You are on page 1of 116

Other Services

Sl.
No

Work Order
no:

Dept.

Equip No.

CM-42367

SAFETY

DV-1

14

CM-61427

INSTRUM
ENT

TV-20050

116-Valve is passing badly, seat and plug to be replaced during


any plant outage.

Control valve

15

CM-63739

WORKSHO
P

UV-25101

061,

ON/OFF VALVE

17

CM-64099

WORKSHO
P

UNTAG-MTBWKS

19

CM-64285

MECHANI
CAL

X-2201

22

CM-68525

CSD

23

CM-68571

ELECTRIC
AL

UPS-141

24

CM-68572

ELECTRIC
AL

25

CM-68577

26

CM-68583

Description

050- DV-1B deluge system for C-2201 to be tested during TA


2010

PSA UNIT isolation valves provision as per PMR-200-263

Asset
Description

Pack
No

Reason

Note

Scaf

Cold Box
Shutdown
work

DELUGE VALVE
(A,B,C,D)

2(B)

Job
Completed

Cold Box
Shutdown
work

I/V to be
provided for
PSA units

Cold Box
Shutdown
work

Operation not
Cold Box
released
Shutdown
during TA
work
2010

Yes

6(b)

Cold Box
Shutdown
work

Yes

UNTAGGED
CONTROL
SYSTEMS ITEM

6(b)

Cold Box
Shutdown
work

Cell # 88 shall be replaced(Found during discharge test during TA


2010)

UNINTERRUPTAB
LE POWER
SUPPLY

6(b)

Cold Box
Shutdown
work

UPS-142

Cell # 97,151,164 shall be replaced(Found during discharge test


during TA 2010)

UNINTERRUPTAB
LE POWER
SUPPLY

6(b)

Cold Box
Shutdown
work

ELECTRIC
AL

BC-151-1

Cell # 29 shall be replaced(Found faulty during discharge test


during TA 2010)

BATTERY
CHARGER

6(b)

Cold Box
Shutdown
work

WORKSHO
P

UNTAG-MTBEWKS

UNTAGGED
WORKSHOP ITEM

1(B)

Cold Box
Shutdown
work

050- Provide sight glass for Cold box product. (PMR approved)

UNTAGGED
WORKSHOP ITEM

26(A)

56,X2201 upgade to be done as per PMR -200-266

OVERHEAD
CRANE FOR C2201

UNTAG-MTB- 061, PMR-200-245


CS
outlet drain lines

Liquid trap at chloride treater bypass and

69- ME-2101-CCV-21001 Bypass I/V to be changed (heavy


corosion).

Cran

Yes

Insu

Hydr
Jett

Sl.
No

Work Order
no:

Dept.

Equip No.

29

CM-68857

WORKSHO
P

E-2316

30

31

Description

061, Strainer housing guide titanium welding repair to be done

TA-2010 Make pockets 4"sq approx, in the external insualtion of


UNTAGvarious equipment and piping of MTBEE plant for thickness
CM-69051
MTBE-MECH checks. Pockets to be closed immediately after thickness check is
completed or before the startup of the plant..
During TA-2010, notice while putting into service, The control
ELECTRIC
cable is not sliding freely and put tension on the end cover
CM-69095
SG-011-E100
AL
installed at breaker which lead to crack, As well as hydralic shock
absorber for shutter become weak.
MECHANI
CAL

Asset
Description

Pack
No

SHELL & TUBE HE

1(B)

UNTAGGED
MECHANICAL
ITEM

Reason

check for job


complection
can be done,
equipment
list / location
to be
provided by
Inspection for
manpower
planning.

Note

6(b)

SHELL & TUBE HE

1(B)

Cold Box
Shutdown
work

COMPRESSOR
MOTOR

6(b)

Cold Box
Shutdown
work

WORKSHO
P

E-2313-C

34

CM-70143

ELECTRIC
AL

X-2701-C-M

35

CM-70242

WORKSHO
P

X-2701

290- X-2701 E3 LG BTM DRAIN VALVE ( SPECIAL TYPE), X-2701


REFRIGERANT AIR
E3 LEVLE SWITCH BTM FLANGE GASKET/ TO BE CHANGED IN THE
CONDENSER
DURING COLD BOX SHUTDOWN

3(B)

Cold Box
Shutdown
work

36

CM-70244

WORKSHO
P

X-2701

290- X 2701 E2 HV 27176/27177/27178/27179/27180 TO BE


CHANGED WITH NEW VALVE ( SPECIAL TYPE) DURING COLD BOX
SHUTDOWN

REFRIGERANT AIR
CONDENSER

2(B)

Cold Box
Shutdown
work

37

CM-70245

WORKSHO
P

X-2701

290- X 2701 COMPRESSOR DRAIN VALVE HV


REFRIGERANT AIR
27450/451/452/455/456/457/458/CV 406 TO BE CHANGED WITH
CONDENSER
NEW VALVE DURING COLD BOX SHUTDOWN

2(B)

Cold Box
Shutdown
work

38

CM-70246

WORKSHO
P

X-2701

290- X 2701 C Gear oil loop near PI 27450 minor welding


seppage to be attended

39

CM-70248

INSTRUM
ENT

TT-22423A

070- TT-22423A is bypassed of C-2201 radial bearing temp. to be


replaced and normalized in S/Down.

Temp. TX

Cold Box
Shutdown
work

6(b)

Yes

Yes

Yes

Cold Box
Shutdown
work

33KV INCOMER
1

REFRIGERANT AIR
CONDENSER

Insu

Cold Box
Shutdown
work

CM-70086

119-Please do the X-2701-C- motor leap test in short shutdown.

Cran

Cold Box
Shutdown
work

33

050- Replace E-2313-C with the same type as existing one

Scaf

Cold Box
Shutdown
work

Hydr
Jett

Sl.
No

Work Order
no:

Dept.

Equip No.

Description

Asset
Description

Pack
No

40

CM-70285

MECHANI
CAL

P-2701-A

070-P-2701-A/B seal pot support badly corroded painting required


in the coming short shut down.

PUMP

6(b)

Cold Box
Shutdown
work

41

CM-70286

MECHANI
CAL

P-2701-A

070-2701-A/B pump foundation corroded painting required


during Coldbox outage.

PUMP

6(b)

Cold Box
Shutdown
work

42

CM-70397

WORKSHO
P

ME-2701

49

CM-71206

WORKSHO
P

X-2701-E2

076- During MTBE short SD opportunity, arrange to inspect floats


in propylene circuit in chiller unit intercooler.

50

CM-71216

WORKSHO
P

LE-12002

070- LE-1 lift line dura lock coupling is leaking to be rectified or


replace the coupling.

Level Instrument

53

CM-71358

WORKSHO
P

E-2703

E 2703 Liquid product strainer cleaning

NO.3 PLATE-FIN
EXCHANGER

1(B)

54

CM-71359

WORKSHO
P

V-2704

290- V 2704 Inspection to be carried out during cold box outage

VESSEL

55

CM-71380

MECHANI
CAL

C-2201

290- C 2201 Turning gear leak to be attended during cold box


outage

57

CM-71384

WORKSHO
P

F-2301-B

290- F -2301 B Drain valve 3/4" to be replaced ( handwheel in


broken condition)

290- Cold box leak to be attended . Currently leaking rate is in


control . If leak increased more coldbox shutdown and repair to
be done

Scaf

Cran

Insu

Hydr
Jett

Cold Box
Shutdown
work

Yes

Yes

Yes

Yes

Cold Box
Shutdown
work

Yes

Yes

Cold Box
Shutdown
work

Yes

Yes

2(B)

Cold Box
Shutdown
work

Yes

Yes

REACTOR
EFFLUENT
COMPRESSOR

6(b)

Cold Box
Shutdown
work

REACTOR FEED
FILTER

1(B)

Cold Box
Shutdown
work

Cold box
exchanger
will be
replaced

CRYOGENIC
SEPARATION UNIT

INTERCOOLER

Reason

4(B)

Note

Cold Box
Shutdown
work

Yes

Sl.
No

Work Order
no:

Dept.

Equip No.

58

CM-71385

WORKSHO
P

V-2302

59

CM-71387

WORKSHO
P

PV-25005

60

CM-71388

WORKSHO
P

UNTAG-MTBWKS

61

CM-71389

WORKSHO
P

P-2240-A-T

62

CM-71390

WORKSHO
P

63

CM-71391

64

Asset
Description

Pack
No

290- V 2302 Ist I/L valve to be replaced . Existing valve gland


filled with fermanite

VESSEL

290- PV 25005 D/S isolation valve to be replaced for passing .

Description

Note

Scaf

Cran

1(B)

Cold Box
Shutdown
work

Yes

Yes

Control Valve

2(B)

Cold Box
Shutdown
work

UNTAGGED
WORKSHOP ITEM

2(B)

Cold Box
Shutdown
work

Yes

290- Wash oil turbine pump 1" bypass of discharge valve to be


changed

TURBINE

1(B)

Cold Box
Shutdown
work

Yes

F-2240-B

290- Wash oil filter B O/L valve to be replaced . Gland leak was
there earlier, currently gland is fully packed.

WASH OIL
CIRCULATION
FILTER

1(B)

Cold Box
Shutdown
work

WORKSHO
P

FV-23016

290- Control valve u/s isolation valve is struck position , to be


serviced

Control Valve

1(B)

Cold Box
Shutdown
work

CM-71394

WORKSHO
P

P-2110

290- Suction/ discharge / drain valve servicing

PUMP

1(B)

Cold Box
Shutdown
work

Yes

65

CM-71395

WORKSHO
P

P-2104-A

290- P 2104A Suction/ discharge / drain valve servicing

PUMP

1(B)

Cold Box
Shutdown
work

Yes

66

CM-71396

WORKSHO
P

P-2104-B

290- P 2104 B Suction / discharge/ drain valve servicing

PUMP

1(B)

Cold Box
Shutdown
work

Yes

290- HS Steam trap near mtbe shelter drain valve to be replaced

Reason

Insu

Hydr
Jett

Asset
Description

Pack
No

Control Valve

1(B)

Cold Box
Shutdown
work

290- Valve painting and pm jobs

Control Valve

6(b)

Cold Box
Shutdown
work

290- Gland leak to be attended during cold box outage

On-Off Valve

6(b)

Cold Box
Shutdown
work

070-V-2704 LALL-27803 is acting to be checked and rectified.

VESSEL

6(b)

Cold Box
Shutdown
work

Yes

070 ME-2101 V-2 Suc. Drum LT,LG and manifold flanges lines are
getting corroded painting required.

VESSEL

6(b)

Cold Box
Shutdown
work

Yes

V-2225

0230 - LE-1 (V-2225) not getting enough cat. pipe from cat.
collector to LE-1 and manual valve to be checked. (S/D w.o.
created instead of w.o.71414)

VESSEL

2(B)

Cold Box
Shutdown
work

WORKSHO
P

UNTAG-MTBWKS

290 PSA H2 to V-2103 manifold ISOLATION VALVE GLAND IS


LEAKING HEAVILY.PACKING TO BE CHANGED.

UNTAGGED
WORKSHOP
ITEM

3(B)

Cold Box
Shutdown
work

CM-71827

WORKSHO
P

FV-23011

076- FV-23011 warmup line clamping to be normalized in next


plant SD opportunity.

Control Valve

1(B)

Cold Box
Shutdown
work

77

CM-71828

WORKSHO
P

V-2401-A

076-V-2401-A/B outlet valves gland leakage to be attended by


replacing packing in next unit SD opportunity.

VESSEL

3(B)

Cold Box
Shutdown
work

96

CM-72061

INSTRUM
ENT

UV-22138

69-Regulator air leak to be arrested.

On-Off Valve

6(b)

Cold Box
Shutdown
work

98

CM-72098

INSTRUM
ENT

TV-22179

To change the Air filter plastic bowel with Metal bowel in next
opportunity.

Control Valve

6(b)

Cold Box
Shutdown
work

Sl.
No

Work Order
no:

Dept.

Equip No.

67

CM-71398

WORKSHO
P

PV-22073

68

CM-71399

INSTRUM
ENT

PV-23049

69

CM-71401

INSTRUM
ENT

UV-24028

70

CM-71415

INSTRUM
ENT

V-2704

71

CM-71418

MECHANI
CAL

ME-2101-V2

72

CM-71423

WORKSHO
P

73

CM-71428

76

Description

290- D/S Valve to be replaced . Valve is passing heavily.

Reason

Note

Scaf

Cran

Insu

Yes

Yes

Yes

Yes

Hydr
Jett

Asset
Description

Pack
No

On-off Vent
Valve

6(b)

Cold Box
Shutdown
work

REACTOR
EFFLUENT
COMPRESSOR

6(b)

Cold Box
Shutdown
work

Sl.
No

Work Order
no:

Dept.

Equip No.

99

CM-72108

INSTRUM
ENT

UV-26027

100

CM-72122

INSTRUM
ENT

C-2201

101

CM-72284

69- Air leak from the following valves tubing to be arrested - UVINSTRUM UNTAG-MTB21080-B , UV-22131 , UV-22130, UV-22134 , UV-22136 , UVENT
INST
22081 , UV-22137.)-

102

CM-72337

WORKSHO
P

PSV-27406A

0230 - PSV-27406 (X-2701-C - inter cooler) to be serviced


(Ref.W.O. 72283).

Pressure Safety
Valve

2(B)

Cold Box
Shutdown
work

105

CM-73804

INSTRUM
ENT

ZT-22001

116-ZI-22001 Indiction is not working, fluctuation noticed


frequently to be attended during any plant outage.

Position TX

6(b)

Cold Box
Shutdown
work

108

CM-73923

WORKSHO
P

E-3205

116-Condensate outlet line elbow clamped portion to be replaced


during any shut down.

EXCESS STEAM
CONDENSER

2(B)

Cold Box
Shutdown
work

116

CM-75015

INSTRUM
ENT

X-2701

290- X 2701 Discharge high temp relay to be attended in any


short shutdown

REFRIGERANT
AIR CONDENSER

119

CM-75251

INSTRUM
ENT

X-2701

2X-2701 C Control system valves / actuvators checking as


recommended by York (OEM)

REFRIGERANT
AIR CONDENSER

6(b)

Cold Box
Shutdown
work

120

CM-75252

INSTRUM
ENT

X-2701

Replace/ Recondition PRV actuator as per York ( OEM)

REFRIGERANT
AIR CONDENSER

6(b)

Cold Box
Shutdown
work

121

CM-75253

INSTRUM
ENT

X-2701

290- Provision of field and control room inst as per York vendor
report dated 23 Nov 2010

REFRIGERANT
AIR CONDENSER

122

CM-75254

MECHANI
CAL

X-2701

290- Refrigerant trace gas ( Non hydrocarbon) and electronic leak


REFRIGERANT
detection arrangement for X-2701C system as per York vendor
AIR CONDENSER
report

129

CM-75605

ELECTRIC
AL

TR-021-L

Description

TO BE REMOVED DURING SHUTDOWN AND TO BE CLEANED

050- Speed indication SI-22761 is not showing, to be attended.

Slight leak from three bolts of fins west side

UNTAGGED
INSTRUMENT
ITEM

TRANSFORMER
25/31.5MVA
-33/6.9kV

Reason

Job
Completed

Job
Completed

6(b)

Note

Scaf

Cran

Insu

Hydr
Jett

Yes

Cold Box
Shutdown
work

Cold Box
Shutdown
work

Cold Box
Duplicate of
Shutdown
CM-81825
work
Mechanical to
make sure
Cold Box
material is
Shutdown
available for
work
test/Producti
on scope
Cold Box
Shutdown
work

Yes

Yes

Yes

Sl.
No

Work Order
no:

Dept.

Equip No.

