2016 - AVIA 3301 ATM

Individual Essay Due Date 9 June 2016


Value 25% of Total Assessment

Essay Topic
Your essay is to provide an overview of the processes required to complete the
following tasks:

1. Determine the arrival capacity of an airport:


Describing the inputs/factors that influence and determine the arrival capacity
of an airport
Identifying the relevant stakeholders that are required to be part of the
determination of arrival capacity

2. As part of ATFM Strategic Planning, implement a Scheduling


Scheme/System at the same airport in 1 above:
Providing a high level description of how you would implement the
scheduling scheme
Identifying the stakeholders that need to be engaged
Providing an estimate (with rationale) of the timeframe required to
implement the scheduling scheme
Notes.
a) Maximum of 6 pages
b) Max line spacing 1.5
c) Arial font at maximum 12