WBS Proyek Pembangunan Gedung Cyber II

Setelah diketahui pengertian dari masing-masing aktivitas, maka aktivitasaktivitas proyek dapat dibagi menjadi elemen-elemen yang lebih kecil untuk
mempermudah dalam mengintegrasikan proyek, berikut WBS proyek cyber II :
Skedule Proyek
1

General Condition

Site preparation

Dewatering

Structure work
4.1 Basement Tower
Excavation Work
4.1.1

4.2

Excavation -6.500

4.1.1.2

Excavation -6.500 s/d -12.600

4.1.2

4.1.1.3
Excavation -12.600 s/d 17.500
Tower Crane Foundation

4.1.3

Foundation Tower

4.1.4

Slab Basement 3 Tower

4.1.5

Slab Basement 2 Tower

4.1.6

Slab Basement 1 Tower

Podium (Rasuna, satrio, Denpasar dan embassy side)


4.2.1

4.2.2

4.3

4.1.1.1

Ground Anchor
4.2.1.1

Layer 1

4.2.1.2

Layer 2

4.2.1.3

Layer 3

Excavation Work
4.2.2.1 Excavation -6.000
4.2.2.2

Excavation -6.000 s/d -9.500

4.2.2.3

Excavation -9.500 s/d -13.000

4.2.2.4

Excavation -13.000 s/d 15.500

4.2.3

Slab Basement 4

4.2.4

Slab Basement 3

4.2.5

Slab Basement 2

4.2.6

Slab Basement 1

Office Tower
4.3.1

Level 1

4.3.2

Level 2

4.3.3

4.3.5

Level 5

4.3.6

Level 6

4.3.7

Level 7

4.3.8

Level 8

4.3.9

Level 9

4.3.10

Level 10

4.3.11

Level 11

4.3.12

Level 12

4.3.13

Level 13

4.3.14

Level 14

4.3.15

Level 15

4.3.16

Level 16

4.3.17

Level 17

4.3.18

Level 18

4.3.19

Level 19

4.3.20

Level 20

4.3.21

Level 21

4.3.22

Level 22

4.3.23

Level 23

4.3.24

Level 24

4.3.25

Level 25

4.3.26

Level 26

4.3.27

Level 27

4.3.28

Level 28

4.3.29

Level 29

4.3.30

Level 30

4.3.31

Level 31

4.3.32

Level 32

4.3.33

M/E Room

4.3.34

Level roof

Finishing
5.1

Level 1

5.2

Level 2

5.3

Level 3

5.4

Level 4

5.5

Level 5

5.6

Level 6

5.7

Level 7

5.8

Level 8

6
7

5.9

Level 9

5.10

Level 10

5.11
5.12
5.13

Level 11
Level 12
Level 13

5.14
5.15
5.16
5.17
5.18

Level
Level
Level
Level
Level

5.19

Level 19

5.20
5.21

Level 20
Level 21

5.22

Level 22

5.23

Level 23

5.24

Level 24

5.25

Level 25

5.26

Level 26

5.27

Level 27

5.28

Level 28

5.29

Level 29

5.30

Level 30

5.31

Level 31

5.32

Level 32

5.33

M/E & Roof Level

14
15
16
17
18

MEP
NSC
7.1

Curtaine Wall

7.2

Stone Work

7.3

Water Feature

7.4

Soft landscape

7.5

Stainless steel

7.6

Special Paint

7.7

Signage

7.8

Building Automation System

7.9
7.10
7.11

Building Maintenance System


Generator
LIFT

Final Testing

9
10

Final Cleaning
Hand Over