FORMATO

VALORIZACION FINAL DE OBRA

:MEJ. DE LA CAPAC RESOLUT DEL PUESTO DE SALUD UNOCOLLA DE LA MICRO RED SANTA ADRIANA-REDESS SAN ROMAN-DISA PU
PROV DE SAN ROMN - PUNO FECHA DE REINICIO DE OBRA
:15/06/2015

OBRA
EN LA C. C. DE UNOCOLLA, DIST DE JULIACA,
ENT. EJ: MUNICIPALIDAD PROVIMCIAL DE SAN ROMN
ENT. FI: MUNICIPALIDAD PROVIMCIAL DE SAN ROMN
CORREP
: JUNIO DEL 2015

Item

Descripcin

Und.

PLAZO DE EJECUCION
: 3 MESES
FECHA DE TERMINO DE LA OBRA : 14/09/2015

PRESUPUESTO DE OBRA
Metrado

PU

ANTERIOR
Parcial MetradoPrecio (S/.)

01.00.OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD


01.01.00 OBRAS PROVISIONALES
01.01.01 CERCO PROVISIONAL DE PROTECCION CON ARPIL M.L
150.00
10.34
1,551.00
150.00
01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X und
1.00
824.23
824.23
1.00
01.01.03 ALMACEN, RESIDENCIA Y CASETA DE GUARDIANA m2
72.00
55.44
3,991.68
72.00
01.02.00 INSTALACIONES PROVISIONALES
01.02.01 AGUA PARA LA CONSTRUCCION
mes
9.00
400.00
3,600.00
9.00
01.02.02 ENERGIA ELECTRICA PARA LA CONSTRUCCION
mes
9.00
400.00
3,600.00
9.00
01.02.03 SERVICIOS HIGINICOS PROVISIONALES
GLB
1.00
200.00
200.00
1.00
01.03.00 TRABAJOS PRELIMINARES
01.03.01 LIMPIEZA DE TERRENO MANUAL
m2
920.80
0.39
359.11
920.80
01.04.00 MOVILIZACIN DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS
01.04.01 MOVILIZACION DE MAQUINARIA Y EQUIPOS
GLB
1.00 2,000.00
2,000.00
1.00
01.04.02 FLETE TERRESTRE
GLB
1.00 3,500.00
3,500.00
1.00
01.05.00 TRAZOS, NIVELES Y REPLANTEO
01.05.01 TRAZO Y REPLANTEO PRELIMINAR
m2
920.80
1.71
1,574.57
920.80
01.05.02 TRAZO Y REPLANTEO DURANTE EL PROCESO
m2
660.00
2.22
1,465.20
660.00
01.06.00 SEGURIDAD, Y SALUD
01.06.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRAB
01.06.01
SEALIZACION TEMPORAL DE SEGURIDAD
GLB
1.00
350.00
350.00
1.00
01.06.02 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO
01.06.02
RECURSOS PARA RESPUESTAS ANTE EMERGE GLB
1.00
450.00
450.00
1.00
01.06.02
IMPLEMENTACION CON EQUIPOS CONTRA INCE GLB
1.00
150.00
150.00
1.00
02.00.00ESTRUCTURAS
02.01.00 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACIONES

AVANCES
ACTUAL
MetradoPrecio (S/.)

1,551.00
824.23
3,991.68

100.00
100.00
100.00

3,600.00
3,600.00
200.00

100.00
100.00
100.00

359.11

100.00

2,000.00
3,500.00
1,574.57
1,465.20
350.00
450.00
150.00

100.00
100.00

100.00
100.00

100.00

100.00
100.00

02.01.01
EXCAVACION EN FORMA MANUAL - ZAPATAS
m3
02.01.01
EXCAVACION EN FORMA MANUAL - CIMIENTOS
m3
02.01.02 RELLENOS
02.01.02
RELLENO CON MATERIAL PROPIO
m3
02.01.02
RELLENO CON MATERIAL DE PRESTAMO
m3
02.01.03 NIVELADO INTERIOR Y APISONADO
02.01.03
NIVELADO Y COMPACTADO C/EQUIPO LIVIANO
m2
02.01.04 ACARREO Y ELIMINACION DE MATERIAL EXCEDENTE
02.01.04
ACARREO Y ELIMINACION DE MATERIAL EXCED m3
02.02.00 OBRAS DE CONCRETO SIMPLE
02.02.01 SOLADOS
02.02.01
SOLADO PARA ZAPATAS DE 4" 1:12 C:H
m2
02.02.02 CIMIENTOS CORRIDOS
02.02.02
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO m3
02.02.03 SOBRECIMIENTOS
02.02.03
SOBRECIMIENTOS: CONCRETO 1:8+25% P.M.
m3
02.02.03
SOBRECIMIENTOS: ENCOFRADO Y DESENCOFR m2
02.03.00 OBRAS DE CONCRETO ARMADO
02.03.01 ZAPATAS
02.03.01
ZAPATAS: CONCRETO F'C= 210 KG/CM2
m3
02.03.01
ZAPATAS: ACERO DE REFUERZO FY=4200 KG/CM kg
02.03.02 VIGAS DE CIMENTACION
02.03.02
VIGAS DE CIMENTACION: CONCRETO F'C= 210 K m3
02.03.02
VIGAS DE CIMENTACION: ENCOFRADO Y DESEN m2
02.03.02
VIGAS DE CIMENTACION: ACERO DE REFUERZO kg
02.03.03 COLUMNAS
02.03.03
COLUMNAS: CONCRETO F'C=210 KG/CM2
m3
02.03.03
COLUMNAS DE CONFINAMIENTO: CONCRETO F' m3
02.03.03
COLUMNAS: ENCOFRADO Y DESENCOFRADO
m2
02.03.03
COLUMNAS: ACERO DE REFUERZO FY=4200 KG/ kg
02.03.04 VIGAS
02.03.04
VIGAS: CONCRETO F'C=210 KG/CM2
m3
02.03.04
VIGAS: ENCOFRADO Y DESENCOFRADO
m2
02.03.04
VIGAS: ACERO DE REFUERZO FY=4200 KG/CM2 kg
02.03.05 LOSAS
02.03.05
LOSAS ALIGERADAS: CONCRETO F'C=210 KG/CM m3
02.03.05
LOSAS ALIGERADAS: ENCOFRADO Y DESENCO m2
02.03.05
LOSA ALIGERADA: ACERO DE REFUERZO FY=42 kg
02.03.05
LOSA ALIGERADA: LADRILLO HUECO/ARCILLA 1 und
02.04.00 VARIOS

