You are on page 1of 140

SCM BLOCK STORES BLOCK AT KOTHAKOTA

CEMENT
S.NO.

DESCRIPTION

QUANTITY

UNIT

COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

4.00

3104.692

1.70

325.601

0.75

176.235

SCM PLANT
1

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,R
SLAB,

536.54

M3

90.843

M3

125.93

M3

22.86

M3

776.173

M3

103.03

M3

34.76

M3

53.74

M3

M3

191.53

M3

67.75

M3

40.8

M3

126.43

M3

M3

234.98

M3

STAFFQUARTERS
2

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,R
SLAB,
SENIOR OFFICE QUARTERS

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,R
SLAB,
STORES FIRST FLOOR
vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,R
SLAB,

SCM PLANT
1

PCC BED(1:4:8)
STAFFQUARTERS

PCC BED(1:4:8)
SENIOR OFFICE QUARTERS

PCC BED(1:4:8)
STORES FIRST FLOOR

PCC BED(1:4:8)

SCM PLANT
1

CRS MASONARY
STAFFQUARTERS

CRS MASONARY
SENIOR OFFICE QUARTERS

CRS MASONARY
STORES FIRST FLOOR

CRS MASONARY

CEMENT
S.NO.
SCM PLANT
1

DESCRIPTION

QUANTITY

UNIT

BRICK WORK 230MM

560.23

M3

81.21

M3

COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

0.95

788.12

0.1428

43.22

0.0851

406.65

0.0547

194.51

STAFFQUARTERS
2

BRICK WORK 230MM


SENIOR OFFICE QUARTERS

BRICK WORK 230MM


STORES FIRST FLOOR

112.94

M3

BRICK WORK 230MM

75.22

M3

829.6

M3

240.52

M2

62.17

M2

SCM PLANT
1

BRICK WORK 115MM


STAFFQUARTERS

BRICK WORK 115MM


SENIOR OFFICE QUARTERS

BRICK WORK 115MM


STORES FIRST FLOOR

0.00

M2

BRICK WORK 115MM

0.00

M2

302.69

M2

3983.13

M2

795.37

M2

SCM PLANT
1

20MMTHICK PLASTERING
STAFFQUARTERS

20MMTHICK PLASTERING
SENIOR OFFICE QUARTERS

20MMTHICK PLASTERING
STORES FIRST FLOOR

0.00

M2

20MMTHICK PLASTERING

0.00

M2

4778.5

M2

3301.87

M2

199.64

M2

SCM PLANT
1

12MM THICK PLASTERING


STAFFQUARTERS

12MM THICK PLASTERING


SENIOR OFFICE QUARTERS

12MM THICK PLASTERING


STORES FIRST FLOOR

0.00

M2

12MM THICK PLASTERING

54.45

M2

3555.96

M2

CEMENT
S.NO.
SCM PLANT

DESCRIPTION

QUANTITY

DPC

85.24

M2

DPC

0.00

M2

UNIT

COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

0.16

13.64

0.00076

0.54

0.263

512.40

1.30

18.20

STAFFQUARTERS
2

SENIOR OFFICE QUARTERS


3

DPC
STORES FIRST FLOOR

0.00

M2

DPC

0.00

M2

85.24

M2

573.92

RM

141.16

RM

SCM PLANT
1

CEMENT MOTAR BANDS


STAFFQUARTERS

CEMENT MOTAR BANDS


SENIOR OFFICE QUARTERS

CEMENT MOTAR BANDS


STORES FIRST FLOOR

0.00

RM

CEMENT MOTAR BANDS

0.00

RM

715.08

RM

1748.64

M2

199.64

M2

SCM PLANT
1

FLOORING
STAFFQUARTERS

FLOORING
SENIOR OFFICE QUARTERS

FLOORING
STORES FIRST FLOOR

0.00

M2

FLOORING

0.00

M2

1948.28

M2

14.00

NO

0.00

NO

SCM PLANT
1

CHAMBERS
STAFFQUARTERS

CHAMBERS
SENIOR OFFICE QUARTERS

CHAMBERS
STORES FIRST FLOOR

0.00

NO

CHAMBERS

0.00

NO

14.00

NO

CEMENT
S.NO.
SCM PLANT
1

DESCRIPTION

QUANTITY

UNIT

WATER PROOFING

0.00

M2

199.64

M2

COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

0.34

68.28

STAFFQUARTERS
2

WATER PROOFING
SENIOR OFFICE QUARTERS

WATER PROOFING
STORES FIRST FLOOR

0.00

M2

WATER PROOFING

0.00

M2

199.64

M2

5652.09
5653.00
565.30
565300.00
11306.00
SCM PLANT
1

STEEL REINFORCEMENT

44.24

MT

6.85

MT

STAFFQUARTERS
2

STEEL REINFORCEMENT
SENIOR OFFICE QUARTERS

STEEL REINFORCEMENT
STORES FIRST FLOOR

9.78

MT

STEEL REINFORCEMENT

2.18

MT

63.05

MT

392.49

M2

0.00

M2

SCM PLANT
1

ACID TILES
STAFFQUARTERS

ACID TILES
SENIOR OFFICE QUARTERS

ACID TILES
STORES FIRST FLOOR

0.00

M2

ACID TILES

0.00

M2

392.49

M2

290.32

M2

0.00

M2

SCM PLANT
1

GLAZED TILES
STAFFQUARTERS

GLAZED TILES
SENIOR OFFICE QUARTERS

GLAZED TILES
STORES FIRST FLOOR

0.00

M2

GLAZED TILES

0.00

M2

KGS
MT
BAGS

CEMENT
S.NO.

DESCRIPTION

QUANTITY UNIT
290.32
M2

COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

RA BILL NO : 4
S.NO.

DESCRIPTION

QUANTITY

UNIT

4209.79

M3

137.58

M3

39.82

M3

27.63

M3

14.21

M3

32.107

M3

54.99

M3

9.42

M3

5.79

M3

5.931

M3

6.84

M3

1.69

M3

INTEGRATED PACK HOUSE


vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
UG SUMP
vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
DM PLANT
vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
MAIN LT PANNEL
vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
COOLING TOWERS
vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
PUMP ROOM
vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
ETP TANK(130kl)
vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
ETP TANK(20kl)
vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
SEPTIC TANK
vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
SECURITY ROOM
vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
TIMER ROOM
vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
TIMER OFFICE
vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
WEIGH BRIDGE

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

S.NO.

DESCRIPTION
vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams

QUANTITY

UNIT

43.26

M3

10.885

M3

219.01

M3

2.16

M3

4821.113

M3

0.24

M3

0.38

M3

0.32

M3

0.13

M3

5.55

M3

0.03

M3

0.15

M3

6.82

M3

1042.98

M3

28.81

M3

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

4.00

19284.45

3.20

21.81

TOILET BLOCK
vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
OUT SIDE DRAIN
vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
WEIGH BRIDGE MONITOR ROOM
vrcc(1:11/2:3) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
TOTAL

ETP TANK PIPE LINE


vrcc(1:2:4) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
SECURITY ROOM
vrcc(1:2:4) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
TIMER ROOM
vrcc(1:2:4) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
TIMER OFFICE
vrcc(1:2:4) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
WEIGH BRIDGE
vrcc(1:2:4) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
TOILET BLOCK
vrcc(1:2:4) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams

ROAD WORKS
vrcc(1:2:4) for coloumns,roof
beams,footings,pedestals,plinth
beams,lintels,tie beams
TOTAL
INTEGRATED PACK HOUSE
PCC (1:4:8)
UG SUMP
PCC (1:4:8)

S.NO.

DESCRIPTION

QUANTITY

UNIT

10.60

M3

11.03

M3

12.70

M3

2.57

M3

9.80

M3

1.95

M3

3.53

M3

9.34

M3

1.70

M3

7.32

M3

6.70

M3

1.84

M3

2.22

M3

1.17

M3

15.90

M3

18.68

M3

4.98

M3

59.42

M3

1.41

M3

46.27
1300.92

M3
M3

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

1.70

2211.56

DM PLANT
PCC (1:4:8)
MAIN LT PANNEL
PCC (1:4:8)
DG GENERATOR PEDESTRAL
PCC (1:4:8)
TRANSFORMER YARD
PCC (1:4:8)
HT YARD
PCC (1:4:8)
COOLING TOWERS
PCC (1:4:8)
PUMP ROOM
PCC (1:4:8)
ETP TANK(130kl)
PCC (1:4:8)
ETP TANK (20kl)
PCC (1:4:8)
ETP TANK PIPE LINE
PCC (1:4:8)
SEPTIC TANK
PCC (1:4:8)
SECURITY ROOM
PCC (1:4:8)
TIMER ROOM
PCC (1:4:8)
TIMER OFFICE
PCC (1:4:8)
COMPOUND WALL
PCC (1:4:8)
WEIGH BRIDGE
PCC (1:4:8)
TOILET BLOCK
PCC (1:4:8)
OUT SIDE DRAIN
PCC (1:4:8)
WEIGH BRIDGE MONITOR ROOM
PCC (1:4:8)
ROAD WORKS
PCC (1:4:8)
TOTAL
INTEGRATED PACK HOUSE
8

S.NO.

DESCRIPTION
PCC (1:2:4)

QUANTITY

UNIT

430.71

M3

12.42

M3

0.25

M3

9.08

M3

1.08

M3

0.02

M3

0.01

M3

1.09

M3

2.73

M3

0.69

M3

2.13

M3

1.20

M3

6.72
468.13

M3
M3

1024.04

M3

65.60

M3

42.77

M3

36.37

M3

0.58

M3

14.04

M3

36.66

M3

6.30

M3

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

3.20

1498.01

UG SUMP
PCC (1:2:4)
MAIN LT PANNEL
PCC (1:2:4)
DG GENERATOR PEDESTRAL
PCC (1:2:4)
HT YARD
PCC (1:2:4)
ETP TANK(130kl)
PCC (1:2:4)
ETP TANK (20kl)
PCC (1:2:4)
ETP TANK PIPE LINE
PCC (1:2:4)
SEPTIC TANK
PCC (1:2:4)
TOILET BLOCK
PCC (1:2:4)
OUT SIDE DRAIN
PCC (1:2:4)
WEIGH BRIDGE MONITOR ROOM
PCC (1:2:4)
ROAD WORKS
PCC (1:2:4)
TOTAL
INTEGRATED PACK HOUSE
Brick Work 230
UG SUMP
Brick Work 230
DM PLANT
Brick Work 230
MAIN LT PANNEL
Brick Work 230
HT YARD
Brick Work 230
PUMP ROOM
Brick Work 230
SEPTIC TANK
Brick Work 230
SECURITY ROOM
Brick Work 230

S.NO.

DESCRIPTION

QUANTITY

UNIT

9.51

M3

5.53

M3

158.63

M3

2.82

M3

22.76

M3

82.63

M3

4.73

M3

4.23
1517.19

M3
M3

214.04

M2

31.37

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

9.36

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

2.50

M2

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

0.95

1441.33

TIMER ROOM
Brick Work 230
TIMER OFFICE
Brick Work 230
COMPOUND WALL
Brick Work 230
WEIGH BRIDGE
Brick Work 230
TOILET BLOCK
Brick Work 230
OUT SIDE DRAIN
Brick Work 230
WEIGH BRIDGE MONITOR ROOM
Brick Work 230
ROAD WORKS
Brick Work 230
TOTAL
INTEGRATED PACK HOUSE
Brick Work 115
UG SUMP
Brick Work 115
DM PLANT
Brick Work 115
MAIN LT PANNEL
Brick Work 115
DG GENERATOR PEDESTRAL
Brick Work 115
TRANSFORMER YARD
Brick Work 115
HT YARD
Brick Work 115
COOLING TOWERS
Brick Work 115
PUMP ROOM
Brick Work 115
ETP TANK(130kl)
Brick Work 115
ETP TANK (20kl)
Brick Work 115
ETP TANK PIPE LINE
Brick Work 115
SEPTIC TANK
10

S.NO.

DESCRIPTION
Brick Work 115

QUANTITY

UNIT

1.91

M2

9.09

M2

9.09

M2

5.89

M2

0.00

M2

0.00

M2

41.95

M2

0.00

M2

5.89

M2

0.00
331.09

M2
M2

835.66

M3

3.11

M3

0.00

M3

10.31

M3

0.00

M3

55.56

M3

41.79

M3

0.00

M3

5.42

M3

16.53

M3

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

0.1428

47.2795092

SECURITY ROOM
Brick Work 115
TIMER ROOM
Brick Work 115
TIMER OFFICE
Brick Work 115
COMPOUND WALL
Brick Work 115
WEIGH BRIDGE
Brick Work 115
TOILET BLOCK
Brick Work 115
OUT SIDE DRAIN
Brick Work 115
WEIGH BRIDGE MONITOR ROOM
Brick Work 115
ROAD WORKS
Brick Work 115
TOTAL

INTEGRATED PACK HOUSE


crs masonary
UG SUMP
crs masonary
DM PLANT
crs masonary
MAIN LT PANNEL
crs masonary
DG GENERATOR PEDESTRAL
crs masonary
TRANSFORMER YARD
crs masonary
HT YARD
crs masonary
COOLING TOWERS
crs masonary
PUMP ROOM
crs masonary
ETP TANK(130kl)
crs masonary
ETP TANK (20kl)
11

S.NO.

