1.0 SCOPE
This document covers the Welding Repair Procedure for RT repairs in piping,
casing and duct installations in AL-AWEER GAS TURBINE POWER STATION H
PHASE III. This shall be used together with related drawings.
2.0 REFERENCE DOCUMENTS
2.1
2.2
2.3
2.4
ASME SEC IX
2.5
ASME B31.1
3.2
3.3
The mapped defects will be grinded till the termination of the defect.
4.2
DPT will be carried out in the grinded portion for ensuring the complete
removal of the defect.
4.3
5.0 WELDING
5.1
Repair welding will be carried out by the qualified welders as per the
approved WPS/PQR.
5.2
After completion of the welding, final DPT will be carried out for any
surface exposed defects, and presence if any will be grinded till its
termination. Surface preparation will be carried out again in the ground
spot as briefed above.
5.3
6.0 REPAIR RT
Final RT of the repair welding will be carried out. RT film interpretation and
subsequent repairs if any shall be carried out by the same procedure briefed in
this document.