Professional Documents
Culture Documents
Job Ref.
1106
Project Title
Description
3.0x1.8 m CULVERT
National code
BS
Date
Author
22.08.2011
F.PETRUF Ing CEng MIEI
CLIENT:
CUSTOMER:
PROJECT:
STRUCTURE:
ENGINEER:
Client
Customer
Project
Structure
Ref.
Job Ref.
Engineer
Date
Sheet No.
STRUCTURAL ANALYSIS
General notes
Combinations
10
25
Bearing pressure
56
Settlement
57
58
Reinforcement output
74
1106
F. Petruf
21/07/2011
2
Client
Customer
Project
Structure
Ref.
Job Ref.
Engineer
Date
Sheet No.
1106
F. Petruf
21/07/2011
3
STRUCTURAL ANALYSIS
General Notes:
Preamble:
This document and related drawings explain the design philosophy for precast concrete culverts.
The culverts above are proposed to use for conveying the watercourse under the carriageway.
Specification:
Design Basis:
1. BS 5400-4:1990 Code of Practice for Design of Concrete Bridges
2. BD 31/01 The Design of Burried Concrete Box and Portal Frame Structures
3. BD 37/01 Loads for Highway Bridges
4. BD 57/01 Design for durability
5. Responsibility of Concast Precast is limited to design, manufacture and supply of precast concrete
units only. There is no responsibility of Concast Precast for ground conditions and foundations,
temporary works, erection and design associated with overall stability of the structure.
Design Criteria:
Loadings:
Densities of materials to be used in the calculation of loading:
Precast Concrete = 24.00
kN/m3
Backfill = 20.00
Road Surfacing = 23.00
kN/m3
kN/m3
Water = 10.00
kN/m3
kN/m3
Permanent Loads:
Dead Load:
kN/m3
kN/m3
HB Loading:
Plant Loading:
kN/m
Client
Customer
Project
Structure
Ref.
Job Ref.
Engineer
Date
Sheet No.
1106
F. Petruf
21/07/2011
4
STRUCTURAL ANALYSIS
Accidental Loading:
During operation of the completed culverts and during a flood event an internal
water pressure is generated in the culverts. This pressure is equivalent to a
hydrostatic head of 3.5m above culvert soffit level shown on the drawings.
Serviceability Requirements :
Cracking:
Durability:
Cover:
Materials Characteristics:
Concrete:
Precast concrete
Reinforced concrete elements, Grade C40/50, fcu = 50.00
N/mm2
Insitu concrete
Upstand to form base for railing, Grade C32/40, fcu = 40.00
N/mm2
Reinforcement:
Main reinforcement
B500B bars to BS 4449:2005, prefix 'B' = High Tensile, fy = 500.00
N/mm2
Secondary reinforcement
B500B bars to BS 4449:2005, prefix 'B' = High Tensile, fy = 500.00
N/mm2
Backfill
Structural backfill to be Type 6N
Bedding
River gravels with min. depth 300mm as shown on the drawings
Ground Conditions:
Cohesion, c = 0.00
kN/mm2
degrees
MN/m2
MN/m2
Ground modulus, Emax = 50.00
Note: - final spring stiffness adjusted to result in maximum settlment in the order of 10mm under dead load with
backfill at the finished level.
For calculation of lateral earth pressure, Kmin = 0.20
For calculation of lateral earth pressure, Ko = 0.60
For calculation of lateral earth pressure, Ka = 0.33
Client
Customer
Project
Structure
Ref.
Job Ref.
Engineer
Date
Sheet No.
1106
F. Petruf
12/08/2011
7
STRUCTURAL ANALYSIS
LC 11
LC 12
kN
PE = 0.5**H2*Kmin
kN
m
PE = 0.5**H2*K0
HE = H/3
Soil pressure from 1m deep soil cover over the culvert with K min , K 0 and plant surcharge loading:
BD 31/01
clause 3.2.6
LC 13
LC 14
LC 15
Note: - when the minimum permanent soil pressure is applied on both sides of the culvert, no live load surcharge
shall be applied to either wall.
Horizontal load from backfill material with Kmin, PE = 23.12
Horizontal load from backfill material with K0, PE = 69.36
1m Dp. Soil cover, vertical load on the roof = 20.00
Depth from bottom of base to PE, HE = 1.133
Horizontal load from plant surcharge loading with K0, PS = 20.40
Depth from bottom of base to PS, HS = 1.700
kN
kN
kN/m
m
kN
m
PS = K0*qkplant*H
HS = H/2
Soil pressure from finished cover over the culvert at finished road surface level with K min ,K 0 and
BD 31/01
clause 3.2.1
LC 16
LC 17
LC 18
LC 19
BD 31/01
clause 3.2.6
=
=
=
=
=
=
16.88
50.63
0.968
17.43
8.72
1.453
kN
kN
m
kN
kN
m
kN/m2
kN/m2
kN/m2
PS = K0*qkHA*H
PS = K0*qkFCT*H
HS = H/2
Client
Customer
Project
Structure
Ref.