DESCRIPTION
crs masonary

QUANTITY

UNIT

0.00

M3

2.50

M3

1.91

M3

0.00

M3

0.00

M3

0.00

M3

65.41

M3

70.86

M3

27.26

M3

9.99

M3

16.24

M3

26.85

M3

1189.40

M3

11804.35

M2

0.00

M2

467.33

M2

339.81

M2

0.00

M2

0.00

M2

0.00

M2

70.47

M2

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

0.75

892.05

ETP TANK PIPE LINE


crs masonary
SEPTIC TANK
crs masonary
SECURITY ROOM
crs masonary
TIMER ROOM
crs masonary
TIMER OFFICE
crs masonary
COMPOUND WALL
crs masonary
WEIGH BRIDGE
crs masonary
TOILET BLOCK
crs masonary
OUT SIDE DRAIN
crs masonary
WEIGH BRIDGE MONITOR ROOM
crs masonary
ROAD WORKS
crs masonary
TOTAL

INTEGRATED PACK HOUSE


20mmplastering
UG SUMP
20mmplastering
DM PLANT
20mmplastering
MAIN LT PANNEL
20mmplastering
DG GENERATOR PEDESTRAL
20mmplastering
TRANSFORMER YARD
20mmplastering
HT YARD
20mmplastering
COOLING TOWERS
20mmplastering
PUMP ROOM
12

S.NO.

DESCRIPTION
20mmplastering

QUANTITY

UNIT

295.85

M2

0.00

M2

51.64

M2

86.74

M2

152.77

M2

126.93

M2

123.46

M2

93.61

M2

861.43

M2

106.67

M2

242.78

M2

1028.22

M2

168.30

M2

16.02

M2

16036.37

M2

2502.02

M2

902.35

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

0.0851

1364.70

ETP TANK(130kl)
20mmplastering
ETP TANK (20kl)
20mmplastering
ETP TANK PIPE LINE
20mmplastering
SEPTIC TANK
20mmplastering
SECURITY ROOM
20mmplastering
TIMER ROOM
20mmplastering
TIMER OFFICE
20mmplastering
COMPOUND WALL
20mmplastering
WEIGH BRIDGE
20mmplastering
TOILET BLOCK
20mmplastering
OUT SIDE DRAIN
20mmplastering
WEIGH BRIDGE MONITOR ROOM
20mmplastering
ROAD WORKS
20mmplastering
TOTAL
INTEGRATED PACK HOUSE
15mmplastering
UG SUMP
15mmplastering
DM PLANT
15mmplastering
MAIN LT PANNEL
15mmplastering
DG GENERATOR PEDESTRAL
15mmplastering
TRANSFORMER YARD
15mmplastering
HT YARD
15mmplastering

13

S.NO.

DESCRIPTION

QUANTITY

UNIT

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

3404.37

M2

14.04

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

0.0874

297.54

COOLING TOWERS
15mmplastering
PUMP ROOM
15mmplastering
ETP TANK(130kl)
15mmplastering
ETP TANK (20kl)
15mmplastering
ETP TANK PIPE LINE
15mmplastering
SEPTIC TANK
15mmplastering
SECURITY ROOM
15mmplastering
TIMER ROOM
15mmplastering
TIMER OFFICE
15mmplastering
COMPOUND WALL
15mmplastering
WEIGH BRIDGE
15mmplastering
TOILET BLOCK
15mmplastering
OUT SIDE DRAIN
15mmplastering
WEIGH BRIDGE MONITOR ROOM
15mmplastering
ROAD WORKS
15mmplastering
TOTAL
INTEGRATED PACK HOUSE
Flush Pointing
UG SUMP
Flush Pointing
DM PLANT
Flush Pointing
MAIN LT PANNEL
Flush Pointing
DG GENERATOR PEDESTRAL
Flush Pointing

14

S.NO.

DESCRIPTION

QUANTITY

UNIT

57.80

M2

36.20

M2

0.00

M2

0.00

M2

16.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

311.85

M2

0.00

M2

0.00

M2

435.89

M2

1229.95

M2

0.00

M2

0.00

M2

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

0.0117

5.10

TRANSFORMER YARD
Flush Pointing
HT YARD
Flush Pointing
COOLING TOWERS
Flush Pointing
PUMP ROOM
Flush Pointing
ETP TANK(130kl)
Flush Pointing
ETP TANK (20kl)
Flush Pointing
ETP TANK PIPE LINE
Flush Pointing
SEPTIC TANK
Flush Pointing
SECURITY ROOM
Flush Pointing
TIMER ROOM
Flush Pointing
TIMER OFFICE
Flush Pointing
COMPOUND WALL
Flush Pointing
WEIGH BRIDGE
Flush Pointing
TOILET BLOCK
Flush Pointing
OUT SIDE DRAIN
Flush Pointing
WEIGH BRIDGE MONITOR ROOM
Flush Pointing
ROAD WORKS
Flush Pointing
TOTAL
INTEGRATED PACK HOUSE
Ceramic and Vertical Wall Tiles
UG SUMP
Ceramic and Vertical Wall Tiles
DM PLANT
Ceramic and Vertical Wall Tiles
MAIN LT PANNEL
15

S.NO.

DESCRIPTION
Ceramic and Vertical Wall Tiles

QUANTITY

UNIT

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

9.28

M2

9.55

M2

4.23

M2

0.00

M2

0.00

M2

169.62

M2

0.00

M2

0.00

M2

0.00

M2

1422.63

M2

1363.72

M2

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

0.1242

176.69

DG GENERATOR PEDESTRAL
Ceramic and Vertical Wall Tiles
TRANSFORMER YARD
Ceramic and Vertical Wall Tiles
HT YARD
Ceramic and Vertical Wall Tiles
COOLING TOWERS
Ceramic and Vertical Wall Tiles
PUMP ROOM
Ceramic and Vertical Wall Tiles
ETP TANK(130kl)
Ceramic and Vertical Wall Tiles
ETP TANK (20kl)
Ceramic and Vertical Wall Tiles
ETP TANK PIPE LINE
Ceramic and Vertical Wall Tiles
SEPTIC TANK
Ceramic and Vertical Wall Tiles
SECURITY ROOM
Ceramic and Vertical Wall Tiles
TIMER ROOM
Ceramic and Vertical Wall Tiles
TIMER OFFICE
Ceramic and Vertical Wall Tiles
COMPOUND WALL
Ceramic and Vertical Wall Tiles
WEIGH BRIDGE
Ceramic and Vertical Wall Tiles
TOILET BLOCK
Ceramic and Vertical Wall Tiles
OUT SIDE DRAIN
Ceramic and Vertical Wall Tiles
WEIGH BRIDGE MONITOR ROOM
Ceramic and Vertical Wall Tiles
ROAD WORKS
Ceramic and Vertical Wall Tiles
TOTAL

INTEGRATED PACK HOUSE


GRONOLOTHIC FLOORING
UG SUMP
16

S.NO.

DESCRIPTION
GRONOLOTHIC FLOORING

QUANTITY

UNIT

0.00

M2

0.00

M2

31.00

M2

0.00

M2

0.00

M2

DM PLANT
GRONOLOTHIC FLOORING
MAIN LT PANNEL
GRONOLOTHIC FLOORING
DG GENERATOR PEDESTRAL
GRONOLOTHIC FLOORING
TRANSFORMER YARD
GRONOLOTHIC FLOORING

17

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

S.NO.

DESCRIPTION

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

M2

0.231

325.88

299.70

RM

0.00053

0.16

413.44

MT

QUANTITY

UNIT

0.00

M2

0.00

M2

16.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

1410.72

HT YARD
GRONOLOTHIC FLOORING
COOLING TOWERS
GRONOLOTHIC FLOORING
PUMP ROOM
GRONOLOTHIC FLOORING
ETP TANK(130kl)
GRONOLOTHIC FLOORING
ETP TANK (20kl)
GRONOLOTHIC FLOORING
ETP TANK PIPE LINE
GRONOLOTHIC FLOORING
SEPTIC TANK
GRONOLOTHIC FLOORING
SECURITY ROOM
GRONOLOTHIC FLOORING
TIMER ROOM
GRONOLOTHIC FLOORING
TIMER OFFICE
GRONOLOTHIC FLOORING
COMPOUND WALL
GRONOLOTHIC FLOORING
WEIGH BRIDGE
GRONOLOTHIC FLOORING
TOILET BLOCK
GRONOLOTHIC FLOORING
OUT SIDE DRAIN
GRONOLOTHIC FLOORING
WEIGH BRIDGE MONITOR ROOM
GRONOLOTHIC FLOORING
ROAD WORKS
GRONOLOTHIC FLOORING
TOTAL

RAISED CEMENT MOTOR BANDS

299.7

INTEGRATED PACK HOUSE


REINFORCEMENT STEEL

GRAND TOTAL

UG SUMP

18

27566.5514093
27567.00
2756.70
MT
55134
BAGS

S.NO.

DESCRIPTION
REINFORCEMENT STEEL

QUANTITY

UNIT

10.45

MT

2.90

MT

2.69

MT

0.63

MT

0.00

MT

0.00

MT

1.08

MT

3.93

MT

0.00

MT

0.00

MT

6.75

MT

0.16

MT

0.00

MT

2.71

MT

0.14

MT

1.79

MT

3.04

MT

3.04

MT

17.23

MT

0.12

MT

0.00

MT

470.09

MT

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

42000.00

19743864.00

DM PLANT
REINFORCEMENT STEEL
MAIN LT PANNEL
REINFORCEMENT STEEL
DG GENERATOR PEDESTRAL
REINFORCEMENT STEEL
TRANSFORMER YARD
REINFORCEMENT STEEL
HT YARD
REINFORCEMENT STEEL
COOLING TOWERS
REINFORCEMENT STEEL
PUMP ROOM
REINFORCEMENT STEEL
ETP TANK(130kl)
REINFORCEMENT STEEL
ETP TANK (20kl)
REINFORCEMENT STEEL
ETP TANK PIPE LINE
REINFORCEMENT STEEL
SEPTIC TANK
REINFORCEMENT STEEL
SECURITY ROOM
REINFORCEMENT STEEL
TIMER ROOM
REINFORCEMENT STEEL
TIMER OFFICE
REINFORCEMENT STEEL
COMPOUND WALL
REINFORCEMENT STEEL
WEIGH BRIDGE
REINFORCEMENT STEEL
TOILET BLOCK
REINFORCEMENT STEEL
OUT SIDE DRAIN
REINFORCEMENT STEEL
WEIGH BRIDGE MONITOR ROOM
REINFORCEMENT STEEL
ROAD WORKS
REINFORCEMENT STEEL
TOTAL

19

S.NO.

DESCRIPTION

QUANTITY

UNIT

20

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

UNIT
INTEGRATED PACK HOUSE
UG SUMP
DM PLANT
MAIN LT PANNEL
DG GENERATOR PEDESTRAL
TRANSFORMER YARD
HT YARD
COOLING TOWERS
PUMP ROOM
ETP TANK(130kl)
ETP TANK(20kl)
ETP TANK PIPE LINE
SEPTIC TANK
SECURITY ROOM
TIMER ROOM
TIMER OFFICE
COMPOUND WALL
WEIGH BRIDGE
TOILET BLOCK
OUT SIDE DRAIN
WEIGH BRIDGE MONITOR ROOM
ROAD WORKS
TOTAL
CEMENT COEFFICIENTS
QUANTITY OF CEMENT IN QUINTALS

Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M
Cu.M

VRCC
(1 : 1 1/2 : 3)

VRCC
(1 : 2 : 4)

PCC
(1 : 4 : 8)

PCC
(1 : 2 : 4)

BRICK WORK
230
115

4209.79
137.58
39.82
27.63
14.21
32.107
54.99
9.42
5.79
5.931
6.84
1.69
43.26
10.885
219.01
2.16
4821.11

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.24
#REF!
0.38
0.32
0.13
5.55
0.03
#REF!
0.15
#REF!

