S No
Location
Observation
Roof Plate/Roof
Nozzle
Stair Way
CURB ANGLE
5a
5b
5c
5d
5e
5f
5g
5h
5i
Bottom Plate
6a
Bottom Plate
6b
Bottom Plate
6c
Bottom Plate
Visual Inspection
6d
Bottom Plate
Bottom Sump
Internal Drain
Water Line
WIND GIRDER
10
RING WALL
FOUNDATION
INSPECTION SUMMARY OF F
S No
Location
Observation
Foam Pourer
Foam Riser A
Foam Riser B
Foam Riser B
2" FW Sprinkler
Ring
3" FW Riser to
--------------
--------------
--------------
--------------
No recommendation
--------------
Adnoc Feedback/R
Rectify it
(1) For shell course 1,2,3 & 4, the minimum thickness observed during
inspection is higher than that of acceptable/required thickness (2) For
Shell Course 6 & 7, observed thickness is higher than that of minimum
design thickness. No immediate action is required. However would
like to know the method/procedure used for calculating the Actual &
Minimum thickness for shell course
Rectify the defect by smooth grinding with pencil grinders and perform
DPT after rectification.
Rectify the defect by smooth grinding with pencil grinders and perform
MPI after rectification.
RF pad shall be a single rolled sheet and it can not be palced/ installed
around nozzle without cutting the existing nozzle.Two piece of RF pads
are not in common and shall not be a good engineering practice.
Stiffners are available for 6" existing nozzle and can continue the
existing situation after rectifying pitting by grinding followed by DPT.
( As per API 650, for Nozzle Size Below 2", RF pad is not
required , stiffners are sufficient)
This nozzle is connected to outlet line of the tank. Introducing new
nozzle to tank shell will be more time consuming and complex activity
and we can go ahead with the same existing situation. IDM suggested
NPSH study for these outlet lines
( SED1 and SED 2)
as Sharjah DPM team raised pump suction issues due to existing outlet
line size.
Do remaining life calculations for drain pipe(as per API 570) and
replace if actual thickness is less than that of minimum required
thickness.Provide new supports for drain pipes.
oc Feedback/Recommendations
et and it can not be palced/ installed around nozzle without cutting the existing
t in common and shall not be a good engineering practice. Stiffners are available
ue the existing situation after rectifying corrossion by grinding followed by DPT.
ozzle Size Below 2", RF pad is not required , stiffners are sufficient)
d inspect the extend of corrossion as per API 574. Insert non metallic interface
U bolt and pipe material to avoid crevice corrosion.Do proper surface preparation
follwed by painting
on and inspect the extend of corrossion as per API 574. Insert non metallic
between u bolt and pipe material to avoid crevice corrosion.Do proper surface
preparation follwed by painting
s observed. Calculate remaining life calculations of piping as per API 574. Insert
e sleeves) in between u bolt and pipe material to avoid crevice corrosion.Do
proper surface preparation follwed by painting
smooth grinding follwed by DPT. Replace the missing U bolt. Insert non metallic
between U bolt and piping. Through surface preparation fowwloed by pinting.