Description

Asset
Description

Pack
No

Reason

Note

133

CM-75676

ELECTRIC
AL

UPS-042

PM # 74404, Cell # 162 low reading need to observe and replace


later

UNINTERRUPTAB
LE POWER
SUPPLY

6(b)

Meoh
interface

Cold Box
Shutdown
work

136

CM-75855

CSD

V-2215-A

061, PMR-200-284
DCS

VESSEL

6(b)

Cold Box
Shutdown
work

137

CM-75857

CSD

V-2215-A

061, PMR-200-285 V-2215A/B inlet and outlet pressure


indications in DCS

VESSEL

6(b)

Cold Box
Shutdown
work

139

CM-75871

ELECTRIC
AL

H-2208

Heater to be released for internal inspection during next


shutdown. (No internal inspection carried out since
commissioning)

REACTOR NO. 3
SURGE POT
HEATER

6(b)

Cold Box
Shutdown
work

146

CM-75879

WORKSHO
P

ME-2101-V2

Vessel to be released for internal inspection during next


shutdown. (No internal inspection carried out since
commissioning)

VESSEL

5(B)

Cold Box
Shutdown
work

147

CM-75880

WORKSHO
P

ME-2101-V1

Vessel to be released for internal inspection during next


shutdown. (No internal inspection carried out since
commissioning)

VESSEL

5(B)

Cold Box
Shutdown
work

148

CM-75881

WORKSHO
P

E-3205-A

Exchanger to be released for internal inspection during next


shutdown. (No internal inspection carried out since
commissioning)

149

CM-75882

ELECTRIC
AL

H-2206

Heater to be released for internal inspection during next


shutdown. (No internal inspection carried out since
commissioning)

151

CM-75884

WORKSHO
P

E-2404

152

CM-75885

WORKSHO
P

E-3205-B

HV-22042A/B limit swiyches provision in

Exchanger to be released for internal inspection during next


shutdown. (No internal inspection carried out since
commissioning)

Air Fin Cooler to be released for internal inspection during next


shutdown. (No internal inspection carried out since
commissioning)

Department
changed to
workshop

AIR FAN COOLER

REDUCTION
GAS HEATER

Cold Box
Shutdown
work

Scaf

Cran

Insu

Hydr
Jett

Yes

Yes

Yes

Yes

Cold Box
Shutdown
work

6(b)

ORU REGENERANT
COOLER

Department
changed to
workshop

Cold Box
Shutdown
work

AIR FAN COOLER

Department
changed to
workshop

Cold Box
Shutdown
work

Sl.
No

Work Order
no:

Dept.

Equip No.

153

CM-75888

WORKSHO
P

V-2611

154

CM-75898

INSTRUM
ENT

155

CM-75899

156

Description

061, To separate V-2611 BOTTOM VENT FROM EXISTING


CONNECTION AND CONNECT TO v-2611 TOP VENT

Asset
Description

Pack
No

VESSEL

4(B)

TE-22077

During Preventive maintenance job for temperature transmitter


found Thermocouple wass faulty. Need to be replaced during
Shutdown if it is possible for replacement.

Temp. Element
(Skin-T/C)

INSTRUM
ENT

TE-22080

During Preventive maintenance job for temperature transmitter


found Thermocouple wass faulty. Need to be replaced during
Shutdown if it is possible for replacement.

Temp. Element
(Skin-T/C)

CM-75900

INSTRUM
ENT

TE-22082

During Preventive maintenance job for temperature transmitter


found Thermocouple wass faulty. Need to be replaced during
Shutdown if it is possible for replacement.

Temp. Element
(Skin-T/C)

157

CM-75901

INSTRUM
ENT

TE-22083

During Preventive maintenance job for temperature transmitter


found Thermocouple wass faulty. Need to be replaced during
Shutdown if it is possible for replacement.

Temp. Element
(Skin-T/C)

158

CM-75902

INSTRUM
ENT

TE-22084

During Preventive maintenance job for temperature transmitter


found Thermocouple wass faulty. Need to be replaced during
Shutdown if it is possible for replacement.

Temp. Element
(Skin-T/C)

159

CM-75903

INSTRUM
ENT

TE-22085

During Preventive maintenance job for temperature transmitter


found Thermocouple wass faulty. Need to be replaced during
Shutdown if it is possible for replacement.

Temp. Element
(Skin-T/C)

160

CM-75904

INSTRUM
ENT

TE-22086

During Preventive maintenance job for temperature transmitter


found Thermocouple wass faulty. Need to be replaced during
Shutdown if it is possible for replacement.

Temp. Element
(Skin-T/C)

161

CM-75905

INSTRUM
ENT

TE-22087

During Preventive maintenance job for temperature transmitter


found Thermocouple wass faulty. Need to be replaced during
Shutdown if it is possible for replacement.

Temp. Element
(Skin-T/C)

162

CM-75923

INSTRUM
ENT

TE-22088

During Preventive maintenance job for temperature transmitter


found Thermocouple wass faulty. Need to be replaced during
Shutdown if it is possible for replacement.

Temp. Element
(Skin-T/C)

163

CM-75924

INSTRUM
ENT

TE-22089

During Preventive maintenance job for temperature transmitter


found Thermocouple wass faulty. Need to be replaced during
Shutdown if it is possible for replacement.

Temp. Element
(Skin-T/C)

164

CM-75925

INSTRUM
ENT

TE-22090

During Preventive maintenance job for temperature transmitter


found Thermocouple wass faulty. Need to be replaced during
Shutdown if it is possible for replacement.

Temp. Element
(Skin-T/C)

165

CM-75926

INSTRUM
ENT

TE-22092

During Preventive maintenance job for temperature transmitter


found Thermocouple wass faulty. Need to be replaced during
Shutdown if it is possible for replacement.

Temp. Element
(Skin-T/C)

Reason

work scope
to be
checked no
welding on
work scope
tubes
to be
checked no
welding on
work scope
tubes
to be
checked no
welding on
work scope
tubes
to be
checked no
welding on
work scope
tubes
to be
checked no
welding on
work scope
tubes
to be
checked no
welding on
work scope
tubes
to be
checked no
welding on
work scope
tubes
to be
checked no
welding on
work scope
tubes
to be
checked no
welding on
work scope
tubes
to be
checked no
welding on
work scope
tubes
to be
checked no
welding on
work scope
tubes
to be
checked no
welding on
tubes

Note

Scaf

Cran

Insu

Cold Box
Shutdown
work

Yes

Yes

Yes

Cold Box
Shutdown
work
Cold Box
Shutdown
work
Cold Box
Shutdown
work
Cold Box
Shutdown
work
Cold Box
Shutdown
work
Cold Box
Shutdown
work
Cold Box
Shutdown
work
Cold Box
Shutdown
work
Cold Box
Shutdown
work
Cold Box
Shutdown
work
Cold Box
Shutdown
work
Cold Box
Shutdown
work

Hydr
Jett

Sl.
No

Work Order
no:

Dept.

Description

Equip No.

During Preventive maintenance job for temperature transmitter


found Thermocouple wass faulty. Need to be replaced during
Shutdown if it is possible for replacement.

166

CM-75927

INSTRUM
ENT

TE-22093

168

CM-75949

WORKSHO
P

V-2108

0230 - V-2108, 2" blank off drain isolation valve gland leakage
(having corrosion) - On line sealed by M/s Wellube, to be
replaced with new valve.

169

CM-77058

INSTRUM
ENT

X-2701

290-

170

CM-77059

INSTRUM
ENT

X-2701

290- Replace machine mounted gauges which are faulty

184

CM-77320

WORKSHO
P

V-2240

185

CM-77321

INSTRUM
ENT

V-2208-A

193

CM-77795

WORKSHO
P

LV-21069

194

CM-78189

CSD

195

CM-78210

ELECTRIC
AL

196

CM-78245

CSD

Replace sight glass in 2nd stage intercooler

290- LCO Chiller package addition to the existing LCO cooling


system

290-V-2215 A/B (fresh feed dryers) and V-2208A/B/C (RED Reactor Effluent Dryers) regen system upgrade as per approved
capital budget
290- Isolation valves to be changed with new one in the short
shutdown

UNTAG-MTB061, PMR-200-287
CS

TR-021-R

CCR PLC upgrade

ReferCm# 75604 for details, buchholz relay oil leak from


discharge cock valve.

UNTAG-MTB- 206, To check and update documentation for all Unidentified tags
CS
in JBMAi204 during next SD opportunity.

Asset
Description

Pack
No

Temp. Element
(Skin-T/C)

Reason

Note

work scope
to be
checked no
welding on
tubes

Cold Box
Shutdown
work

VESSEL

2(B)

Cold Box
Shutdown
work

REFRIGERANT
AIR CONDENSER

6(b)

Cold Box
Shutdown
work

REFRIGERANT
AIR CONDENSER

6(b)

Cold Box
Shutdown
work

Scaf

WORK SCOPE
IS NOT YET
CLEAR .
Cold Box
PRODUCTION Shutdown
NEED TO
work
STUDY AND
RASIE PMR

VESSEL

VESSEL

On-Off Valve

3(B)

UNTAGGED
CONTROL
SYSTEMS ITEM

6(b)

TRANSFORMER
25/31.5MVA
-33/6.9kV

6(b)

UNTAGGED
CONTROL
SYSTEMS ITEM

6(b)

WORK SCOPE
IS NOT YET
CLEAR .
Cold Box
PRODUCTION Shutdown
NEED TO
work
STUDY AND
RASIE PMR
Cold Box
Shutdown
work
CCR
UPGRADE

Cold Box
Shutdown
work
Cold Box
Shutdown
work

MEOH plant
running

Cold Box
Shutdown
work

Yes

Cran

Insu

Hydr
Jett

Sl.
No

Work Order
no:

Dept.

Equip No.

197

CM-78247

WORKSHO
P

V-2611

198

CM-78269

ELECTRIC
AL

BC-151-2

199

CM-78368

MECHANI
CAL

E-2240

205

CM-79367

274

CM-79555

WORKSHO
P

PSV-31026

276

CM-80465

INSTRUM
ENT

TT-22352

277

CM-80466

INSTRUM
ENT

C-2201

Asset
Description

Pack
No

VESSEL

Note

Scaf

3(B)

Cold Box
Shutdown
work

Yes

BATTERY
CHARGER

6(b)

Cold Box
Shutdown
work

061, PMR-200-286 E-2240/X-2701-E1 retrofit - Check HAZOP


what if analysis recommendations

WASH OIL
CIRCULATION
COOLER

6(b)

Cold Box
Shutdown
work

Yes

Remove the existing insulation & provide Weather Shield for


MECHANI UNTAG-MTBequipment and pipe flanges in hydrogen service in the MTBE
CAL
MECH
plant. Marked P&IDs with priority will be provided by production.

UNTAGGED
MECHANICAL
ITEM

6(b)

Cold Box
Shutdown
work

Yes

101- PSV-31026 up stream isolation valve hand wheel is free.

Pressure Safety
Valve

3(B)

Cold Box
Shutdown
work

116-TT-22352/353 showing negative reading, to be attended


during any plant outage.

Temp TX

6(b)

Cold Box
Shutdown
work

REACTOR
EFFLUENT
COMPRESSOR

6(b)

Cold Box
Shutdown
work

278

CM-80512

CSD

281

CM-80550

INSTRUM
ENT

282

CM-80551

WORKSHO
P

V-2118

Description

290-Ejector to V 2611 Line 260- VG-1045-OR18S-6"


( Hastelloy ) line is having patch up for leak , that area also to
be considered for replacement by our piping.
PM # 77476, Reading shows Cell # 22 low voltage, Need to
monitor if required replace

116-C-2201 Turning gear not getting disengaged during startup,


to be attended.

061,

PMR-200-290

PSV-26027A 061 Can be done during VGWT modifications

PSV-25800

061, PSV-25800 relocation as per PMR-200-294

VESSEL

PMR-200-293

6(b)

Pressure Safety
Valve

Pressure Safety
Valve

4(B)

Reason

V-2118
Cold Box
level
PSV-26027A- Shutdown
indication in
work
B set point
DCS
change to
Cold Box
885 kpag;
Shutdown
Department
work
to be
changed to
Cold Box
Workshop
Relocation of
Shutdown
PSV tapping
work

Cran

Yes

Insu

Hydr
Jett

Sl.
No

283

Work Order
no:

CM-80552

Dept.

WORKSHO
P

Description

Equip No.

V-2310

061, To provide LSLL to v-2310 water boot PMR-200-295

061, PMR-200-295

Pack
No

Reason

Note

Scaf

4(B)

To provide
new LSLL
tapping to
v-2310
water boot

Cold Box
Shutdown
work

Yes

VESSEL

6(b)

To provide
new LSLL
tapping to
v-2310
water boot

Cold Box
Shutdown
work

Asset
Description

VESSEL

284

CM-80553

CSD

V-2310

285

CM-80554

MECHANI
CAL

G-2701-A

061- To inspect FD-27650(2) & RO-27660(2) in next TA as per


MTBE ReHAZOP recommendation

EXPANDER /
DYMOMETER

6(b)

Cold Box
Shutdown
work

286

CM-80555

MECHANI
CAL

G-2701-B

061 , To inspect FD-27750(2) AND RO-27760(2) as per ReHAZOP


recommendations

EXPANDER /
DYMOMETER

6(b)

Cold Box
Shutdown
work

287

CM-80556

061, X-2701-C-E6-A/B
WORKSHO
X-2701-C-E6-A
P
recommendation

SHELL & TUBE HE

4(B)

Cold Box
Shutdown
work

288

CM-80557

061, X-2701-C-E4-A/B hydrotest and inspection as per ReHAZOP


WORKSHO
X-2701-C-E4-A
P
recommendations

SHELL & TUBE HE

4(B)

Cold Box
Shutdown
work

290

CM-80616

INSTRUM
ENT

C-2201

REACTOR
EFFLUENT
COMPRESSOR

6(b)

Cold Box
Shutdown
work

291

CM-80622

WORKSHO
P

PSV-22402

Pressure Safety
Valve

3(B)

Cold Box
Shutdown
work

hydrotest and inspection as per Rehazop

119-C-2201 Governer failure alarm UA-22086A/UA22086B is not


getting reset in start up. Governer failure alarm to be checked
and problem to be solved in next shut down.

119- PSV-22402 To be Calibrated during shutdown.

Cran

Insu

Hydr
Jett

Sl.
No

Work Order
no:

Dept.

Equip No.

Description

Asset
Description

Pack
No

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

119-PSA inlet strainer to be cleaned in Turn around.

UNTAGGED
WORKSHOP ITEM

4(B)

By pass to be
provided for
strainer
Cold Box
( operation
Shutdown
will check
work
PMR )stand
by PMR to be
issued

R-2201

070- R-2201 inner and outer screens to be cleaned in the coming


shutdown 2011

Dehydrogenation
Reactor No.1

5(B)

Cold Box
Shutdown
work

Yes

Yes

Yes

Yes

WORKSHO
P

R-2202

070- R-2202 inner and outer screens to be cleaned in the coming


shutdown 2011

REACTOR

5(B)

Cold Box
Shutdown
work

Yes

Yes

Yes

Yes

WORKSHO
P

R-2203

070- R-2203 inner and outer screens to be cleaned in the coming


shutdown 2011

REACTOR

5(B)

Cold Box
Shutdown
work

Yes

Yes

Yes

Yes

292

CM-80682

WORKSHO
P

UNTAG-MTBWKS

293

CM-80692

WORKSHO
P

294

CM-80693

295

CM-80694

Work Order
no:

Dept.

Equip No.

297

CM-80734

WORKSHO
P

R-2201

R-2201 inlet scoop replacemnt.

Dehydrogenation
Reactor No.1

Cold Box
Shutdown
work

298

CM-80735

WORKSHO
P

R-2201

290-R-2201 catalyst transfer pipes replacemnt.

Dehydrogenation
Reactor No.1

Cold Box
Shutdown
work

299

CM-80736

WORKSHO
P

R-2201

290- R-2201 cover plate replacement.