1042.98
28.81
10.60
11.03
12.70
2.57
9.80
1.95
3.53
9.34
1.70
7.32
6.70
1.84
2.22
1.17
15.90
18.68
4.98
59.42
1.41
46.27
1300.92

430.71
12.42
#REF!
0.25
9.08
#REF!
1.08
#REF!
#REF!
0.02
0.01
1.09
2.73
#REF!
#REF!
#REF!
#REF!
#REF!
0.69
2.13
1.20
6.72
#REF!

1024.04
65.60
42.77
36.37
#REF!
#REF!
0.58
#REF!
14.04
#REF!
#REF!
#REF!
36.66
6.30
9.51
5.53
158.63
2.82
22.76
82.63
4.73
4.23
#REF!

4.00

3.20

1.70

3.20

0.95

19284.45

#REF!

2211.56

#REF!

#REF!

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

#REF!

PRODUCTION, STORES, MAINTENANCE ROOM AT PAMURU


S.NO.

DESCRIPTION

PRODUCTION BLOCK

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,R
SLAB,

QUANTITY

UNIT

379.599

M3

84.01

M3

10.74
474.349

M3
M3

32.78

M3

21.92

M3

4.9
59.6

M3
M3

186.83

M3

88.95

M3

0.00
275.78

M3
M3

22.61

M3

0.00

M3

0.00
22.61

M3
M3

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

4.00

1897.396

1.70

101.32

0.75

206.835

0.95

21.4795

STORES BLOCK
2

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,R
SLAB,
MAINTENANCE ROOM

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,R
SLAB,

II

PRODUCTION BLOCK

PCC BED(1:4:8)
STORES BLOCK

PCC BED(1:4:8)
MAINTENANCE ROOM

PCC BED(1:4:8)

III

PRODUCTION BLOCK

CRS MASONARY
STORES BLOCK

CRS MASONARY
MAINTENANCE ROOM

CRS MASONARY

IV

PRODUCTION BLOCK

BRICK WORK 230MM

BRICK WORK 230MM

STORES BLOCK

MAINTENANCE ROOM
3

BRICK WORK 230MM

PRODUCTION BLOCK

BRICK WORK 115MM

0.00

M2

0.00

M2

0.00
0.00

M2
M2

29.31

M2

0.00

M2

0.00
29.31

M2
M2

0.00

M2

0.00

M2

0.00
0.00

M2
M2

90.54

M2

53.91

M2

0.00
144.45

M2
M2

0.00

RM

0.00

RM

0.00
0.00

RM
RM

STORES BLOCK
2

BRICK WORK 115MM


MAINTENANCE ROOM

BRICK WORK 115MM

VI

PRODUCTION BLOCK

20MMTHICK PLASTERING

0.1428

0.00

0.0851

2.49

0.0547

0.00

0.16

23.11

0.00076

0.00

STORES BLOCK
2

20MMTHICK PLASTERING

20MMTHICK PLASTERING

MAINTENANCE ROOM

VII

PRODUCTION BLOCK

12MM THICK PLASTERING


STORES BLOCK

12MM THICK PLASTERING


MAINTENANCE ROOM

12MM THICK PLASTERING

VIII

PRODUCTION BLOCK

DPC
STORES BLOCK

DPC
MAINTENANCE ROOM

DPC

IX

PRODUCTION BLOCK

CEMENT MOTAR BANDS

CEMENT MOTAR BANDS

CEMENT MOTAR BANDS

STORES BLOCK

MAINTENANCE ROOM

PRODUCTION BLOCK

FLOORING

0.00

M2

0.00

M2

0.00
0.00

M2
M2

0.00

NO

0.00

NO

0.00
0.00

NO
NO

0.00

M2

0.00

M2

0.00
0.00

M2
M2

7.29

M3

4.04

M3

0.00
11.33

M3
M3

51.89

MT

7.00

MT

0.00
58.89

MT
MT

STORES BLOCK
2

FLOORING
MAINTENANCE ROOM

FLOORING

XI

PRODUCTION BLOCK

CHAMBERS

0.263

0.00

1.30

0.00

0.34

0.00

3.20

36.26
2288.89
2289.00
228.90
228900.00
4578.00

STORES BLOCK
2

CHAMBERS
MAINTENANCE ROOM

CHAMBERS

XII

PRODUCTION BLOCK

WATER PROOFING
STORES BLOCK

WATER PROOFING
MAINTENANCE ROOM

WATER PROOFING

XIII

PRODUCTION BLOCK

CC(1:2:4)
STORES BLOCK

CC(1:2:4)
MAINTENANCE ROOM

CC(1:2:4)

XIV

PRODUCTION BLOCK

STEEL REINFORCEMENT
STORES BLOCK

STEEL REINFORCEMENT
MAINTENANCE ROOM

STEEL REINFORCEMENT

XV

PRODUCTION BLOCK

ACID TILES

0.00

M2

0.00

M2

0.00
0.00

M2
M2

0.00

M2

0.00

M2

0.00
0.00

M2
M2

0.18

MT

0.00

MT

0.00
0.18

MT
MT

STORES BLOCK
2

ACID TILES
MAINTENANCE ROOM

ACID TILES

XVI

PRODUCTION BLOCK

GLAZED TILES
STORES BLOCK

GLAZED TILES
MAINTENANCE ROOM

GLAZED TILES

XVII

PRODUCTION BLOCK

STUCTURAL STEEL

STUCTURAL STEEL

STORES BLOCK

MAINTENANCE ROOM
3

STUCTURAL STEEL

Quintals
Quintals
MT
Kgs
BAGS

BOILERSHEAD & PRODUCTION BLOCK &CC ROADS AT BOBILLI


S.NO.

DESCRIPTION

QUANTITY UNIT CEMENT


QUANTITY OF
COEFFICIENTS CEMENT IN
QUINTALS

BOILERSHEAD
1

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSL
AB,

36.35

M3

23.94

M3

23.54
83.83

M3
M3

19.53

M3

23.37

M3

11.20
54.1

M3
M3

39.12

M3

25.12

M3

28.58
92.82

M3
M3

39.3

M3

38.01

M3

10.18
87.49

M3
M3

0.00

M2

20.92

M2

0.00
20.92

M2
M2

PRODUCTION BLOCK
2

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSL
AB,
CC ROADS

II

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSL
AB,

4.00

335.32

1.70

91.97

0.75

69.615

0.95

83.1155

0.1428

2.99

BOILERSHEAD
1

PCC BED(1:4:8)
PRODUCTION BLOCK

PCC BED(1:4:8)

PCC BED(1:4:8)

CC ROADS

III

BOILERSHEAD
1

CRS MASONARY
PRODUCTION BLOCK

CRS MASONARY
CC ROADS

IV

CRS MASONARY

BOILERSHEAD
1

BRICK WORK 230MM


PRODUCTION BLOCK

BRICK WORK 230MM


CC ROADS

BRICK WORK 230MM

BRICK WORK 115MM

BOILERSHEAD

PRODUCTION BLOCK
2

BRICK WORK 115MM

BRICK WORK 115MM

CC ROADS

31

S.NO.

DESCRIPTION

VI

BOILERSHEAD
1

20MMTHICK PLASTERING

20MMTHICK PLASTERING

QUANTITY UNIT CEMENT


QUANTITY OF
COEFFICIENTS CEMENT IN
QUINTALS

0.00

M2

960.14

M2

287.94
1248.08

M2
M2

0.00

M2

0.00

M2

0.00
0.00

M2
M2

20.77

M2

30.14

M2

30.32
81.23

M2
M2

0.00

RM

0.00

RM

0.00
0.00

RM
RM

0.00

M2

219.54

M2

50.87
270.41

M2
M2

PRODUCTION BLOCK

CC ROADS
3

20MMTHICK PLASTERING

12MM THICK PLASTERING

VII

0.0851

106.21

0.0547

0.00

0.16

13.00

0.00076

0.00

0.263

71.12

BOILERSHEAD

PRODUCTION BLOCK
2

12MM THICK PLASTERING

12MM THICK PLASTERING

CC ROADS

VIII

BOILERSHEAD
1

DPC
PRODUCTION BLOCK

DPC
CC ROADS

IX

DPC

BOILERSHEAD
1

CEMENT MOTAR BANDS

CEMENT MOTAR BANDS

PRODUCTION BLOCK

CC ROADS
3

CEMENT MOTAR BANDS

BOILERSHEAD
1

FLOORING
PRODUCTION BLOCK

FLOORING
CC ROADS

FLOORING

32

S.NO.

DESCRIPTION

XI

BOILERSHEAD
1

CHAMBERS

QUANTITY UNIT CEMENT


QUANTITY OF
COEFFICIENTS CEMENT IN
QUINTALS
0.00

NO

0.00

NO

0.00
0.00

NO
NO

0.00

M2

0.00

M2

0.00
0.00

M2
M2

1.66

M3

36.81

M3

125.56
164.03

M3
M3

PRODUCTION BLOCK
2

CHAMBERS

CHAMBERS

WATER PROOFING

CC ROADS

XII

1.30

0.00

0.34

0.00

3.20

524.90
1298.23
1299.00
129.90
129900.00
2598.00

BOILERSHEAD

PRODUCTION BLOCK
2

WATER PROOFING
CC ROADS

XIII

WATER PROOFING

BOILERSHEAD
1

CC(1:2:4)
PRODUCTION BLOCK

CC(1:2:4)
CC ROADS

XIV

CC(1:2:4)

Quintals
Quintals
MT
Kgs
BAGS

BOILERSHEAD
1

STEEL REINFORCEMENT

2.50

MT

1.50

MT

2.50
6.50

MT
MT

0.00

M2

6.30

M2

PRODUCTION BLOCK
2

STEEL REINFORCEMENT

STEEL REINFORCEMENT

CC ROADS

XV

BOILERSHEAD
1

ACID TILES
PRODUCTION BLOCK

ACID TILES

6.3

CC ROADS
3

ACID TILES

0.00
6.30

M2
M2

33

S.NO.

DESCRIPTION

XVI

BOILERSHEAD
1

GLAZED TILES

QUANTITY UNIT CEMENT


QUANTITY OF
COEFFICIENTS CEMENT IN
QUINTALS

0.00

M2

57.20

M2

0.00
57.20

M2
M2

0.00

MT

0.07

MT

0.00
0.07

MT
MT

PRODUCTION BLOCK
2

GLAZED TILES
CC ROADS

GLAZED TILES

STUCTURAL STEEL

XVII

BOILERSHEAD

PRODUCTION BLOCK
2

STUCTURAL STEEL
CC ROADS

STUCTURAL STEEL

34

CIVIL WORKS OF ALTERNATION WORKS FOR DAIRY BLOCK AT UPPAL


S.NO.

DESCRIPTION

ADDITIONALWORKS AT ETP AREA


1

QUANTITY

UNIT

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSLAB,

0.12

M3

7.79

M3

47.11

M3

10.56

M3

3.66

M3

29.66

M3

49.73

M3

0.00
148.63

M3
M3

6.22

M3

9.72

M3

GENERATOR&TRANSFORMER YARD
2

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSLAB,

0.748

DAIRY BLOCK
3

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSLAB,
WORKS OUT SIDE THE DAIRY BLOCK

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSLAB,

WORKS OUT SIDE THE COMPOUND WALL


5

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSLAB,
CONSTRUCTION OF SALES OFFICE

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSLAB,

ALTERNATION WORKS IN PRODUCTION BLOCK


7

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSLAB,

SUPPLY ITEMS
8

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSLAB,

II

ADDITIONALWORKS AT ETP AREA


1

PCC BED(1:4:8)
GENERATOR&TRANSFORMER YARD

PCC BED(1:4:8)

35

4.00

594.528

S.NO.

DESCRIPTION

QUANTITY

UNIT

DAIRY BLOCK
3

0.00

PCC BED(1:4:8)

36

M3

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

S.NO.

DESCRIPTION

QUANTITY

UNIT

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

1.70

205.105

0.75

32.91

WORKS OUT SIDE THE DAIRY BLOCK


4

PCC BED(1:4:8)

18.27

M3

11.14

M3

9.39

M3

65.91

M3

0.00
120.65

M3
M3

10.95

M3

9.50

M3

0.00

M3

0.00

M3

0.00

M3

11.00

M3

12.43

M3

0.00
43.88

M3
M3

9.76

M3

10.40

M3

WORKS OUT SIDE THE COMPOUND WALL


5

PCC BED(1:4:8)
CONSTRUCTION OF SALES OFFICE

PCC BED(1:4:8)
ALTERNATION WORKS IN PRODUCTION BLOCK

PCC BED(1:4:8)

PCC BED(1:4:8)

SUPPLY ITEMS

III

ADDITIONALWORKS AT ETP AREA


1

CRS MASONARY
GENERATOR&TRANSFORMER YARD

CRS MASONARY
DAIRY BLOCK

CRS MASONARY
WORKS OUT SIDE THE DAIRY BLOCK

CRS MASONARY
WORKS OUT SIDE THE COMPOUND WALL

CRS MASONARY
CONSTRUCTION OF SALES OFFICE

CRS MASONARY
ALTERNATION WORKS IN PRODUCTION BLOCK

CRS MASONARY

CRS MASONARY

SUPPLY ITEMS

IV

ADDITIONALWORKS AT ETP AREA


1

BRICK WORK 230MM


GENERATOR&TRANSFORMER YARD

BRICK WORK 230MM

37

S.NO.

