You are on page 1of 7

LAMPIRAN F

(PWD 142C - Rev.2012)

JABATAN PENGAIRAN DAN SALIRAN MALAYSIA


AS COMPLETED DETAILED ABSTRACT FOR

Total Amount of Main Tender: RM


Contractor for Main Works

Class

Date of Prossession of Site

Actual Date of Completion

Original Contract Period


Extension of Time (if any)
Head Sub/Head Year

Total Prov.
RM
Prov. for Const. RM

Amount of L&A Damages (if any)

BRIEF DESCRIPTION OF BUILDINGS


BUILDING

Frame

Wall

Roof

Floor

Ceiling

Window

Standard

a
b
c
d
e
f

PRIME COST AND PROVISIONAL SUMS


ITEM

ALLOWED RM

ACTUAL RM

a
b
c
d
e
f
g
h
BREAKDOWN OF COST
1 PRELIMINARIES
2 PILING/SPECIAL FOUNDATION
Type and Size

COST

RM
Being

% of Remainder of Main Tender


Unit

Quantity

Unit Cost

a
b
c
d
e
f
Floor
3 BUILDING
a
b
c
d
e
f
g
SUBTOTAL
carried forward
* Refer to Note 6.2 (b)

Drawing No.

Area m2

Cost/m2

Vol.m3*

Cost/m3*

BREAKDOWN OF COST (CONT'D)

COST RM

SUBTOTAL brought forward


4

INTERNAL SERVICES

Plumbing Installation

b
c
d

Sanitary Appliances
Electrical Installation
Fire Protection Installation

e
f

Air Conditioning Installation


Lift & Conveyor Installation

5
a

EXTERNAL WORKS
i) Site Preparation

ii) Earthwork (I.f. =


Roads, Hardstanding,

Footpaths & Paving


Fencing & Gates

Building
Served
Ref. No.

Turfing & Soft Landscaping


(S.t. =
%)

e
f
g

Surface Drainage
Sewerage
External Water Reticulation

Appropriate Unit
i) Hectares
%)

6
VARIATION OF PRICES
7 CONTRIBUTION FEE TO LOCAL
a

AND UTILITY AUTHORITY


TNB & JBA

Telekom

8
a
b

Floor Area Served

Cost
/m2

% of
Bldg.

RM

Cost

Quantity

ii) Cu. m moved (m3)


Surface Area (m2)
Perimeter (m)
Turfed Area (m2)
Tot. length of drn. & pipes (m)
No. of occupants served
Total length of pipe (m)

ALL IN UNIT RATE


Total Floor Area m2 :

(of Total Items 1 to 9)


Cost/m2 :

Project Officer

MISCELLANEOUS
Advertisement & Documentation
Soil Investigation

Date :
Division Director

CONTINGENCIES
TOTAL (Items 1 to 9)

10
11

SUPERVISION
PROFESSIONAL FEES

a
b

Architect
Civil & Structural Engineer

c
d

Mechanical Engineer
Electrical Engineer

Quantity Surveyor

TOTAL COST OF PROJECT

Unit Cost

Date :

* Refer to Note 7.1 (b) & 8.2

NOTES ON FILLING OF AS COMPLETED ABSTRACT FORM (ACDA)


1.0

GENERAL INFORMATION
1.1
1.2

2.0

TOTAL PROVISION
2.1

3.0

Total Provision shall be the Total Provision as stated in the latest approved ATDA.

PROVISION FOR CONSTRUCTION


3.1

4.0

The information given on this Detailed Abstract is for Government use only.
No portion of the form is to be left blank. Items not applicable in any particular case shall have a dash inserted against them.
If any item is included under `BUILDING' this shall be stated in the "COST" column.

Provision for Construction shall be the Total Cost of Project as stated in the latest approved ATDA.