Dehydrogenation
Reactor No.1

Cold Box
Shutdown
work

300

CM-80737

WORKSHO
P

R-2202

290- R-2202 cover plate replacement.

REACTOR

Cold Box
Shutdown
work

301

CM-80738

WORKSHO
P

R-2203

290-R-2203 cover plate replacement.

REACTOR

Cold Box
Shutdown
work

302

CM-80744

INSPECTI
ON

ME-2101

Inspection for CUI of cold insulated piping and vessels in ME2101-C refrigerant loop (MTBE HAZOP recommendation 102)

BUTAMER
REFRIGERATION
PACKAGE

Cold Box
Shutdown
work

303

CM-80745

INSPECTI
ON

E-2313-A

Thickness survey of MeOH extraction section (V-2306, P-2306A/B,


E-2313A/B/C) i.e. Line # 230-PL-041-CA11-6" & 230-PL-041CA11-6" (MTBE HAZOP recommendation#158)

SHELL & TUBE


HE

Cold Box
Shutdown
work

304

CM-80759

WORKSHO
P

V-2604

Inspectino of cooling water coil of V-2604 (MTBE HAZOP


recommendation#442).

305

CM-80760

INSPECTI
ON

V-2612

Inspection of Expansion Bellows & Flexible joints (Elutriation gas &


dust collectorV-2612) 260-CAT-1019-OR8-4", FA-2602 u/s & d/s
lines, H-2602 d/s, u/s of E-2602 (MTBE HAZOP
recommendation#436). )

306

CM-80761

INSPECTI
ON

X-2701

Inspection of chiller for leakage of tubes. (MTBE HAZOP


recommendation#426)

Description

Asset
Description

Pack
No

Sl.
No

VESSEL

4(B)

Reason

Note

Cold Box
Shutdown
work

DUST
COLLECTOR

Cold Box
Shutdown
work

REFRIGERANT
AIR CONDENSER

Cold Box
Shutdown
work

Scaf

Yes

Cran

Insu

Hydr
Jett

Asset
Description

Pack
No

VESSEL

H-2201 inlet and outlet headers - insulation to be removed for its


full length for inspection.

H-2202

MECHANI
CAL

CM-81004

CSD

410

CM-81005

MECHANI
CAL

C-2201

411

CM-81278

INSTRUM
ENT

412

CM-81279

INSTRUM
ENT

418

CM-81741

INSTRUM
ENT

PV-25005

419

CM-81744

WORKSHO
P

422

CM-81824

423

CM-81825

Sl.
No

Work Order
no:

Dept.

Equip No.

307

CM-80762

INSPECTI
ON

V-2217

Inspection (internal) of V-2217 sulphur injection drum

406

CM-80987

MECHANI
CAL

H-2201

407

CM-80988

MECHANI
CAL

408

CM-80989

409

Description

Reason

Note

Scaf

5(B)

Cold Box
Shutdown
work

Yes

Yes

CHARGE HEATER

6(b)

Cold Box
Shutdown
work

Yes

Yes

H-2202 inlet and outlet headers - insulation to be removed for its


full length for inspection.

INTERHEATER
NO. 1

6(b)

Cold Box
Shutdown
work

Yes

Yes

H-2203

H-2203 inlet and outlet headers - insulation to be removed for its


full length for inspection.

INTERHEATER
NO. 2

6(b)

Cold Box
Shutdown
work

Yes

Yes

C-2201

061 PMR-200-298

REACTOR
EFFLUENT
COMPRESSOR

6(b)

Cold Box
Shutdown
work

061, PMR-200-298

REACTOR
EFFLUENT
COMPRESSOR

6(b)

UV-22081

REPLACE THE POSITIONER AND DO PREVENTIVE MAINTENANCE

Antisurg Valve

6(b)

PV-22030

SERVICE THE ACTUATOR AND REPLACE THE POSITIONER

Damper

6(b)

Cold Box
Shutdown
work

C-2201
Radial brg.
Cold Box
temp wiring Shutdown
and logic
work
change
Cold Box
Shutdown
work

061, PMR-200-299

Control Valve

6(b)

MTBE
Cold Box
critical valves
Shutdown
positioners
work
change

X-2701-C

116-X-2701-C Casing drain line injected portion to be replaced


with new line.

REFRIGERANT
COMPRESSOR

4(B)

Cold Box
Shutdown
work

WORKSHO
P

X-2701-C

061,

REFRIGERANT
COMPRESSOR

4(B)

INSTRUM
ENT

X-2701-C

PMR-200-289

061, PMR-200-289

REFRIGERANT
COMPRESSOR

Providing
Cold Box
new LT
Shutdown
TAPPING
X-2701C
ON
work
modifications
X-2701-C
as per
Vendor
Cold Box
recommendat
Shutdown
ions,
work
Providing
new LT
TAPPING ON
X-2701-C

Cran

Insu

Yes

Yes

Yes

Hydr
Jett

Asset
Description

Pack
No

061, PMR-200-289

REFRIGERANT
COMPRESSOR

6(b)

P-2111-A

061, PMR-200-292

PUMP

CSD

P-2111-A

061, PMR-200-292

PUMP

6(b)

CM-81884

WORKSHO
P

V-2201

VESSEL

4(B)

429

CM-82065

WORKSHO
P

UNTAG-MTBWKS

430

CM-82066

431

CM-82114

WORKSHO
P

V-2210

432

CM-82130

INSPECTI
ON

C-2201-E-A

433

CM-82131

INSPECTI
ON

434

CM-82133

435

CM-82134

Sl.
No

Work Order
no:

Dept.

Equip No.

424

CM-81826

CSD

X-2701-C

425

CM-81850

INSTRUM
ENT

426

CM-81851

427

436

CM-82135

Description

70- V-2201 Damaged Demister to be changed in 2011 T/A.

061, PMR-200-281

INSTRUM UNTAG-MTB061, PMR-200-281


ENT
INST

116-Internal inspection to be done during TA

UNTAGGED
WORKSHOP ITEM

4(B)

UNTAGGED
INSTRUMENT
ITEM

VESSEL

4(B)

116-Inspection to be done during TA-2011

SHELL & TUBE


HE

6(b)

C-2201-E-B

116-Inspection to be done during TA-2011

SHELL & TUBE


HE

INSPECTI
ON

EJ-2201

116-Inspection to be done during TA-2011

EJECTOR

INSPECTI
ON

EJ-2201-SI

116-Inspection to be done during TA-2011

SILENCER

INSPECTI
ON

R-2204-A

116-Inspection to be done.

REACTOR

Reason
Note
Scaf
X-2701C
modifications
Cold Box
as per
Shutdown
Vendor
work
recommendat
To provide
ions
Cold Box
low level trip
Shutdown
for P-2111Awork
B
To provide
Cold Box
low level trip
Shutdown
for P-2111Awork
B
Cold Box
Shutdown
work

Yes

PROVISION
OF
ISOLATION
VALVES

Cold Box
Shutdown
work

Yes

Isolation
valves for
TDC-2712827131

Cold Box
Shutdown
work

oder
demister

Cold Box
Shutdown
work

Yes

Cold Box
Shutdown
work

Yes

Cran

Insu

Yes

Yes

Yes

Cold Box
Shutdown
work
5(B)

Cold Box
Shutdown
work

Yes

Cold Box
Shutdown
work

5(B)

Replace
media if
Cold Box
avabile in one
Shutdown
R-2204 B
work
NEW CM FOR
B- VESSEL

Yes

Yes

Hydr
Jett

Sl.
No

Work Order
no:

Dept.

Equip No.

437

CM-82136

INSPECTI
ON

X-2701-C-V

116-Inspection to be done during TA-2011

438

CM-82744

WORKSHO
P

UNTAG-MTBWKS

69-HV-22018 - U/S sample cooler, D/S I/V bonnet leak to be


attended.

CSD

CCR-PLC-01

Description

061, PMR-200-301

Asset
Description

Pack
No

UNTAGGED
WORKSHOP
ITEM

4(B)

RITTAL IO PANEL

6(b)

CM-82756

440

CM-82759

462

CM-82816

WORKSHO
P

V-2601

116-CCR screen to be cleaned and inspected during TA-2011

VESSEL

5(B)

463

CM-82817

WORKSHO
P

E-2201-A

116-Blind to be provided for neutralization solution circulation


during TA-2011

SHELL & TUBE


HE

4(B)

464

CM-82818

MECHANI
CAL

C-2201

116-Off line washing to be done during TA-2011

REACTOR
EFFLUENT
COMPRESSOR

480

CM-82851

WORKSHO
P

EJ-2101

119-Inspection to be carried out during 2011 T/A.

481

CM-82877

INSPECTI
ON

ME-2601

482

CM-82879

INSPECTI
ON

V-3107

070- V-3107 Butanes sphere inspection to be carried out in 2011


T/A

483

CM-82880

INSPECTI
ON

SI-2201

070 In the coming 2011 T/A inspection to be carried out of the


said equipment ( SI-2201 Silencer for C-2201-T --- -- REC
turbine).

070- ME-2601 air dryer in CCR inspection to be carried out in


2011 T/A

UNTAGGED
INSTRUMENT
ITEM

EJECTOR

SILENCER

Scaf

Cran

Insu

Yes

Yes

Yes

Yes

Yes

Yes

Cold Box
Shutdown
work

Additional FT
&PT for CCR
reduction
Cold Box
zone and LE- Shutdown
Additional FT
4 - CCR-PLC
work
&PT for CCR
Upgrade
reduction
Cold Box
project
zone and LE- Shutdown
4 - CCR-PLC
work
Upgrade
project
Cold Box
Shutdown
work

Cold Box
Shutdown
work
Production
scope

Replace the
media

5(B)

Cold Box
Shutdown
work
Cold Box
Shutdown
work

4(B)

AIR DRYER
PACKAGE

SPHERE

Note
Cold Box
Shutdown
work

VESSEL

439

INSTRUM UNTAG-MTB061, PMR-200-301


ENT
INST

Reason

YES

Cold Box
Shutdown
work
Cold Box
Shutdown
work
Cold Box
Shutdown
work

Yes

Hydr
Jett

Asset
Description

Pack
No

050-Hydrogen supply at PSA header to V-2103 I/V gland leakage


to be attended.

UNTAGGED
WORKSHOP
ITEM

4(B)

Cold Box
Shutdown
work

050- Attend pressure regulator leakage near salt bath heater (s/d
job) LDAR tag# 495

Self Actuated
Control Valve

6(b)

Cold Box
Shutdown
work

116-Blinds to be provided to circulate neutralizing solution.

SHELL & TUBE


HE

4(B)

Cold Box
Shutdown
work

Sl.
No

Work Order
no:

Dept.

Equip No.

526

CM-82953

WORKSHO
P

UNTAG-MTBWKS

527

CM-82962

INSTRUM
ENT

PCV-21095

529

CM-83005

WORKSHO
P

E-2201-B

530

CM-83036

INSTRUM
ENT

FT-23005

050- LDAR leak arresting for tag# 1211

Diff. Pressure TX

Job
Completed

Cold Box
Shutdown
work

531

CM-83038

INSTRUM
ENT

FV-23022

050- LDAR leak arresting for tag# 1185

Control Valve

Job
Completed

Cold Box
Shutdown
work

532

CM-83039

INSTRUM
ENT

UV-24021

050- LDAR leak arresting for tag# 1373

On-Off Valve

Job
Completed

Cold Box
Shutdown
work

533

CM-83040

INSTRUM
ENT

UV-24030

050- LDAR leak arresting for tag# 1396

On-Off Valve

Job
Completed

Cold Box
Shutdown
work

534

CM-83041

INSTRUM
ENT

UV-24028

On-Off Valve

Still leaking
new CM86219
created

Cold Box
Shutdown
work

536

CM-83059

INSTRUM
ENT

X-2701

Replace machine mounted gauges and indicators that are faulty vendor recommendation

REFRIGERANT
AIR CONDENSER

Duplicate of
CM-77059

Cold Box
Shutdown
work

537

CM-83060

INSTRUM
ENT

X-2701

Replace sight glass in 2nd stage intercooler - vendor


recommendation

REFRIGERANT
AIR CONDENSER

Duplicate of
CM-77058

Cold Box
Shutdown
work

538

CM-83069

INSTRUM UNTAG-MTBORBIT Valves Maintenance in Cold Box S/D (List attached)


ENT
INST

539

CM-83077

MTNINSPEC

V-3101

Description

050- LDAR leak arresting for tag# 1389

290- To be inspected

Reason

Note

UNTAGGED
INSTRUMENT
ITEM

6(b)

Cold Box
Shutdown
work

SPHERE

5(B)

Cold Box
Shutdown
work

Scaf

Cran

Insu

Yes

Yes

Yes

Yes

Yes

Yes

Hydr
Jett

Asset
Description

Pack
No

Diff. Pressure TX

6(b)

Cold Box
Shutdown
work

UNTAG-MTB- 206 - Marshalling cabinet check and inspection for all marshalling
CS
in MRR and CSB-1 during next MTBE TA

UNTAGGED
CONTROL
SYSTEMS ITEM

6(b)

Cold Box
Shutdown
work

CSD

UNTAG-MTB- 206 - 24 Volt DC Power Supply check and inspection of PLC-2 in


CS
MCB and CSB-1 during next MTBE TA

UNTAGGED
CONTROL
SYSTEMS ITEM

6(b)

Cold Box
Shutdown
work

CM-83149

CSD

UNTAG-MTB- 206 - Coaxial connectors and Grounding TAP connection check


CS
and inspection of PLC-2 during next MTBE TA

UNTAGGED
CONTROL
SYSTEMS ITEM

6(b)

Cold Box
Shutdown
work

545

CM-83150

CSD

UNTAG-MTB- 206 - PLC Module check and inspection for all PLC-2 cards during
CS
next MTBE TA

UNTAGGED
CONTROL
SYSTEMS ITEM

6(b)

Cold Box
Shutdown
work

546

CM-83151

CSD

UNTAG-MTB- 206 - DCS module check and inspection for all 01CP03, 01CP04,
CS
01CP05, RRCP06, RRCP07 and RRCP08 during next MTBE TA

UNTAGGED
CONTROL
SYSTEMS ITEM

6(b)

Cold Box
Shutdown
work

547

CM-83156

CSD

UNTAG-MTB- 206, To check and update documentation for all Unidentified tags
CS
in JBMV201 during next SD opportunity.

UNTAGGED
CONTROL
SYSTEMS ITEM

6(b)

Cold Box
Shutdown
work

548

CM-83157

CSD

UNTAG-MTB- 206, To check and update documentation for all Unidentified tags
CS
in JBMV207 during next SD opportunity.

UNTAGGED
CONTROL
SYSTEMS ITEM

6(b)

Cold Box
Shutdown
work

549

CM-83158

CSD

UNTAG-MTB- 206, To check and update documentation for all Unidentified tags
CS
in JBMV209 during next SD opportunity.

UNTAGGED
CONTROL
SYSTEMS ITEM

6(b)

Cold Box
Shutdown
work

550

CM-83159

CSD

UNTAG-MTB- 206, To check and update documentation for all Unidentified tags
CS
in D5TB-2601 during next SD opportunity.

UNTAGGED
CONTROL
SYSTEMS ITEM

6(b)

Cold Box
Shutdown
work

551

CM-83160

CSD

UNTAG-MTB- 206, To check and update documentation for all Unidentified tags
CS
in D5TB-2602 during next SD opportunity.

UNTAGGED
CONTROL
SYSTEMS ITEM

6(b)

Cold Box
Shutdown
work

CM-83213

WORKSHO
P

4(B)

Replacing C.S
elobw and
Cold Box
welding new Shutdown
S.S Elbow to
work
the line

Sl.
No

Work Order
no:

Dept.

Equip No.