DESCRIPTION

QUANTITY

DAIRY BLOCK

38

UNIT

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

S.NO.

DESCRIPTION

QUANTITY

UNIT

BRICK WORK 230MM

119.26

M3

10.66

M3

5.45

M3

14.11

M3

249.87

M3

0.00
419.51

M3
M3

0.00

M2

63.08

M2

448.36

M2

109.70

M2

72.26

M2

0.00

M2

769.02

M2

0.00
1462.42

M2
M2

93.55

M2

228.83

M2

2561.10

M2

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

0.95

398.5345

0.1428

208.834

WORKS OUT SIDE THE DAIRY BLOCK


4

BRICK WORK 230MM


WORKS OUT SIDE THE COMPOUND WALL

BRICK WORK 230MM


CONSTRUCTION OF SALES OFFICE

BRICK WORK 230MM


ALTERNATION WORKS IN PRODUCTION BLOCK

BRICK WORK 230MM


SUPPLY ITEMS

BRICK WORK 230MM

ADDITIONALWORKS AT ETP AREA


1

BRICK WORK 115MM


GENERATOR&TRANSFORMER YARD

BRICK WORK 115MM


DAIRY BLOCK

BRICK WORK 115MM


WORKS OUT SIDE THE DAIRY BLOCK

BRICK WORK 115MM


WORKS OUT SIDE THE COMPOUND WALL

BRICK WORK 115MM


CONSTRUCTION OF SALES OFFICE

BRICK WORK 115MM


ALTERNATION WORKS IN PRODUCTION BLOCK

BRICK WORK 115MM

BRICK WORK 115MM

SUPPLY ITEMS

VI

ADDITIONALWORKS AT ETP AREA


1

20MMTHICK PLASTERING
GENERATOR&TRANSFORMER YARD

20MMTHICK PLASTERING
DAIRY BLOCK

20MMTHICK PLASTERING

39

S.NO.

DESCRIPTION

QUANTITY

40

UNIT

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

S.NO.

DESCRIPTION

QUANTITY

UNIT

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

0.0851

656.237

0.0547

0.000

WORKS OUT SIDE THE DAIRY BLOCK


4

20MMTHICK PLASTERING

312.10

M2

179.22

M2

399.68

M2

3936.88

M2

0.00

M2

7711.36

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

WORKS OUT SIDE THE COMPOUND WALL


5

20MMTHICK PLASTERING
CONSTRUCTION OF SALES OFFICE

20MMTHICK PLASTERING
ALTERNATION WORKS IN PRODUCTION BLOCK

20MMTHICK PLASTERING

20MMTHICK PLASTERING

SUPPLY ITEMS

VII

ADDITIONALWORKS AT ETP AREA


1

12MM THICK PLASTERING


GENERATOR&TRANSFORMER YARD

12MM THICK PLASTERING


DAIRY BLOCK

12MM THICK PLASTERING


WORKS OUT SIDE THE DAIRY BLOCK

12MM THICK PLASTERING


WORKS OUT SIDE THE COMPOUND WALL

12MM THICK PLASTERING


CONSTRUCTION OF SALES OFFICE

12MM THICK PLASTERING


ALTERNATION WORKS IN PRODUCTION BLOCK

12MM THICK PLASTERING

12MM THICK PLASTERING

SUPPLY ITEMS

VIII

ADDITIONALWORKS AT ETP AREA


1

DPC
GENERATOR&TRANSFORMER YARD

DPC
DAIRY BLOCK

DPC
WORKS OUT SIDE THE DAIRY BLOCK

41

S.NO.

DESCRIPTION

QUANTITY

DPC

0.00

42

UNIT

M2

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

S.NO.

DESCRIPTION

QUANTITY

UNIT

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

0.16

9.53

0.00076

0.047

WORKS OUT SIDE THE COMPOUND WALL


5

DPC

0.00

M2

0.00

M2

59.54

M2

0.00

M2

59.54

M2

0.00

RM

0.00

RM

61.74

RM

0.00

RM

0.00

RM

0.00

RM

0.00

RM

0.00

RM

61.74

RM

55.64

M2

80.87

M2

238.34

M2

128.41

M2

CONSTRUCTION OF SALES OFFICE


6

DPC
ALTERNATION WORKS IN PRODUCTION BLOCK

DPC
SUPPLY ITEMS

IX

DPC

ADDITIONALWORKS AT ETP AREA


1

CEMENT MOTAR BANDS


GENERATOR&TRANSFORMER YARD

CEMENT MOTAR BANDS


DAIRY BLOCK

CEMENT MOTAR BANDS


WORKS OUT SIDE THE DAIRY BLOCK

CEMENT MOTAR BANDS


WORKS OUT SIDE THE COMPOUND WALL

CEMENT MOTAR BANDS


CONSTRUCTION OF SALES OFFICE

CEMENT MOTAR BANDS


ALTERNATION WORKS IN PRODUCTION BLOCK

CEMENT MOTAR BANDS

CEMENT MOTAR BANDS

SUPPLY ITEMS

ADDITIONALWORKS AT ETP AREA


1

FLOORING
GENERATOR&TRANSFORMER YARD

FLOORING
DAIRY BLOCK

FLOORING
WORKS OUT SIDE THE DAIRY BLOCK

FLOORING
WORKS OUT SIDE THE COMPOUND WALL

43

S.NO.

DESCRIPTION

QUANTITY

FLOORING

0.00

44

UNIT

M2

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

S.NO.

DESCRIPTION

QUANTITY

UNIT

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

0.263

217.609

1.30

0.000

CONSTRUCTION OF SALES OFFICE


6

FLOORING

0.00

M2

324.15

M2

0.00

M2

827.41

M2

0.00

NO

0.00

NO

0.00

NO

0.00

NO

0.00

NO

0.00

NO

0.00

NO

0.00

NO

0.00

NO

0.00

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

ALTERNATION WORKS IN PRODUCTION BLOCK


7

FLOORING
SUPPLY ITEMS

XI

FLOORING

ADDITIONALWORKS AT ETP AREA


1

CHAMBERS
GENERATOR&TRANSFORMER YARD

CHAMBERS
DAIRY BLOCK

CHAMBERS
WORKS OUT SIDE THE DAIRY BLOCK

CHAMBERS
WORKS OUT SIDE THE COMPOUND WALL

CHAMBERS
CONSTRUCTION OF SALES OFFICE

CHAMBERS
ALTERNATION WORKS IN PRODUCTION BLOCK

CHAMBERS
SUPPLY ITEMS

XII

CHAMBERS

ADDITIONALWORKS AT ETP AREA


1

WATER PROOFING
GENERATOR&TRANSFORMER YARD

WATER PROOFING

WATER PROOFING

DAIRY BLOCK

WORKS OUT SIDE THE DAIRY BLOCK


4

WATER PROOFING
WORKS OUT SIDE THE COMPOUND WALL

WATER PROOFING
CONSTRUCTION OF SALES OFFICE

45

S.NO.

DESCRIPTION

QUANTITY

WATER PROOFING

83.48

46

UNIT

M2

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

S.NO.

DESCRIPTION

QUANTITY

UNIT

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

0.34

28.55

3.20

420.58
2772.46
2773.00
277.30
277300.00
5546.00

ALTERNATION WORKS IN PRODUCTION BLOCK


7

WATER PROOFING

WATER PROOFING

0.00

M2

0.00

M2

83.48

M2

0.00

M3

2.35

M3

6.82

M3

0.00

M3

16.36

M3

2.96

M3

102.94

M3

0.00

M3

131.43

M3

SUPPLY ITEMS

XIII

ADDITIONALWORKS AT ETP AREA


1

CC(1:2:4)
GENERATOR&TRANSFORMER YARD

CC(1:2:4)
DAIRY BLOCK

CC(1:2:4)
WORKS OUT SIDE THE DAIRY BLOCK

CC(1:2:4)
WORKS OUT SIDE THE COMPOUND WALL

CC(1:2:4)
CONSTRUCTION OF SALES OFFICE

CC(1:2:4)
ALTERNATION WORKS IN PRODUCTION BLOCK

CC(1:2:4)
SUPPLY ITEMS

CC(1:2:4)

Say

47

S.NO.

DESCRIPTION

XIV

QUANTITY

UNIT

ADDITIONALWORKS AT ETP AREA


1

STEEL REINFORCEMENT

0.00

MT

0.28

MT

7.94

MT

0.44

MT

0.31

MT

2.88

MT

2.24

MT

0.00

MT

14.09

MT

0.00

M2

0.00

M2

275.50

M2

GENERATOR&TRANSFORMER YARD
2

STEEL REINFORCEMENT

STEEL REINFORCEMENT

DAIRY BLOCK

WORKS OUT SIDE THE DAIRY BLOCK


4

STEEL REINFORCEMENT
WORKS OUT SIDE THE COMPOUND WALL

STEEL REINFORCEMENT
CONSTRUCTION OF SALES OFFICE

STEEL REINFORCEMENT
ALTERNATION WORKS IN PRODUCTION BLOCK

STEEL REINFORCEMENT
SUPPLY ITEMS

XV

STEEL REINFORCEMENT

ADDITIONALWORKS AT ETP AREA


1

ACID TILES
GENERATOR&TRANSFORMER YARD

ACID TILES
DAIRY BLOCK

ACID TILES

48

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

S.NO.

DESCRIPTION

QUANTITY

UNIT

WORKS OUT SIDE THE DAIRY BLOCK


4

ACID TILES

0.00

M2

0.00

M2

0.00

M2

0.00

M2

908.79

M2

1184.29

M2

0.00

M2

0.00

M2

176.64

M2

0.00

M2

0.00

M2

0.00

M2

0.00

M2

1193.81

M2

1370.45

M2

WORKS OUT SIDE THE COMPOUND WALL


5

ACID TILES
CONSTRUCTION OF SALES OFFICE

ACID TILES
ALTERNATION WORKS IN PRODUCTION BLOCK

ACID TILES
SUPPLY ITEMS

XVI

ACID TILES

ADDITIONALWORKS AT ETP AREA


1

GLAZED TILES
GENERATOR&TRANSFORMER YARD

GLAZED TILES
DAIRY BLOCK

GLAZED TILES
WORKS OUT SIDE THE DAIRY BLOCK

GLAZED TILES
WORKS OUT SIDE THE COMPOUND WALL

GLAZED TILES
CONSTRUCTION OF SALES OFFICE

GLAZED TILES
ALTERNATION WORKS IN PRODUCTION BLOCK

GLAZED TILES
SUPPLY ITEMS

GLAZED TILES

49

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

S.NO.

DESCRIPTION

XVII

QUANTITY

UNIT

ADDITIONALWORKS AT ETP AREA


1

STUCTURAL STEEL

0.00

MT

0.00

MT

0.00

MT

0.00

MT

0.00

MT

0.00

MT

0.00

MT

0.43

MT

0.43

MT

GENERATOR&TRANSFORMER YARD
2

STUCTURAL STEEL

STUCTURAL STEEL

DAIRY BLOCK

WORKS OUT SIDE THE DAIRY BLOCK


4

STUCTURAL STEEL
WORKS OUT SIDE THE COMPOUND WALL

STUCTURAL STEEL
CONSTRUCTION OF SALES OFFICE

STUCTURAL STEEL
ALTERNATION WORKS IN PRODUCTION BLOCK

STUCTURAL STEEL
SUPPLY ITEMS

STUCTURAL STEEL

50

Cement
Co-eff

QTY OF
CEMENT IN
QUINTALS

51

52

53

54

55

56

57

58

59

60

61

62

Quintals
Quintals
MT
Kgs
BAGS

63

64

65

0.48

66

BAKERY BLOCK&BUTTER DEEP FREEZE BLOCK AT UPPAL


S.NO.

