Vicolungo, 27/03/2015
OFFER N. 19857/F.15.03.00.05
Company
AL HASSAN ENGINEERING CO.
ABU DHABI L.L.C.
Copy to
//
From
Pag.
1/3
Kind attention
Mr. Leons Muthaiyan
RE:
Refering your kindly request we send you our best offer for what is analytically reported in
the enclosures and we remember you that all is not written in this offer will not be object of
our supply if is not differently agreement.
The trade conditions above mentioned can not be separated from our prices. Every
different require will be valued.
R.E.A.
134641 Novara
Partita IVA/C.F.
00808140156
Cap. Soc.
106.000 int. Vers.
B.1.0
B.2.0
INSULATING COAT made with mineral resin fibre water proof thickness mm.
80 density kg/mc 80 with protection on one side, special type for ventilated
facades.
B.3.0
CLADDING
Profile
Material
Thickness
Protection external side
Colour external side
Internal side
condesation)
N1851/11
Attestato di centro di
produzione lamiere grecate
: HV 3510/6 curved
: stainless steel AISI 316 10088-2 1.4404
: mm. 7/10
: natural finished 2 b
: natural
: Hecofelt (special felt against expansion noise and
B.4.0
SHINGLES
Profile type
Material
Thickness
External protection
Colour
Approximate quantity
: m 1.410,00
/m . 720,00
: 0-500 mm.
/mt. 180,00
Development max
/mt. 230,00
EXECUTIVE PROJECT
7.0
Project of our suppling in the executive phase include: drawings, drawings of every single
component of wall cladding, accessories, different unions, diagram and clamps particular, list of all
components.
Drawings will be send to the client in n. 3 copies for check and comment. After they will be revise
and finally delivered in n. 1 copy on magnetic support.
Eventually others disegns copies, if required and eventually modifications required by client will be
valued economically.
The default or delaying projects approval by the client, will involve a sliding of the delivery terms
without that the Client have no retaliation right, so give at the supplier , eventually and
documented, prices adjournement.
Projects approval is considered renounced conditions to go on with the supply.
Our project does not include:
1)
2)
3)
Any practice about law disposition for building concession in your Country.
Expenses for eventually testing and sampling and/or laboratorys test.
If necessary inspection on site for technical and dimensional verification before, during and after
execution of project and works.
Remuneration for services above specified will be calculated including maximum dimension of
external surfaces including empty.
2
/m . 15,00
GENERAL CONDITIONS
Delivery
Site
Test
Payement
: Project 60 work days from the order and receiving technical drawings by your
technician (engineering) dwg supports
Beginning works within 60 days from the date of the project approval
Assemblage: 90 days (3 months)
: materials delivered on your yard installed
: within 10 days from the end of our works. In contrary case it will be reteined
favourable.
: To be dened
In according to the Art. 1656 c.c. HEDAR is always authorized to subcontract part of this contract.
GUARANTIES
Materials above mentrioned are guaranteed in according to the enforced law.
MEASUREMENTS
For coverings measurements of the works will be effectued: for the covers elements, walls,
coverings, floors, ceiling works, etc. multiplicand elementss number for real lenght for breadth of
the element adoptee.
For flangings and gutters will be calculate the real materials measure supplying, considering
shrinkage and superposition of the customer.
Best regards.
HEDAR Edilizia Metallica s.r.l.