540

CM-83093

INSTRUM
ENT

PDT-22181

542

CM-83147

CSD

543

CM-83148

544

556

E-2306

Description

During P.M. job found Transmitter is faulty, to be rectified during


any CCR S/D.

061,

Condensate line elbow material upgrade PMR-200-300

SHELL & TUBE HE

Reason

Note

Scaf

Yes

Cran

Insu

Hydr
Jett

Sl.
No

Work Order
no:

Dept.

Equip No.

562

CM-83991

INSTRUM
ENT

UV-22105C

563

CM-84060

WORKSHO
P

E-2317-A

69- Damaged SW Inlet strainer to be replaced.

564

CM-84085

WORKSHO
P

P-2111-A

101- gate valve 3x300 # gland leaking P2111A recycle valve


gland leak.

565

CM-84086

WORKSHO
P

E-2103

566

CM-84087

WORKSHO
P

567

CM-84089

568

Description

Valve is taking jerk need to replace.

Asset
Description

Pack
No

On-Off Valve

Reason

Note

Job
Completed

Cold Box
Shutdown
work

Scaf

SHELL & TUBE HE

4(B)

Cold Box
Shutdown
work

Yes

PUMP

4(B)

Cold Box
Shutdown
work

Yes

101- 8x300 rating gate valve gland leak.

SHELL & TUBE


HE

4(B)

Cold Box
Shutdown
work

Yes

E-2115

101-Gate valve 3x300# gland leaking.

SHELL & TUBE


HE

WORKSHO
P

V-2451

101- 6" flange leak, to be replaced the gasket.

VESSEL

4(B)

Cold Box
Shutdown
work

CM-84090

WORKSHO
P

V-2401-A

101- Flange leak connection of LSH 001

VESSEL

4(B)

Cold Box
Shutdown
work

569

CM-84091

WORKSHO
P

V-3107

101- Bottom of vessel 2" globe valve passing to be replaced.

SPHERE

4(B)

Cold Box
Shutdown
work

570

CM-84092

WORKSHO
P

V-3107

101- Top of the vessel 2" gate valve gland leak.

SPHERE

4(B)

Cold Box
Shutdown
work

Cold Box
Shutdown
work

Yes

Cran

Insu

Yes

Hydr
Jett

Sl.
No

Work Order
no:

Dept.

Equip No.

571

CM-84093

WORKSHO
P

V-3101

572

CM-84119

WORKSHO
P

UNTAG-MTBWKS

050- Two (02) spare strainers for each exchangers as mentioned


is required. E-2316, E-2317-A, E-2317-B, E-2305 & E-2301A/B.

P-2304-B

222, Re-route the pump casing line to flare to avoid tripping


hazard per safety related recommendation under PMR#200-

573

CM-84135

WORKSHO
P

Description

101-Bottom of the vessel manway flange leak.

Asset
Description

Pack
No

SPHERE

UNTAGGED
WORKSHOP ITEM

PUMP

Note

Scaf

4(B)

Cold Box
Shutdown
work

Yes

4(B)

Cold Box
Shutdown
work

4(B)

pump casing
line to be
Cold Box
rerouted due Shutdown
to safety
work
issue

219.

574

CM-84198

INSTRUM UNTAG-MTB- PMR-200-295 PROVIDE LSLL for V-2310 water boot AS PER
ENT
INST
HAZOP STUDY

576

CM-84239

INSTRUM
ENT

X-2701-E2

076- X-2701-E2 intercooler receiver top sight glass leakage to be


attended in next CB outage.

UNTAGGED
INSTRUMENT
ITEM
INTERCOOLER

Reason

To provide
new LSLL
tapping to
v-2310
water boot

Cold Box
Shutdown
work

lightting to
be provided
in all levels
(included
with CM86081)

Cold Box
Shutdown
work

6(b)

Cran

Insu

Hydr
Jett

Cold Box
Shutdown
work

577

CM-84240

ELECTRIC
AL

ME-2701

Pl provide lighting for good visibility working in the night on the


scaffolding and ground level surrounding MTBE cold box for
scanning purpose.

CRYOGENIC
SEPARATION
UNIT

6(b)

580

CM-84271

ELECTRIC
AL

P-2701-A-E

076- P-2701 A/B both pumps lube oil heaters to be inspected in


the next CB outage.

FLASH DRUM
PUMP LUBE OIL
HEATER

6(b)

Cold Box
Shutdown
work

582

CM-84298

WORKSHO
P

E-2301-A

116-Exchanger to be cleaned during TA-2011

SHELL & TUBE HE

5(B)

Cold Box
Shutdown
work

Yes

Yes

Yes

583

CM-84299

WORKSHO
P

E-2301-B

116-Exchanger to be cleaned during TA-2011

SHELL & TUBE HE

5(B)

Cold Box
Shutdown
work

Yes

Yes

Yes

584

CM-84300

WORKSHO
P

E-2316

116-Exchanger to be cleaned during TA-2011

SHELL & TUBE HE

5(B)

Cold Box
Shutdown
work

Yes

Yes

Yes

Sl.
No

Work Order
no:

Dept.

Equip No.

585

CM-84304

INSTRUM
ENT

FT-22027

586

CM-84314

MECHANI
CAL

C-2201

587

CM-84370

MECHANI
CAL

P-2101-B

589

CM-84372

WORKSHO
P

E-2305

Description

116-Impulse lines flushing to be done during any plant outage.

050- C-2201 NDEbearing oil outlet dropwise leakage to be


arrestd.
230 - Suction i/v ( 24" ) gland online leak sealing done to be
revert back.

116-S/W Exchanger to be cleaned during TA-2012

Asset
Description

Pack
No

Diff. Pressure TX

6(b)

Cold Box
Shutdown
work

REACTOR
EFFLUENT
COMPRESSOR

6(b)

Cold Box
Shutdown
work
Duplicate of
CM-85672

PUMP

SHELL & TUBE HE

Reason

Note

5(B)

Cold Box
Shutdown
work

Yes

5(B)

providing a
new LT
Cold Box
tapping to
Shutdown
the vessel vwork
2118

Yes

providing a
new LT
tapping for
P-2111 A&B

Yes

CM-84415

WORKSHO
P

UNTAG-MTBWKS

PMR-200-290 V-2118 level indication in DCS. TWO TAPPINGS


ON STAND PIPE WITH DRAIN LINE CONNECTION. PERC SERVICE

UNTAGGED
WORKSHOP ITEM

601

CM-84422

WORKSHO
P

UNTAG-MTBWKS

PMR-200-292 NEW LT PROVISION AS PER HAZOP STUDY. TWO


TAPPINGS ON THE STAND PIPE TO BE PROVIDED FOR NEW LT

UNTAGGED
WORKSHOP ITEM

5(B)

635

CM-85104

MECHANI
CAL

X-2701-C

REFRIGERANT
COMPRESSOR

6(b)

Cold Box
Shutdown
work

636

CM-85109

WORKSHO
P

LV-23012

050- LV-23012 downstream 8" isolation valve to be replaced as it


is passing.

Control Valve

5(B)

Cold Box
Shutdown
work

638

CM-85194

MECHANI
CAL

V-2612

69-Bags to be replaced .

DUST
COLLECTOR

6(b)

Cold Box
Shutdown
work

641

CM-85379

ELECTRIC
AL

P-2102-B-M

Track release lever ( Shutter) strock nut need to fix back.


Removed due to jam. Nut kept tie in the panel.

PUMP MOTOR

6(b)

Cold Box
Shutdown
work

645

CM-85606

INSTRUM
ENT

UV-22102B

050- UV-22102B gets stuck to be replaced/ repaired during RED B


change out.

On-Off Valve

6(b)

Replace
during Nov11 red
change

Cran

Insu

Hydr
Jett

Yes

Yes

Cold Box
Shutdown
work

597

Compressor to be rebuild.

Scaf

Cold Box
Shutdown
work

Cold Box
Shutdown
work

Yes

Yes

Yes

Sl.
No

Work Order
no:

646

CM-85608

647

CM-85640

WORKSHO
P

C-2101-A-M

648

CM-85667

WORKSHO
P

V-2309

649

CM-85670

WORKSHO
P

PV-25005

650

CM-85671

WORKSHO
P

651

CM-85672

652

Dept.

Equip No.

Description

INSTRUM UNTAG-MEO063, TI-10631-A (X-1103-C-A Disch. temp) to be replaced.


ENT
INST

Provide Crane and rigger for removing and intallation of HT Motor


(14 ton),overhaulin shall be done in manweir (Doha)

Asset
Description

Pack
No

Reason

Note

UNTAGGED
INSTRUMENT
ITEM

Cold Box
Shutdown
work

COMPRESSOR
MOTOR

Cold Box
Shutdown
work

Scaf

VESSEL

5(B)

Cold Box
Shutdown
work

0230 - PV250005 d/s i/v to make up dryer - Gland leak on line


sealing to be revert back.

Control Valve

5(B)

Cold Box
Shutdown
work

FV-26004

0230 - FV-26004 battery limit i/v 2" X 150# - gland leak on line
sealed to be reverted.

Control Valve

5(B)

Cold Box
Shutdown
work

Yes

WORKSHO
P

P-2101-B

0230 - P-2101B suction i/v gland leak on line selaed - to be revert


back (24" valve).

PUMP

5(B)

Cold Box
Shutdown
work

Yes

CM-85673

WORKSHO
P

V-2108

0230 - V-2108 draing valve 2" X 600# gland leak on line sealed to be reverted back.

VESSEL

654

CM-85968

INSTRUM
ENT

V-2225

Servicing of Catalyst valves upstream of V-2225

VESSEL

6(b)

655

CM-86081

Arrange lightings and cables for the inspection of equuipments VELECTRIC UNTAG-MTB2704/2604/2217/2601/3107/3101, R-2201/2202/2203 and MEAL
ELEC
2704. Remove electrical heat tracing for V-2611 vent line

UNTAGGED
ELECTRICAL
ITEM

6(b)

656

CM-86219

INSTRUM
ENT

On-Off Valve

UV-24028

0230 - FV-23025 d/s manual isolation valve wheel lock nut to be


fixed. (Based on CM-85612)

69-Still gland is leaking after tightening.(LEL- over range)

Duplicate of
CM-75949

Cran

Yes

Yes

Cold Box
Shutdown
work
Cold Box
Shutdown
work

Cold Box
Duplicate of
Shutdown
CM-71401;
work
repeat of
cmo -83041
Cold Box
(retained this Shutdown
CM as CMwork
83041 is
closed in the
system)

Insu

Yes

Yes

Hydr
Jett

Asset
Description

Pack
No

LIFT GAS
BLOWER

6(b)

Cold Box
Shutdown
work

EXPANDER /
DYMOMETER

6(b)

Cold Box
Shutdown
work

To check/ verify operating condition and adjust system


parameters by OEM- (Chloride) as per service contract PO1013459.

BATTERY
CHARGER

6(b)

Cold Box
Shutdown
work

BC-051-2

To check/ verify operating condition and adjust system


parameters by OEM- (Chloride) as per service contract PO1013459.

BATTERY
CHARGER

6(b)

Cold Box
Shutdown
work

ELECTRIC
AL

BC-151-1

To check/ verify operating condition and adjust system


parameters by OEM- (Chloride) as per service contract PO1013459.

BATTERY
CHARGER

6(b)

Cold Box
Shutdown
work

CM-86983

ELECTRIC
AL

BC-151-2

To check/ verify operating condition and adjust system


parameters by OEM- (Chloride) as per service contract PO1013459.

BATTERY
CHARGER

6(b)

Cold Box
Shutdown
work

676

CM-86992

ELECTRIC
AL

UPS-041

To check/ verify operating condition and adjust system


parameters by OEM- (Chloride) as per service contract PO1013459.

UNINTERRUPTAB
LE POWER
SUPPLY

6(b)

Cold Box
Shutdown
work

677

CM-86993

ELECTRIC
AL

UPS-042

To check/ verify operating condition and adjust system


parameters by OEM- (Chloride) as per service contract PO1013459.

UNINTERRUPTAB
LE POWER
SUPPLY

6(b)

Cold Box
Shutdown
work

678

CM-86994

ELECTRIC
AL

UPS-141

To check/ verify operating condition and adjust system


parameters by OEM- (Chloride) as per service contract PO1013459.

UNINTERRUPTAB
LE POWER
SUPPLY

6(b)

Cold Box
Shutdown
work

679

CM-86995

ELECTRIC
AL

UPS-142

To check/ verify operating condition and adjust system


parameters by OEM- (Chloride) as per service contract PO1013459.

UNINTERRUPTAB
LE POWER
SUPPLY

6(b)

Cold Box
Shutdown
work

CM-87179

WORKSHO
P

H-2201

290- Charge heater rad/ convection tubes cleaning / Blower


arrangement for entry

CHARGE HEATER

Operation to
Cold Box
find better
Shutdown
method for
work
cleaning

CM-87180

WORKSHO
P

290- Interheater 1 rad/ convection tubes cleaning

INTERHEATER NO.
1

Operation to
Cold Box
find better
Shutdown
method for
work
cleaning

Sl.
No

Work Order
no:

Dept.

Equip No.

659

CM-86304

MECHANI
CAL

FA-2604

660

CM-86305

MECHANI
CAL

G-2701-B

Expander wheel inspection during TA-2012

664

CM-86980

ELECTRIC
AL

BC-051-1

665

CM-86981

ELECTRIC
AL

666

CM-86982

667

690

691

H-2202

Description

(PdM) Blower to be replaced with refurbished one during TA-2012

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

Sl.
No

Work Order
no:

Dept.

Equip No.

692

CM-87182

WORKSHO
P

H-2203

693

CM-87202

MECHANI
CAL

C-2201-T

694

CM-87203

MECHANI
CAL

696

CM-87213

697

Description

290- Inter heater 2 radiation / Convection tubes cleaning

Asset
Description

Pack
No

Reason

Note

Scaf

Cran

Yes

Operation to
Cold Box
find better
Shutdown
method for
work
cleaning

INTERHEATER NO.
2

Steam leak from ESV flange to be attended during MTBE


shutdown.

TURBINE

6(b)

Cold Box
Shutdown
work

Yes

X-2701-E3

X-2701-E3 bottom & bottom line painting & insulation to be done.

CHILLER

6(b)

Cold Box
Shutdown
work

Yes

WORKSHO
P

LSHH-31002

189, During P.M. Job of level switch found Isolation valve is


passing, to be rectify during shutdwon. (V-3107).

Level Switch
(Float)

7(b)

Cold Box
Shutdown
work

Yes

CM-87214

WORKSHO
P

LSLL-31003

189, During P.M. Job of level switch found Isolation valve is


passing, to be rectify during shutdwon. (V-3107).

Level Switch
(Float)

7(b)

Cold Box
Shutdown
work

Yes

698

CM-87215

WORKSHO
P

LSLL-31009

189, During P.M. Job of level switch found Isolation valve is


passing, to be rectify during shutdwon. (V-3101).

Level Switch
(Float)

7(b)

Cold Box
Shutdown
work

Yes

699

CM-87228

INSTRUM
ENT

V-2310

PMR-200-295 PROVIDE NEW LT FOR LSLL LEVEL ON V-2310

VESSEL

700

ELECTRIC
CM-87229
AL

ORU
REGENERANT
SUPERHEATER

6(b)

Cold Box
Shutdown
work

701

CM-87251

UNTAGGED
INSTRUMENT
ITEM

6(b)

Cold Box
Shutdown
work

061, To arrange H-2401 salt drain line electrical tracing for salt
unloading. In 2010 TA failed to unload salt as it is solidifying.
H-2401
Electrical tracing to be arranged to as trial and arrange for salt
bath heaters inspections in futu
206, Check and verify unidentified tags in field JB : JBMV201,
INSTRUM UNTAG-MTBJBMV207, JBMV209, D5TB-2601 & D5TB-2602 during next
ENT
INST
shutdown opportunity

Insu

Dupicate of
CM-84198

Cold Box
Shutdown
work
Yes

Yes

Hydr
Jett

Sl.
No

Work Order
no:

Dept.