108.39
58.69

30.59
26.23

3,315.65
1,539.44

108.39
58.69

157.82
433.90

11.36
110.01

1,792.84
47,733.34

157.82
433.90

2,858.79

1.61

4,602.65

2,573.00

51.03

12.76

651.14

51.03

136.02

28.54

3,882.01

136.02

29.37

174.05

5,111.85

29.37

20.50
273.27

258.38
46.99

5,296.79
12,840.96

20.50
273.27

28.90
690.37

291.52
5.26

8,424.93
3,631.35

28.90
690.37

25.39
142.12
3,402.20

333.58
69.91
5.62

8,469.60
9,935.61
19,120.36

25.39
142.12
3,402.20

23.00
15.04
634.10
12,227.42

348.86
396.92
64.06
5.76

8,023.78
23.00
5,969.68
15.04
40,620.45
634.10
70,429.94 12,227.42

45.39
249.82
10,581.80

304.53
62.93
5.62

13,822.62
45.39
15,721.17
249.82
59,469.72 10,581.80

42.00
502.11
3,285.65
4,001.00

310.40
41.32
5.62
5.21

13,036.80
20,747.19
18,465.35
20,845.21

42.00
502.11
3,285.65
4,001.00

3,315.65
1,539.44
1,792.84
47,733.34
4,142.53
651.14
3,882.01
5,111.85
5,296.79
12,840.96
8,424.93
3,631.35
8,469.60
9,935.61
19,120.36
8,023.78
5,969.68
40,620.45
70,429.94
13,822.62
15,721.17
59,469.72
13,036.80
20,747.19
18,465.35
20,845.21

100.00
100.00

100.00
100.00

90.00

100.00

100.00

100.00

100.00
100.00

100.00
100.00

100.00
100.00
100.00

100.00
100.00
100.00
100.00

100.00
100.00
100.00

100.00
100.00
100.00
100.00

02.04.01 PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD


02.04.01
PRUEBAS Y ENSAYOS DE CONTROL DE CALIDA und
03.00.00ARQUITECTURA
03.01.00 MUROS Y TABIQUES DE ALBAILERIA
03.01.01 MURO DE LADRILLO KK MECANIZADO DE ARCILLA
03.01.01
MUROS DE LADRILLO KK DE ARCILLA 9X14X24 DE m2
03.02.00 REVOQUES Y REVESTIMIENTOS
03.02.01 TARRAJEO EN INTERIORES
m2
03.02.02 TARRAJEO EN EXTERIORES
m2
03.02.03 TARRAJEO DE COLUMNAS
m2
03.02.04 TARRAJEO DE VIGAS
m2
03.02.05 VESTIDURA DE DERRAMES
m
03.02.06 BRUAS DE 1.0cm
m
03.03.00 CIELORRASOS
03.03.01 CIELORASO CON BALDOSA
m2
03.03.02 CIELO RASO CON MEZCLA
m2
03.04.00 PISOS Y PAVIMENTOS
03.04.01 CONTRAPISOS
03.04.01
CONTRAPISO DE CONCRETO DE 2"
m2
03.04.02 PISOS
03.04.02
FALSO PISO DE CONCRETO F'C=100 KG/CM2 E=4 m2
03.04.02
PISO DE CERAMICO ANTIDESLIZANTE 0.30 x 0.
m2
03.04.02
PISO DE PORCELANATO STONE BEIGE
m2
03.04.02
PISO DE CONCRETO FROTACHADO, IMPERMEA m2
03.04.02
VEREDA DE CONCRETO CONCRETO F'C=140 Kg/ m2
03.04.02
ENCOFRADO Y DESENCOFRADO NORMAL DE V m2
03.04.02
BRUAS DE 1.0cm
m
03.04.02
JUNTA ASFALTICA E=1", EN VEREDAS
m
03.04.03 GRADAS
03.04.03
GRADAS: CONCRETO f'c=175 kg/cm
m3
03.04.03
ENCOFRADO Y DESENCOFRADO DE GRADAS
m2
03.04.04 RAMPAS
03.04.04
RAMPAS: CONCRETO f'c= 210 kg/cm
m3
03.04.04
ENCOFRADO Y DESENCOFRADO EN RAMPAS
m2
03.04.04
RAMPAS: ACERO DE REFUERZO GRADO 60
kg
03.05.00 ZOCALOS Y CONTRAZOCALOS
03.05.01 ZOCALOS
03.05.01
ZOCALO DE CEMENTO SIMPLE H=0.80 M.
m2
03.05.01
ZOCALO DE LOSETA CERAMICA DE 20 x 30 cm
m2
03.05.02 CONTRAZOCALOS

