2 KN/m X (6m)2 = 219.46 KNm


Mneg = -0.1wL2 = -0.1 X 76.2 KN/m X (6m)2 = 274.32 KNm

d= h - concrete cover - stirrup bar diameter - (main bar diameter)


(ACI 318-05 section 7.7.1)
= 0.65m + 0.038m + 0.01m + (0.029m)
= 0.588m

act =

.
.

= 0.00962

(ACI 318-05 section 7.6.1)

act = 0.00962 which is > min = 0.0033 and < max = 0.0214
Mu = 0.9Asfyd { 1- [ 0.59(

)] }

= 0.9 X (3 x 1 in2) X 60000 psi X 23.15 in { 1- [ 0.59(

)] }

= 3,431,010.7 lb.in = 387.65 KNm


2014/07/18

12
Integrated Design Project II

Mpos = 219.46 KNm < 387.65 KNm OK


Mneg = 274.32 KNm < 387.65 KNm OK

Checking originally assumed beam weight


Assumed beam weight = 6 KN/m

0.35m
Actual Beam Dimensions

0.65m

Beam Weight = Unit Weight X Volume


= 24KN/m3 X (0.35m X 0.65m)
= 5.46 KN/m < 6 KN/m OK

2014/07/18

13
Integrated Design Project II

3.3 Column
Assumptions
Concrete fc = 4000 PSI
16mm Grade 60 main tension bars
10mm Grade 60 shrinkage bars
Concrete cover = 1.5 (0.04m)
Concrete Density = 24 KN/m3
3% Steel Reinforcement

Pu = Force from roof on column + Force from beams on column


= 342 KN + 2(1.1 X 76.2 KN/m X 6m)
= 1347.84 KN = 303006.49 lbf

Pn =

.
.

= 466163.83 lbf

Pn = 0.80 x [ 0.85 fc (Ag Ast) + fy Ast]


0.65 x 466163.83 lbf = 0.80 x 0.65 [0.85 x 4000 (Ag- 0.03Ag) + 60000 (0.03Ag)
303006.49 lbf = 0.52 (3400Ag 102Ag + 1800Ag)
303006.49 lbf = 2650.96 Ag
Ag = 114.3 in2

Use a 12 X 12 Column (144 m2) = 0.3m X 0.3m column

2014/07/18

14
Integrated Design Project II

h = h cover stirrup diameter - main bar diameter


(0.3m) = 0.3m 2[ 0.04m 0.01m - (0.016m)
= 0.85

Rn =

Kn =

=0

= 0.81

Using Interaction Diagram L4-60.8 =0.01

(ACI 318-05 section 10.2 & 10.3)

Using Interaction Diagram L4-60.9 =0.01

Area of Steel Required = Ag X = 0.3m X 0.3m X 0.01 = 0.0009 m2

Use 6 16mm bars (0.0012 m2)

2014/07/18

15
Integrated Design Project II

3.4 Square Pad Footing


Assumptions
Concrete fc = 4000 PSI
25mm (#8) Grade 60 main bars

24

12

Concrete cover = 3
qu =120 KN/m2 = 2506.25 psf

20

CONC. = 150 pcf


s = 100 pcf
Roof Slab = 0.3m thick
6m

6m

5m

5m
Roof dead load = 25 KN/m3 X 0.3m = 7.5 KN/m2
Roof live load = 1.5 KN/m2
Total Combined Load = 1.6 L.L. + 1.2 D.L. = 1.6 X 1.5 KN/m2 + 1.2 X 7.5 KN/m2 = 11.4
KN/m2
Force on Interior Column = 11.4 KN/m2 X 6m X 5m = 342 KN

Factored Loads acting on footing = Load from roof + Load from beam + Self weight of
column
= 342 KN + 2(1.1 X 76.2 KN/m X 6m) + (24 KN/m3 X 0.3m X 0.3m X 8m)
= 1365.12 KN = 306891.19 lbf