BRIEF DESCRIPTION OF BUILDING


4.1

The following abbreviations shall be used in completing the "Brief description of Buildings":
Al

- Aluminium

CCR

- Coloured Cement
Rendering

MFB

- Mineral Fibre Board

AB

- Acoustic Board

CHB

- Concrete Hollow
Bricks

MSW

- Metal Framed Screen Wall

Tyn

AC

- Asbestos Cement

Ff

- Fairface

OGB

- Ordinary Gypsum Board

Tz

Bk

- Common Brick

FSW

- Fairface Screen
Wall

Pqt

- Parquet

TB

BRF

- Built-up Roofing Felt

FCB

- Fibre Cement
Board

PF

- Plastered Finish

TS

CBk

- Cement Sand Brick

GMD

- Galvanised Metal
Decking

PCM

- Precast Concrete Members

TT

CR

- Cement Rendering

GWB

- Glass Wool Board

QT

- Quarry Tiles

TSW

CT

- Ceramic Tiles

HP

- Hyrib Plaster

RC

- Reinforced Concrete

VT

Con

- Concrete

LV

- Marble Slab

RGB

- Reinforcement Gypsum
Board

WCB

Co.T

- Concrete Tiles

MS

- Mosaic Tiles

St.

- Steel

WCR

Both the base material and the finish shall be given in the case of floors, walls, and flat roofs, thus:
Con./VT

RC/WCR

Both the base material or the type of suspension/framing and the finish shall be given in the case of ceilings, thus:
T/WCB
4.2

Al./WFB

The standard of the building relates to the general standard of finishes rather than to construction and shall be given as one the
three categories:
High, normal, low.

5.0

PRIME COST AND PROVISIONAL SUMS


5.1

All Prime Cost and Provisional Sums shall be listed in the spaces provided or on an attached sheet. The sums as allowed and as
expended (including variation works) shall be shown.

6.0

7.0

PILING/SPECIAL FOUNDATION
6.1

Each type and size of Piling/Special Foundation and its unit quantity and unit cost shall be stated separately.

6.2

The Unit for piling shall be in linear metres and quantity for piling shall be the tendered/driven length. The Unit for special found
be in square metres and the quantity shall be the Floor Area of the building concerned.

BUILDING
7.1

The cost for the building shall be exclusive of all services.

7.2

(a)

The Floor Area shall mean the Gross Floor Area of all enclosed spaces fulfilling the functional requirements of the buildin
measured flat on plan to the internal face of the enclosing walls.

(b)

The Volume and Cost/m3 shall be stated only for buildings for which functional requirements is determined by volume s
Stores, Godowns, Warehouses Lecture Theatres, Auditoriums and the like.

7.3

8.0

9.0

10.0

INTERNAL SERVICES
8.1

The cost for internal services shall be inclusive of Profit and Attendance and all builders work in connection therewith where app

8.2

(a)

Reference for building served shall be the same as the reference in item 3 eg 3(a), 3(b), etc. The total cost of each inte
service, its Cost/m2 of the Floor Area served and its cost in relation to the cost of the buildings served by the respective

(b)

The spaces provided in the column marked with an asterisk shall be inserted with the letter T for items included in the M
Tender, D for items which have been or will be done Departmentally and X for other items not included in the Main Ten

EXTERNAL WORKS
9.1

The total cost of each of the External Work listed and its Appropriate Unit, Quantity and Unit Cost shall be inserted in the Detaile
forms.

9.2

The spaces provided in the column marked with an asterisk shall be inserted with the letter T for items included in the Main
Tender, D for items which have been or will be done Departmentally and X for other items not included in the Main Tender.

9.3

The relevant service authority to whose system the works are connected shall be consulted before costs of Capital/Service charg
inserted in the Detailed Abstract.

VARIATION OF PRICES
10.1

11.0

The amount to be allowed for Variation of Prices shall be calculated in accordance with the contract.

SAVINGS
11.1

12.0

The Drawing Numbers to be stated shall only be those of the architectural floors plans, sections and elevations. Structural and
detailed drawing numbers need not be inserted.

Saving shall be the difference between Provsion for Construction and the Total Cost of Project.

PROFESSIONAL FEES
12.1

The amount of Professional Fees for each Consultant shall be inserted in the "Cost" column.

inserted against them.

- Timber
- Tyrolene
- In-situ Terrazo
- Timber Boarding
- Timber Strip
- Terrazzo Tiles

- Timber Framed Screen


Wall
- Vinyl Tiles
- Wood Cement Rendering
- Waterproof Cement
Rendering

eilings, thus:

d shall be given as one the following

e sums as allowed and as actually

The Unit for special foundation shall

requirements of the building

s determined by volume such as

levations. Structural and other

ction therewith where applicable.

The total cost of each internal


s served by the respective services.

for items included in the Main


t included in the Main Tender.

l be inserted in the Detailed Abstract

s included in the Main


d in the Main Tender.

sts of Capital/Service charges are

You might also like