65.00

30.00

1,950.00

65.00

1,950.00

100.00

683.46

104.70

71,558.26

683.46

71,558.26

100.00

972.38
328.73
294.20
249.82
238.40
290.30

48.78
50.54
40.57
65.19
12.73
7.65

47,432.70
16,614.01
11,935.69
16,285.77
3,034.83
2,220.80

972.38
328.73
294.20
249.82
238.40
290.30

47,432.70
16,614.01
11,935.69
16,285.77
3,034.83
2,220.80

100.00
100.00
100.00
100.00
100.00
100.00

479.22
48.75

70.71
73.41

33,885.65
3,578.74

48.75

3,578.74

100.00

479.22

29.30

14,041.15

479.22

14,041.15

100.00

479.22
309.41
169.81
569.64
331.59
172.21
345.00
228.85

37.00
71.88
64.09
64.32
54.24
38.21
7.65
16.77

17,731.14
22,240.39
10,883.12
36,639.24
17,985.44
6,580.14
2,639.25
3,837.81

479.22
278.36

17,731.14
20,008.52
36,639.24
17,985.44
6,580.14
2,639.25
-

100.00
89.96
100.00
100.00
100.00
100.00
-

1.06
3.65

326.42
59.00

346.01
215.35

1.93
1.20
58.74

379.97
59.00
7.90

733.34
70.80
464.05

68.38
326.23

22.97
104.39

1,570.69
34,055.15

569.64
331.59
172.21
345.00

68.38
264.98

1,570.69
27,661.26

100.00
81.22

90.00
-

6,363.90
-

03.05.02
03.05.02
03.06.00
03.06.01
03.06.01
03.07.00
03.07.01
03.07.01
03.07.01
03.07.02
03.07.02
03.07.03
03.07.03
03.07.03
03.08.00
03.08.01
03.08.01
03.08.02
03.08.02
03.08.02
03.08.03
03.08.03
03.08.04
03.08.04
03.09.00
03.09.01
03.09.01
03.09.01
03.09.01
03.09.02
03.09.02
03.09.02
03.10.00
03.10.01
03.10.02
03.10.03
03.10.04
03.10.05
03.11.00
03.11.01

CONTRAZOCALO DE CERMICO H=0.15 m. 20 X m


CONTRAZOCALO DE SANITARIO CURVO DE PVC m
CARPINTERIA DE MADERA
PUERTAS
PUERTAS DE MADERA TABLERO REBAJADO
m2
CARPINTERIA METALICA Y HERRERIA
COBERTURAS METALICAS
COBERTURA TIPO I
und
COBERTURA TIPO II (rea verde)
und
PUERTAS DE AlUMINIO
PUERTA DE ALUMINIO
und
DIVISIN DE ALUMINIO PARA SERVICIOS HIGINICOS
DIVISIN DE ALUMINIO PARA SERVICIOS HIG
und
DIVISIN DE ALUMINIO PARA URINARIO CON
und
CERRAJERIA
BISAGRAS
BISAGRA ALUMINAZADA CAPUCHINA DE 4"X4"
UND
CERRADURAS
CERRADURA DOS GOLPES PARA PUERTAS INTE und
CERRADURA TRES GOLPES PARA PUERTAS EXT und
SISTEMA O MECANISMOS
SISTEMA CORREDIZO PARA PUERTA DE MADERA und
ACCESORIOS DE CIERRE
ACCESORIOS DE CIERRE - PICAPORTES
und
VIDRIOS, CRISTALES Y SIMILARES
ESPEJOS
ESPEJO TIPO I (0.60 X 0.70 m)
und
ESPEJO TIPO II (1.50 X 0.60 m)
und
ESPEJO TIPO III (1.00 X 0.60 m)
und
VIDRIOS SISTEMA MODUGLASS
VENTANA DE ALUMINIO CON VIDRIO E=6.0 MM
m2
VIDRIO CATEDRAL TIPO ARENISCA E=6.0 MM
m2
PINTURA
PINTURA EN INTERIORES
m2
PINTURA EN EXTERIORES
m2
PINTURA EN COLUMNAS
m2
PINTURA EN CIELO RASO Y VIGAS
m2
PINTURA EN PUERTAS C/BARNIZ 2 MANOS
m2
VARIOS, LIMPIEZA, JARDINERIA
LIMPIEZA PERMANENTE DE OBRA
m2