Job Ref.
Engineer
Date
Sheet No.
1106
F. Petruf
12/08/2011
8
STRUCTURAL ANALYSIS
Horizontal Loading continuous:
BD 37/01
clause 6.10
LC 20
kN/m
LC 21
LC 22
LC 23
kN
kN
per lane
per metre width assuming a 2.5m
lane width
Flooding condition with water level at the top of the culvert roof and culvert running dry
The hydrostatic pressure shall be taken = 19.20
kN/m
qh = 10*Z*(1-Kmin)
Z = H2+T1+T2
Flooding condition with culvert running full of water assuming pressure equal to a hydrostatic head of
3.5m of water above the culvert roof
Z = 3.5-H1
The hydrostatic pressure at the finished road surface level = 23.96
kN/m
Z = 3.5+T1
The hydrostatic pressure at the finished road surface level = 30.40
kN/m
Z = 3.5+T1+H2
The hydrostatic pressure at the finished road surface level = 44.80
kN/m
LC 24
h = 2.40
h1 = 0.3h but < or equal to 0.15m, h1 = 0.150
h2 = 0.3h but > 0.1m and < 0.25m, h2 = 0.250
h1 = 0.3h but < 0.1m+surfacing depth, h3 = 0.605
Area A1 of culvert section from top of roof up to h1 = 0.540
=
=
=
=
=
=
=
=
h1
h2
h3
m2
m
m2
C
C
0
C
0
C
0
C
0
C
0
C
0
negligible
0.150
0.250
0.605
T3 [0C]
7.5
2.1
1.5
m
m
m
m
Group 4
29.0
31.0
10.0
-2.0
-0.16
29.0
29.0
h [m]
T1 [0C]
h1
0.150
17.5
h2
h3
0.250
T2 [0C]
T3 [0C]
12.1
0.605
11.5
0.150
0.250
0.605
19.0
19.0
19.0
Client
Customer
Project
Structure
Ref.
Job Ref.
Engineer
Date
Sheet No.
STRUCTURAL ANALYSIS
Combinations:
Name
Description
Type
Load cases
CO 1
Coeff.
[-]
CO 2
CO 2.1
CO 3
CO 5.1
1.5
1.15
1.2
1.5
1.15
1.2
1.6
1.15
1.2
1.6
1.5
1.2
1.15
1.5
1.2
1.5
1.15
1.6
1.2
1.5
CO 3.1
1.15
1.6
1.15
1.75
1.2
1.5
1.15
1.75
1.2
1.5
1.15
1.75
1.2
1.5
1.5
1.5
1.5
1.15
1.75
1.2
1.5
1.5
1.5
1.5
1106
F. Petruf
22/08/2011
10
1106
Job Ref.
Project Title
3.0x1.8 m CULVERT
Description
BS
National code
22.08.2011
Date
Author
6. Structural model
Page Number
28
1106
Job Ref.
Project Title
3.0x1.8 m CULVERT
Description
BS
National code
22.08.2011
Date
Author
Z
Y
X
Z
Y
X
Z
Y
X
Page Number
30
1106
Job Ref.
Project Title
3.0x1.8 m CULVERT
Description
BS
National code
22.08.2011
Date
Author
Z
Y
X
Z
Y
X
Z
Y
X
Page Number
32
1106
Job Ref.
Project Title
3.0x1.8 m CULVERT
Description
BS
National code
22.08.2011
Date
Author
Z
Y
X
Z
Y
X
F67
F68
F69
F70
F71
Member
System
F
[kN]
Load case
Dir
Type
S1
LC5 - HA - KEL at the edge
S1
LC6 - HA - KEL in the middle
W1
LC11 - PE with Kmin - Soil at the roof
W2
LC11 - PE with Kmin - Soil at the roof
W1
LC12 - PE with Ko - Soil at the roof
GCS
Z
GCS
Z
GCS
X
GCS
X
GCS
X
-32.88
Force
-32.88
Force
11.52
Force
-11.52
Force
34.56
Force
x
[m]
Coor
Rep (n)
Orig
0.050 Abso
From
0.500 Rela
From
0.412 Abso
From
0.412 Abso
From
0.412 Abso
From
1
start
1
start
1
start
1
start
1
start
Page Number
38
1106
Job Ref.