Equip No.

702

CM-87257

WORKSHO
P

H-2201

703

CM-87260

INSTRUM
ENT

ME-2101

061, PMR-200-309

704

CM-87749

ELECTRIC
AL

HTP-2601

Remove Heat tracing cable permanently,PIPE will be replaced to


PVC,refer attached drawg 260-AV-1063,1064 AND Partly in line
1068.Job shall be done during cold box S/D (MTBE TA 2012)

705

CM-87783

WORKSHO
P

H-2401

706

CM-87806

ELECTRIC
AL

X-2701-C

709

CM-87810

WORKSHO
P

UNTAG-UTYWKS

061, PMR-000-077

711

CM-87822

WORKSHO
P

X-2701-C-M

712

CM-87823

ELECTRIC
AL

713

CM-87824

714

715

Description

290- Oleflex heater common stock covering with plate to avoid


moisture entry and Crane arrangement for the same

ME-2101C PLC upgrade

Asset
Description

Pack
No

CHARGE HEATER

BUTAMER
REFRIGERATION
PACKAGE

Reason

Note

HEATER
WORKS ON
HOLD

Cold Box
Shutdown
work

Scaf

Yes

Cold Box
Shutdown
work

Yes

Cold Box
Shutdown
work

Yes

UNTAGGED
WORKSHOP
ITEM

Cold Box
Shutdown
work

Yes

Provide assistance for Motor replacement during TA 2012.


Removal of existing motor and Installtion of new motor.
Mobilization of Motor From W/H to site and vice versa.

COMPRESSOR
MOTOR

Cold Box
Shutdown
work

P-2701-A-M

Perform MOTOR LEAP Test ,during TA 2012 and Sent for O/H as
per Task:ELE:0073S

PUMP MOTOR

6(b)

Cold Box
Shutdown
work

ELECTRIC
AL

P-2701-B-M

Perform MOTOR LEAP Test during TA 2012 and sent for O/H as per
task: ELE:0073S.

PUMP MOTOR

6(b)

Cold Box
Shutdown
work

CM-87825

ELECTRIC
AL

C-2101-A-M

Perform MOTOR LEAP Test during TA 2012 and sent for O/H as per
task: ELE:0073A

COMPRESSOR
MOTOR

6(b)

Cold Box
Shutdown
work

CM-87826

ELECTRIC
AL

C-2101-B-M

Perform MOTOR LEAP Test during TA 2012 and sent for O/H as per
task: ELE:0073A

COMPRESSOR
MOTOR

6(b)

Cold Box
Shutdown
work

101-H-2401 salt to be unload & Load during coming next shut


down.

070- Provide current of X-2701-CM on DCS.

Utility Tie-ins for new lab building

6(b)

ORU REGENERANT
SUPERHEATER

REFRIGERANT
COMPRESSOR

Insu

Yes

Yes

Cold Box
Shutdown
work
Cold Box
Shutdown
work

HEAT TRACING
PANEL

Cran

6(b)

Hydr
Jett

Sl.
No

Work Order
no:

Dept.

Equip No.

716

CM-87905

WORKSHO
P

E-2240

717

CM-88889

ELECTRIC
AL

SG-032-L

720

CM-89146

MECHANI
CAL

721

CM-89153

722

Description

Asset
Description

Pack
No

Note

Scaf

Cran

WASH OIL
CIRCULATION
COOLER

Cold Box
Shutdown
work

Yes

Yes

Addition of MCC Column to existing switch gear in Main SubStation for LAB Building.

SWITCH GEAR
(LV)

Cold Box
Shutdown
work

C-2101-A-M

Provide assistance for removal and installation of HV motor for


O/H in man weir during MTBE -TA 2012. (Decouple, base bolt
removal, alignment etc)

COMPRESSOR
MOTOR

Cold Box
Shutdown
work

WORKSHO
P

UNTAG-MTBWKS

061, PMR-200-311 PSA feed strainer bypass strainer

UNTAGGED
WORKSHOP ITEM

Cold Box
Shutdown
work

CM-89157

INSTRUM
ENT

C-2101-A-M

Provide assistance for disconnection/connection of Brg and Wind


temp sensor cables for Motor O/H.(TA-2012)

COMPRESSOR
MOTOR

Cold Box
Shutdown
work

723

CM-89158

MECHANI
CAL

C-2101-B-M

Provide assistance for removal and installation of HV motor for


O/H in man weir. (Decouple, base bolt removal, alignment etc)-TA
2012

COMPRESSOR
MOTOR

Cold Box
Shutdown
work

724

CM-89160

WORKSHO
P

C-2101-B-M

Provide assistance for removal and installation of HV motor for


O/H in man weir.( Arrange crane ,rigger, loading/unloading to
truck etc)

COMPRESSOR
MOTOR

Cold Box
Shutdown
work

PMR-200-286 E-2240/X-2701-E1 retrofit - Check HAZOP what


if analysis recommendations

Reason

Yes

Insu

Yes

Hydr
Jett

Sl.
No

Work Order
no:

Dept.

Equip No.

725

CM-89161

INSTRUM
ENT

C-2101-B-M

726

CM-89215

MECHANI
CAL

H-2206

Removal and installation of Insulation for Heater bundle


inspection.(H-2206 A/B/C)

727

CM-89216

WORKSHO
P

H-2206

Provide assistance for removal and installation of heater bundle


for inspection.(arrange chain block and fitter)

728

CM-89217

INSTRUM
ENT

H-2206

Provide assistance for disconnection and connection of


thermocouple cables for Heater inspection (H-2206/A/B/C).

729

CM-89218

MECHANI
CAL

H-2207

Removal and installation of Insulation shall be done for heater


inspection.

730

CM-89219

WORKSHO
P

H-2207

Provide assistance for removal and installation of heater bundle


for inspection.(arrange chain block and fitter)

731

CM-89220

INSTRUM
ENT

H-2207

732

CM-89221

MECHANI
CAL

733

CM-89222

WORKSHO
P

Description

Asset
Description

Pack
No

Reason

Note

COMPRESSOR
MOTOR

Cold Box
Shutdown
work

REDUCTION
GAS HEATER

Cold Box
Shutdown
work

REDUCTION GAS
HEATER

Cold Box
Shutdown
work

REDUCTION
GAS HEATER

Cold Box
Shutdown
work

REACTOR NO. 2
SURGE POT
HEATER

Cold Box
Shutdown
work

REACTOR NO. 2
SURGE POT
HEATER

Cold Box
Shutdown
work

Provide assistance for disconnection and connection of


thermocouple cables for Heater inspection (H-2206/A/B/C)

REACTOR NO. 2
SURGE POT
HEATER

Cold Box
Shutdown
work

H-2208

Removal and installation of Insulation shall be done for heater


inspection.

REACTOR NO. 3
SURGE POT
HEATER

Cold Box
Shutdown
work

H-2208

Provide assistance for removal and installation of heater bundle


for inspection.(arrange chain block and fitter)

REACTOR NO. 3
SURGE POT
HEATER

Cold Box
Shutdown
work

Provide assistance for disconnection/connection of Brg and Wind


temp sensor cables for Motor O/H.

Scaf

Cran

Insu

Hydr
Jett

Sl.
No

Work Order
no:

Dept.

Equip No.

734

CM-89223

INSTRUM
ENT

H-2208

Provide assistance for disconnection and connection of


thermocouple cables for Heater inspection (H-2206/A/B/C)

735

CM-89224

WORKSHO
P

H-2602

Provide assistance for removal and installation of heater bundle


for inspection.CCR-9th floor.

736

CM-89225

MECHANI
CAL

H-2603

Provide scffolding for terminal inspection. CCR-8 th floor.

737

CM-89228

MECHANI
CAL

P-2001-A-M

738

CM-89229

WORKSHO
P

P-2001-A-M

739

CM-89230

MECHANI
CAL

P-2001-B-M

740

CM-89231

WORKSHO
P

741

CM-89238

742

Description

Asset
Description

Pack
No

Reason

Note

REACTOR NO. 3
SURGE POT
HEATER

Cold Box
Shutdown
work

REGENERATION
HEATER

Cold Box
Shutdown
work

AIR HEATER

Cold Box
Shutdown
work

Provide assistance for removal and installation of LV motor for


O/H in man weir. (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

Provide assistance for removal and installation of LV motor for


O/H, (Arrange crane, rigger and shifting )

PUMP MOTOR

Cold Box
Shutdown
work

Provide assistance for removal and installation of LV motor


(75KW) for O/H in man weir. (Decouple, base bolt removal,
alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

P-2001-B-M

Provide assistance for removal and installation of motor (75KW ,V


mount) for O/H in man weir.( Arrange crane ,rigger,
loading/unloading to truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

MECHANI
CAL

P-2004-M

Provide assistance for removal,shifting and installation of LV


motor for O/H in man weir. (Decouple, base bolt removal,
alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

CM-89241

MECHANI
CAL

P-2007-A-M

Provide assistance for removal and installation of LV motor for


O/H in man weir. (Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

743

CM-89243

WORKSHO
P

P-2007-A-M

Provide assistance for removal and installation of LV motor for


O/H, (Arrange crane, rigger & shifting etc)

PUMP MOTOR

Cold Box
Shutdown
work

744

CM-89244

MECHANI
CAL

P-2007-B-M

Provide assistance for removal and installation of LV motor for


O/H in man weir. (Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

Scaf

Cran

Insu

Hydr
Jett

Pack
No

Sl.
No

Work Order
no:

Dept.

Equip No.

Description

Asset
Description

745

CM-89245

WORKSHO
P

P-2007-B-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

746

CM-89246

MECHANI
CAL

P-2101-A-M

Provide assistance for removal and installation of HV motor for


O/H in man weir. (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

747

CM-89247

WORKSHO
P

P-2101-A-M

Provide assistance for removal and installation of HV motor for


O/H in man weir.( Arrange crane ,rigger, loading/unloading to
truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

748

CM-89248

MECHANI
CAL

P-2101-B-M

Provide assistance for removal and installation of HV motor for


O/H in man weir. (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

749

CM-89249

WORKSHO
P

P-2101-B-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

750

CM-89250

MECHANI
CAL

P-2102-A-M

Provide assistance for removal and installation of HVmotor for O/H


in man weir. (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

751

CM-89251

WORKSHO
P

P-2102-B-M

Provide assistance for removal and installation of HV motor for


O/H in man weir.( Arrange crane ,rigger, loading/unloading to
truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

752

CM-89252

MECHANI
CAL

P-2102-B-M

Provide assistance for removal and installation of HV motor for


O/H in man weir. (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

753

CM-89253

WORKSHO
P

P-2102-B-M

Provide assistance for removal and installation of HV motor for


O/H in man weir.( Arrange crane ,rigger, loading/unloading to
truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

754

CM-89261

MECHANI
CAL

P-2103-A-M

Provide assistance for removal and installation of motor for O/H in


man weir. (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

755

CM-89263

MECHANI
CAL

P-2103-B-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

Work Order
no:

Dept.

Equip No.

756

CM-89264

WORKSHO
P

P-2103-B-M

Provide assistance for removal and installation of LV motor for


O/H in man weir.( Arrange crane or Fork lift ,rigger, shifting of
motor to EWS etc)

PUMP MOTOR

Cold Box
Shutdown
work

757

CM-89265

WORKSHO
P

P-2104-A-M

Provide assistance for removal and installation of LV motor for


O/H in man weir.( Arrange Fork lift , shifting of motor to EWS
etc)

PUMP MOTOR

Cold Box
Shutdown
work

758

CM-89266

MECHANI
CAL

P-2104-A-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

759

CM-89267

MECHANI
CAL

P-2105-A-M

Provide assistance for removal and installation of LV motor for


O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

760

CM-89268

WORKSHO
P

P-2105-A-M

Provide assistance for removal and installation of LV motor for


O/H( Arrange Fork lift , shifting of motor to EWS etc)

PUMP MOTOR

Cold Box
Shutdown
work

761

CM-89269

MECHANI
CAL

P-2105-B-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

762

CM-89270

WORKSHO
P

P-2105-B-M

Provide assistance for removal and installation of LV motor for


O/H .( Arrange crane or Fork lift , shifting of motor to EWS etc)

PUMP MOTOR

Cold Box
Shutdown
work

763

CM-89271

MECHANI
CAL

P-2106-A-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

764

CM-89272

MECHANI
CAL

P-2106-B-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

765

CM-89273

MECHANI
CAL

P-2108-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

766

CM-89275

MECHANI
CAL

P-2111-A-M

Provide assistance for removal and installation of motor (75KW)


for O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

Description

Asset
Description

Pack
No

Sl.
No

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

Work Order
no:

Dept.

Equip No.

767

CM-89276

WORKSHO
P

P-2111-A-M

Provide assistance for removal and installation of motor(75KW)


for O/H in man weir.( Arrange crane ,rigger, loading/unloading to
truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

768

CM-89277

MECHANI
CAL

P-2111-B-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

769

CM-89278

WORKSHO
P

P-2111-B-M

Provide assistance for removal and installation of motor (75KW)


for O/H in man weir.( Arrange crane ,rigger, loading/unloading to
truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

770

CM-89279

MECHANI
CAL

P-2203-A-M

Provide assistance for removal and installation of motor(15KW)


for O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

771

CM-89280

WORKSHO
P

P-2203-A-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

772

CM-89281

MECHANI
CAL

P-2203-B-M

Provide assistance for removal and installation of motor


(15KW)for O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

773

CM-89282

WORKSHO
P

P-2203-B-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

774

CM-89283

MECHANI
CAL

P-2204-A-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

775

CM-89285

MECHANI
CAL

P-2204-C-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

776

CM-89288

MECHANI
CAL

P-2207-M

Provide assistance for removal and installation of motor (37KW)


for O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

777

CM-89290

MECHANI
CAL

P-2240-B-M

Provide assistance for removal and installation of motor(110kw)


for O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

Description

Asset
Description

Pack
No

Sl.
No

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

Work Order
no:

Dept.

Equip No.

778

CM-89291

WORKSHO
P

P-2240-B-M

Provide assistance for removal and installation of motor (110kw)


for O/H in man weir.
( Arrange crane ,rigger, loading/unloading to truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

779

CM-89292

MECHANI
CAL

P-2241-A-M

Provide assistance for removal and installation of motor (1.5 KW)


for O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

780

CM-89293

MECHANI
CAL

P-2241-B-M

Provide assistance for removal and installation of motor(1.5kw)


for O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

781

CM-89296

MECHANI
CAL

P-2301-A-M

Provide assistance for removal and installation of motor(75kw)


for O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

782

CM-89297

WORKSHO
P

P-2301-A-M

Provide assistance for removal and installation of motor (75kw)


for O/H in man weir.( Arrange crane ,rigger, loading/unloading to
truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

783

CM-89298

MECHANI
Provide assistance for removal and installation of motor (0.75kw)
P-2301-A-P-M
CAL
for O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

784

CM-89299

MECHANI
Provide assistance for removal and installation of motor (0.75) for
P-2301-B-P-M
CAL
O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

785

CM-89300

MECHANI
CAL

P-2302-A-M

Provide assistance for removal and installation of motor(150kw)


for O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

786

CM-89301

WORKSHO
P

P-2302-A-M

Provide assistance for removal and installation of LV motor (150


kw) for O/H in man weir.( Arrange crane ,rigger, loading/unloading
to truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

787

CM-89311

MECHANI
CAL

P-2302-B-M

Provide assistance for removal and installation of motor(150Kw)


for O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

788

CM-89312

WORKSHO
P

P-2302-B-M

Provide assistance for removal and installation of motor(150KW)


for O/H in man weir.( Arrange crane ,rigger, loading/unloading to
truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

Description

Asset
Description

Pack
No

Sl.
No

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

Work Order
no:

Dept.