2014/07/18

16
Integrated Design Project II

Unfactored Loads on Footing


Roof Dead Load = 7.5 KN/m2 X 5m X 6m = 225KN
Roof Loads

Roof Live Load = 1.5 KN/m2 X 5m X 6m = 45KN

Loads on Beam - Floor Live load = 3 KN/m2 X 5m = 15 KN/m


- Floor Dead Load = 6.5 KN/m2 X 5m = 32.5 KN/m
- Dead Load from Partition = 1.5 KN/m2 X 4m = 6 KN/m
Load from Self Weight of Beam = 6 KN/m

Slab +

Loads from beams transferred to column = 2[1.1wl]

Beam Loads

= 2 [ 1.1 X (15 + 32.5 + 6 + 6) X 6m]


= 785.4 KN

Self Weight of Column = 24 KN/m3 X 0.3m X 0.3m X 8m = 17.28KN

Column Load (Self Weight)

Unfactored Loads = 225KN + 45KN + 785.4KN + 17.28KN = 1072.68KN = 241148.06lbf

Effective Depth, d = overall depth concrete cover - (diameter main bar)


= 20 3 - (1)
= 16.5
Footing Weight = 150 pcf X (
Weight of Soil = 100 pcf X (

"

) = 250 psf

) = 200 psf

"

qe = 2506.25 200 250 = 2056.25 psf


Area Required =

.
.

= 117.84 ft2

Therefore Use a 11ft X 11ft Footing (Area= 121 ft2)


2014/07/18

17
Integrated Design Project II

Bearing Pressure for Strength Design, qu =

= 2536.3 psf

11ft=132

12

16.5

60 = 5
12 + 16.5 = 28.5= 2.4
43.5 = 3.6

Depth Required for Punching Shear (Two Way Shear)


bo =
(ACI 318-05 section 11.12.12)

4(a+d) = 4(12 + 16.5) = 114

Vu2 = [A (a+d)2] x qu = [121 ft2 (2.4ft)2] x 2536.3 psf = 292283.2lbf

d=

.
.

"

= 13.5 < 16.5

(ACI 318-05 section

11.12.2.1(c))

d=

.
.


"

.
.

(ACI 318-05 section

11.12.2.1(b))
d=

.
.

1897.37d2 + 10815d 292283.2 = 0


d= 9.9 < 16.5

2014/07/18

18
Integrated Design Project II

Depth Required for One Way Shear

Vu1 = 11ft X 3.6ft X 2536.3 = 100437.48 lbf


d=

.
.

"

= 8 < 16.5

(ACI 318-05 section 11.3.1.1)

Therefore 20 for the total depth can be used

Mu = 5 X 11 X 2536.3 X = 348741.25 ft.lb


"

.
. "

= 129.4 psi

Using Table A-13


= 0.0022
=
As = x b x d = 0.0022 x 132 x 16.5 = 4.79 in2

Use 7 25mm (#8 bars in both directions (5.53 in2)

2014/07/18

19
Integrated Design Project II

4.0 Drawings

4.1 Designed Elements


4.2 Force Elements
4.3 Floor Slab
4.4 Beam and Column Section
4.5 Beam and Column Front Elevation
4.6 Beam and Column Side Elevation
4.7 First Floor Entrance
4.8 Pad Footing Entrance
4.9 Foundation Plan Entrance
4.10 First Floor Layout
4.11 Second Floor Layout
4.12 Front Elevation of Office Building
4.13 Rear Elevation of Office Building
4.14 Side Elevation of Office Building

2014/07/18

R.C Floor Slab

R.C Beam

R.C Column

PREPARED FOR:

R.C Pad Footing

DRAWING TITLE

DATE:

SCALE:

Designed Elements

18th July
2014

NOT
TO
SCALE

Adesh Ramharack

52784

Donothan Sookraj

52682

Kieron Ramlochan

52696

Imzaman John

60690

THE UNIVERSITY OF TRINIDAD AND TOBAGO


BASc. CIVIL ENGINEERING SYSTEMS

INTEGRATED DESIGN PROJECT 2

Richard Flick

PREPARED FOR:

DRAWING TITLE

DATE:

SCALE:

Force Elements

18th July
2014

NOT
TO
SCALE

Adesh Ramharack

52784

Donothan Sookraj

52682

Kieron Ramlochan

52696

Imzaman John

60690

THE UNIVERSITY OF TRINIDAD AND TOBAGO


BASc. CIVIL ENGINEERING SYSTEMS

INTEGRATED DESIGN PROJECT 2

Richard Flick

5m

6m

Plan View

Section C-C
PREPARED FOR:

Section D-D
DRAWING TITLE

DATE:

SCALE:

Floor Slab

18th July
2014

NOT
TO
SCALE

Adesh Ramharack

52784

Donothan Sookraj

52682

Kieron Ramlochan

52696

Imzaman John

60690

THE UNIVERSITY OF TRINIDAD AND TOBAGO


BASc. CIVIL ENGINEERING SYSTEMS

INTEGRATED DESIGN PROJECT 2

Richard Flick

0.35 m

0.04 m

0.3 m
0.04 m

0.65 m

0.3 m

Column

Beam
PREPARED FOR:

DRAWING TITLE

DATE:

SCALE:

18th July
2014

NOT
TO
SCALE

Adesh Ramharack

52784

Donothan Sookraj

52682

Kieron Ramlochan

52696

Imzaman John

60690

THE UNIVERSITY OF TRINIDAD AND TOBAGO


BASc. CIVIL ENGINEERING SYSTEMS

INTEGRATED DESIGN PROJECT 2

Richard Flick

Beam & Column


Section

PREPARED FOR:

DRAWING TITLE

.3m x .3m

.35m x .65m

.3m x .3m

.3m x .3m

.35m x .65m

.3m x .3m

Ring Beam
.3m x .3m

.3m x .3m

Ring Beam

DATE:

SCALE:

18th July
2014

NOT
TO
SCALE

Adesh Ramharack

52784

Donothan Sookraj

52682

Kieron Ramlochan

52696

Imzaman John

60690

THE UNIVERSITY OF TRINIDAD AND TOBAGO


BASc. CIVIL ENGINEERING SYSTEMS

INTEGRATED DESIGN PROJECT 2

Richard Flick

Front Elevation for


Beams and Columns

PREPARED FOR:

DRAWING TITLE

DATE:

SCALE:

18th July
2014

NOT
TO
SCALE

.3m x .3m

.3m x .3m

Ring Beam

.3m x .3m

.35m x .65m

.3m x .3m

.35m x .65m

.3m x .3m

.35m x .65m

.3m x .3m

.35m x .65m

Ring Beam
.3m x .3m

.3m x .3m

Ring Beam

.3m x .3m

.35m x .65m

.3m x .3m

.3m x .3m

.35m x .65m

Ring Beam
.3m x .3m

Ring Beam
.3m x .3m

.3m x .3m

Ring Beam

.35m x .65m

.3m x .3m

.35m x .65m

.3m x .3m

.3m x .3m

.35m x .65m

Ring Beam
.3m x .3m

.3m x .3m

Ring Beam

.3m x .3m

Ring Beam

Adesh Ramharack

52784

Donothan Sookraj

52682

Kieron Ramlochan

52696

Imzaman John

60690

THE UNIVERSITY OF TRINIDAD AND TOBAGO


BASc. CIVIL ENGINEERING SYSTEMS

INTEGRATED DESIGN PROJECT 2

Richard Flick

Side Elevation for


Beams and Columns

DRAWING TITLE

DATE:

SCALE:

18th July
2014

NOT
TO
SCALE

.3m x .3m

.3m x .3m
.3m x .3m

.3m x .3m

.3m x .3m
.3m x .3m

.3m x .3m
.3m x .3m

.3m x .3m

.3m x .3m
.3m x .3m

.3m x .3m

.3m x .3m
.3m x .3m

.3m x .3m

.3m x .3m
.3m x .3m

PREPARED FOR:

.3m x .3m

.3m x .3m
.3m x .3m

.3m x .3m

.3m x .3m

R.C Column
0.3m x 0.3m x 4m x 33No .

