PRODUCTION PLANNING

WORK INSTRUCTIONS

Akzo Nobel Amides


Routings

Created on 17/08/2001 10:21:00


Last printed 23/06/1997 05:06:00 PM
/var/www/apps/conversion/tmp/scratch_1/325433844.doc

Work instructions
CONTENTS
1.

INTRODUCTION.......................................................................................................................... 3

2.

MASTER DATA............................................................................................................................. 4

2.1
ROUTINGS PP........................................................................................................................ 4
2.1.1
Creating a Routing (CA01)............................................................................................... 4
2.1.2
Changing a Routing (CA02)............................................................................................. 5
2.1.3
Deleting a Routing and/or Operation................................................................................6
2.1.4
Displaying a Routing (CA03)............................................................................................ 6
2.1.5
Routing Reporting............................................................................................................ 6
2.1.6
Mass Replacement of Work Centres in Routings (CA85)................................................7
2.1.7
Maintaining Standard Texts (CA10)..................................................................................8

325433844.doc

Page 2 of 8

Work instructions
1.
INTRODUCTION
This document is designed for use in the Akzo Nobel Amides plant of Akzo Nobel Polymer
Chemicals. It has as base the manual from K. Harding for the Genesis project in Gillingham.
It gives instructions HOW to carry out tasks/functions with the SAP system as it is implemented in
Kyunju Korea.
It does not contain the procedures how to perform tasks or functions. So it is only a help if you
already know what you are going to do.
This manual covers all PP-aspects as they are used in Kyungju, some FI-CO aspects and some FIPA aspects.
Amersfoort, September 2001
P. Palm
E. Verbon

325433844.doc

Page 3 of 8

Work instructions
2.
MASTER DATA
2.1

Routings PP

2.1.1

Creating a Routing (CA01)


From the main menu select the following menu path:
Logistics -> Production -> Master data -> Routings -> Routings -> Routing -> Create
On the initial screen enter the following information:Material code
Plant code
Group
Profile
Change number
Key date
Revision level

input SAP material code.


enter plant/site code e.g. 0080 for Kyungju.
leave blank.
this is dependent on plant code e.g. use profile 0080 for Kyungju.
empty in Kyungju
default is 'todays' date, leave as this.
leave blank.

After entering values in fields above press ENTER. The general view of the routing header will
then follow. Now proceed as detailed below:
HEADER - GENERAL VIEW
Group counter
leave setting (will be '1' for first routing and be increment by 1 if
alternative routing being created).
Routing description basic description is copied from material master. This can be changed
Plant code
copied from first input screen, do not change.
Deletion indicator
leave blank.
Usage
default set to '1', do not change.
Planner group
leave blank
Status
default is '4' (Released - general), do not change.
From lot size
leave blank.
To lot size
leave default of 99,999,999.000.
After entering values in fields above select menu path: Goto -> Operation overview.
A screen opens up to enter the operations to be performed. Each operation is numbered and
the steps are incremented by 10. Proceed as detailed below.
OPERATION OVERVIEW
WorkCntr
enter work center code.
Sop
leave blank.
Ctrl
leave blank, this will be copied in
TextKey
leave blank
Txt
Description

from work center defaults.

leave blank., this will be automatically set if there is a text.


leave blank, this will be copied in from the short text key..

Enter data as above, tabbing down (avoid pressing ENTER) through the lines for each
operation required. Start with work centers for costing (C-ANA01) and finish in the last
operation step with the work center for planning (e.g. O-ANA01). When completed press
ENTER and the system will then display the Operation - Standard Values screen, where the
times for the operation should be entered.
Proceed as follows:
Base quantity
Electricity
Gas
325433844.doc

default 1.000 kg
enter amount KWH for the base quantity
enter amount KM3 for the base quantity
Page 4 of 8

Work instructions
Sundry packaging

enter amount KRW (leave unit PCK) for the base quantity

All other fields should remain unchanged. Press ENTER to proceed to next screen.
Base quantity
default 1.000 kg
Machine
enter machine hours for the base quantity
Labor
enter labor hours for the base quantity
You will finally be returned to the operation overview screen.
In order for components to be connected to the routing-operation, it is necessary to allocate the
bill of material components to the routing operation. The can be done selecting the operation
and then using menu path: Goto -> Comp. alloc. gen. Select all of the components listed and
then use the New Allocation button. The system will then ask you to enter the operation
number that the components are to be allocated to. Always use the last operation step (named
O-ANAaxx: normally operation 0020) The system will then confirm this is the list of materials.
For the time being there will be no backflushing in Kyungju, but if later ....then:
From the list mark the field under column named B (this stands for backflushing). The record
can then be saved.
2.1.2

Changing a Routing (CA02)


From the main menu select the following menu path:
Logistics -> Production -> Master data -> Routings -> Routings -> Routing -> Change
On the initial screen enter the following information:
Material code
Plant code
Group
Profile
Change number
Key date
Revision level

input SAP material code.


enter plant/site code e.g. 0080 for
leave blank.
leave blank.
leave blank
default is 'todays' date, leave as this.
leave blank.

Kyungju.

Also leave all of the further selection criteria fields blank.