Equip No.

789

CM-89313

MECHANI
CAL

P-2303-A-M

Provide assistance for removal and installation of HV motor for


O/H . (Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

790

CM-89314

WORKSHO
P

P-2303-A-M

Provide assistance for removal and installation of HV motor for


O/H in man weir.( Arrange crane ,rigger, loading/unloading to
truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

791

CM-89315

MECHANI
CAL

P-2303-B-M

Provide assistance for removal and installation of HV motor for


O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

792

CM-89316

WORKSHO
P

P-2303-B-M

Provide assistance for removal and installation of HV motor for


O/H in man weir.( Arrange crane ,rigger, loading/unloading to
truck etc)

PUMP MOTOR

Cold Box
Shutdown
work

793

CM-89318

MECHANI
CAL

P-2306-A-M

Provide assistance for removal and installation of LV motor


(30KW) for O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

794

CM-89319

WORKSHO
P

P-2306-A-M

Provide assistance for removal and installation of LV motor


(30KW)for O/H .( Arrange crane , shifting of motor to EWS etc)

PUMP MOTOR

Cold Box
Shutdown
work

795

CM-89321

CSD

FT-22042A

089 TO CHECK THIS TRANSMITTER ON THE MARSHALLING SIDE


AS DIFFERENCE EXISTS BETWEEN FT-22042and FT-22042A.

Diff. Pressure TX

Cold Box
Shutdown
work

796

CM-89324

MECHANI
CAL

P-2306-B-M

Provide assistance for removal and installation of motor (30Kw)


for O/H . (Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

797

CM-89325

WORKSHO
P

P-2306-B-M

Provide assistance for removal and installation of LV motor (30kw)


for O/H .( Arrange crane or Fork lift , shifting of motor to EWS
etc)

PUMP MOTOR

Cold Box
Shutdown
work

798

CM-89326

MECHANI
CAL

P-2307-A-M

Provide assistance for removal and installation of LV motor for


O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

799

CM-89327

WORKSHO
P

P-2307-A-M

Provide assistance for removal and installation of LV motor


(5.5KW) for O/H .( Arrange crane or Fork lift , shifting of motor to
EWS etc)

PUMP MOTOR

Cold Box
Shutdown
work

Description

Asset
Description

Pack
No

Sl.
No

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

Work Order
no:

Dept.

Equip No.

801

CM-89350

MECHANI
CAL

P-2307-B-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

802

CM-89351

WORKSHO
P

P-2307-B-M

Provide assistance for removal and installation of LV motor for


O/H .( Arrange crane or Fork lift , shifting of motor to EWS etc)

PUMP MOTOR

Cold Box
Shutdown
work

803

CM-89352

MECHANI
CAL

P-2308-A-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

804

CM-89354

WORKSHO
P

P-2308-B-M

Provide assistance for removal and installation of LV motor for


O/H .( Arrange crane or Fork lift , shifting of motor to EWS
etc)Motor weight-540Kg

PUMP MOTOR

Cold Box
Shutdown
work

805

CM-89355

MECHANI
CAL

P-2308-B-M

Provide assistance for removal and installation of motor (55KW)


for O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

806

CM-89360

MECHANI
CAL

P-2401-A-M

Provide assistance for removal and installation of motor (18.5KW)


for O/H . (Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

807

CM-89362

WORKSHO
P

P-2401-A-M

Provide assistance for removal and installation of LV motor for


O/H .( Arrange crane or Fork lift , shifting of motor to EWS etc)

PUMP MOTOR

Cold Box
Shutdown
work

808

CM-89363

WORKSHO
P

P-2451-A-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck
etc)Motor weight -1000kg,

PUMP MOTOR

Cold Box
Shutdown
work

809

CM-89364

MECHANI
CAL

P-2451-A-M

Provide assistance for removal and installation of motor (150kw)


for O/H . (Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

810

CM-89365

MECHANI
CAL

P-2451-B-M

Provide assistance for removal and installation of motor (150KW)


for O/H . (Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

Description

Asset
Description

Pack
No

Sl.
No

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

Pack
No

Sl.
No

Work Order
no:

Dept.

Equip No.

Description

Asset
Description

811

CM-89366

WORKSHO
P

P-2451-B-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck
etc)Motor weight-1000kg.

PUMP MOTOR

Cold Box
Shutdown
work

812

CM-89367

WORKSHO
P

P-2452-A-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck
etc)Motor weight-690kg.

PUMP MOTOR

Cold Box
Shutdown
work

813

CM-89368

MECHANI
CAL

P-2452-A-M

Provide assistance for removal and installation of motor (75KW)


for O/H . (Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

814

CM-89369

MECHANI
CAL

P-2452-B-M

Provide assistance for removal and installation of motor (75KW)


for O/H . (Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

815

CM-89370

WORKSHO
P

P-2452-B-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck
etc)Motor weight-690kg.

PUMP MOTOR

Cold Box
Shutdown
work

816

CM-89371

MECHANI
CAL

P-2603-A-M

Provide assistance for removal ,Shifting and installation of motor


for O/H . (Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

817

CM-89372

MECHANI
CAL

P-2603-B-M

Provide assistance for removal,shifting and installation of motor


for O/H . (Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

818

CM-89373

MECHANI
CAL

P-2701-A-M

Provide assistance for removal and installation of HV motor for


O/H . (Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

819

CM-89374

WORKSHO
P

P-2701-A-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck
etc)Motor weight-1850kg.

PUMP MOTOR

Cold Box
Shutdown
work

820

CM-89375

WORKSHO
P

P-2701-B-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck
etc)Motor weight-1850kg.

PUMP MOTOR

Cold Box
Shutdown
work

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

Work Order
no:

Dept.

Equip No.

821

CM-89376

MECHANI
CAL

P-2701-B-M

Provide assistance for removal and installation of HV motor for


O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

822

CM-89377

MECHANI
CAL

P-3101-A-M

Provide assistance for removal and installation of LV motor


(75KW)for O/H . (Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

823

CM-89378

WORKSHO
P

P-3101-A-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck etc)
Motor weight-800kg.

PUMP MOTOR

Cold Box
Shutdown
work

824

CM-89380

MECHANI
CAL

P-3101-B-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

825

CM-89381

WORKSHO
P

P-3101-B-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck
etc)Motor weight-800Kg.

PUMP MOTOR

Cold Box
Shutdown
work

826

CM-89382

WORKSHO
P

P-3102-A-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck etc)
Motor weight-1500kg.

PUMP MOTOR

Cold Box
Shutdown
work

827

CM-89383

MECHANI
CAL

P-3102-A-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

828

CM-89384

MECHANI
CAL

P-3102-B-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

829

CM-89385

WORKSHO
P

P-3102-B-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck etc)
Motor weight-1500kg.

PUMP MOTOR

Cold Box
Shutdown
work

Description

Asset
Description

Pack
No

Sl.
No

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

Pack
No

Sl.
No

Work Order
no:

Dept.

Equip No.

Description

Asset
Description

830

CM-89386

WORKSHO
P

P-3103-A-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck etc)
Motor weight-830Kg.

PUMP MOTOR

Cold Box
Shutdown
work

831

CM-89387

MECHANI
CAL

P-3103-A-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

832

CM-89388

MECHANI
CAL

P-3103-B-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

833

CM-89389

WORKSHO
P

P-3103-B-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck
etc)Motor weight-830kg.

PUMP MOTOR

Cold Box
Shutdown
work

834

CM-89390

WORKSHO
P

P-3107-A-M

Provide assistance for removal and installation of motor for O/H in


man weir.( Arrange crane ,rigger, loading/unloading to truck etc)
Motor weight -250kg.

PUMP MOTOR

Cold Box
Shutdown
work

835

CM-89391

MECHANI
CAL

P-3107-A-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

836

CM-89392

MECHANI
CAL

P-3107-B-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

837

CM-89393

WORKSHO
P

P-3107-B-M

Provide assistance for removal and installation of LV motor for


O/H .( Arrange crane or Fork lift , shifting of motor to EWS etc)
Motor weight-250kg.

PUMP MOTOR

Cold Box
Shutdown
work

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

Work Order
no:

Dept.

Equip No.

838

CM-89394

WORKSHO
P

P-3110-M

Provide assistance for removal and installation of LV motor for


O/H .( Arrange crane or Fork lift , shifting of motor to EWS etc)
Motor weight-275Kg.

PUMP MOTOR

Cold Box
Shutdown
work

839

CM-89395

MECHANI
CAL

P-3110-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

840

CM-89397

WORKSHO
P

X-2701-V-C-M

Provide assistance for removal and installation of LV motor for


O/H .( Arrange crane ,Rigger and shifting of motor to EWS etc)

COMPRESSOR
MOTOR

Cold Box
Shutdown
work

841

CM-89398

MECHANI
CAL

TR-021-L

Scaffolding shall be errected for Bus duct and Transformer PM.

TRANSFORMER
25/31.5MVA
-33/6.9kV

Cold Box
Shutdown
work

842

CM-89399

MECHANI
CAL

TR-021-R

Scaffolding shall be erected for Bus duct and Transformer PM

TRANSFORMER
25/31.5MVA
-33/6.9kV

Cold Box
Shutdown
work

843

CM-89400

MECHANI
CAL

TR-031-L

Removal and Installation of cladding for Bus duct and erect


scaffolding for Transformer PM.

TRANSFORMER
2000kVA 6.6/0.4kV

Cold Box
Shutdown
work

844

CM-89401

MECHANI
CAL

TR-031-R

Removal and Installation of cladding for Bus duct and erect


scaffolding for Transformer PM.

TRANSFORMER
2000kVA 6.6/0.4kV

Cold Box
Shutdown
work

845

CM-89402

MECHANI
CAL

TR-032-L

Removal and Installation of cladding for Bus duct and erect


scaffolding for Transformer PM.

TRANSFORMER
2000kVA 6.6/0.4kV

Cold Box
Shutdown
work

846

CM-89403

MECHANI
CAL

TR-032-R

Removal and Installation of cladding for Bus duct and erect


scaffolding for Transformer PM.

TRANSFORMER
2000kVA 6.6/0.4kV

Cold Box
Shutdown
work

847

CM-89404

MECHANI
CAL

TR-131-L

Removal and Installation of cladding for Bus duct and erect


scaffolding for Transformer PM.

TRANSFORMER
2000kVA 6.6/0.4kV

Cold Box
Shutdown
work

848

CM-89405

MECHANI
CAL

TR-131-R

Removal and Installation of cladding for Bus duct and erect


scaffolding for Transformer PM.

TRANSFORMER
2000kVA 6.6/0.4kV

Cold Box
Shutdown
work

849

CM-89406

MECHANI
CAL

TR-132-L

Removal and Installation of cladding for Bus duct and erect


scaffolding for Transformer PM.

TRANSFORMER
2000kVA 6.6/0.4kV

Cold Box
Shutdown
work

Description

Asset
Description

Pack
No

Sl.
No

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

Work Order
no:

Dept.

Equip No.

850

CM-89407

MECHANI
CAL

TR-132-R

Removal and Installation of cladding for Bus duct and erect


scaffolding for Transformer PM.

TRANSFORMER
2000kVA 6.6/0.4kV

Cold Box
Shutdown
work

851

CM-89408

MECHANI
CAL

TR-133-L

Removal and Installation of cladding for Bus duct and erect


scaffolding for Transformer PM.

TRANSFORMER
2000kVA 6.6/0.4kV

Cold Box
Shutdown
work

852

CM-89409

MECHANI
CAL

TR-133-R

Removal and Installation of cladding for Bus duct and erect


scaffolding for Transformer PM.

TRANSFORMER
2000kVA 6.6/0.4kV

Cold Box
Shutdown
work

853

CM-89410

MECHANI UV-21003-M- Removal and Installation of Insulation shall be done for UV PM.(VCAL
FIV
2102 Bottom)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

854

CM-89411

MECHANI UV-21033-M- Removal and Installation of Insulation shall be done for UV PM.
CAL
FIV
(V-2106)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

855

CM-89412

MECHANI UV-21057-M- Removal and Installation of Insulation shall be done for UV PM.
CAL
FIV
(V-2105 bottom)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

856

CM-89413

MECHANI UV-21058-M- Removal and Installation of Insulation shall be done for UV PM.
CAL
FIV
(V-2111 inlet)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

857

CM-89414

MECHANI UV-21062-M- Removal and Installation of Insulation shall be done for UV PM.
CAL
FIV
(V-2117 suction)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

858

CM-89415

MECHANI
CAL

UV-21071-M

Removal and Installation of Insulation shall be done for UV PM.


(near R-2101)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

859

CM-89416

MECHANI
CAL

UV-21071-M

Removal and Installation of Insulation shall be done for UV PM.


(near R-2101)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

860

CM-89417

MECHANI UV-22076-M- Removal and Installation of Insulation shall be done for UV PM.(VCAL
FIV
2216 Bottom)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

861

CM-89418

MECHANI UV-22082-M- Removal and Installation of Insulation shall be done for UV PM.
CAL
FIV
(near C-2201 shelter top)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

862

CM-89419

MECHANI UV-23004-M- Removal and Installation of Insulation shall be done for UV PM.
CAL
FIV
( V-2301 Bottom)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

Description

Asset
Description

Pack
No

Sl.
No

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

Work Order
no:

863

CM-89420

MECHANI UV-23008-M- Removal and Installation of Insulation shall be done for UV PM.
CAL
FIV
( V-2303 Bottom)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

864

CM-89421

MECHANI UV-23016-M- Removal and Installation of Insulation shall be done for UV PM.
CAL
FIV
( V-2305 Bottom)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

865

CM-89422

MECHANI UV-23031-M- Removal and Installation of Insulation shall be done for UV PM)
CAL
FIV
(V-2310 bottom)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

866

CM-89423

MECHANI UV-24041-M- Removal and Installation of Insulation shall be done for UV PM)
CAL
FIV
(V-2402 Bottom)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

867

CM-89424

MECHANI UV-24048-M- Removal and Installation of Insulation shall be done for UV PM)
CAL
FIV
(V-2451 Bottom)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

868

CM-89425

MECHANI UV-24052-M- Removal and Installation of Insulation shall be done for UV PM)
CAL
FIV
(V-2452 Bottom)

MOTOR
OPERATED
VALVE

Cold Box
Shutdown
work

869

CM-89430

INSTRUM
C-2101-A-H1 Heater thermostat calibration shall be done
ENT

MAKE-UP GAS
COMP LUBE OIL
HEATER

Cold Box
Shutdown
work

870

CM-89443

WORKSHO
P

H-2401

Provide assistance to relocate the existing cable tray for installing


electrical heat tracing. (L angle shall be welded on the H-2401
Base.

ORU
REGENERANT
SUPERHEATER

Cold Box
Shutdown
work

871

CM-89444

MECHANI
CAL

H-2401

Scaffolding shall be erected for pulling Cable from HTP-01 (RED


area )to H 2401. Contact Ragu.

ORU
REGENERANT
SUPERHEATER

Cold Box
Shutdown
work

872

CM-89445

MECHANI
CAL

X-2701-C-M

Scaffolding shall be erected for laying cable from Control building


to Main substation.

COMPRESSOR
MOTOR

Cold Box
Shutdown
work

873

CM-89446

MECHANI
CAL

HTP-2601

Scaffolding shall be erected to remove the heat tracing cable on


CCR platforms between 3rd & 5 th floor.

HEAT TRACING
PANEL

Cold Box
Shutdown
work

874

CM-89472

MECHANI C-2101-A-P1- Provide assistance for removal and installation of motor for O/H .
CAL
B-M
(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

Dept.

Equip No.