169.55
132.16

35.55
29.29

6,027.50
3,870.97

169.55

6,027.50
-

100.00
-

84.98

355.51

30,211.24

1.00
1.00

2,988.61
2,592.99

2,988.61
2,592.99

27.98

193.38

5,410.77

7.00
1.00

415.85
86.49

2,910.95
86.49

105.00

134.95

14,169.75

40.00

5,398.00

25.00
2.00

90.87
126.15

2,271.75
252.30

12.00

1,090.44
-

2.00

188.69

377.38

7.00

12.26

85.82

8.00
1.00
1.00

73.70
171.12
82.56

589.60
171.12
82.56

140.81
29.05

89.93
75.71

12,663.04
2,199.38

972.38
328.73
294.20
754.95
154.28

12.84
17.46
18.37
18.37
11.68

12,485.36
5,739.63
5,404.45
13,868.43
1,801.99

972.38
328.73
294.20
450.00

12,485.36
5,739.63
5,404.45
8,266.50
-

100.00
100.00
100.00
59.61
-

920.80

0.94

865.55

895.00

841.30

97.20

40.00

14,220.40

03.11.02 LIMPIEZA FINAL DE OBRA


m2
920.80
1.34
03.11.03 LIMPIEZA DE VIDRIOS
m2
111.76
3.42
03.11.04 CURADO PERMANENTE EN OBRA
DIA
180.00
39.55
03.11.05 PLACA RECORDATORIA MARMOL ITALIANO E=2.0cmund
1.00 1,050.05
03.12.00 SEMBRO DE GRASS
03.12.01 PREPARACION DE TERRENO
m2
27.09
1.84
03.12.02 SEMBRADO DE GRASS
m2
27.09
14.89
03.12.03 SEMBRADO DE ARBUSTOS
und
32.00
9.56
03.13.00 MITIGACION DE IMPACTO AMBIENTAL
03.13.01 TALLER PARTICIPATIVO PBLICO
03.13.01
TALLER PARTICIPATIVO PUBLICO
GLB
1.00 1,500.00
03.13.02 PROCEDIMIENTOS DE CONSULTA PREVIA
03.13.02
PROCEDIMIENTOS DE CONSULTA PREVIA
GLB
1.00 2,000.00
03.13.03 MEDIDAS DE PREVENCIN, MITIGACIN, REMEDIACIN Y COMPENSACIN
03.13.03
MEDIDAS DE PREVENCIN, MITIGACIN, REM
GLB
1.00 3,000.00
03.13.04 PROGRAMA DE MANEJO DE RESIDUOS SLIDOS Y LQUIDOS
03.13.04
PROGRAMA DE MANEJO DE RESDUOS SLIDOS GLB
1.00 2,000.00
03.13.05 PROGRAMA DE SEGUIMIENTO Y CONTROL
03.13.05
PROGRAMA DE SEGUIMIENTO Y CONTROL
GLB
1.00 2,000.00
03.13.06 CAPACITACION Y SENSIBILIZACION
03.13.06
CAPACITACION Y SENSIBILIZACION
GLB
1.00 2,000.00
04.00.00INSTALACIONES SANITARIAS
04.01.00 APARATOS SANITARIOS Y ACCESORIOS
04.01.01 SUMINISTRO DE APARATOS SANITARIOS
04.01.01
INODORO TANQUE BAJO
und
13.00
230.00
04.01.01
INODORO TANQUE BAJO PARA DISCAPACITADOS und
2.00
235.00
04.01.01
LAVATORIO DE LOZA
und
13.00
95.00
04.01.01
DUCHA CON ACCESORIO MEZCLADOR
und
1.00
185.00
04.01.01
URINARIOS DE PARED
und
2.00
95.00
04.01.02 SUMINISTRO DE ACCESORIOS
04.01.02
LAVADERO DE CIRUJANO
und
9.00
240.00
04.01.02
ACCESORIOS: PORTA PAPEL HIGINICO
und
15.00
30.00
04.01.02
ACCESORIOS: PORTA TOALLAS
und
13.00
40.00
04.01.02
ACCESORIOS: PORTA PAPEL TOALLA
und
13.00
40.00
04.01.02
ACCESORIOS: ESPEJOS
und
2.00
15.00
04.01.03 INSTALACIONES DE APARATOS SANITARIOS
04.01.03
INSTALACIN DE APARATOS SANITARIOS
und
31.00
75.69
04.01.04 INSTALACIN ACCESORIOS
04.01.04
INSTALACIN DE ACCESORIOS
und
52.00
50.45
04.02.00 SISTEMA DE AGUA FRIA

1,233.87
382.22
7,119.00
1,050.05

180.00

49.85
403.37
305.92

7,119.00
-

100.00
-

27.09

49.85
-

1,500.00

1.00

1,500.00

100.00

2,000.00

1.00

2,000.00

100.00

3,000.00

1.00

3,000.00

100.00

2,000.00

1.00

2,000.00

100.00

2,000.00

1.00

2,000.00

100.00

2,000.00

1.00

2,000.00

100.00

185.00
-

100.00
-

8.00

2,160.00
-

100.00
-

2,990.00
470.00
1,235.00
185.00
190.00
2,160.00
450.00
520.00
520.00
30.00

1.00

9.00

2,346.39

2,623.40

8.00
-

16.00

1,840.00
760.00
1,211.04
-

04.02.01 SALIDA DE AGUA FRIA


04.02.01
SALIDA DE AGUA FRIA
pto
04.02.02 REDES DE DISTRIBUCION
04.02.02
TUBERIA PVC SAP CLASE 10 DE 1/2"
m
04.02.02
TUBERIA PVC SAP CLASE 10 DE 3/4"
m
04.02.02
TUBERIA PVC SAP CLASE 10 DE 1"
m
04.02.02
TUBERIA PVC SAP CLASE 10 DE 1 1/2"
m
04.02.03 REDES DE ALIMENTACION
04.02.03
EXCAVACION DE ZANJAS PARA TENDIDO DE TUB m3
04.02.03
REFINE DE ZANJA INCL.CAMA DE APOYO EN TUB m
04.02.03
RELLENO Y COMPACTADO DE ZANJAS CON MAT m3
04.02.03
SUMINISTRO E INSTALACION DE TUBERIA DE PVC m
04.02.04 ACCESORIOS DE REDES DE AGUA
04.02.04
TEE PVC SAP 1 1/2"
und
04.02.04
TEE PVC SAP 1"
und
04.02.04
TEE PVC SAP 3/4"
und
04.02.04
TEE PVC-SAP 1/2"
und
04.02.04
CODO PVC SAP 1 1/2"
und
04.02.04
CODO PVC SAP 1"
und
04.02.04
CODO PVC SAP 3/4"
und
04.02.04
CODO PVC SAP 1/2"
und
04.02.04
REDUCCION PVC DE 1 x 1
und
04.02.04
REDUCCION PVC DE 1 x 3/4
und
04.02.04
REDUCCION PVC DE 3/4 x 1/2
und
04.02.04
TAPON DE PVC SAP 1/2"
und
04.02.05 VALVULAS
04.02.05
VALVULA DE COMPUERTA 1/2"
und
04.02.05
VALVULA DE COMPUERTA 3/4"
und
04.02.05
VALVULA DE COMPUERTA 1"
und
04.02.05
VALVULA DE COMPUERTA 1 1/2"
und
04.02.05
VALVULA CHECK DE 1 1/2"
und
04.02.06 ALMACENAMIENTO DE AGUA
04.02.06
ACCESORIOS VARIOS PARA TANQUE CISTERNA GLB
04.02.06
ACCESORIOS VARIOS PARA TANQUE ELEVADO GLB
04.02.07 DOTACION DE AGUA
04.02.07
INSTALACION DE TANQUE ELEVADO
und
04.02.07
INSTALACION DE POZO TUBULAR
und
04.03.00 SISTEMA CONTRA INCENDIO
04.03.01 INSTALACIONES ESPECIALES
04.03.01
RECURSOS PARA RESPUESTAS ANTE INCENDIO und

