You are on page 1of 7

SARAWAK ENERGY BERHAD

DOCUMENT REVIEW STATUS


STATUS 1:
STATUS 2:

WORK MAY PROCEED.


REVISE AND RESUBMIT. WORK MAY PROCEED SUBJECTED TO
INCORPORATION OF COMMENTS INDICATED.
REVISE AND RESUBMIT. WORK MAY NOT PROCEED.
REVIEW NOT REQUIRED. WORK MAY PROCEED.
REJECTED AND RESUBMIT. WORK MAY NOT PROCEED.

STATUS 3:
STATUS 4:
STATUS 5:

PERMISSION TO PROCEED SHALL NOT CONSTITUTE ACCEPTANCE OR APPROVAL OF DESIGN


DETAILS, CALCULATIONS, ANALYSIS, TEST METHODS, OR MATERIALS DEVELOPED OR SELECTED
BY CONTRACTOR AND SHALL NOT RELIEVE CONTRACTOR FROM FULL COMPLIANCE WITH
CONTRACT TECHNICAL SPECIFICATIONS AND DRAWINGS.
SEB____________________________________ DATE ____________________

Employer:

SARAWAK ENERGY BERHAD


MENARA SARAWAK ENERGY
NO.1, THE ISTHMUS,
93050 KUCHING, SARAWAK.

Main Contractor:

SEE ENERGY SDN. BHD.


MUARA TABUAN LAND DISTRICT, LORONG 8,
OFF JALAN SETIA RAJA, MUARA TABUAN LIGHT INDUSTRIAL PARK,
93350 KUCHING, SARAWAK.

Civil
Subcontractor:

BONG JEE NYAN CONSTRUCTION SDN. BHD.


1ST FLR, BANGUNAN THE YANTT, LOT 1214,
BLK 36, 9TH MILE PENRISSEN ROAD,
93250 KUCHING, SARAWAK

PROJECT:

Astana 132kV Substation Establishment &


Sejingkat 132kV Substation Extension Project
(Contract No. PLS-120064)
SUBJECT:

ASTSEJ: Anti-Corrosion Paint


DOCUMENT NO:

PLS120064-ASTSEJ-C-CAT-CE-007

Rev:

Client:
Sarawak Energy Berhad

Main Contractor:
SEE Energy Sdn Bhd

Civil Subcontractor:
Bong Jee Nyan Construction Sdn
Bhd

Project:
Astana 132Kv Establishment
Substation & Sejingkat 132Kv
Extension Substation
Contract No:PLS-120064

Document No.:
Revision:
Date:

Material

PLS120064-ASTSEJ-C-CAT-CE-0007
B
24th September 2015

: NIPPON PAINT
Nippon Red Oxide Primer

Materials Properties

Method of Application

Brush 1-2 layers onto surface of pile joints after welding.

Structures/ Activities
Involved

Pile joint after welding for pile jointing

Client:
Sarawak Energy Berhad

Main Contractor:
SEE Energy Sdn Bhd

Civil Subcontractor:
Bong Jee Nyan Construction Sdn
Bhd

Project:
Astana 132Kv Establishment
Substation & Sejingkat 132Kv
Extension Substation
Contract No:PLS-120064

Document No.:
Revision:
Date:

APPENDIX 1

PLS120064-ASTSEJ-C-CAT-CE-0007
B
24th September 2015

: Technical Data Sheet

COMMENT SHEET REF: C-CAT-CE-007_01_RESPONSE_01


CONTRACT NO.: PLS-120064
Astana 132kV Substation Establishment and Sejingkat 132kV Substation Extension Project
Catalogues
DocumentBeingReviewed:
DesignCalculations/Drawings
PU Engineering Sdn. Bhd.
Civil Engineering
Reviewer:
Discipline:
PLS120064-ASTSEJ-C-CAT-CE-007 Rev A
Document/DrawingNo.:
Anti-Corrosion Paint
Document/DrawingTitle:

No.
1.

Comment
The submission on Anti Corrosion Paint Catalogue is too
general. To resubmit the Anti Corrosion Paint Catalogue
including:
i) Material properties
ii) Method of application
iii) Structures involved for this type of Anti Corrosive paint

2.

To kindly check with the supplier Nippon on the material


(technical) properties and the method of application such
as brush equipment to be used and how many layers of
application.

Submittal:

PLS120064-C-TML-IN-0013

Date:
InitialRev.Number/Date:
UptodateRev.No/Date:
ApprovalStatus:

04/09/2015
Rev A / 17.08.2015
Rev A / 17.08.2015
3

Contractor
Disposition

Explanation

Reviewer
Acceptance

WI
WIP
WNI
By : Sheryl D.
Date: 2/10/15

Yes
No

WI
WIP
WNI
By : Sheryl D.
Date: 2/10/15

Yes
No

Resolution

Verification

Dispositions: WI = Will Incorporate; WIP = Will Incorporate in Part; WNI = Will Not Incorporate

You might also like