Description

Asset
Description

Pack
No

Sl.
No

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

Work Order
no:

875

CM-89475

MECHANI C-2101-B-P1- Provide assistance for removal and installation of motor for O/H .
CAL
B-M
(Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

876

CM-89477

MECHANI C-2101-P2-A- Provide assistance for removal and installation of motor for O/H .
CAL
M
(Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

877

CM-89479

MECHANI C-2101-P2-B- Provide assistance for removal and installation of motor for O/H .
CAL
M
(Decouple, base bolt removal, alignment etc).

PUMP MOTOR

Cold Box
Shutdown
work

878

CM-89481

MECHANI
CAL

FA-2603-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc).

BLOWER MOTOR

Cold Box
Shutdown
work

879

CM-89483

WORKSHO
P

FA-2603-M

Provide assistance for removal and installation of LV motor for


O/H .(Motor shall be shifted form CCR 8th floor)

BLOWER MOTOR

Cold Box
Shutdown
work

880

CM-89484

MECHANI
Provide assistance for removal and installation of motor for O/H .
FA-2604-FA-M
CAL
(Decouple, base bolt removal, alignment etc).

COMPRESSOR
MOTOR

Cold Box
Shutdown
work

881

CM-89485

MECHANI
CAL

FA-2604-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc).

BLOWER MOTOR

Cold Box
Shutdown
work

882

CM-89487

WORKSHO
P

FA-2604-M

Provide assistance for removal and installation of LV motor for


O/H .( Fork lift , shifting of motor to EWS etc)

BLOWER MOTOR

Cold Box
Shutdown
work

883

CM-89489

MECHANI G-2701-A-P- Provide assistance for removal and installation of motor for O/H .
CAL
A-M
(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

884

CM-89490

WORKSHO
P

G-2701-A-P-A- Provide assistance for removal and installation of LV motor for


M
O/H .( Arrange crane or Fork lift , shifting of motor to EWS etc)

PUMP MOTOR

Cold Box
Shutdown
work

885

CM-89492

WORKSHO
P

G-2701-A-P-B- Provide assistance for removal and installation of LV motor for


M
O/H .( Arrange crane or Fork lift , shifting of motor to EWS etc)

PUMP MOTOR

Cold Box
Shutdown
work

Dept.

Equip No.

Description

Asset
Description

Pack
No

Sl.
No

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

Work Order
no:

886

CM-89493

MECHANI G-2701-A-P- Provide assistance for removal and installation of motor for O/H .
CAL
B-M
(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

887

CM-89494

MECHANI G-2701-B-P- Provide assistance for removal and installation of motor for O/H .
CAL
A-M
(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

888

CM-89495

MECHANI G-2701-B-P- Provide assistance for removal and installation of motor for O/H .
CAL
B-M
(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

889

CM-89496

WORKSHO
P

G-2701-B-P-A- Provide assistance for removal and installation of LV motor for


M
O/H .( Arrange crane or Fork lift , shifting of motor to EWS etc)

PUMP MOTOR

Cold Box
Shutdown
work

890

CM-89497

WORKSHO
P

G-2701-B-P-B- Provide assistance for removal and installation of LV motor for


M
O/H .( Arrange crane or Fork lift , shifting of motor to EWS etc)

PUMP MOTOR

Cold Box
Shutdown
work

891

CM-89498

MECHANI ME-2101-P-B- Provide assistance for removal and installation of motor for O/H .
CAL
M
(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

892

CM-89499

MECHANI X-2701-C-P1- Provide assistance for removal and installation of motor for O/H .
CAL
B-M
(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

893

CM-89500

MECHANI X-2701-C-P2- Provide assistance for removal and installation of motor for O/H .
CAL
B-M
(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

894

CM-89501

MECHANI
CAL

P-3209-B-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

895

CM-89502

MECHANI
CAL

P-2110-M

Provide assistance for removal and installation of motor for O/H .


(Decouple, base bolt removal, alignment etc)

PUMP MOTOR

Cold Box
Shutdown
work

899

CM-89546

ELECTRIC
Disconnect and reconnect Motor power cable for Turning Gear
C-2201-TR-M
AL
maintenance jobs (MTBE S/D - 2012)

MISC MOTOR

Cold Box
Shutdown
work

900

CM-89547

ELECTRIC
AL

REFRIGERANT
COMPRESSOR

Cold Box
Shutdown
work

Dept.

Equip No.

X-2701-C

Description

Provide assistance for Electrical works on Compressor rebuild jobs


(MTBE S/D - 2012)

Asset
Description

Pack
No

Sl.
No

Reason

Note

Scaf

Cran

Insu

Hydr
Jett

Sl.
No

Work Order
no:

Dept.

Equip No.

901

CM-89548

ELECTRIC
AL

E-2240

903

CM-89814

WORKSHO
P

UNTAG-MTBWKS

Description

Provide assistance for Electrical works of E-2240/X-2701-E1;


Retrofit jobs (MTBE S/D - 2012)

To be remove and installed back after servicing the Orbit valves as


per attached list.

Asset
Description

Pack
No

Reason

Note

WASH OIL
CIRCULATION
COOLER

Cold Box
Shutdown
work

VESSEL

Cold Box
Shutdown
work

Scaf

Cran

Insu

Hydr
Jett

Other Division Assistance

Oth Asst.

WKS

Inspection of
weld joints

Electrical:of
Inspection
Required
to
weld joints
disconnect/
connect Electric
cables,
Workshop:
Structural Fitter/
Welder required
to assist crane
disassembly/inst
allation

INSP
ECTI
ON

ROT

Yes

Yes

Yes

Y
e
s

Oth Asst.

WKS

Inspection of
weld joints

Inspection
Exchanger
Fabrication &
arranging forklift
Installation
for removal &
install new
motor,decoupling & base
bolt removal
,install new
motor

INSP
ECTI
ON

Yes

Yes

Yes

Yes

Inspection of
weld joints

Yes

Inspection of
weld joints

Yes

To open
compressor and
remove bearing

ROT

Yes

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Inspection of
exchanger
replacement
works. Internal
lighting
arrangement

Yes

Y
e
s

Internal
inspection of
Exchanger.
Instrument
connection
removal

Yes

Y
e
s

Vessel
inspection.
Provide internal
lighting

Yes

Y
e
s

Inspection of
weld joints

Yes

Oth Asst.

WKS

INSP
ECTI
ON

Inspection of
weld joints

Yes

Inspection of
weld joints

Yes

ROT

Oth Asst.

WKS

Removal and
fixing back of
valve

Yes

painting
inspection

INSP
ECTI
ON

Yes

Y
e
s

Servicing of
valves

Inspection of
weld joints

ROT

Yes

Oth Asst.

WKS

Removal and
fixing back of
valve

Yes

INSP
ECTI
ON

Coordination for
Lube oil system
stop

Inspection of
weld joints

ROT

Yes

Yes

Oth Asst.

WKS

INSP
ECTI
ON

Workshop:
remove & fix the
heater bundle
A/B/C asper the
attached draw &
disconnection ,
Instrument:
connection of
heater
Vessel
thermostat
inspection.

Yes

Yes

Vessel
inspection.

Internal
Inspection of
remove & fix the
tubes
heater bundle
A/B/C asper the
attached draw &
disconnection ,
connection of
heater
thermostat/
inspection as per
task

Internal
Inspection of
tubes

ROT

Y
e
s

Yes

Yes

Yes

Yes

Yes

Y
e
s

Oth Asst.

Carry out N.D.T.


Removal of
Electrical heat
tracing

WKS

INSP
ECTI
ON

Yes

ROT

Y
e
s

Oth Asst.

WKS

To lift cabinet to
MCB rack room

Yes

Instrument to
check
unidentfied tags
in field

INSP
ECTI
ON

ROT

Y
e
s

Oth Asst.

WKS

INSP
ECTI
ON

Disconnection of
instrunment &
electrical tubing
& cables

Yes

Inspection of
weld joints

Yes

ROT

Y
e
s

Y
e
s

For opening
heater panel
Coordination for
Lube oil system
stop

Inspection of
weld joints

Yes

Yes

Oth Asst.

Inspection of
weld joints

WKS

INSP
ECTI
ON

Yes

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Inspection of the
strainer

Yes

Reactor internal
inspection.
Instrunment
connection
removal, Provide
internal lighting .

Yes

Y
e
s

Reactor internal
inspection.
Instrunment
connection
removal, Provide
internal lighting .

Yes

Y
e
s

Reactor internal
inspection.
Instrunment
connection
removal, Provide
internal lighting .

Yes

Y
e
s

Oth Asst.

Vessel
inspection.
Provide internal
lighting

WKS

INSP
ECTI
ON

Yes

ROT

Y
e
s

Oth Asst.

WKS

INSP
ECTI
ON

Vessel
inspection.
Provide internal
lighting

Yes

Inspection of
pipe spools

Yes

Inspection of
pipe spools

Yes

Inspection of
pipe spools

Yes

Disconnection of
instrunment &
electrical tubing
& cables

Inspection of
weld joints

ROT

Y
e
s

Y
e
s

Yes

Oth Asst.

WKS

INSP
ECTI
ON

Vessel
inspection.
Provide internal
lighting

Yes

Inspection of
weld joints

Yes

ROT

Y
e
s

Inspection of
weld joints

Inspection of
weld joints

Yes

Inspection of
weld joints

Yes

Inspection of
weld joints
Inspection of
weld joints

Yes

Inspection of
weld joints
Inspection of
weld joints

Yes

Y
e
s

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Inspection of
weld joints

Inspection of
weld joints

Inspection of
weld joints

Yes

Y
e
s

YES

Yes

Y
e
s

Oth Asst.

WKS

Remove and
install back
valves

Yes

INSP
ECTI
ON

Yes

ROT

Y
e
s

Oth Asst.

WKS

INSP
ECTI
ON

Instrument to
check
unidentified tags
in field
Instrument to
check
unidentified tags
in field
Instrument to
check
unidentified tags
in field
Instrument to
check
unidentified tags
in field
Instrument to
check
unidentified tags
in field

Inspection of
weld joints

ROT

Y
e
s
Y
e
s
Y
e
s
Y
e
s
Y
e
s

Yes

Oth Asst.

WKS

INSP
ECTI
ON

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Yes

Yes

Yes

Yes

thermostat
calibration

Yes

Yes

Yes

Yes

Oth Asst.

WKS

INSP
ECTI
ON

Yes

Yes

Yes

Yes

Inspection of
weld joints

Remove and
install back valve

Yes

ROT

Oth Asst.

WKS

INSP
ECTI
ON

Inspection of
weld joints

Inspection of
weld joints

Inspection of
weld joints

crane assistance
for unload the
generator

Yes

Yes

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

To disconnect
and connect
instrumentation

Y
e
s

Assistance for
verification of
each loop

Y
e
s

Oth Asst.

WKS

INSP
ECTI
ON

Internal
Inspection of
heater

Yes

Inspection of
weld joints

Yes

arranging forklift
for removal &
install new
motor,dearranging forklift
coupling & base
for removal &
bolt removal
install new
,install new
motor,demotorforklift
arranging
coupling & base
for removal &
bolt removal
install new
,install new
motor,demotorforklift
arranging
coupling & base
for removal &
bolt removal
install new
,install new
motor,demotor
coupling & base
bolt removal
,install new
motor

ROT

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

INSP
ECTI
ON

ROT

Rotating:removal
of fan
accessories;
Instrument:
Removal of
instruments and
connections,
Electrical:
Removal of
electrical
connections and
lighting for night
work
_____________
____

Yes

Yes

Inspection of
weld joints

Yes

Oth Asst.

WKS

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Internal
inspection of
tube bundle
/discoonct&
connection of
thermostat

Yes

Y
e
s

Internal
inspection of
tube bundle
/discoonct&
connection of
thermostat

Yes

Y
e
s

Internal
inspection of
tube bundle
/disconnection &
connection of
thermostat

Yes

Y
e
s

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

Oth Asst.

WKS

INSP
ECTI
ON

ROT

HE pre test
E-2313A

CM-80745

X-2701

CM-80761

C-2201-E-A /b

CM-82130/82131

E-3205A

CM-75881

E-3205B

CM-75885

E-2404

CM-75884

X-2701-C-E6A

CM-80556

X-2701-C-E4A

CM-80557

V-2604 Cooling coils

CM-80759

E-2201B

CM-83005

SW HE Cleaning , Pr
test
E-2306

CM-83212

E-2317A

CM-84060

E-2301A
E-2301B

CM-84298

CM-84299

E-2316

CM-84300

E-2305

CM-84372

E-2313C (New Exch)

CM-70086

SW Strainers
E-2301A/B,

CM-84119

E-2305

CM-84119

E-2316

CM-84119

E-2317A/B

CM-84119

Scaffolding
V-3101
V-3107
V-3103

Ext & internal scaffolding


Ext & internal scaffolding
Ext Scaffolding for NDT locations

TA2010 Piping Thickness reduction was reported in 7 nos of lines as under:


(i)200-FL-403-AA11-16 Although the piping schedule is sch 20 (7.9mm W.T.), but the thickness obs
(ii)210-HG-095-CA21-1.5 The original WT is 5.08mm whereas the measured was 3.8mm. During TA-2
(iii)220-PL-744-AA11-2- The original WT is 5.54mm, whereas the actual measured was 4.4/4.6 at som
(iv)220-BW-1117-FA12-3 - The original schedule WT is 7.62mm whereas the measured was 5.8/8.1 at
(v)260-CA-021-AA11-2 The original schedule WT is 5.54mm, whereas the measured was 3.9/4.2mm
(vi)260-CH-001-AA11-1 The original schedule WT is 4.55mm, whereas the actual measured was 3.6/
(vii)CS-1137-OR8-3 The original schedule WT is 5.49mm whereas the measured was 3.8/5.5mm.
E-2313A MeOH extraction line (HAZOP)
Expansion Bellows elutriation gas, dust collector (V-2612) HAZOP

nternal scaffolding
nternal scaffolding
affolding for NDT locations

reduction was reported in 7 nos of lines as under:

Although the piping schedule is sch 20 (7.9mm W.T.), but the thickness observed were 6.4 / 6.5mm for all the three locations whi

The original WT is 5.08mm whereas the measured was 3.8mm. During TA-2007, the same spot was 4.0mm. To be monitored.
The original WT is 5.54mm, whereas the actual measured was 4.4/4.6 at some locations. During TA-2007 it was 5.5mm.

- The original schedule WT is 7.62mm whereas the measured was 5.8/8.1 at some locations. To be monitored.

The original schedule WT is 5.54mm, whereas the measured was 3.9/4.2mm at some locations. To be monitored.

The original schedule WT is 4.55mm, whereas the actual measured was 3.6/4.2mm. This area does not have history. To be monito

e original schedule WT is 5.49mm whereas the measured was 3.8/5.5mm. To be monitored.

n line (HAZOP)
ation gas, dust collector (V-2612) HAZOP

the three locations which were checked. This corresponds to sch10 (3.65mm W.T.). There is no history for this line No. During the n
To be monitored.

was 5.5mm. To be monitored.

history. To be monitored.

this line No. During the next opportunity rechecking will confirm the actual condition. To be monitored

MTBE cold box TA-2012 Important Inspection jobs


Sl.
No

Work Order no:

Dept.

Equip No.