Project Title
3.0x1.8 m CULVERT
Description
BS
National code
22.08.2011
Date
Author
Name
Member
Type
Dir
P1
[kN/m]
x1
[m]
Coor
Load case
System
Distribution
P2
[kN/m]
x2
[m]
Loc
LF127
C2
Force
GCS
LF128
GCS
LF129
GCS
LF130
GCS
LF131
Force
Z
Uniform
LF132
Uniform
LF133
Uniform
LF134
Uniform
LF135
GCS
LF136
GCS
LF137
GCS
Force
X
Trapez
X
Trapez
31.10
0.000 Abso
30.40
0.124 Length
44.10
0.000 Rela
31.10
1.000 Length
44.10
0.000 Abso
44.80
0.124 Length
Orig
Ecc ez
[m]
From end
Force
Force
Force
Force
Trapez
X
Trapez
-44.10
0.000 Abso
-44.80
0.124 Length
-20.00
0.000 Rela
From start
-20.00
0.000 Rela
-20.00
0.000 Rela
From start
0.000 Rela
From start
0.000 Rela
From start
Uniform
0.000 Rela
0.000
0.000
From start
0.000
0.000
From start
0.000
0.000
From start
0.000
0.000
From start
1.000 Length
-44.80
0.000
0.000
1.000 Length
-20.00
0.000
0.000
1.000 Length
-20.00
0.000
0.000
1.000 Length
Uniform
Z
From end
1.000 Length
Uniform
Z
0.000 Rela
0.000
0.000
1.000 Length
-20.00
0.000
0.000
Ecc ey
[m]
0.000
0.000
From start
1.000 Length
0.000
0.000
Description
Action type
Self Weight
Superimposed Dead - Deck Surfacing
Superimposed Dead - Other Loads
HA Nominal UDL
Permanent
Permanent
Permanent
Variable
LoadGroup
LG1
LG1
LG1
LG2
Load type
Self weight
Standard
Standard
Static
Page Number
42
1106
Job Ref.
Project Title
3.0x1.8 m CULVERT
Description
BS
National code
22.08.2011
Date
Author
Name
LC5
LC6
LC7
LC8
LC9
LC10
LC11
LC12
LC13
LC14
LC15
LC15.1
LC16
LC17
LC18
LC18.1
LC19
LC19.1
LC20
LC21
LC22
LC23
LC24
LC25
Description
Action type
Variable
Variable
Variable
Variable
Variable
Variable
Permanent
Permanent
Permanent
Permanent
Variable
Variable
Permanent
Permanent
Variable
Variable
Variable
Variable
Variable
Variable
Variable
Variable
Variable
Variable
LoadGroup
LG2
LG2
LG2
LG2
LG2
LG2
LG1
LG1
LG1
LG1
LG2
LG2
LG1
LG1
LG2
LG2
LG2
LG2
LG2
LG4
LG2
LG2
LG3
LG3
Load type
Static
Static
Static
Static
Static
Static
Standard
Standard
Standard
Standard
Static
Static
Standard
Standard
Static
Static
Static
Static
Static
Static
Static
Static
Static
Static
Load
Permanent
Variable
Variable
Accidental
Relation
Type
Standard
Standard
Exclusive
I - imposed load
T - temperature load
List
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
11.1
22.1
33.1
44.1
55.1
5.2
5.3
Linear - Linear
Linear - Linear
Linear - Linear
Linear - Linear
Linear - Linear
- Linear
- Linear
ultimate
- ultimate
ultimate
- ultimate
ultimate
- ultimate
ultimate
- ultimate
ultimate
- ultimate
- ultimate
- ultimate
Page Number
43
1106
Job Ref.
Project Title
Description
BS
National code
22.08.2011
Date
Author
Name
RC2
List
RC3
Page Number
45
1106
Job Ref.
Project Title
Description
BS
National code
22.08.2011
Date
Author
Name
List
LC16
LC17
LC4
LC5
LC6
LC7
LC8
LC9
LC10
LC15
LC15.1
LC18
LC18.1
LC19
LC19.1
LC20
LC21
LC22
LC23
LC24
LC25
RC3
RC4
Z
Y
Page Number
46
1106
Job Ref.
Project Title
3.0x1.8 m CULVERT
Description
BS
National code
22.08.2011
Date
Author
Z
Y
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
Case
dx
[m]
5.12/1
6.8/2
5.3/3
5.10/4
5.4/5
5.12/1
3.1/6
5.10/4
6.8/2
3.1/6
5.1/7
5.12/1
1/8
5.10/4
5.10/4
5.10/4
1.1/9
5.12/1
5.12/1
6.1/10
0.000
0.000
2.824
0.000
0.000
2.206
0.000
1.883
0.000
0.000
0.000
1.883
0.000
0.941
2.824
0.000
1.624
0.000
1.065
0.000
N
[kN]
-131.52
40.19
-32.63
-126.66
-37.56
-131.52
-54.64
-100.41
33.06
-76.57
-70.92
-95.54
-16.64
-0.42
-100.41
-264.55
-14.22
-246.41
-237.75
-180.51
Vy
[kN]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Vz
[kN]
207.68
85.35
-149.82
225.82
164.31
-0.93
69.69
150.31
-71.61
-81.94
-133.95
152.15
-21.18
-73.49
150.31
-24.57
-10.78
-29.43
-131.52
86.03
Mx
[kNm]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
My
[kNm]
-124.42
-7.47
-39.71
-113.21
-14.90
116.38
-13.59
-12.54
10.55
45.83
47.48
-18.04
7.76
-132.49
128.97
-6.06
-5.11
-3.89
-72.08
-67.44
Mz
[kNm]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page Number
47
1106
Job Ref.