Adesh Ramharack

52784

Donothan Sookraj

52682

Kieron Ramlochan

52696

Imzaman John

60690

THE UNIVERSITY OF TRINIDAD AND TOBAGO


BASc. CIVIL ENGINEERING SYSTEMS

INTEGRATED DESIGN PROJECT 2

Richard Flick

First Floor Beam


and Column Plan

0.08 m

3.3 m

3.3 m

0.5 m

0.08 m

0.5 m

0.08 m

Plan View

3.3 m

3.3 m

Section A-A
PREPARED FOR:

Section B-B
DRAWING TITLE

DATE:

SCALE:

Pad Footing

18th July
2014

NOT
TO
SCALE

Adesh Ramharack

52784

Donothan Sookraj

52682

Kieron Ramlochan

52696

Imzaman John

60690

THE UNIVERSITY OF TRINIDAD AND TOBAGO


BASc. CIVIL ENGINEERING SYSTEMS

INTEGRATED DESIGN PROJECT 2

Richard Flick

R.C Ground Beam x 50No

R.C Column
0.3m x 0.3m x 4m x 33No

R.C Pad Footing


3.3m x 3.3m x 0.5m x 33No

12m

6m C/C

5m C/C

50m

PREPARED FOR:

DRAWING TITLE

DATE:

SCALE:

Foundation Plan

18th July
2014

NOT
TO
SCALE

Adesh Ramharack

52784

THE UNIVERSITY OF TRINIDAD AND TOBAGO


BASc. CIVIL ENGINEERING SYSTEMS

INTEGRATED DESIGN PROJECT 2

Richard Flick

Donothan Sookraj

52682

Kieron Ramlochan

52696

Imzaman John

60690

50 m
water closet

office space
hallway

12 m
reception

office space

PREPARED FOR:

DRAWING TITLE

DATE:

SCALE:

First Floor Layout

18th July
2014

NOT
TO
SCALE

Adesh Ramharack

52784

Donothan Sookraj

52682

Kieron Ramlochan

52696

Imzaman John

60690

THE UNIVERSITY OF TRINIDAD AND TOBAGO


BASc. CIVIL ENGINEERING SYSTEMS

INTEGRATED DESIGN PROJECT 2

Richard Flick

Se
c
o
n
d

Fr
o
n
t
El
e
v
a
t
i
o
n

8.0 m

Vent Windows for Water Closet

6 m C/C
12 m

PREPARED FOR:

DRAWING TITLE

DATE:

SCALE:

Rear Elevation

18th July
2014

NOT
TO
SCALE

Adesh Ramharack

52784

Donothan Sookraj

52682

Kieron Ramlochan

52696

Imzaman John

60690

THE UNIVERSITY OF TRINIDAD AND TOBAGO


BASc. CIVIL ENGINEERING SYSTEMS

INTEGRATED DESIGN PROJECT 2

Richard Flick

Vent Windows for Water Closet

1m

4m

8m

1m

3.6 m

50 m

PREPARED FOR:

DRAWING TITLE

DATE:

SCALE:

18th July
2014

NOT
TO
SCALE

Adesh Ramharack

52784

Donothan Sookraj

52682

Kieron Ramlochan

52696

Imzaman John

60690

THE UNIVERSITY OF TRINIDAD AND TOBAGO


BASc. CIVIL ENGINEERING SYSTEMS

INTEGRATED DESIGN PROJECT 2

Richard Flick

Side Elevation of
Building

34

Integrated Design Project II

5.0 Material List

2014/07/18

35

UNIVERSITY OF TRINIDAD AND TOBAGO


DEPARTMENT OF CIVL ENGINEERING
INTEGRATED DESIGN PROJECT 2
MATERIAL LIST
Description

12mm HT Steel per tonne


16mm HT Steel per tonne
20mm HT Steel per tonne
Concrete per m
6''x8''x16'' c/block
Door frames- 36'' x 80''
Door locks
Form Ply sheet 3/4 thk.
Rough pitch pine- 2'' x 4'' x12'
Rough pitch pine- 1'' x 4'' x12'
Rough pitch pine- 2'' x 2'' x12'
Nails- 2 1/2'' (kg)
Nails- 3'' (kg)
Nails- 4'' (kg)
Gypsum screws 2''
Gypsum screws 2 1/2''
Cement (sacks)
Red Sand (m)
Graded Gravel (m)
Plastering Sand (m)
Paint (gallon)
Glass doors- 1.475m x 2.133m

Quantity
9
14
9
781
8000
30
30
100
200
100
140
25
25
12.5
5000
5000
2000
100
100

548.24
200
1

Rate
$7,000.00
$7,000.00
$7,000.00
$1,000.00
$5.60
$300.00
$200.00
$180.00
$60.00
$30.00
$30.00
$18.00
$18.00
$18.00
$0.25
$0.35
$60.00
$300.00
$300.00
$60.00
$180.00
$8,000.00

Amount
$63,000.00
$98,000.00
$63,000.00
$781,000.00
$44,800.00
$9,000.00
$6,000.00
$18,000.00
$12,000.00
$3,000.00
$4,200.00
$450.00
$450.00
$225.00
$1,250.00
$1,750.00
$120,000.00
$30,000.00
$30,000.00
$32,894.40
$36,000.00
$8,000.00

Subtotal TT$
VAT (15%) TT$
TOTAL MATERIAL ONLY TT$

1363,019.40
204,452.91
1567,472.31

36

Integrated Design Project II

6.0 Bills of Quantities

2014/07/18

37

UNIVERSITY OF TRINIDAD AND TOBAGO


DEPARTMENT OF CIVL ENGINEERING
INTEGRATED DESIGN PROJECT 2
BILL OF QUANTITIES

Ref
A

Item Description
SITE PREPREPARATION
1 To clean and clear area before and after work is
completed
To set out taking lines and levels
Cleaning and clearing Site After Completion
OSHA
Scaffolding
To summary
EXCAVATION
Excavate trench for foundation base
Removal of excavated earth to be reused for backfill

Unit

Qty

Rate

600

TT$200.00
allow
allow
allow
allow

179.685

TT$400.00
allow

To summary
C

CARPENTRY- Only PP Lumber to be used.


Building Formwork,Profile,Etc Placed & Removed
RPP Lumber Supplied
25mm x 102mm x 3.66m RPP
51mm x 51mm x 3.66m
51mm x 102mm x 3.66m RPP
16mm x 1.2m x 2.4m const ply

Length
Length
Length
Sheet

150
100
200
150

TT$36.00
TT$36.00
TT$75.00
TT$190.00

To summary
D

STEEL WORK
High Tensile Bars Cut .Bend , Place And Tied
12mm HT Rods
16mm HT Rods
25mm HT Rods
16 Gauge Binding Wire

tonne
tonne
tonne
lb

9
14
9
200

TT$16,000.00
TT$16,000.00
TT$16,000.00
TT$10.00

To summary
E

CONCRETE WORK
In- situ Concrete 1:2:4 mix -Mixed and Pour for
Infill Blocks
To Cast Foundation, Column, Floor and Roof using
Ordinary Portland Cement
To summary
BLOCK WORK Cement Mortar 1:3 Mix
Making good all concrete works; fair face to internal
wall face.
152mm x 204mm x 406mm Concrete Block

CEILING
1 To supply and install suspended gypsum ceiling
To Summary
TILING
1 To supply and place floor tiles