47.00

61.24

2,878.28

47.00

2,878.28

100.00

133.99
67.91
77.42
49.10

13.55
9.20
10.52
15.05

1,815.56
624.77
814.46
738.96

133.99
67.91
77.42
49.10

1,815.56
624.77
814.46
738.96

100.00
100.00
100.00
100.00

12.00
50.00
12.50
50.00

31.40
4.94
27.45
14.38

376.80
247.00
343.13
719.00

12.00
50.00
12.50
50.00

376.80
247.00
343.13
719.00

100.00
100.00
100.00
100.00

14.00
9.00
30.00
56.00
3.00
10.00
32.00
65.00
9.00
20.00
45.00
8.00

19.16
18.16
16.66
22.29
13.66
10.37
10.26
15.37
13.66
11.66
16.21
25.74

268.24
163.44
499.80
1,248.24
40.98
103.70
328.32
999.05
122.94
233.20
729.45
205.92

14.00
9.00
30.00
56.00
3.00
10.00
32.00
65.00
9.00
20.00
45.00
8.00

268.24
163.44
499.80
1,248.24
40.98
103.70
328.32
999.05
122.94
233.20
729.45
205.92

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

24.00
2.00
2.00
2.00
2.00

47.89
68.46
71.89
81.89
106.91

1,149.36
136.92
143.78
163.78
213.82

24.00
2.00
2.00
2.00
2.00

1,149.36
136.92
143.78
163.78
213.82

100.00
100.00
100.00
100.00
100.00

1.00
1.00

350.00
400.00

350.00
400.00

1.00
1.00

350.00
400.00

100.00
100.00

1.00
1.00

1,398.09
2,612.33

1,398.09
2,612.33

1.00

1,398.09
-

100.00
-

10.00

89.89

898.90

04.03.02 SEALIZACIN DE SEGURIDAD


04.03.02
SEALIZACION DE SEGURIDAD
und
04.04.00 SISTEMA DE DRENAJE PLUVIAL
04.04.01 RED DE RECOLECCION
04.04.01
TUBERIA PVC SAP 3" PARA MONTANTES DE A pto
04.05.00 DESAGUE Y VENTILACION
04.05.01 SALIDA DE DESAGE
04.05.01
SALIDA DE DESAGE PVC 4 PARA INODORO
pto
04.05.01
SALIDA DE DESAGE PVC DE 2 PARA LAVATORI pto
04.05.01
SALIDA DE DESAGE PVC PARA SUMIDERO DE 2 pto
04.05.01
SALIDA DE DESAGE PVC PARA RR DE 2
pto
04.05.01
SALIDA DE VENTILACION DE 2"
pto
04.05.01
SALIDA DE DESAGE PVC PARA RR DE 4
pto
04.05.02 REDES DE DERIVACION
04.05.02
TUBERIA PVC SAL 2"
m
04.05.02
TUBERIA PVC SAL 4"
m
04.05.03 REDES COLECTORAS
04.05.03
EXCAVACION DE ZANJAS PARA TENDIDO DE TUB m3
04.05.03
PREPARACION DE CAMA DE APOYO CON ARENA m
04.05.03
RELLENO Y COMPACTADO DE ZANJAS CON MAT m3
04.05.03
TUBERIA PVC SAL 6"
m
04.05.03
SUMINISTRO E INSTALACION DE BIODIGESTOR GLB
04.05.04 ACCESORIOS DE REDES DE DERIVACION
04.05.04
YEE PVC SAL 4"
und
04.05.04
YEE CON REDUCCION PVC 4 a 2
und
04.05.04
YEE PVC SAL 2"
und
04.05.04
TEE PVC SAL 4"
und
04.05.04
TEE PVC SAL 2" X 2"
und
04.05.04
CODO PVC SAL 4"X90
pza
04.05.04
CODO PVC SAL 2"X90
pza
04.05.04
CODO PVC 4 x 45
und
04.05.04
CODO PVC 2 x 45
und
04.05.04
REDUCCION PVC SAL 4" A 2"
und
04.05.05 CAMARAS DE INSPECCION
04.05.05
CAJA DE REGISTRO DE 12" x 24"
und
04.06.00 VARIOS
04.06.01 PRUEBA HIDRAULICA Y DESINFECION DE REDES
m
04.06.02 PRUEBAS HIDRAULICAS REDES DE DESAGE
m
05.00.00INSTALACIONES ELECTRICAS Y MECANICAS
05.01.00 CONEXIN A LA RED EXTERNA DE MEDIDORES