302

CM-80744

INSPECTIO
N

ME-2101

Inspection for CUI of cold insulated piping and vessels in ME2101-C refrigerant loop (MTBE HAZOP recommendation 102)

Piping
E-2313-A

Thickness survey of MeOH extraction section


(V-2306 top O/L 230-PL-036-CA11-10",
P-2306A/B Disch to E-2313A/B/C 230-pl-037-CA11, 230-PL-041CA11-6"
V-2306 Bot O/L to V-2307 230-pl-038, 39,40 -CA11-3",
(MTBE HAZOP recommendation#158)

Piping
SHELL & TUBE
HE

Inspection of Expansion Bellows & Flexible joints (Elutriation gas


& dust collectorV-2612)
U/s FA-2604 260-RG-1048, 1049-OR8-6" (IC-details in vendor
scope),
U/S & D/S FA-2602 260-RG-1041, 1042-OR5-24"-Ih140 (IC260/803)
U/s E-2602 260-RG-1040-OR5-24"-Ih140 (IC-260/801),
E-2602 to Vent 260-AV-1067-MS1-18" (IC-260/843);
FA-2603 to E-2602 260-AV-1065-MS1-18" (IC-260/843);
H-2602 d/s, 260-RG-1043-OR5-30"-Ih150 (IC-260/806)
FA-2603 U/s & d/s (IC-details in vendor scope)
(MTBE HAZOP recommendation#436). )

DUST
COLLECTOR

303

CM-80745

INSPECTIO
N

305

CM-80760

INSPECTIO
N

V-2612

306

CM-80761

INSPECTIO
N

X-2701-E3

Description

Inspection of chiller for leakage of tubes. (MTBE HAZOP


recommendation#426)

MTBE ColdBox TA-2012, Insp Jobs Pg 95 of 116

Asset
Description

BUTAMER
REFRIGERATION
PACKAGE

REFRIGERANT
AIR
CONDENSER

Pack
No

Sl.
No

Work Order no:

Dept.

Equip No.

Asset
Description

Pack
No

307

CM-80762

INSPECTIO
N

V-2217

VESSEL

5(B)

432

CM-82130

INSPECTIO
N

C-2201-E-A

116-Inspection to be done during TA-2011

SHELL & TUBE


HE

6(b)

433

CM-82131

INSPECTIO
N

C-2201-E-B

116-Inspection to be done during TA-2011

SHELL & TUBE


HE

434

CM-82133

INSPECTIO
N

EJ-2201

116-Inspection to be done during TA-2011

EJECTOR

435

CM-82134

INSPECTIO
N

EJ-2201-SI

116-Inspection to be done during TA-2011

SILENCER

Description

Inspection (internal) of V-2217 sulphur injection drum

MTBE ColdBox TA-2012, Insp Jobs Pg 96 of 116

5(B)

Sl.
No

Work Order no:

Dept.

Equip No.

436

CM-82135

INSPECTIO
N

R-2204-A

437

CM-82136

INSPECTIO
N

X-2701-C-V

481

CM-82877

INSPECTIO
N

ME-2601

482

CM-82879

INSPECTIO
N

V-3107

070- V-3107 Butanes sphere inspection to be carried out in 2011


T/A

SPHERE

5(B)

539

CM-83077

MTNINSPEC

V-3101

290- To be inspected

SPHERE

5(B)

Description

116-Inspection to be done.

116-Inspection to be done during TA-2011

070- ME-2601 air dryer in CCR inspection to be carried out in


2011 T/A

V-3103

Asset
Description

Pack
No

REACTOR

5(B)

VESSEL

AIR DRYER
PACKAGE

Sphere

MTBE ColdBox TA-2012, Insp Jobs Pg 97 of 116

Sl.
No

Work Order no:

Dept.

Equip No.

483

CM-82880

INSPECTIO
N

SI-2201

070 In the coming 2011 T/A inspection to be carried out of the


said equipment ( SI-2201 Silencer for C-2201-T --- -- REC
turbine).

SILENCER

42

CM-70397

WORKSHOP

ME-2701

290- Cold box leak to be attended . Currently leaking rate is in


control . If leak increased more coldbox shutdown and repair to
be done

CRYOGENIC
SEPARATION
UNIT

33

CM-70086

WORKSHOP

E-2313-C

050- Replace E-2313-C with the same type as existing one

54

CM-71359

WORKSHOP

V-2704

146

CM-75879

WORKSHOP

147

CM-75880

WORKSHOP

Description

Asset
Description

Pack
No

SHELL & TUBE


HE

1(B)

290- V 2704 Inspection to be carried out during cold box outage

VESSEL

2(B)

ME-2101-V2

Vessel to be released for internal inspection during next


shutdown. (No internal inspection carried out since
commissioning)

VESSEL

5(B)

ME-2101-V1

Vessel to be released for internal inspection during next


shutdown. (No internal inspection carried out since
commissioning)

VESSEL

5(B)

MTBE ColdBox TA-2012, Insp Jobs Pg 98 of 116

Sl.
No

Work Order no:

Dept.

Equip No.

Description

148

CM-75881

WORKSHOP

E-3205-A

Exchanger to be released for internal inspection during next


shutdown. (No internal inspection carried out since
commissioning)

151

CM-75884

WORKSHOP

E-2404

Exchanger to be released for internal inspection during next


shutdown. (No internal inspection carried out since
commissioning)

152

CM-75885

WORKSHOP

E-3205-B

184

CM-77320

WORKSHOP

V-2240

CM-80556

061, X-2701-C-E6-A/B hydrotest and inspection as per


WORKSHOP X-2701-C-E6-A
Rehazop recommendation

287

Asset
Description

AIR FAN
COOLER

ORU
REGENERANT
COOLER

Air Fin Cooler to be released for internal inspection during next


shutdown. (No internal inspection carried out since
commissioning)

AIR FAN
COOLER

290- LCO Chiller package addition to the existing LCO cooling


system

VESSEL

MTBE ColdBox TA-2012, Insp Jobs Pg 99 of 116

SHELL & TUBE


HE
(Tube:
Admirality,

Pack
No

4(B)

Sl.
No

Work Order no:

288

CM-80557

WORKSHOP X-2701-C-E4-A

061, X-2701-C-E4-A/B hydrotest and inspection as per


ReHAZOP recommendations

293

CM-80692

WORKSHOP

R-2201

070- R-2201 inner and outer screens to be cleaned in the coming Dehydrogenatio
shutdown 2011
n Reactor No.1

5(B)

294

CM-80693

WORKSHOP

R-2202

070- R-2202 inner and outer screens to be cleaned in the coming


shutdown 2011

REACTOR

5(B)

295

CM-80694

WORKSHOP

R-2203

070- R-2203 inner and outer screens to be cleaned in the coming


shutdown 2011

REACTOR

5(B)

297

CM-80734

WORKSHOP

R-2201

R-2201 inlet scoop replacemnt.

Dept.

Equip No.

Description

MTBE ColdBox TA-2012, Insp Jobs Pg 100 of 116

Asset
Description

Pack
No

SHELL & TUBE


HE

4(B)

Dehydrogenatio
n Reactor No.1

Sl.
No

Work Order no:

Dept.

Equip No.

298

CM-80735

WORKSHOP

R-2201

290-R-2201 catalyst transfer pipes replacemnt.

Dehydrogenatio
n Reactor No.1

299

CM-80736

WORKSHOP

R-2201

290- R-2201 cover plate replacement.

Dehydrogenatio
n Reactor No.1

300

CM-80737

WORKSHOP

R-2202

290- R-2202 cover plate replacement.

REACTOR

301

CM-80738

WORKSHOP

R-2203

290-R-2203 cover plate replacement.

REACTOR

304

CM-80759

WORKSHOP

V-2604

Inspectino of cooling water coil of V-2604 (MTBE HAZOP


recommendation#442).

VESSEL

4(B)

431

CM-82114

WORKSHOP

V-2210

116-Internal inspection to be done during TA

VESSEL

4(B)

462

CM-82816

WORKSHOP

V-2601

116-CCR screen to be cleaned and inspected during TA-2011

VESSEL

5(B)

480

CM-82851

WORKSHOP

EJ-2101

119-Inspection to be carried out during 2011 T/A.

EJECTOR

4(B)

Description

MTBE ColdBox TA-2012, Insp Jobs Pg 101 of 116

Asset
Description

Pack
No

Sl.
No

Work Order no:

Dept.

Equip No.

582

CM-84298

WORKSHOP

E-2301-A

583

CM-84299

WORKSHOP

E-2301-B

Asset
Description

Pack
No

116-Exchanger to be cleaned during TA-2011

SHELL & TUBE


HE

5(B)

116-Exchanger to be cleaned during TA-2011

SHELL & TUBE


HE

5(B)

Description

MTBE ColdBox TA-2012, Insp Jobs Pg 102 of 116

Sl.
No

Work Order no:

Dept.

Equip No.

584

CM-84300

WORKSHOP

E-2316

589

CM-84372

WORKSHOP

E-2305

Asset
Description

Pack
No

116-Exchanger to be cleaned during TA-2011

SHELL & TUBE


HE

5(B)

116-S/W Exchanger to be cleaned during TA-2012

SHELL & TUBE


HE

5(B)

Description

MTBE ColdBox TA-2012, Insp Jobs Pg 103 of 116

Sl.
No

Work Order no:

Dept.

Equip No.

705

CM-87783

WORKSHOP

H-2401

101-H-2401 salt to be unload & Load during coming next shut


down.

ORU
REGENERANT
SUPERHEATER

716

CM-87905

WORKSHOP

E-2240

PMR-200-286 E-2240/X-2701-E1 retrofit - Check HAZOP what


if analysis recommendations

WASH OIL
CIRCULATION
COOLER

727

CM-89216

WORKSHOP

H-2206

Provide assistance for removal and installation of heater bundle


for inspection.(arrange chain block and fitter)

REDUCTION
GAS HEATER

730

CM-89219

WORKSHOP

H-2207

Provide assistance for removal and installation of heater bundle


for inspection.(arrange chain block and fitter)

REACTOR NO. 2
SURGE POT
HEATER

Description

MTBE ColdBox TA-2012, Insp Jobs Pg 104 of 116

Asset
Description

Pack
No

Sl.
No

Work Order no:

Dept.

Equip No.

733

CM-89222

WORKSHOP

H-2208

Description

Provide assistance for removal and installation of heater bundle


for inspection.(arrange chain block and fitter)

Asset
Description

REACTOR NO. 3
SURGE POT
HEATER

Catalyst Transfer lines


735

CM-89224

WORKSHOP

H-2602

Provide assistance for removal and installation of heater bundle


for inspection.CCR-9th floor.

MTBE ColdBox TA-2012, Insp Jobs Pg 105 of 116

REGENERATION
HEATER

Pack
No

Insp Activities

Open Cold insulation at


selected / vulnerable locations;
Profile RT Completed online;

Piping thk check

Vis,
DPT,
Thk

Vis, Thk of accessible area,


Pressure test

MTBE ColdBox TA-2012, Insp Jobs Pg 106 of 116

Insp Activities
Routine Vessel int insp (Vis, FMPI,
Thk)

Vis, DPT , Pr Test,

Vis, DPT , Pr Test,

Vis insp of ejector,


DPT/MPI,
Thk;
Vis insp of U/S & D/S piping ID;
DPT at bore ends ID upto
accessible length,
(when accessible),
Vis, DPT/MPI (when accessible),
Thk;
Vis insp of U/S & D/S piping ID;
DPT at bore ends ID upto
accessible length,
(when accessible),

MTBE ColdBox TA-2012, Insp Jobs Pg 107 of 116

Insp Activities

Completed earlier in 2009

Vis, thk, MPI/DPT of noz (as


accessible)

Vis, Thk

Vis,
100% FMPI of all internal welds
(butt & Fillet), cleat marks/arc
stricks;
TOFD, UFD & RT (verification of
old TOFD report)
Vis,
100% FMPI of all internal welds
(butt & Fillet), cleat marks/arc
stricks;
TOFD, UFD & RT (verification of
old TOFD report)
TOFD, UFD & RT (verification of
old TOFD report)

MTBE ColdBox TA-2012, Insp Jobs Pg 108 of 116

Insp Activities
Vis, DPT/MPI (when accessible),
Thk

Vis, DPT, RT,


New exch to be replaced;
Soap leak check

New Exch to be replaced,


Pressure test
(Shell Des Pr=4000KpaG, Shell
Op Pr= 2578 KpaG;
Tube Des Pr= 2700KpaG, Tube
Op Pr = 2335KpaG)

Routine Int insp (Vis, DPT, thk)

Vis, Thk

Vis, Thk

MTBE ColdBox TA-2012, Insp Jobs Pg 109 of 116

Insp Activities
Vis, MPI, Thk
Open 35 Plugs in each header to
inspect ID (V-pattern);

Vis, MPI, Thk


Open 20 Plugs in each header
(V-pattern);

Vis, MPI, Thk


Open 35 Plugs in each header
(V-pattern);

Not in TA-2012

Vis, Pr test, Thk of shell


(Shell Des Pr=300 psiG
shell test Pr=450 psiG
Tube Des Pr=150 psiG
Tube Test Pr=225 psiG)

MTBE ColdBox TA-2012, Insp Jobs Pg 110 of 116

Insp Activities
Vis, Pr test, Thk of shell
(Shell Des Pr=300 psiG
shell test Pr= psiG
Tube Des Pr=150 psiG
Tube Test Pr= psiG)

Vis, DPT

Vis, DPT

Vis, DPT
- Crack on withdrawal scoop
to be verified;
- Inner screen weld area
crack to be repaired (found
during glass bead cleaning in Nov
2011 before the TA-2012)

Vis, DPT

MTBE ColdBox TA-2012, Insp Jobs Pg 111 of 116

Insp Activities
Vis, DPT

Vis

Vis

Vis

Pressure test of coil;


Vis, DPT, thk

Demister to be inspected.
Problems in service.

Vis, DPT, thk

Vis, DPT/MPI (when accessible),


Thk

MTBE ColdBox TA-2012, Insp Jobs Pg 112 of 116

Insp Activities
Vis, DPT of tube to T.S welds
(random), DPT of tube side noz
to channel, thk of channel, shell
& noz pipes;
Pr test
(Shell Des=3600KpaG
shell Op Pr=1931KpaG
Shell Test (Hydro)Pr=5400kpaG;
Tube Des Pr=2400kpaG
Tube Op Pr=350kpaG
Tube Test (hydro) Pr=3600kpaG

Vis, DPT of tube to T.S welds


(random), DPT of tube side noz
to channel, thk of channel, shell
& noz pipes;
Pr test
(Shell Des=3600KpaG
shell Op Pr=1931KpaG
Shell Test (Hydro)Pr=5400kpaG;
Tube Des Pr=2400kpaG
Tube Op Pr=350kpaG
Tube Test (hydro) Pr=3600kpaG

MTBE ColdBox TA-2012, Insp Jobs Pg 113 of 116

Insp Activities
Vis, DPT of tube to T.S welds
(random), DPT of tube side noz
to channel, thk of channel, shell
& noz pipes;
Pr test
(Shell Des=2600KpaG
shell Op Pr=2277KpaG
Shell Test (Hydro)Pr=3900kpaG;
Tube Des Pr=1740kpaG
Tube Op Pr=345kpaG
Tube Test (hydro) Pr=2610kpaG)

Vis, DPT of tube to T.S welds


(random), DPT of tube side noz
to channel, thk of channel, shell
& noz pipes;
(Shell Des=1470KpaG
shell Op Pr=1033KpaG
Shell Test (Hydro)Pr=2205kpaG;
Tube Des Pr=1000kpaG
Tube Op Pr=315kpaG
Tube Test (hydro) Pr=1500kpaG)

MTBE ColdBox TA-2012, Insp Jobs Pg 114 of 116

Insp Activities
Vis, Thk, MPI/DPT of noz / shell
Scope:

New Exch repalcement;


Pr Test

Vis, DPT of U-bend (as


accessible),THk (when
accessible)

Vis, DPT of U-bend (as


accessible),THk (when
accessible)

MTBE ColdBox TA-2012, Insp Jobs Pg 115 of 116

Insp Activities
Vis, DPT of U-bend (as
accessible),THk (when
accessible)
Thk check
Vis, DPT of U-bend (as
accessible),THk (when
accessible)

MTBE ColdBox TA-2012, Insp Jobs Pg 116 of 116

You might also like