To Summary

205,000.00

TT$
TT$

71,874.00
20,000.00

TT$

91,874.00

TT$
TT$
TT$
TT$

5,400.00
3,600.00
15,000.00
28,500.00

TT$

52,500.00

TT$
TT$
TT$
TT$

144,000.00
224,000.00
144,000.00
2,000.00

TT$

514,000.00

TT$

52,806.00

781.755

TT$1,300.00

TT$
TT$

1016,281.50
1069,087.50

m
m

548.24
250

TT$125.00
TT$181.29

TT$
TT$

68,530.00
45,322.50

TT$

113,852.50

TT$

232,800.00

TT$

232,800.00

TT$

324,000.00

TT$

324,000.00

TT$

100,000.00

TT$

100,000.00

TT$160.00

TT$
TT$

87,718.40
87,718.40

allow

TT$

300,000.00

TT$

300,000.00

TT$
TT$

120,400.00
66,000.00

TT$

186,400.00

1200

1200

TT$194.00

TT$270.00

allow

548.24

ELECTRICAL
To supply all material and labour for electrical

FINISHES
To supply and install Glass Cladding
To supply and install windows

TT$

TT$1,300.00

To Summary
L

120,000.00
10,000.00
10,000.00
25,000.00
40,000.00

40.62

To Summary
PLUMBING
1 To supply and install toilets and sinks
To Summary
PAINTING
1 To supply and work concrete paint and primer
To Summary

TT$
TT$
TT$
TT$
TT$

To summary
G

Amount

m
item

14
44

TT$8,600.00
TT$1,500.00

UNIVERSITY OF TRINIDAD AND TOBAGO


DEPARTMENT OF CIVL ENGINEERING
INTEGRATED DESIGN PROJECT 2

38

BILL OF QUANTITY

SUMMARY
A
B
C
D
E
F
G
H
I
J
K
L

SITE PREPAPARTION
EXCAVATION
CARPENTRY
STEEL WORK
CONCRETE WORK
BLOCK WORK Cement Mortar
CEILING
TILING
PLUMBING
PAINTING
ELECTRICAL
FINISHES

TT$
TT$
TT$
TT$
TT$
TT$
TT$
TT$
TT$
TT$
TT$
TT$

205,000.00
91,874.00
52,500.00
514,000.00
1069,087.50
113,852.50
232,800.00
324,000.00
100,000.00
87,718.40
300,000.00
186,400.00

Value add tax

15%

SUB TOTAL TT$


TT$
SUB TOTAL TT$

3277,232.40
491,584.86
3768,817.26

Contingencies

10%

TT$

376,881.73

TOTAL BILL TT$

4145,698.99

39

Integrated Design Project II

7.0 Conclusion

At the end of the project the following was designed for the office building:

Floor Slab
-

0.25m thick slab

16mm tension bars @ 0.3m c/c

12mm shrinkage bars @ 0.23m c/c

Beam
-

0.35m x 0.65m beam

Column
-

12 x 12 column

6 16mm bars (0.0012 m2)

Footing
-

11ft x 11ft footing

7 25mm (#8 bars in both directions (5.53 in2)

Total estimate for the office building = TT$ 4,145,698.99

8.0 References

Building code requirements for structural concrete (ACI 318-05) and commentary (ACI
318R-05). (2005). Farmington Hills, Mich.: American Concrete Institute.

McCormac, J. C. (1986). Design of reinforced concrete (2nd ed.). New York: Harper &
Row.
2014/07/18

40

Integrated Design Project II

9.0 Appendix

2014/07/18

41

Integrated Design Project II

9.1 Appendix A
Dead Loads and Live Loads

2014/07/18

01 ConPal Dewalt

7/8/05

3:50 PM

Page 29

ROOF DEAD LOADS


Material

Weight, psf

Shingles:
Asphalt (14" approx.) ..................................................2.0
Book tile (2")............................................................12.0
Book tile (3")............................................................20.0
Cement asbestos (38" approx.) .................................4.0
Clay tile (for mortar add 10 psf) ................................9.0 to 14.0
Ludowici ..................................................................10.0
Roman .....................................................................12.0
Slate (14") .................................................................10.0
Spanish....................................................................19.0
Wood (1")...................................................................3.0