Project Title
3.0x1.8 m CULVERT
Description
BS
National code
22.08.2011
Date
Author
Member
C4
C4
C4
Case
LC15
LC23
LC15.1
dx
[m]
0.000
0.000
0.000
N
[kN]
-3.54
3.05
2.45
Vy
[kN]
0.00
0.00
0.00
Vz
[kN]
Mx
[kNm]
My
[kNm]
Mz
[kNm]
-3.54
0.00
0.00
50.91
8.43
0.00
0.00
1.40
-1.65
0.00
0.00
Z
Y
Z
Y
Page Number
56
1106
Job Ref.
Project Title
Description
BS
National code
22.08.2011
Date
Author
Z
Y
Page Number
57
Client
Customer
Project
Structure
Ref.
Job Ref.
Engineer
Date
Sheet No.
1106
F. Petruf
24/08/2011
58
STRUCTURAL ANALYSIS
S1
Result Class/Combination:
General Parameters :
Width of slab, b
Breadth of section, ba and bt
Depth of slab, h
General cover to reinforcement, c
Assumed bar diameter,
Effective depth to the tension reinforcement, d
Characteristic concrete strength at 28-days, fcu
Characteristic strength of reinforcement, fy
Characteristic strength of link reinforcement, fyv
Design Moment :
Design Shear :
=
=
=
=
=
=
=
=
=
1000
1000
300
55
16
237.0
50
500
500
M = 124.42
V = 225.82
mm
mm
mm
mm
mm
mm
N/mm2
N/mm2
N/mm2
kNm
kN
Hogging Moment
External face
Bending :
clause 5.4.2
clause 5.3.2.3
=
=
=
=
=
=
=
>
3435
199.22
225.15
199.2
1436
3435
1.449
0.15
clause 5.8.4
mm2/m
mm
mm
mm
mm2/m
mm2/m
%
%
B16
at 150 mm C/C
z = (1-1.1*fy*As/(fcu*b*d))*d
z < or = 0.95*d
As = Mu/(0,87*fy*z)
B16
at 150 mm C/C
p =(As,prov/(ba*d))*100
of ba*d
PASS
mm2/m B10
at 200 mm C/C
%
p =(As,prov/(bt*d))*100
%
of bt*d
PASS
Note: allow B20 at 150 mm C/C at wall external face to be anchoraged into roof top and work together with
the above B16 at 150 mm C/C against shear stress. Than As, prov = 3435 mm2/m.
Area of provided secondary reinforcement, As, prov = 393
Percentage of the secondary reinforcement, p = 0.166
Minimum area of the secondary reinforcement > 0.12
Shear :
clause 5.4.4
=
=
=
=
0.953
1.205
0.7
1.5
= 0.836
N/mm2 v = V/(b*d)
s = (500/d)1/4
for d = 2000 mm and more
for d = 100 mm and less
N/mm2 fcu should not exceed 40 N/mm2
= 1.25
= 1.449
<
3.0
< s*vc = 1.0075
PASS
PASS
Client
Customer
Project
Structure
Ref.
Job Ref.
Engineer
Date
Sheet No.
1106
F. Petruf
24/08/2011
59
STRUCTURAL ANALYSIS
S1
General Parameters :
clause 5.8.8.2
= 150
= 89.95
mm
mm
= 300
= 106.34
mm
mm
Mg = 11.64
Mq = 73.96
kNm
kNm
Hogging Moment
Hogging Moment
kN/mm2
2
kN/mm
Ec = (5.5*(fcu/1.5)^0.5)/2
=
=
=
=
=
=
=
15.877
200
12.597
0.014
106.337
1.1E+09
0.0006
= (Es/Ec)
mm
mm4
p = As/(bd)
x = (-p+((p)^2+2p)^0.5)*d
STs = /Es*(Mg+Mq)/Ic*(d-x)
1 = STs*(h-x)/(d-x)
s = b*(h-x)^2/(3*Es*As*(d-x))
PASS
Maximum bar spacing, S = 150
Maximum allowable bar spacing should be not grater than
300
mm
mm
PASS
Client
Customer
Project
Structure
Ref.
Job Ref.
Engineer
Date
Sheet No.
1106
F. Petruf
24/08/2011
74
STRUCTURAL ANALYSIS