60.00

15.40

924.00

29.00

130.30

3,778.70

29.00

3,778.70

100.00

15.00
20.00
16.00
5.00
13.00
13.00

52.47
52.47
60.42
60.42
91.80
68.88

787.05
1,049.40
966.72
302.10
1,193.40
895.44

15.00
20.00
16.00
5.00
13.00
13.00

787.05
1,049.40
966.72
302.10
1,193.40
895.44

100.00
100.00
100.00
100.00
100.00
100.00

48.54
123.63

10.50
16.33

509.67
2,018.88

48.54
123.63

509.67
2,018.88

100.00
100.00

16.96
70.65
12.72
70.65
1.00

31.40
4.86
27.45
17.91
7,896.20

532.54
343.36
349.16
1,265.34
7,896.20

16.96
70.65
12.72
70.65
0.35

532.54
343.36
349.16
1,265.34
2,763.67

100.00
100.00
100.00
100.00
35.00

0.40

2.00
14.00
25.00
25.00
5.00
5.00
73.00
11.00
20.00
9.00

17.84
17.84
13.84
18.63
18.18
13.91
16.49
15.34
12.84
16.11

35.68
249.76
346.00
465.75
90.90
69.55
1,203.77
168.74
256.80
144.99

2.00
14.00
25.00
25.00
5.00
5.00
73.00
11.00
20.00
9.00

35.68
249.76
346.00
465.75
90.90
69.55
1,203.77
168.74
256.80
144.99

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

17.00

63.88

1,085.96

17.00

1,085.96

100.00

328.42
242.82

2.03
4.12

666.69
1,000.42

328.42
242.82

666.69
1,000.42

100.00
100.00

3,158.48

05.01.01
05.02.00
05.02.01
05.02.01
05.02.01
05.02.01
05.02.01
05.02.01
05.02.01
05.02.02
05.02.02
05.02.02
05.02.02
05.02.02
05.02.02
05.02.02
05.02.03
05.02.03
05.02.03
05.02.03
05.02.03
05.02.03
05.02.03
05.02.04
05.02.04
05.02.05
05.02.05
05.02.06
05.02.06
05.02.06
05.02.06
05.02.06
05.02.06
05.02.06
05.02.06
05.03.00
05.03.01
05.04.00
05.04.01
05.05.00

CONEXIN A LA RED EXTERNA DE MEDIDORES (TRGLB


1.00 1,150.00
SALIDAS PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEALES DEBILES
SALIDAS
CAJA OCTOGONAL DE 4 X 4 DE FG PESADO
und
88.00
9.43
CAJA RECTANGULAR DE 4 X 2 DE FG PESADO und
84.00
9.43
CAJA DE PASO DE FG PESADO 30x30 cm, CON und
1.00
67.70
INTERRUPTOR UNIPOLAR SIMPLE
UND
23.00
14.34
INTERRUPTOR UNIPOLAR DOBLE
UND
7.00
17.59
TOMACORRIENTE DUPLEX CON PUESTA A TIER und
54.00
36.97
CANALIZACION, CONDUCTOS O TUBERIAS
TUBERIA PVC SEL 2"
m
45.00
7.40
TUBERIA PVC SEL 1"
m
68.00
7.66
TUBERIA PVC SEL 3/4"
m
450.00
5.65
CURVA PVC DE 3/4" X 90
und
110.00
3.53
CURVA PVC DE 1" X 90
und
25.00
5.43
CURVA PVC DE 2" X 90
und
12.00
5.73
CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS
CONDUCTOR THW 1X2.50 mm2
m
1,458.00
2.88
CONDUCTOR THW 1X4.00 mm2
m
964.00
3.62
CONDUCTOR TWC 1X10.00 mm2
m
260.00
9.21
CONDUCTOR ELECTRICO CONCENTRICO TRIFAS m
24.00
27.90
CONDUCTOR ELECTRICO NLT 2x14 mm2
m
15.00
16.90
CONDUCTOR DE COBRE DESNUDO DE 25 mm2
m
65.00
17.37
TABLERO PRINCIPAL
TABLERO METALICO TRIFASICO TIVEN P/EMPO und
1.00
889.66
TABLEROS DE DISTRIBUCION
TABLERO BTDIN METALICO P/EMPOTRAR 6 POL und
3.00
256.92
DISPOSITIVOS DE MANIOBRA Y PROTECCION
DISPOSITIVOS BIPOLARES
INTERRUPTOR TERMOMAGNETICO DIN 2 x 32 A und
10.00
75.41
INTERRUPTOR TERMOMAGNETICO DIN 2 x 20 A und
3.00
69.89
INTERRUPTOR TERMOMAGNETICO DIN 3 x 32 A und
3.00
75.41
DISPOSITIVOS TRIPOLARES
INTERRUPTOR TERMOMAGNETICO DIN 3 x 100 und
1.00
500.41
INTERRUPTOR TERMOMAGNETICO DIN 3 x 50 A und
4.00
175.41
INSTALACION DE PARARRAYOS
PARARRAYO
und
1.00 5,537.67
SISTEMA DE PUESTA A TIERRA
SISTEMA DE PUESTA A TIERRA
und
2.00 1,177.07
ARTEFACTOS

