HYDRO,
40531.41 MW, 16.68%
THERMAL,
168254.99 MW, 69.23%
Power Projections
Details of Super-Critical Units in 10th , 11th , 12th &13th
Sub Critical
(MW)
660
MW
(No.)
800
MW
(No.)
Super Critical
(MW)
5 Year Plans
TOTAL
MW
10th Plan
9620
9620
11th Plan
45470
5420
50890
12th Plan
18270
25
33
42,900
61,170
13th Plan
4000
36
36
52,560
56,560
50000
45470
42,900
40000
30000
18270
20000
10000
9620
5420
4000
0
10th Plan
11th Plan
12th Plan
13th Plan
ISO 9001
VIZAG
Corporate Office
Manufacturing Unit
Service Centers
Karnataka Power Corporation Limited
- Quality Management
System Certified
ISO 14001
- Environmental
Management System
Certified
OHSAS 18001 - Occupational Health
& Safety Management
System Certified
ISO/IEC 27001 - Information Security
Management System
(ISMS) Certified
Brief Overview
BHEL-Electronics Division ties up with Metso Automation for DCS under
collaboration agreement for both maxDNA and Metso DNA.
BHEL has facilities and expertise for:
Cumulative Running hours has crossed over 30 Lakh Hours in over 270
units
Engineering for all rating of sub critical up to 600 MW and supercritical
up to 800 MW
Total MW (maxDNA & Metso DNA) 1,37,546 MW [118991+18555]
Boiler Controls
Turbine Controls
Station C&I
HMI
Power Plant SCADA
PADO (Performance Analysis
Diagnostics & Optimisation)
Offsite Balance Of Plant Controls
Other Systems
Interlocking in Excitation Systems
Interlocking in FSC / CSR / SVC /
STATCOM
Interlocking in VFD system
Karnataka Power Corporation Limited
Auto Sequencer
Governor Controls
Remote Operation
HMI
Optimization Packages
HRSG Controls
Steam Turbine Controls
Station C&I
HMI
Interface to Gas Turbines
Power Plant SCADA
Remote
Connections
CONTROL ROOM
Operation, Maintenance, Reporting
Firewall
OFFICE
Reporting, Enterprise Integration
AUTOMATION ROOM
Controls, Optimization, Connectivity
Distributed
Centralized
Safety
instrumented
system
FIELD
Wireless solutions
for operation and
maintenance
FIELD
FIELD
FIELD
Supercritical Projects
PROJECTS Executed
Bara 3x660MW
Lalitpur Power Generation
Co.Ltd. (LPGCL) 3x660MW
Yeramaras 2x800 MW
Bellary Phase-3 1x700 MW
PROJECTS Under Execution
North Karanpura 3x660 MW
Suratgarh 2x660 MW
IB Valley 2x660 MW
Gadarwara 2x800 MW
Karnataka Power Corporation Limited
STEAM PRESSURE
> 221.2 BAR
Improvement
4.3 %
Temperature
45
40
35
30
25
20
15
Entropy
10
5
0
500 MW
Sub critical
170 ata / 537 C / 537 C
660 MW
Super Critical
247 ata / 565 C / 593 C
INCREASE IN PRESSURE AND MAIN & REHEAT TEMP. > 537 Deg C
RESULTS IN SIGNIFICANT IMPROVEMENT IN EFFICIENCY
Karnataka Power Corporation Limited
Sagardhighi 2x500 MW
Lalitpur 3x660 MW
>1200 Drives
10 OPS + 10 OPS - LVS + EAS +
EAC + INFO + 2 LIS
New Applications
Add on packages:
A
H
P
C
H
P
W
T
R
W
T
R
S
A
#
2
maxLinks
RS 485
Status,
Event
and
Alarm
display
IEC-60870-5-103
(online)
PROTOCOL
54Mbps RF
Link2
: Latitude -1511'46.48"N
: Longitude - 7643'14.88"E
: Elevation 1576ft
25Mbps
Throughput
ENGINEER
maxSTORIAN
maxLINK
RS485
CONVERTER
GIU(Graphical
Interface Units)
at 35 various field
locations for
assisting during
Local operation
Interfaced through
MODBUS
GIUs at Remote
Locations
RPU PANEL
ECS Experience
GT Control Room
EWS
ECS Room
Existing Control Room
OWS-1 OWS-2
Disturbance
( Portable)
EWS CIJP
DMP B/W LP
Analyser Node
(A4/A3 LP (A4)
HISTORIAN
(A4/A3
)
To Existing Control
)
OWS-3
Room (Approx. 1000 FOC
meters)
IRIG-B
output from
the existing
Master
clock
Redundant
maxNET (data
highway)
Control Panels
(ECS RTU)
FOC
maxLINK
Transducer panels
FOC
for interfacing
numerical relays on
relay & metering
LAN
Relay panels
GT System SWITCHBOARD
IOCL-Mathura 2005
IOCL-Bongaigaon 2009
IOCL-Paradip 2011
GSPC-Kakinada 2011
OPaL-Dahej (under
commissioning)
Rack Room