DESCRIPTION

QUANTITY

UNIT

CEMENT
QUANTITY OF
COEFFICIE CEMENT IN
NTS
QUINTALS

BAKERYBLOCK&BUTTER BLOCK
1

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSL
AB,

1424.16

M3

0.00

M3

0.00
1424.16

M3
M3

194.98

M3

SUUPLY ITEMS
2

II

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSL
AB,

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSL
AB,

4.00

5696.64

1.70

331.466

0.75

162.225

0.95

570.1995

BAKERYBLOCK&BUTTER BLOCK
1

PCC BED(1:4:8)

PCC BED(1:4:8)

0.00

M3

PCC BED(1:4:8)

0.00
194.98

M3
M3

216.3

M3

SUUPLY ITEMS

III

BAKERYBLOCK&BUTTER BLOCK
1

CRS MASONARY
SUUPLY ITEMS

CRS MASONARY

0.00

M3

CRS MASONARY

0.00
216.3

M3
M3

600.21

M3

IV

BAKERYBLOCK&BUTTER BLOCK
1

BRICK WORK 230MM


SUUPLY ITEMS

BRICK WORK 230MM

0.00

M3

BRICK WORK 230MM

0.00
600.21

M3
M3

67

S.NO.

DESCRIPTION

QUANTITY

UNIT

CEMENT
QUANTITY OF
COEFFICIE CEMENT IN
NTS
QUINTALS

BAKERYBLOCK&BUTTER BLOCK
1

BRICK WORK 115MM

3098.33

M2

SUUPLY ITEMS
2

BRICK WORK 115MM

0.00

M2

BRICK WORK 115MM

0.00
3098.33

M2
M2

7285.95

M2

VI

0.1428

442.44

0.0851

620.03

0.0547

493.63

0.16

16.34

0.00076

0.45

BAKERYBLOCK&BUTTER BLOCK
1

20MMTHICK PLASTERING

20MMTHICK PLASTERING

0.00

M2

20MMTHICK PLASTERING

0.00
7285.95

M2
M2

9024.34

M2

SUUPLY ITEMS

VII

BAKERYBLOCK&BUTTER BLOCK
1

12MM THICK PLASTERING


SUUPLY ITEMS

12MM THICK PLASTERING

0.00

M2

12MM THICK PLASTERING

0.00
9024.34

M2
M2

102.13

M2

VIII

BAKERYBLOCK&BUTTER BLOCK
1

DPC
SUUPLY ITEMS

DPC

0.00

M2

DPC

0.00
102.13

M2
M2

591.18

RM

IX

BAKERYBLOCK&BUTTER BLOCK
1

CEMENT MOTAR BANDS


SUUPLY ITEMS

CEMENT MOTAR BANDS

0.00

RM

CEMENT MOTAR BANDS

0.00
591.18

RM
RM

68

S.NO.

DESCRIPTION

QUANTITY

69

UNIT

CEMENT
QUANTITY OF
COEFFICIE CEMENT IN
NTS
QUINTALS

S.NO.

DESCRIPTION

QUANTITY

UNIT

CEMENT
QUANTITY OF
COEFFICIE CEMENT IN
NTS
QUINTALS

BAKERYBLOCK&BUTTER BLOCK
1

FLOORING

1793.80

M2

SUUPLY ITEMS
2

FLOORING

0.00

M2

FLOORING

0.00
1793.80

M2
M2

0.00

NO

XI

0.263

471.77

1.30

0.00

0.34

342.43

3.20

463.14

BAKERYBLOCK&BUTTER BLOCK
1

CHAMBERS
SUUPLY ITEMS

CHAMBERS

0.00

NO

CHAMBERS

0.00
0.00

NO
NO

1001.25

M2

XII

BAKERYBLOCK&BUTTER BLOCK
1

WATER PROOFING
SUUPLY ITEMS

WATER PROOFING

0.00

M2

WATER PROOFING

0.00
1001.25

M2
M2

144.73

M3

XIII

BAKERYBLOCK&BUTTER BLOCK
1

CC(1:2:4)
SUUPLY ITEMS

CC(1:2:4)

0.00

M3

CC(1:2:4)

0.00
144.73

M3
M3

70

S.NO.

DESCRIPTION

XIII

QUANTITY

UNIT

CEMENT
QUANTITY OF
COEFFICIE CEMENT IN
NTS
QUINTALS

BAKERYBLOCK&BUTTER BLOCK
1

TANDUR BLUE STONE

0.00

M2

SUUPLY ITEMS
2

TANDUR BLUE STONE

52.35

M2

TANDUR BLUE STONE

0.00
52.35

M2
M2

0.00

M3

0.00

M3

0.00
0.00

M3
M3

XIII

0.14

7.07

0.00

0.00
9617.83
9618.00
961.80
961800.00
19236.00
24055.00

BAKERYBLOCK&BUTTER BLOCK
1
SUUPLY ITEMS

RMCBAGS =4819 BAGS

TOTAL BAGS

71

Quintals
Quintals
MT
Kgs
BAGS

S.NO.

DESCRIPTION

XIV

QUANTITY

UNIT

BAKERYBLOCK&BUTTER BLOCK
1

STEEL REINFORCEMENT

80.78

MT

SUUPLY ITEMS
2

STEEL REINFORCEMENT

0.00

MT

STEEL REINFORCEMENT

0.00
80.78

MT
MT

0.00

M2

XV

BAKERYBLOCK&BUTTER BLOCK
1

ACID TILES
SUUPLY ITEMS

ACID TILES

0.00

M2

ACID TILES

0.00
0.00

M2
M2

0.00

M2

XVI

BAKERYBLOCK&BUTTER BLOCK
1

GLAZED TILES
SUUPLY ITEMS

GLAZED TILES

0.00

M2

GLAZED TILES

0.00
0.00

M2
M2

0.00

MT

XVII

BAKERYBLOCK&BUTTER BLOCK
1

STUCTURAL STEEL

STUCTURAL STEEL

0.00

MT

STUCTURAL STEEL

0.00
0.00

MT
MT

SUUPLY ITEMS

72

CEMENT
QUANTITY OF
COEFFICIE CEMENT IN
NTS
QUINTALS

SMP GODOWN AT GOKUL


S.NO.

DESCRIPTION

Smp godown
1 vrcc(1:11/2:3) for
FOUNDATION&FOOTI
NG,

QUANTITY

UNIT

CEMENT COFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

4.00

155.36

0.00 M3

1.70

0 M3

0.75

38.84 M3

2 vrcc(1:11/2:3) for
coloumns&pedestals

0.00 M3

3 vrcc(1:11/2:3) for plinth


beams, lintels, rb, slabs

0.00 M3
38.84 M3

II

III

IV

Smp godown
1 PCC BED(1:4:8)

Smp godown
1 CRS MASONARY
Smp godown
1 BRICK WORK 230MM

2 BRICK WORK 230MM

VI

0.00 M3

89.19 M3

0.00 M3
89.19 M3

0.95

84.7305

17.31 M2

0.1428

2.47

Smp godown
1 50MMTHICK
PLASTERING

0.00 M2

0.21275

0.00

Smp godown
2 20MMTHICK
PLASTERING

997.00 M2

0.0851

84.84

Smp godown
1 BRICK WORK 115MM

17.31 M2

2 BRICK WORK 115MM

0.00 M2

3 20MMTHICK
PLASTERING

0.00 M2
997.00 M2

VII

VIII

IX

Smp godown
1 12MM THICK
PLASTERING

2 12MM THICK
PLASTERING

0.00 M2

3 12MM THICK
PLASTERING

0.00 M2
0.00 M2

0.0547

0.00

0.00 M2
0.00 M2

0.16

0.00

0.00 RM

0.00076

0.00

Smp godown
1 tandur blue stone

0.00 M2

0.1374

0.00

Smp godown
2 glazed tiles

0.00 M2

0.1242

0.00

1.30

0.00

0.05

0.00

Smp godown
1 DPC

Smp godown
1 CEMENT MOTAR
BANDS

2 CEMENT MOTAR
BANDS

3 FLOORING

XI

Smp godown
1 CHAMBERS

2 CHAMBERS

XII

0.00 M2

0.00 RM

0.00 RM

0.00 M2
0.00 M2

0.00 NO

0.00 NO
0.00 NO

Smp godown
1 IWC

0.00 M2

2 EWC

0.00 M2
0.00 M2

XIII

Smp godown

1 CC(1:2:4)

Smp godown
water proofing

0.00 M3
0.00 M3

3.20

0.00

432.00 M2
432.00 M2

0.34

146.88

Quintals
Quintals
MT
Kgs
BAGS

474.29
475.00
47.50
47500.00
950.00

RS

204250.00

37000.00

1048950.00

TOTAL

1253200.00

TOTAL COST OF
CEMENT(215.00PER
BAG)
XIV

Smp godown
1 STEEL
REINFORCEMENT

2 STEEL
REINFORCEMENT

28.35 MT

0.00 MT

28.35 MT

DMS&SVH COLLEGE OF ENGINEERING


S.NO.

DESCRIPTION

QUANTITY

NEW BLOCK
1 vrcc(1:11/2:3) for FOUNDATION&FOOTING,

UNIT

CEMENT
COFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

4.00

1768

84.00 M3

1.70

142.8

0 M3

0.75

121.00 M3

NEW BLOCK
2 vrcc(1:11/2:3) for coloumns&pedestals

61.00 M3

3 vrcc(1:11/2:3) for plinth beams, lintels, rb, slabs

260.00 M3
442.00 M3

II

III

IV

NEW BLOCK
1 PCC BED(1:4:8)

84.00 M3

NEW BLOCK
1 CRS MASONARY
NEW BLOCK
1 BRICK WORK 230MM

130.00 M3

NEW BLOCK
2 BRICK WORK 230MM

VI

130.00 M3
260.00 M3

0.95

247

57.00 M2

0.1428

8.14

NEW BLOCK
1 50MMTHICK PLASTERING

96.00 M2

0.21275

20.42

NEW BLOCK
2 20MMTHICK PLASTERING

1050.00 M2

0.0851

89.36

0.0547

180.29

NEW BLOCK
1 BRICK WORK 115MM

28.50 M2

NEW BLOCK
2 BRICK WORK 115MM

28.50 M2

3 20MMTHICK PLASTERING

VII

0.00 M2
1050.00 M2

NEW BLOCK
1 12MM THICK PLASTERING

1800.00 M2

NEW BLOCK
2 12MM THICK PLASTERING

748.00 M2

3 12MM THICK PLASTERING

748.00 M2
3296.00 M2

76

S.NO.

VIII

IX

DESCRIPTION

QUANTITY

NEW BLOCK
1 DPC

NEW BLOCK
1 tandur blue stone
NEW BLOCK
2 glazed tiles

0.00

147.00 RM
294.00 RM

0.00076

0.22

1245.00 M2

0.1374

171.06

0.1242

10.93

1.30

10.40

0.05

0.50

3.20
Quintals
Quintals
MT
Kgs
BAGS

3.65
2652.77
2653.00
265.30
265300.00
5306.00

RS

1246910.00

45000.00

2272500.00

TOTAL

3519410.00

31.00 M2
88.00 M2

NEW BLOCK
1 CHAMBERS

3.00 NO

NEW BLOCK
2 CHAMBERS

XII

0.16

57.00 M2

3 FLOORING

XI

QUANTITY OF
CEMENT IN
QUINTALS

147.00 RM

NEW BLOCK
2 CEMENT MOTAR BANDS

CEMENT
COFFICIENTS

0.00 M2
0.00 M2

NEW BLOCK
1 CEMENT MOTAR BANDS

5.00 NO
8.00 NO

NEW BLOCK
1 IWC

6.00 M2

NEW BLOCK
2 EWC

4.00 M2
10.00 M2

XIII

NEW BLOCK
1 CC(1:2:4)

1.14 M3
1.14 M3

TOTAL COST OF CEMENT(235.00PER BAG)


XIV

UNIT

NEW BLOCK
1 STEEL REINFORCEMENT

28.50 MT

NEW BLOCK
2 STEEL REINFORCEMENT

22.00 MT
50.50 MT

77

RMRD BLOCK &COMPOUND WALL AT BANGLORE


DESCRIPTION

S.N
O.

QUANTITY

UNIT

CEMENT COFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

RMRD BLOCK
1

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSL
AB,

52.63

M3

0.00

M3

0.00
52.63

M3
M3

13.98

M3

COMPOUND WALL
2

II

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSL
AB,

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSL
AB,

4.00

210.52

1.70

129.676

0.75

347.385

0.95

133.456

RMRD BLOCK
1

PCC BED(1:4:8)
COMPOUND WALL

PCC BED(1:4:8)

62.3

M3

PCC BED(1:4:8)

0.00
76.28

M3
M3

CRS MASONARY

44.68

M3

III

RMRD BLOCK

COMPOUND WALL
2

CRS MASONARY

418.5

M3

CRS MASONARY

0.00
463.18

M3
M3

22.6

M3

IV

RMRD BLOCK
1

BRICK WORK 230MM


COMPOUND WALL

BRICK WORK 230MM

117.88

M3

BRICK WORK 230MM

0.00
140.48

M3
M3

BRICK WORK 115MM

0.00

M2

BRICK WORK 115MM

0.00

M2

RMRD BLOCK

COMPOUND WALL

DESCRIPTION

S.N
O.