1,150.00

829.84
792.12
67.70
329.82
123.13
1,996.38

88.00
84.00
1.00

100.00
100.00
100.00
100.00

54.00

829.84
792.12
67.70
1,996.38

333.00
520.88
2,542.50
388.30
135.75
68.76

45.00
68.00
450.00
110.00
25.00
12.00

333.00
520.88
2,542.50
388.30
135.75
68.76

100.00
100.00
100.00
100.00
100.00
100.00

4,199.04
3,489.68
2,394.60
669.60
253.50
1,129.05

400.00
964.00

1,152.00
3,489.68
-

27.43
100.00
-

889.66

1.00

889.66

100.00

770.76

3.00

770.76

100.00

754.10
209.67
226.23

500.41
701.64

5,537.67

2,354.14

05.05.01 LAMPARAS
05.05.01
FLUORESCENTE LINEAL 2x36 W TIPO REJILLA
und
1.00
05.05.01
FLUORESCENTE LINEAL 2x36 W TIPO HERMETI und
2.00
05.05.01
FLUORESCENTE CIRCULAR 32 W C/PANTALL
und
12.00
05.05.01
FLUORESCENTE LINEAL CUADRADO TL-D 4 X 1 und
9.00
05.05.01
FLUORESCENTE LINEAL 1X18 W C/DIFUSOR PR und
18.00
05.05.01
SPOT LIGHT CIRCULAR DE 2X20 W. TIPO (DIC
und
45.00
05.05.01
LUZ DE EMERGENCIA 2X5 W. DE 6V.
und
5.00
05.05.02 REFLECTORES
05.05.02
POSTE DE ALUMBRADO PUBLICO CON FAROLA und
3.00
05.06.00 EQUIPOS ELECTRICOS Y MECANICOS
05.06.01 ELECTROBOMBA PARA AGUA DE 2HP 1/4"x1" centrif und
4.00
05.07.00 VARIOS
05.07.01 INFRAESTRUCTURA ELCTRICA
05.07.01
OBRAS PRELIMINARES
05.07.01
SOLADO PARA POSTER DE CONCRETO C.A.C. 1 m3
3.00
05.07.01
ENSAYOS Y PRUEBAS DE CONTROL DE LABORATORIO
05.07.01
CORTE PARA PUESTA EN SERVICIO
GLB
1.00
05.07.01
REVISION Y PRUEBAS ELECTRICAS
GLB
1.00
05.07.01
PINTADO Y SEALIZACION DE POSTES
und
3.00
05.07.01
EXCAVACIN DE HOYOS
05.07.01
EXCAVACION DE HOYO PARA POSTES 13/
m3
3.00
05.07.01
EXCAVACION DE HOYO PARA TRATAMIENT
m3
3.00
05.07.01
CABLES DE ENERGA EN TENSIN DEL SUBSISTEMA
05.07.01
CONDUCTOR DE COBRE NYY 35 MM2
m
18.00
05.07.01
CONDUCTOR DE COBRE NYY 1x25 MM2
m
12.00
05.07.01
CONDUCTOR DE COBRE DESNUDO 25 MM2
m
10.00
05.07.01
REDES AREAS
05.07.01
CABLE DE ENERGIA DE MEDIA TENSION DE
m
200.00
05.08.00 OTROS
05.08.01 PRUEBAS DEL SISTEMA ELECTRICO
GLB
1.00

COSTO DIRECTO
GASTOS GENERALES
GASTOS DE SUPERVISIN
GASTOS DE ELABORACIN DE EXPEDIENTE TCNICO
GASTOS DE LIQUIDACIN

173.46
136.46
93.46
173.46
113.46
96.46
154.34

173.46
272.92
1,121.52
1,561.14
2,042.28
4,340.70
771.70

909.38

2,728.14

577.69

2,310.76

85.44

256.32

934.28
913.43
36.26

934.28
913.43
108.78

36.71
36.71

110.13
110.13

67.00
12.37
18.62

1,206.00
148.44
186.20

59.47

11,894.00

538.19

538.19

17.43
4.56
4.81
1.19

1,104,189.08
192,507.40
50,339.57
53,068.99
13,193.95

0.1743
0.0456
0.0481
0.0119

79.77%

880,827.21
153,565.87
40,156.59
42,333.88
10,525.00

0.1743
0.0456
0.0481
0.0119

COSTO TOTAL

1,413,298.99

1,127,408.54

309,109.91

ING. RESIDENTE DE OBRA

V B ING. SUPERVISOR

ON FINAL DE OBRA

A ADRIANA-REDESS SAN ROMAN-DISA PUNO,

AVANCES
ACTUAL

DEPARTAMENTO
PROVINCIA
DISTRITO
LOCALIDAD

:
:
:
:

PUNO
SAN ROMAN
JULIACA
C.C. UNOCOLLA

ACUMULADO
MetradoPrecio (S/.)
%

SALDO
Metrado Precio (S/.)

150.00
1.00
72.00

1,551.00
824.23
3,991.68

100.00
100.00
100.00

9.00
9.00
1.00

3,600.00
3,600.00
200.00

100.00
100.00
100.00

920.80

359.11

100.00

1.00
1.00

2,000.00
3,500.00

100.00
100.00

920.80
660.00

1,574.57
1,465.20

100.00
100.00

1.00

350.00

100.00

1.00
1.00

450.00
150.00

100.00
100.00

108.39
58.69

3,315.65
1,539.44

100.00
100.00

157.82
433.90

1,792.84
47,733.34

100.00
100.00

2,573.00

4,142.53

90.00

51.03

651.14

100.00

136.02

3,882.01

100.00

29.37

5,111.85

100.00

20.50
273.27

5,296.79
12,840.96

100.00
100.00

28.90
690.37

8,424.93
3,631.35

100.00
100.00

25.39
142.12
3,402.20

8,469.60
9,935.61
19,120.36

100.00
100.00
100.00

23.00
15.04
634.10
###

8,023.78
5,969.68
40,620.45
70,429.94

100.00
100.00
100.00
100.00

45.39
249.82
###

13,822.62
15,721.17
59,469.72

100.00
100.00
100.00

42.00
502.11
3,285.65
4,001.00

13,036.80
20,747.19
18,465.35
20,845.21

100.00
100.00
100.00
100.00

285.79

460.12

10.00

65.00

1,950.00

100.00

683.46

71,558.26

100.00

972.38
328.73
294.20
249.82
238.40
290.30

47,432.70
16,614.01
11,935.69
16,285.77
3,034.83
2,220.80

100.00
100.00
100.00
100.00
100.00
100.00

90.00
48.75

6,363.90
3,578.74

18.78
100.00

479.22

14,041.15

100.00

479.22
278.36
569.64
331.59
172.21
345.00
-

17,731.14
20,008.52
36,639.24
17,985.44
6,580.14
2,639.25
-

100.00
89.96
100.00
100.00
100.00
100.00
-

18.78
-

68.38
264.98

1,570.69
27,661.26

100.00
81.22

389.22
31.05
169.81
228.85
1.06
3.65
1.93
1.20
58.74
61.25
-

27,521.75
2,231.87
10,883.12
3,837.81
346.01
215.35
733.34
70.80
464.05
6,393.89
-