After entering values in fields above press ENTER there are two possibilities, firstly if there is
only one routing available for the material, then the Operation overview screen will follow. If
more than one routing exists then a list of them will be displayed. The required routing can be
selected by double clicking on the line. Once again the Operation overview view of the
routing will be displayed.
Double clicking on the operation line takes you to the Standard values screen, where the
operation times and base quantity can be maintained.
You can return to the Operation overview screen by menu path: Goto -> Operation
overview .
New operations can be added by using the New entries button. A screen will be displayed that
will allow you to add new operations, the numbers being incremented by 10 for each new
operation. The Insert button enables you to insert new operations in the list and the number will
have to be assigned manually.
When satisfied with the changes the record can be updated via menu path: Routing -> Save
or by using the Save icon.
325433844.doc

Page 5 of 8

Work instructions
2.1.3

Deleting a Routing and/or Operation


To delete an operation proceed as for changing the routing. From the Operation overview
screen select the operation to be deleted and use Delete button.
To delete the entire routing use the menu path: Goto -> Header overview to go to the header
of the routing. Select the group counter to be deleted (this will be pre-selected if only one
routing exists) and then press Delete button. A pop-up window will be displayed, requesting
confirmation that you want to delete the routing, press Yes button.

2.1.4

Displaying a Routing (CA03)


From the main menu select the following menu path:
Logistics -> Production -> Master data -> Routings -> Routings -> Routing -> Display
On the initial screen enter the following information:Material code
Plant code
Group
Profile
Change number
Key date
Revision level

input SAP material code.


enter plant/site code e.g. 0080 for Kyungju.
leave blank.
leave blank.
leave blank
default is 'todays' date, leave as this.
leave blank.

Also leave all of the further selection criteria fields blank.


After entering values in fields above press ENTER there are two possibilities, firstly if there is
only one routing available for the material, then the Operation overview screen will follow. If
more than one routing exists then a list of them will be displayed. The required routing can be
selected by double clicking on the line. Once again the Operation overview view of the
routing will be displayed.
Double clicking on the operation line takes you to the Standard values screen, where the
operation times and base quantity are displayed. Menu path: Operation -> general view will
display the screen where the number of employees can be viewed.
You can return to the Operation overview screen by menu path: Goto -> Operation
overview.
2.1.5

Routing Reporting
From the main menu select the following menu path:
Logistics -> Production -> Master data -> Routings -> Routings -> Reporting
There are a number of options under this menu heading:
Work Center Where-used (CA80)
This transaction can be used to display a list of routings that use a particular work center. On
the input screen enter the work center number and the task list type 'N' and use Execute
button. A list of different report layouts is then displayed, select the first type and the list of
routings will be displayed.

325433844.doc

Page 6 of 8

Work instructions
Routing list (CA51)
This transaction is used to generate a list of routings. On the input screen enter the task list
type 'N' and a range of material numbers, together with the plant e.g. '0080' for Kyungju. Press
the Execute button and the list will be output.
NOTE
If the material code is not entered then the list of routings will not show the material code for
the routing, only the group number.
Another version of this report can be obtained using transaction code ZZ20 or via menu path:
Logistics -> Akzo Nobel Reports -> Production Planning -> Master data-> Routings
printout
This version contains more information on the routing times.
!! Both lists have the opportunity to print a list in which the Routing and the BOM quantities
together , in the entry screen use the button right under [+] or [>] to go the next part of the
screen, there you can activate :material components. In this version of SAP it only has three
positions for the quantities, quantities bigger than 999 will show only the last three digits.
Routing Changes (CA60)
This report generates a list of the changes that have been made to a routing. On the initial
screen enter the material code, plant e.g. '0080' for Kyungju and type 'N'. Press Execute to
output the list. If more than one routing exists for a product then each alternative will be listed.
This can be restricted by entering the group counter on the initial screen.
2.1.6

Mass Replacement of Work Centres in Routings (CA85)


From the main menu select the following menu path:
Logistics -> Production -> Master data -> Routings -> Details ->Mass replace -> Work
centers
On the initial screen enter the following information:
Work center
New work center
Plant code
Change number
Key date
Task list

number of work center to be replaced.


enter the replacement work center code.
enter plant/site code e.g.0080 for Kyungju.
leave blank.
leave blank.
set to 'N'.

All other fields can be left blank unless further restrictions e.g. material number range is
required. Now press Proceed and a list of routings containing the work center to be replaced
will be output. The headers and/or operations where the work center is to be replaced should be
selected and the Replace work center button pressed to proceed. A message will be output at
the bottom of the screen confirming that the processing is complete.
2.1.7

Maintaining Standard Texts (CA10)


Standard texts can be created in the system to reduce the need for re-keying common
operation descriptions or for copying a section of text into an operation. These standard texts
can be maintained via the configuration menus but there is also a standard menu path and
transaction to maintain them.
The menu path is:

325433844.doc

Page 7 of 8

Work instructions
Logistics -> Production -> Master data -> Routings -> Details -> Standard texts
There are buttons then for Create, Change, Delete or Display.
For the last three options enter the number of the standard text that you wish to change/display
or delete, prior to using required button.
For Create enter the new text number and then a description of the text in the adjacent field (is
not the text itself) prior to using the button.
To obtain a list of the current standard texts there is a match code facility. Access this by
clicking on the down arrow adjacent to the text number field and a list will be displayed.
Once on the text editor screen type the text that you want, remembering to use the Line button
at the end of each line, to avoid the text being rolled up into single lines. If you want to remove
line breaks then take out the '/' indicator to the left and use the Format button to reformat the
text up onto the previous line. Save the changes when you have finished typing.

325433844.doc

Page 8 of 8