CEILING DEAD LOADS


Material

Weight, psf

Acoustical fiber tile ........................................................1.0


Channel-suspended system .........................................1.0

FLOOR DEAD LOADS


Material

Weight, psf

Hardwood (1" nominal)..................................................4.0


Plywood (per inch of thickness) ....................................3.0
Asphalt mastic (per inch of thickness) ........................12.0
Cement finish (per inch of thickness)..........................12.0
Ceramic and quarry tile (34")........................................10.0
Concrete (per inch of thickness)
Lightweight ................................................................6.0 to 10.0
Reinforced (normal weight) .....................................12.5
Stone .......................................................................12.0
Cork tile (116").................................................................0.5
Flexicore (6" slab)........................................................46.0
Linoleum (14").................................................................1.0
Terrazzo finish (112") ....................................................19.0
Vinyl tile (18")..................................................................1.4

01 ConPal Dewalt

7/8/05

3:50 PM

Page 30

WALL AND PARTITION DEAD LOADS


Material

Weight, psf

Wood paneling (1") ..........................................................2.5


Wood studs (2 x 4 DF-Larch)
12" o.c........................................................................1.3
16" o.c........................................................................1.0
24" o.c........................................................................0.7
Glass block (4") .............................................................18.0
Glass (14" plate) ...............................................................3.3
Glazed tile......................................................................18.0
Marble or marble wainscoting.......................................15.0
Masonry (per 4" of thickness)
Brick .........................................................................38.0
Concrete block.........................................................30.0
Cinder concrete block .............................................20.0
Hollow clay tile, load bearing...................................23.0
Hollow clay tile, non-load bearing ...........................18.0
Hollow gypsum block ..............................................13.0
Limestone ................................................................55.0
Terra-cotta tile..........................................................25.0
Stone........................................................................55.0
Plaster (1") .......................................................................8.0
Plaster (1") on wood lath...............................................10.0
Plaster (1") on metal lath .................................................8.5
Gypsum wallboard (1")....................................................5.0
Porcelain-enameled steel ................................................3.0
Stucco (78")....................................................................10.0
Windows (glass, frame, and sash) ..................................8.0

AVERAGE WEIGHT OF HOUSE BY AREA


Unit
Roof
Attic (low)
Attic (full)
Second floor
First floor
Wall

Load/ft.2
40 lb.
20 lb.
30 lb.
30 lb.
40 lb.
12 lb.

Live load on roof = local requirements for wind and snow. (Usually 30 lbs. per sq. ft.)
Dead load of roof of wood shingle construction = 10 lbs. per sq. ft.

Dead load of partitions = 20 lbs. per sq. ft. of floor area

7/8/05

Live load on attic floor = local requirements.


(Usually 20 lbs. per sq. ft. when used for storage only)
Dead load of attic floor, not floored = 10 lbs. per sq. ft.
Dead load of attic floor when floored = 20 lbs. per sq. ft. (Storage space.)

01 ConPal Dewalt

FIGURING LOADS FOR FRAME OF A TWO-STORY HOME

Live load on second floor = local requirements. (Usually 40 lbs. per sq. ft.)

Joist span

Bridging

Live load on first floor = local requir ements. (Usually 40 lbs. per sq. ft.)
Dead load of first floor, ceiling not plastered = 10 lbs. per sq. ft.
Dead load of first floor, ceiling plastered = 20 lbs. per sq. ft.
Post
Plan of floor framing
showing the
Girder load area.

Girder load width


Girder
Joists

Page 31

Half
joist span

Dead load of partitions = 20 lbs. per sq. ft. of floor area

3:50 PM

Dead load on second floor = 20 lbs. per sq. ft.

45

Integrated Design Project II

9.2 Appendix B
Interaction Diagram

2014/07/18

47

Integrated Design Project II

9.3 Appendix C
Table A.13 from McCormac, J. C. (1986). Design of reinforced concrete

2014/07/18

You might also like