81.22
-

10.04
100.00
100.00
100.00
100.00
100.00
100.00
100.00

18.78

47.07

169.55
-

6,027.50
-

100.00
-

40.00

14,220.40

47.07

38.10

40.00

5,398.00

38.10

48.00
-

12.00
-

1,090.44
-

48.00
-

972.38
328.73
294.20
450.00
-

12,485.36
5,739.63
5,404.45
8,266.50
-

100.00
100.00
100.00
59.61
-

895.00

841.30

97.20

132.16
44.98
1.00
1.00
27.98
7.00
1.00
65.00
13.00
2.00
2.00
7.00
8.00
1.00
1.00
140.81
29.05
304.95
154.28
25.80

3,870.97
15,990.84
2,988.61
2,592.99
5,410.77
2,910.95
86.49
8,771.75
1,181.31
252.30
377.38
85.82
589.60
171.12
82.56
12,663.04
2,199.38
5,601.93
1,801.99

100.00

24.25

2.80

52.93

100.00
100.00
100.00
100.00
100.00

61.90
52.00
100.00
100.00
100.00

100.00
100.00
100.00
100.00
100.00
40.39
100.00

180.00
-

7,119.00
-

100.00
-

27.09
-

49.85
-

100.00
-

1.00

1,500.00

100.00

1.00

2,000.00

100.00

1.00

3,000.00

100.00

1.00

2,000.00

100.00

1.00

2,000.00

100.00

1.00

2,000.00

100.00

8.00
8.00
1.00
-

1,840.00
760.00
185.00
-

61.54
61.54
100.00
-

9.00
-

2,160.00
-

100.00
-

16.00

1,211.04

51.61

100.00
-

61.54
61.54
51.61
-

920.80
111.76
1.00
27.09
32.00
5.00
2.00
5.00
2.00
15.00
13.00
13.00
2.00
15.00
52.00
-

1,233.87
382.22
1,050.05

100.00
100.00
100.00

403.37
305.92

100.00
100.00

1,150.00
470.00
475.00
190.00

38.46
100.00
38.46
100.00

450.00
520.00
520.00
30.00

100.00
100.00
100.00
100.00

1,135.35

48.39

2,623.40

100.00

47.00

2,878.28

100.00

133.99
67.91
77.42
49.10

1,815.56
624.77
814.46
738.96

100.00
100.00
100.00
100.00

12.00
50.00
12.50
50.00

376.80
247.00
343.13
719.00

100.00
100.00
100.00
100.00

14.00
9.00
30.00
56.00
3.00
10.00
32.00
65.00
9.00
20.00
45.00
8.00

268.24
163.44
499.80
1,248.24
40.98
103.70
328.32
999.05
122.94
233.20
729.45
205.92

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

24.00
2.00
2.00
2.00
2.00

1,149.36
136.92
143.78
163.78
213.82

100.00
100.00
100.00
100.00
100.00

1.00
1.00

350.00
400.00

100.00
100.00

1.00
-

1,398.09
-

100.00
-

1.00
10.00

2,612.33

100.00

898.90

100.00

29.00

3,778.70

100.00

15.00
20.00
16.00
5.00
13.00
13.00

787.05
1,049.40
966.72
302.10
1,193.40
895.44

100.00
100.00
100.00
100.00
100.00
100.00

48.54
123.63

509.67
2,018.88

100.00
100.00

16.96
70.65
12.72
70.65
0.75

532.54
343.36
349.16
1,265.34
5,922.15

100.00
100.00
100.00
100.00
75.00

2.00
14.00
25.00
25.00
5.00
5.00
73.00
11.00
20.00
9.00

35.68
249.76
346.00
465.75
90.90
69.55
1,203.77
168.74
256.80
144.99

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

17.00

1,085.96

100.00

328.42
242.82

666.69
1,000.42

100.00
100.00

40.00

60.00
0.25
-

924.00

100.00

1,974.05

25.00

88.00
84.00
1.00
54.00

829.84
792.12
67.70
1,996.38

100.00
100.00
100.00
100.00

45.00
68.00
450.00
110.00
25.00
12.00

333.00
520.88
2,542.50
388.30
135.75
68.76

100.00
100.00
100.00
100.00
100.00
100.00

400.00
964.00
-

1,152.00
3,489.68
-

27.43
100.00
-

1.00

889.66

100.00

3.00

770.76

100.00

1.00
23.00
7.00
1,058.00
260.00
24.00
15.00
65.00
10.00
3.00
3.00
1.00
4.00
1.00
2.00
-

1,150.00

100.00

329.82
123.13
-

100.00
100.00
-

3,047.04
2,394.60
669.60
253.50
1,129.05

72.57
100.00
100.00
100.00
100.00

754.10
209.67
226.23

100.00
100.00
100.00

500.41
701.64

100.00
100.00

5,537.67

100.00

2,354.14

100.00

3.09%

34,092.11
5,943.71
1,554.25
1,638.52
407.37

0.1743
0.0456
0.0481
0.0119

82.86%

914,919.31
159,509.58
41,710.83
43,972.40
10,932.37

1.00
2.00
12.00
9.00
18.00
45.00
5.00
3.00
4.00
3.00
1.00
1.00
3.00
3.00
3.00
18.00
12.00
10.00
200.00
1.00

173.46
272.92
1,121.52
1,561.14
2,042.28
4,340.70
771.70

100.00
100.00
100.00
100.00
100.00
100.00
100.00

2,728.14

100.00

2,310.76

100.00

256.32

100.00

934.28
913.43
108.78

100.00
100.00
100.00

110.13
110.13

100.00
100.00

1,206.00
148.44
186.20

100.00
100.00
100.00

11,894.00

100.00

538.19

100.00
17.14%

0.1743
0.0456
0.0481
0.0119

189,269.74
32,997.81
8,628.74
9,096.59
2,261.58

43,635.95

1,171,044.49

V B SUB GERENTE DE INFRAESTRUCTURA

242,254.47