BRICK WORK 115MM

QUANTITY

0.00
0.00

UNIT

M2
M2

CEMENT COFFICIENTS

0.1428

QUANTITY OF
CEMENT IN
QUINTALS

0.00

S.N
O.

DESCRIPTION

VI

RMRD BLOCK
1

20MMTHICK PLASTERING

QUANTITY

UNIT

0.00

M2

CEMENT COFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

COMPOUND WALL
2

20MMTHICK PLASTERING

0.00

M2

20MMTHICK PLASTERING

0.00
0.00

M2
M2

12MM THICK PLASTERING

0.00

M2

12MM THICK PLASTERING

0.00

M2

12MM THICK PLASTERING

0.00
0.00

M2
M2

0.00

M2

VII

0.0851

0.00

0.0547

0.00

0.16

0.00

0.00076

0.00

0.263

0.00

RMRD BLOCK

COMPOUND WALL

VIII

RMRD BLOCK
1

DPC
COMPOUND WALL

DPC

0.00

M2

DPC

0.00
0.00

M2
M2

0.00

RM

IX

RMRD BLOCK
1

CEMENT MOTAR BANDS

CEMENT MOTAR BANDS

0.00

RM

CEMENT MOTAR BANDS

0.00
0.00

RM
RM

0.00

M2

COMPOUND WALL

RMRD BLOCK
1

FLOORING
COMPOUND WALL

FLOORING

0.00

M2

FLOORING

0.00
0.00

M2
M2

S.N
O.

DESCRIPTION

QUANTITY

UNIT

CEMENT COFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

S.N
O.

DESCRIPTION

XI

RMRD BLOCK
1

CHAMBERS

QUANTITY

UNIT

0.00

NO

CEMENT COFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

COMPOUND WALL
2

CHAMBERS

0.00

NO

CHAMBERS

0.00
0.00

NO
NO

WATER PROOFING

0.00

M2

WATER PROOFING

0.00

M2

WATER PROOFING

0.00
0.00

M2
M2

0.00

M3

XII

1.30

0.00

0.34

0.00

3.20

0.00
821.04
822.00
82.20
82200.00
1644.00

RMRD BLOCK

COMPOUND WALL

XIII

RMRD BLOCK
1

CC(1:2:4)
COMPOUND WALL

CC(1:2:4)

0.00

M3

CC(1:2:4)

0.00
0.00

M3
M3

Quintals
Quintals
MT
Kgs
BAGS

S.N
O.

DESCRIPTION

XIV

RMRD BLOCK
1

STEEL REINFORCEMENT

QUANTITY

UNIT

5.19

MT

COMPOUND WALL
2

STEEL REINFORCEMENT

0.00

MT

STEEL REINFORCEMENT

0.00
5.19

MT
MT

0.00

M2

XV

RMRD BLOCK
1

ACID TILES
COMPOUND WALL

ACID TILES

0.00

M2

ACID TILES

0.00
0.00

M2
M2

0.00

M2

XVI

RMRD BLOCK
1

GLAZED TILES
COMPOUND WALL

GLAZED TILES

0.00

M2

GLAZED TILES

0.00
0.00

M2
M2

0.00

MT

XVII
1

RMRD BLOCK
STUCTURAL STEEL
COMPOUND WALL

STUCTURAL STEEL

0.00

MT

STUCTURAL STEEL

0.00
0.00

MT
MT

CEMENT COFFICIENTS

QUANTITY OF
CEMENT IN
QUINTALS

MISCELLENEOUS WORKS AT GOKUL


S.NO.

DESCRIPTION

I
1

MISCELLENEOUS WORKS
vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEA
MS,RSLAB,

2.18

M3

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEA
MS,RSLAB,

M3

0.00
2.18

M3
M3

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEA
MS,RSLAB,

QUANTITY UNIT

II
1

MISCELLENEOUS WORKS
PCC BED(1:4:8)

7.57

M3

PCC BED(1:4:8)

M3

PCC BED(1:4:8)

0.00
7.57

M3
M3

III
1

MISCELLENEOUS WORKS
CRS MASONARY

M3

CRS MASONARY

M3

CRS MASONARY

0.00
0

M3
M3

IV

MISCELLENEOUS WORKS

CEMENT
COEFFICI
ENTS

QUANTITY OF
CEMENT IN
QUINTALS

4.00

8.72

1.70

12.869

0.75

BRICK WORK 230MM

14.69

M3

BRICK WORK 230MM

0.00

M3

BRICK WORK 230MM

0.00
14.69

M3
M3

V
1

MISCELLENEOUS WORKS
BRICK WORK 115MM

0.00

M2

BRICK WORK 115MM

0.00

M2

BRICK WORK 115MM

0.00
0.00

M2
M2

0.95

13.9555

0.1428

0.00

VI
1

MISCELLENEOUS WORKS
20MMTHICK PLASTERING

251.41

M2

20MMTHICK PLASTERING

0.00

M2

20MMTHICK PLASTERING

0.00
251.41

M2
M2

0.0851

21.39

MISCELLENEOUS WORKS
RCM PARDA DROP

0.00

M2

0.1702

0.00

VII
1

MISCELLENEOUS WORKS
12MM THICK PLASTERING

0.00

M2

12MM THICK PLASTERING

0.00

M2

12MM THICK PLASTERING

0.00
0.00

M2
M2

VIII
1

MISCELLENEOUS WORKS
DPC

3.34

M2

DPC

0.00

M2

DPC

0.00
3.34

M2
M2

IX
1

MISCELLENEOUS WORKS
AR TILES

81.53

M2

AR TILES

0.00

M2

AR TILES

0.00
81.53

M2
M2

X
1

MISCELLENEOUS WORKS
GLAZED TILES

70.61

M2

GLAZED TILES

0.00

M2

GLAZED TILES

0.00
70.61

M2
M2

XI
1

MISCELLENEOUS WORKS
CERAMIC TILES

25.07

M2

CERAMIC TILES

0.00

M2

0.0547

0.00

0.16

0.53

0.0862

7.03

0.1242

8.77

CERAMIC TILES

0.00
25.07

M2
M2

XII
1

MISCELLENEOUS WORKS
WATER PROOFING

0.00

M2

WATER PROOFING

0.00

M2

WATER PROOFING

0.00
0.00

M2
M2

XIII
1

MISCELLENEOUS WORKS
CC(1:2:4)

32.50

M3

CC(1:2:4)

0.00

M3

CC(1:2:4)

0.00
32.50

M3
M3

XIV
1

MISCELLENEOUS WORKS
STEEL REINFORCEMENT

0.25

MT

STEEL REINFORCEMENT

0.00

MT

STEEL REINFORCEMENT

0.00
0.25

MT
MT

0.12

3.11

0.34

0.00

3.20
Quintals
Quintals
MT
Kgs
BAGS

104.00
180.39
181.00
18.10
18100.00
362.00

XV
1

MISCELLENEOUS WORKS
ACID TILES

81.53

M2

ACID TILES

0.00

M2

ACID TILES

0.00
81.53

M2
M2

XVI
1

MISCELLENEOUS WORKS
GLAZED TILES

70.61

M2

GLAZED TILES

0.00

M2

GLAZED TILES

0.00
70.61

M2
M2

MISCELLENEOUS WORKS
CERAMIC TILES

25.07

M2

CERAMIC TILES

0.00

M2

CERAMIC TILES

0.00
25.07

M2
M2

XVII
1

MISCELLENEOUS WORKS
STUCTURAL STEEL

0.00

MT

STUCTURAL STEEL

0.00

MT

STUCTURAL STEEL

0.00
0.00

MT
MT

COLD STORAGE AT GOKUL


S.NO.

DESCRIPTION

I
1

COLD STORE
vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEA
MS,RSLAB,

260.6

M3

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEA
MS,RSLAB,

M3

0.00
260.6

M3
M3

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEA
MS,RSLAB,

QUANTITY UNIT

II
1

COLD STORE
PCC BED(1:4:8)

43.64

M3

PCC BED(1:4:8)

M3

PCC BED(1:4:8)

0.00
43.64

M3
M3

III
1

COLD STORE
CRS MASONARY

57.94

M3

CRS MASONARY

M3

CRS MASONARY

0.00
57.94

M3
M3

CEMENT
COEFFICIE
NTS

QUANTITY OF
CEMENT IN
QUINTALS

4.00

1042.4

1.70

74.188

0.75

43.455

IV
1

COLD STORE
BRICK WORK 230MM

29.21

M3

BRICK WORK 230MM

0.00

M3

BRICK WORK 230MM

0.00
29.21

M3
M3

V
1

COLD STORE
BRICK WORK 115MM

0.00

M2

BRICK WORK 115MM

0.00

M2

BRICK WORK 115MM

0.00
0.00

M2
M2

0.95

27.7495

0.1428

0.00

VI
1

COLD STORE
20MMTHICK PLASTERING

0.00

M2

20MMTHICK PLASTERING

0.00

M2

20MMTHICK PLASTERING

0.00
0

M2
M2

0.0851

0.00

COLD STORE
RCM PARDA DROP

0.00

M2

0.1702

0.00

COLD STORE
12MM THICK PLASTERING

325.77

M2

VII
1

12MM THICK PLASTERING

0.00

M2

12MM THICK PLASTERING

0.00
325.77

M2
M2

VIII
1

COLD STORE
DPC

1.81

M2

DPC

0.00

M2

DPC

0.00
1.81

M2
M2

IX
1

COLD STORE
CEMENT MOTAR BANDS

0.00

RM

CEMENT MOTAR BANDS

0.00

RM

CEMENT MOTAR BANDS

0.00
0.00

RM
RM

X
1

COLD STORE
FLOORING

0.00

M2

FLOORING

0.00

M2

FLOORING

0.00
0.00

M2
M2

0.00

NO

XI
1

COLD STORE
CHAMBERS

0.0547

17.82

0.16

0.29

0.00076

0.00

0.263

0.00

CHAMBERS

0.00

NO

CHAMBERS

0.00
0.00

NO
NO

XII
1

COLD STORE
WATER PROOFING

0.00

M2

WATER PROOFING

0.00

M2

WATER PROOFING

0.00
0.00

M2
M2

XIII
1

COLD STORE
CC(1:2:4)

32.50

M3

CC(1:2:4)

0.00

M3

CC(1:2:4)

0.00
32.50

M3
M3

XIV
1

COLD STORE
STEEL REINFORCEMENT

31.53

MT

STEEL REINFORCEMENT

0.00

MT

1.30

0.00

0.34

0.00

3.20
Quintals
Quintals
MT
Kgs
BAGS

104.00
1309.90
1310.00
131.00
131000.00
2620.00

0.00
31.53

MT
MT

COLD STORE
ACID TILES

0.00

M2

ACID TILES

0.00

M2

ACID TILES

0.00
0.00

M2
M2

XVI
1

COLD STORE
GLAZED TILES

0.00

M2

GLAZED TILES

0.00

M2

GLAZED TILES

0.00
0.00

M2
M2

XVII
1

COLD STORE
STUCTURAL STEEL

0.74

MT

STUCTURAL STEEL

0.00

MT

STUCTURAL STEEL

0.00
0.74

MT
MT

STEEL REINFORCEMENT

XV
1

SMP GODOWN AT GOKUL


S.NO.

