Rs. 24,67,548
: L.S.
Rs. 18,00,000
(C)
: L.S.
Rs.
5,00,00
(D)
Electrification
: L.S.
Rs.
1,50,000
(E)
Rs.
50,000
(F)
Rs.
32,452
(B)
-------------------------Grand Total
Rs. 50,00,000
===============
(Rupees Fifty Lakhs only)
--------------------------------------------------------------------------------------------
CONSTRUCTION OF
GAS CREMETORIUM
DETAILED ESTIMATE
************
1. Clearing light jungle including uprooting of thick
vegetation and small trees of girth up to 30cms and
removal of rubbish upto a distance of 150m outside
the periphery of the area cleared etc. complete.
(Assume that 25cents from the available land has to be cleared)
Rs. 4,336
-do-
Rs. 10,116
:
:
:
:
=
=
=
=
5.76
3.42
1.92
1.80
= 0.39
Parapet .. :
-do:
-do:
Step ... :
-do:
=
=
=
=
=
Watchman room,
Generator room
-do-do- parapet .....
-do- step .....
-do- -do- ..
:
:
:
:
:
3.24
0.90
0.58
0.84
0.42
Deductions
Roof beam .. : 2 x 5.60 x 0.20 x 0.40 =
lintel main building : 1 x 36.00 x 0.20 x 0.15 =
0.89
1.08
-do: 2 x 10.35 x 0.20 x 0.15 = 0.63
lintel main building : 2 x 5.40 x 0.20 x 0.15
= 0.32
lintel - watchman room : 1 x 22.20 x 0.20 x 0.15 = 0.67
rolling shutter main bldg : 1 x 3.20 x 0.20x 3.60 = 2.30
rolling shutter w.man room: 1 x 2.00 x 0.20 x 2.10 = 0.84
door main building : 4 x 0.90 x 0.20 x 2.10 = 1.51
door main building : 6 x 0.90 x 0.20 x 2.10 = 2.70
toilet door main building : 2 x 0.80 x 0.20 x 2.10 = 0.67
door w.man room : 1 x 0.90 x 0.20 x 2.10 = 0.38
window main building : 6 x 1.50 x 0.20 x 1.5 = 2.70
-do: 4 x 1.00 x 0.20 x 1.50 = 1.20
window w.man room : 3 x 1.00 x 0.20 x 1.50 = 0.90
ventilator main building : 2 x 0.60 x 0.20 x 0.60 = 0.14
-------------------------------Total deductions : 16.93m3
----------Net less deductions 65.58 -16.93 = 48.65 m3
=======
Say 49 m3 @ 4242.86/m3 ......................................... Rs. 2,07,900
------------------Total : 2.240dm3
------------------Say 2240dm3 @ 172.09/10dm3/m3 ........................... Rs. 38,548
(b)
-do-do-
2
Portico slopped slab : 2 x 4.95+3.95 x 3.10 x 0.12 = 3.310
2
-------------------Total : 11.622m3
Deductions
-------------------Parapet side : 1 x 11.20 x 0.70 x 0.12 = 0.948
Portico triangle portion : 1x 4.50x2.10 x 0.12 = 0.492
2
------------------Total deductions : 1.440m3
------------------Net less deductions : 11.622 - 1.440 = 10.182m3
=======
3
3
Say 10200dm @ 146.22/10dm ......................... Rs. 1,49,144
14. Reinforcement for R.C.C. work, bent, tied and placed
in position (plain grill requiring bending cold) using
torsteel (TMT) including cost and conveyance of
materials, labour charges etc. complete.
7
size 1.50 x 1.50 m., three leaves leaf with glass panes
alround outer frames and shutter frame of I section
of size 20 x 19 mm, 3mm. thick, corner of the section
with Flush Butt welded, fixing the frame to column or
walls, including providing and fixing best quality
glass panes 3mm.with wooden channel fixing with
beeding and screws approved projection box type
hinges 2Nos. on each leaf and horizontal bars using
12mm. square M.S. rod, welded to the frame of
spacing approximately 10cm. centre to centre
including cleaning the surface thoroughly and painted
9
size 1.00 x 1.50 m., two leaves leaf with glass panes
alround outer frames and shutter frame of I section
of size 20 x 19 mm, 3mm. thick, corner of the section
with Flush Butt welded, fixing the frame to column or
walls, including providing and fixing best quality
glass panes 3mm.with wooden channel fixing with
beeding and screws approved projection box type
hinges 2Nos. on each leaf and horizontal bars using
12mm. square M.S. rod, welded to the frame of
spacing approximately 10cm. centre to centre
including cleaning the surface thoroughly and painted
with two coats synthetic enamel paint over a priming
coat including 2 Nos. approved window handle with
necessary screws, washers, checknuts etc. complete
(as per standard drawings)
(Steel window size 1.00 x 1.50 = 1.50m2)
Steel Window ... : 24 x 1.00 x 1.50 = 3.00m2
-----------------Total : 3.00m2
-----------------Say 3.00m2@ 3127.74/m2..................................... Rs. 9,383
21. Providing M.S. grills for windows or compound gates
including all labour and hire charges for fabricating and
cost of materials and applying a coat of iron primer etc.
M.S. grill in gas room andGenerator room
(size of grill =1.50 x 1.50 m.)
(a) Alround frame with M.S. equal angles 25x 25mm., thickness 5mm.
. : 2 Nos.
----------------Total : 2 Nos.
-- -------------Say 2 Nos. @ Rs. 2,000/Each ........... ..... Rs. 4,000
11
1 x 3.40 = 3.40
1 x 2.20 = 2.20
----------------Total : 5.60m
-----------------
2
Portico slopped slab : 2 x 4.95+3.95 x3.10 = 27.49
2
-------------------Total : 303.85m3
-------------------Deductions
Parapet side ...: 1 x 11.20 x 0.70 = 7.84
Portico triangle portion :1x 4.50x2.10 x 0.12 = 4.30
2
------------------Total deductions :12.14
------------------12
2
Portico slopped slab : 2 x 4.95+3.95 x3.10 = 27.49
2
-------------------Total : 104.37m2
-------------------Deductions
Parapet side ...: 1 x 11.20 x 0.70 = 7.84
Portico triangle portion :1x 4.50x2.10 x 0.12 = 4.30
2
------------------Total deductions :12.14
------------------Net area : 92.232m2
============
2
2
2
Say 95 m @ 7288.56/10m /m ......................... Rs. 69,241
32. Finishing the floors with joint free rectified tiles (IS
15622 1st quality) approved quality and colour for
floor 90cm. x 90cm. size laid in 12mm. thick cement
mortar 1:3 to correct lines and levels including cutting
joints neatly and pointing with matching water resistant
cement based powdered grout, including cost and
conveyance of all materials, labour charges etc.
complete.
Main building hall
: 1x 12.00 x 6.00 = 72.00
-do- office, gas room :2 x 2.85 x 2.20 = 12.54
-doverandah : 1x 11.20 x 3.70 = 41.44
-do-step - thread : 2 x 11.20 x 0.25 = 5.60
15
===========
Say 590 m2 @ 209.65/10m2 ............................... Rs. 12,369
2
Portico slopped slab : 2 x 4.95+3.95 x3.10 = 27.49
2
-------------------Total : 104.37m3
--------------------
Deductions
Parapet side ...: 1 x 11.20 x 0.70 = 7.84
Portico triangle portion :1x 4.50x2.10 x 0.12 = 4.30
2
------------------Total deductions :12.14
------------------18
Rs. 84
Rs. 53
20