DESCRIPTION

QUANTITY

UNIT

I
1

SMPGODOWN
vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,
RBEAMS,RSLAB,

38.84

M3

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,
RBEAMS,RSLAB,

M3

0.00
38.84

M3
M3

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,
RBEAMS,RSLAB,

II
1

SMPGODOWN
PCC BED(1:4:8)

13.55

M3

PCC BED(1:4:8)

M3

PCC BED(1:4:8)

0.00
13.55

M3
M3

III
1

SMPGODOWN
CRS MASONARY

5.69

M3

CRS MASONARY

M3

CRS MASONARY

0.00
5.69

M3
M3

IV

SMPGODOWN

CEMENT
COEFFICI
ENTS

QUANTITY OF
CEMENT IN
QUINTALS

4.00

155.36

1.70

23.035

0.75

4.2675

BRICK WORK 230MM

89.19

M3

BRICK WORK 230MM

0.00

M3

BRICK WORK 230MM

0.00
89.19

M3
M3

V
1

SMPGODOWN
BRICK WORK 115MM

17.31

M2

BRICK WORK 115MM

0.00

M2

BRICK WORK 115MM

0.00
17.31

M2
M2

0.95

84.7305

0.1428

2.47

VI
1

SMPGODOWN
20MMTHICK PLASTERING

997.00

M2

20MMTHICK PLASTERING

0.00

M2

20MMTHICK PLASTERING

0.00
997

M2
M2

0.0851

84.84

SMPGODOWN
RCM PARDA DROP

0.00

M2

0.1702

0.00

VII
1

SMPGODOWN
12MM THICK PLASTERING

0.00

M2

12MM THICK PLASTERING

0.00

M2

12MM THICK PLASTERING

0.00
0.00

M2
M2

VIII
1

SMPGODOWN
DPC

23.98

M2

DPC

0.00

M2

DPC

0.00
23.98

M2
M2

IX
1

SMPGODOWN
CEMENT MOTAR BANDS

0.00

RM

CEMENT MOTAR BANDS

0.00

RM

CEMENT MOTAR BANDS

0.00
0.00

RM
RM

X
1

SMPGODOWN
FLOORING

0.00

M2

FLOORING

0.00

M2

FLOORING

0.00
0.00

M2
M2

XI
1

SMPGODOWN
CHAMBERS

0.00

NO

CHAMBERS

0.00

NO

0.0547

0.00

0.16

3.84

0.00076

0.00

0.263

0.00

CHAMBERS

0.00
0.00

NO
NO

XII
1

SMPGODOWN
WATER PROOFING

0.00

M2

WATER PROOFING

0.00

M2

WATER PROOFING

0.00
0.00

M2
M2

XIII
1

SMPGODOWN
CC(1:2:4)

0.00

M3

CC(1:2:4)

0.00

M3

CC(1:2:4)

0.00
0.00

M3
M3

XIV
1

SMPGODOWN
STEEL REINFORCEMENT

10.00

MT

STEEL REINFORCEMENT

0.00

MT

STEEL REINFORCEMENT

0.00
10.00

MT
MT

1.30

0.00

0.34

0.00

3.20

0.00
358.55
359.00
35.90
35900.00
718.00

XV
1

SMPGODOWN
ACID TILES

0.00

M2

ACID TILES

0.00

M2

ACID TILES

0.00
0.00

M2
M2

XVI
1

SMPGODOWN
GLAZED TILES

0.00

M2

GLAZED TILES

0.00

M2

GLAZED TILES

0.00
0.00

M2
M2

XVII
1

SMPGODOWN
STUCTURAL STEEL

0.00

MT

STUCTURAL STEEL

0.00

MT

STUCTURAL STEEL

0.00
0.00

MT
MT

Quintals
Quintals
MT
Kgs
BAGS

CURD BLOCK AT BAYAVARAM


S.NO
.

DESCRIPTION

QUANTITY

UNIT

I
1

CURD BLOCK
vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBE
AMS,RSLAB,

455.37

M3

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBE
AMS,RSLAB,

M3

0.00
455.37

M3
M3

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBE
AMS,RSLAB,

II
1

CURD BLOCK
PCC BED(1:4:8)

M3

PCC BED(1:4:8)

M3

PCC BED(1:4:8)

105.66
105.66

M3
M3

III
1

CURD BLOCK
CRS MASONARY

269.2

M3

CRS MASONARY

M3

CRS MASONARY

0.00
269.2

M3
M3

IV
1

CURD BLOCK
BRICK WORK 230MM

35.72

M3

BRICK WORK 230MM

0.00

M3

BRICK WORK 230MM

0.00
35.72

M3
M3
104

CEMENT QUANTITY OF
COEFFIC CEMENT IN
IENTS
QUINTALS

4.00

1821.48

1.70

179.622

0.75

201.9

0.95

33.934

S.NO
.

DESCRIPTION

QUANTITY

UNIT

V
1

CURD BLOCK
BRICK WORK 115MM

158.72

M2

BRICK WORK 115MM

0.00

M2

BRICK WORK 115MM

0.00
158.72

M2
M2

CEMENT QUANTITY OF
COEFFIC CEMENT IN
IENTS
QUINTALS

0.1428

22.67

VI
1

CURD BLOCK
20MMTHICK PLASTERING

2350.12

M2

20MMTHICK PLASTERING

0.00

M2

20MMTHICK PLASTERING

0.00
2350.12

M2
M2

0.0851

200.00

CURD BLOCK
RCM PARDA DROP

38.20

M2

0.1702

6.50

VII
1

CURD BLOCK
12MM THICK PLASTERING

1339.24

M2

12MM THICK PLASTERING

0.00

M2

12MM THICK PLASTERING

0.00
1339.24

M2
M2

0.0547

73.26

VIII
1

CURD BLOCK
DPC

0.00

M2

DPC

19.73

M2
105

S.NO
.

DESCRIPTION

QUANTITY

UNIT

DPC

0.00
19.73

M2
M2

106

CEMENT QUANTITY OF
COEFFIC CEMENT IN
IENTS
QUINTALS

0.16

3.16

S.NO
.

DESCRIPTION

QUANTITY

UNIT

IX
1

CURD BLOCK
CEMENT MOTAR BANDS

0.00

RM

CEMENT MOTAR BANDS

0.00

RM

CEMENT MOTAR BANDS

0.00
0.00

RM
RM

X
1

CURD BLOCK
FLOORING

0.00

M2

FLOORING

0.00

M2

FLOORING

0.00
0.00

M2
M2

XI
1

CURD BLOCK
CHAMBERS

10.00

NO

CHAMBERS

0.00

NO

CHAMBERS

0.00
10.00

NO
NO

XII
1

CURD BLOCK
WATER PROOFING

0.00

M2

WATER PROOFING

0.00

M2

WATER PROOFING

0.00
0.00

M2
M2

107

CEMENT QUANTITY OF
COEFFIC CEMENT IN
IENTS
QUINTALS

0.00076

0.00

0.263

0.00

1.30

13.00

0.34

0.00

S.NO
.

DESCRIPTION

QUANTITY

UNIT

XIII
1

CURD BLOCK
CC(1:2:4)

0.00

M3

CC(1:2:4)

19.64

M3

CC(1:2:4)

0.00
19.64

M3
M3

XIV
1

CURD BLOCK
STEEL REINFORCEMENT

37.07

MT

STEEL REINFORCEMENT

0.00

MT

STEEL REINFORCEMENT

0.00
37.07

MT
MT

108

CEMENT QUANTITY OF
COEFFIC CEMENT IN
IENTS
QUINTALS

3.20

62.85
2618.36
2619.00
261.90
261900.00
5238.00

Quintals
Quintals
MT
Kgs
BAGS

S.NO
.

DESCRIPTION

QUANTITY

UNIT

XV
1

CURD BLOCK
ACID TILES

0.00

M2

ACID TILES

0.00

M2

ACID TILES

0.00
0.00

M2
M2

XVI
1

CURD BLOCK
GLAZED TILES

0.00

M2

GLAZED TILES

0.00

M2

GLAZED TILES

0.00
0.00

M2
M2

XVII
1

CURD BLOCK
STUCTURAL STEEL

0.00

MT

STUCTURAL STEEL

0.00

MT

STUCTURAL STEEL

0.00
0.00

MT
MT

109

CEMENT QUANTITY OF
COEFFIC CEMENT IN
IENTS
QUINTALS

MISCELLANEOUS CIVIL WORKS AT BAYAVARAM


QUANTITY UNIT CEMENT
COEFFIC
IENTS

S.NO.

DESCRIPTION

I
1

CIVILWORKS
vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEA
MS,RSLAB,

67.94

M3

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEA
MS,RSLAB,

M3

0.00
67.94

M3
M3

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEA
MS,RSLAB,

II
1

CIVILWORKS
PCC BED(1:4:8)

21.51

M3

PCC BED(1:4:8)

M3

PCC BED(1:4:8)

0.00
21.51

M3
M3

III
1

CIVILWORKS
CRS MASONARY

29.48

M3

CRS MASONARY

M3

CRS MASONARY

0.00
29.48

M3
M3

IV
1

CIVILWORKS
BRICK WORK 230MM

51.42

M3

BRICK WORK 230MM

0.00

M3

BRICK WORK 230MM

0.00
51.42

M3
M3

110

QUANTITY OF
CEMENT IN
QUINTALS

4.00

271.76

1.70

36.567

0.75

22.11

0.95

48.849

V
1

CIVILWORKS
BRICK WORK 115MM

48.30

M2

BRICK WORK 115MM

0.00

M2

BRICK WORK 115MM

0.00
48.30

M2
M2

0.1428

6.90

VI
1

CIVILWORKS
20MMTHICK PLASTERING

873.05

M2

20MMTHICK PLASTERING

0.00

M2

20MMTHICK PLASTERING

0.00
873.05

M2
M2

0.0851

74.30

CIVILWORKS
RCM PARDA DROP

16.03

M2

0.1702

2.73

VII
1

CIVILWORKS
12MM THICK PLASTERING

192.71

M2

12MM THICK PLASTERING

0.00

M2

12MM THICK PLASTERING

0.00
192.71

M2
M2

0.0547

10.54

0.16

0.84

VIII
1

CIVILWORKS
DPC

5.23

M2

DPC

0.00

M2

DPC

0.00
5.23

M2
M2

111

IX
1

CIVILWORKS
CEMENT MOTAR BANDS

0.00

RM

CEMENT MOTAR BANDS

0.00

RM

CEMENT MOTAR BANDS

0.00
0.00

RM
RM

X
1

CIVILWORKS
FLOORING

0.00

M2

FLOORING

0.00

M2

FLOORING

0.00
0.00

M2
M2

XI
1

CIVILWORKS
CHAMBERS

0.00

NO

CHAMBERS

0.00

NO

CHAMBERS

0.00
0.00

NO
NO

XII
1

CIVILWORKS
WATER PROOFING

0.00

M2

WATER PROOFING

0.00

M2

WATER PROOFING

0.00
0.00

M2
M2

XIII
1

CIVILWORKS
CC(1:2:4)

21.22

M3

CC(1:2:4)

0.00

M3

112

0.00076

0.00

0.263

0.00

1.30

0.00

0.34

0.00

CC(1:2:4)

0.00
21.22

M3
M3

XIV
1

CIVILWORKS
STEEL REINFORCEMENT

2.82

MT

STEEL REINFORCEMENT

0.00

MT

STEEL REINFORCEMENT

0.00
2.82

MT
MT

XV
1

CIVILWORKS
ACID TILES

0.00

M2

ACID TILES

0.00

M2

ACID TILES

0.00
0.00

M2
M2

XVI
1

CIVILWORKS
GLAZED TILES

0.00

M2

GLAZED TILES

0.00

M2

GLAZED TILES

0.00
0.00

M2
M2

XVII
1

CIVILWORKS
STUCTURAL STEEL

0.00

MT

STUCTURAL STEEL

0.00

MT

STUCTURAL STEEL

0.00
0.00

MT
MT

113

3.20

67.90
542.49
543.00
54.30
54300.00
1086.00

Quintals
Quintals
MT
Kgs
BAGS

STORES BLOCK AT BAYYAVARAM

S.NO.

DESCRIPTION

QUANTITY

UNIT

I
1

STORES BLOCK
vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS
,RBEAMS,RSLAB,

334.53

M3

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS
,RBEAMS,RSLAB,

M3

0.00
334.53

M3
M3

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS
,RBEAMS,RSLAB,

II
1

STORES BLOCK
PCC BED(1:4:8)

64.69

M3

PCC BED(1:4:8)

M3

PCC BED(1:4:8)

0.00
64.69

M3
M3

III
1

STORES BLOCK
CRS MASONARY

55.89

M3

CRS MASONARY

M3

CRS MASONARY

0.00
55.89

M3
M3

191.19

M3

IV
1

STORES BLOCK
BRICK WORK 230MM

114

CEMEN QUANTITY
T
OF CEMENT
COEFFI IN QUINTALS
CIENTS

4.00

1338.12

1.70

109.973

0.75

41.9175

S.NO.

DESCRIPTION

QUANTITY

UNIT

BRICK WORK 230MM

0.00

M3

BRICK WORK 230MM

0.00
191.19

M3
M3

V
1

STORES BLOCK
BRICK WORK 115MM

261.47

M2

BRICK WORK 115MM

0.00

M2

BRICK WORK 115MM

0.00
261.47

M2
M2

CEMEN QUANTITY
T
OF CEMENT
COEFFI IN QUINTALS
CIENTS

0.95

181.6305

0.1428

37.34

VI
1

STORES BLOCK
20MMTHICK PLASTERING

2945.96

M2

20MMTHICK PLASTERING

0.00

M2

20MMTHICK PLASTERING

0.00
2945.96

M2
M2

0.0851

250.70

453.02
453.02

M2
M2

0.1702

77.10

RCMPARDA DROP

VII
1

STORES BLOCK
12MM THICK PLASTERING

1187.54

M2

12MM THICK PLASTERING

0.00

M2

115

S.NO.

DESCRIPTION

QUANTITY

UNIT

12MM THICK PLASTERING

0.00
1187.54

M2
M2

VIII
1

STORES BLOCK
DPC

130.44

M2

DPC

0.00

M2

DPC

0.00
130.44

M2
M2

IX
1

STORES BLOCK
CEMENT MOTAR BANDS

1049.16

RM

CEMENT MOTAR BANDS

0.00

RM

CEMENT MOTAR BANDS

0.00
1049.16

RM
RM

X
1

STORES BLOCK
FLOORING

357.19

M2

FLOORING

0.00

M2

FLOORING

0.00
357.19

M2
M2

XI
1

STORES BLOCK
CHAMBERS

0.00

NO

CHAMBERS

0.00

NO

116

CEMEN QUANTITY
T
OF CEMENT
COEFFI IN QUINTALS
CIENTS

0.0547

64.96

0.16

20.87

0.00076

0.80

0.263

93.94

S.NO.

DESCRIPTION

QUANTITY

UNIT

CHAMBERS

0.00
0.00

NO
NO

XII
1

STORES BLOCK
WATER PROOFING

383.33

M2

WATER PROOFING

0.00

M2

WATER PROOFING

0.00
383.33

M2
M2

XIII
1

STORES BLOCK
CC(1:2:4)

0.00

M3

CC(1:2:4)

8.86

M3

CC(1:2:4)

0.00
8.86

M3
M3

XIV
1

STORES BLOCK
STEEL REINFORCEMENT

41.91

MT

STEEL REINFORCEMENT

0.00

MT

STEEL REINFORCEMENT

0.00
41.91

MT
MT

117

CEMEN QUANTITY
T
OF CEMENT
COEFFI IN QUINTALS
CIENTS

1.30

0.00

0.34

131.10

3.20

28.35
2376.80
2377.00
237.70
237700.00
4754.00

Quintals
Quintals
MT
Kgs
BAGS

S.NO.

DESCRIPTION

QUANTITY

UNIT

XV
1

STORES BLOCK
ACID TILES

0.00

M2

ACID TILES

0.00

M2

ACID TILES

0.00
0.00

M2
M2

XVI
1

STORES BLOCK
GLAZED TILES

0.00

M2

GLAZED TILES

0.00

M2

GLAZED TILES

0.00
0.00

M2
M2

XVII
1

STORES BLOCK
STUCTURAL STEEL

0.00

MT

STUCTURAL STEEL

0.00

MT

STUCTURAL STEEL

0.00
0.00

MT
MT

118

CEMEN QUANTITY
T
OF CEMENT
COEFFI IN QUINTALS
CIENTS

BOILERSHEAD & PRODUCTION BLOCK &CC ROADS AT BOBILLI


S.NO.

DESCRIPTION

QUANTITY

UNIT

CEMENT
COEFFICIENTS

BOILERSHEAD
1

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSL
AB,

M3

M3

0.00
0

M3
M3

2.83

M3

M3

0.00
2.83

M3
M3

M3

M3

0.00
0

M3
M3

M3

6.56

M3

PRODUCTION BLOCK
2

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSL
AB,
CC ROADS

II

vrcc(1:11/2:3) for
coloumns,FOOTINGS,PBEAMS,RBEAMS,RSL
AB,

4.00

BOILERSHEAD
1

PCC BED(1:4:8)
PRODUCTION BLOCK

PCC BED(1:4:8)
CC ROADS

III

PCC BED(1:4:8)

1.70

BOILERSHEAD
1

CRS MASONARY
PRODUCTION BLOCK

CRS MASONARY
CC ROADS

IV

CRS MASONARY

BOILERSHEAD
1

BRICK WORK 230MM


PRODUCTION BLOCK

BRICK WORK 230MM


CC ROADS

0.75

BRICK WORK 230MM

BRICK WORK 115MM

0.00
6.56

M3
M3

0.00

M2

0.00

M2

0.00
0.00

M2
M2

56.00

M2

0.00

M2

0.00
56

M2
M2

0.00

M2

0.00

M2

0.00
0.00

M2
M2

0.00

M2

0.00

M2

0.00
0.00

M2
M2

0.95

BOILERSHEAD

PRODUCTION BLOCK
2

BRICK WORK 115MM

BRICK WORK 115MM

CC ROADS

VI

0.1428

BOILERSHEAD
1

20MMTHICK PLASTERING
PRODUCTION BLOCK

20MMTHICK PLASTERING
CC ROADS

VII

20MMTHICK PLASTERING

0.0851

BOILERSHEAD
1

12MM THICK PLASTERING

12MM THICK PLASTERING

PRODUCTION BLOCK

CC ROADS
3

VIII

12MM THICK PLASTERING

0.0547

BOILERSHEAD
1

DPC
PRODUCTION BLOCK

DPC
CC ROADS

IX

DPC

BOILERSHEAD

0.16

CEMENT MOTAR BANDS

0.00

RM

0.00

RM

0.00
0.00

RM
RM

0.00

M2

0.00

M2

0.00
0.00

M2
M2

0.00

NO

0.00

NO

0.00
0.00

NO
NO

0.00

M2

0.00

M2

0.00
0.00

M2
M2

7.33

M3

0.00

M3

PRODUCTION BLOCK
2

CEMENT MOTAR BANDS

CEMENT MOTAR BANDS

CC ROADS

0.00076

BOILERSHEAD
1

FLOORING
PRODUCTION BLOCK

FLOORING
CC ROADS

XI

FLOORING

0.263

BOILERSHEAD
1

CHAMBERS
PRODUCTION BLOCK

CHAMBERS
CC ROADS

XII

CHAMBERS

1.30

BOILERSHEAD
1

WATER PROOFING
PRODUCTION BLOCK

WATER PROOFING
CC ROADS

XIII

WATER PROOFING

BOILERSHEAD
1

CC(1:2:4)
PRODUCTION BLOCK

CC(1:2:4)
CC ROADS

0.34

XIV

CC(1:2:4)

0.00
7.33

M3
M3

2.50

MT

1.50

MT

2.50
6.50

MT
MT

0.00

M2

6.30

M2

0.00
6.30

M2
M2

0.00

M2

57.20

M2

0.00
57.20

M2
M2

0.00

MT

0.07

MT

0.00
0.07

MT
MT

BOILERSHEAD
1

STEEL REINFORCEMENT
PRODUCTION BLOCK

STEEL REINFORCEMENT
CC ROADS

XV

STEEL REINFORCEMENT

BOILERSHEAD
1

ACID TILES
PRODUCTION BLOCK

ACID TILES
CC ROADS

XVI

ACID TILES

BOILERSHEAD
1

GLAZED TILES
PRODUCTION BLOCK

GLAZED TILES
CC ROADS

XVII

GLAZED TILES

BOILERSHEAD
1

STUCTURAL STEEL
PRODUCTION BLOCK

STUCTURAL STEEL
CC ROADS

STUCTURAL STEEL

3.20

LLI
QUANTITY OF
CEMENT IN
QUINTALS

0.72

0.444
0.399

0.81
0

0.4725
2.5905
3.063

4.811
6.549
1.506
3.2745
4.7805

6.232

0.00

4.77

0.0547

0.00

0.00

0.00

0.00

0.00

0.00

23.46
39.26
40.00
4.00
4000.00
80.00

Quintals
Quintals
MT
Kgs
BAGS

0.09
870
0.09
66

6.3

46

1429
0.04
0.04
1616.5

0.04
57.2

0.07056

70.56
40.68

0.04068

0.04
7258.25

132.14
6607

SNO

DISCREPTION

1 REINFORCEMENT STEEL
2 CEMENT BAGS

QUANTITY

ABSTRACT
RATE
AMOUNT

470.09

44000.00

###

68348.00

235.00

###

TOTAL

###

(RUPEESTHREECRORES SIXTYSEVEN LAKS FOURTY FIVE THOUSAND SEVEN HUNDRED FOURTY ONLY)

RED FOURTY ONLY)

1 unit of tipper load is 2.832 cum


S.NO.

DESCRIPTION

QUANTITY

UNIT

CUM

2.1

CUM

Concrete constant is 15.2 for 10 Cum

I
1

CONCRETE WORK
P.C.C. (1:5:10)

P.C.C. (1:4:8)

P.C.C. (1:3:6) (M10)

CUM

P.C.C. (1:2:4) (M15)

CUM

P.C.C. (1:1.5:3) (M20)

29.7

CUM

P.C.C. (1:1:2) (M25)

CUM

II

CEMENT MORTAR FOR PLASTERING WORK

6mm plastering constant is 1.00 for


100.00
6mm thick C.M.
1:3 sqm

SQM

12mm plastering constant is 2.00 for


100.00
12mm thick C.M.
1:6sqm

SQM

12mm thick C.M. 1:5

SQM

12mm thick C.M. 1:4

99

SQM

12mm thick C.M. 1:3

SQM

15mm plastering constant is 2.50 for


100.00
15mm thick C.M.
1:6sqm

SQM

15mm thick C.M. 1:5

SQM

15mm thick C.M. 1:4

344

SQM

15mm thick C.M. 1:3

SQM

10

20mm plastering constant is 3.00 for


100.00
20mm thick C.M.
1:6sqm

65

SQM

11

20mm thick C.M. 1:4

48

SQM

12

18mm thick (12mm1:5+6mm1:3)

317

SQM

13

20mm thick (15mm1:5+6mm1:3)

140

SQM

III

BRICK AND STONEMASONRY WORK

6.9

CUM

RR masonary constant is 4.00 for


10.00C.M.
CUM
R.R. MASONRY
1:6

C.R.S. MASONRY C.M. 1:6

CUM

BRICK masonary constant is 3.00


for 10.00C.M.
CUM1:6
BRICK MASONRY

30

CUM

BRICK MASONRY C.M. 1:4

CUM

115 BRICKMASONRY C.M. 1:3

104

SQM

CEMENT
COEFFICIENTS

QUANTITY OF
CEMENT IN
(CUM)

QUANTITY
OF CEMENT
IN (KGS)

QUANTITY OF
CEMENT IN
(BAGS)

QUANTITY
OF SAND IN
(CUM)

0.095

0.095

136.80

2.74

0.48

0.117

0.117

353.58

7.07

0.98

0.152

0.152

0.00

0.00

0.00

0.217

0.22

0.00

0.00

0.00

0.276

0.276

11819.52

236.39

12.31

0.380

0.38

0.00

0.00

0.00

0.003

0.003

0.00

0.00

0.00

0.0030

0.0030

0.00

0.00

0.00

0.0040

0.0040

0.00

0.00

0.00

0.0040

0.0040

570.24

11.40

1.58

0.0050

0.0050

0.00

0.00

0.00

0.0040

0.0040

0.00

0.00

0.00

0.0050

0.0050

0.00

0.00

0.00

0.0050

0.0050

2476.80

49.54

6.88

0.0070

0.0070

0.00

0.00

0.00

0.0050

0.0050

468.00

9.36

1.95

0.0060

0.0060

414.72

8.29

1.15

0.0070

0.0070

3195.36

63.91

9.19

0.0080

0.0080

1612.80

32.26

4.76

0.0580

0.0580

576.29

11.53

2.40

0.0580

0.0580

0.00

0.00

0.00

0.0430

0.0430

1857.60

37.15

7.74

0.0600

0.0600

0.00

0.00

0.00

0.0090

0.0090

1347.84

26.96

2.81

Description
Cement
Steel
Bricks
sand
Metal (20mm)
Metal (40mm)
Floorinhg
Wood
Sundries
Total
Labour

Requirement
for Sq.M
4.22
17.5
400
19
12

Rate
210
34
2.75
20
25

0.023

Per bag
Per Kg
Each
Per Cft
Per Cft

40000 Per Cum

30%

Add for services

Cost for 1 Sft (Load bearing structure)

Rs

Plinth area rate


Total built up area
Total cost of project

Per Sft.
Sft
Rupees

Cement
Steel
Sand
Aggregate
Bricks
Wood(Door frames & shutter)
Windows and glazing
Flooring/ Dado/Kitchen
Plumbing/Sanitary/Drainage
Electrical material
Painting material
Other building material
Miscellaneous

900
1000
900000

712.00

18.60%
13.50%
10.70%
4.50%
9.30%
8.20%
4.10%
10%
7.90%
4.50%
3.50%
3.40%
1.80%

167400
121500
96300
40500
83700
73800
36900
90000
71100
40500
31500
30600
16200

Amount
886.20
595.00
1100.00
380.00
300.00

920.00
263.00
4444.20
1333.26

5777.46
1875.00
7652.46
711.20