Professional Documents
Culture Documents
Pgina :
0401001
Fecha
Lugar
01/01/2015
010602
Cdigo
Recurso
0147000022
0147000023
0147000032
0147010002
0147010003
0147010004
Unidad
Cantidad
Precio S/.
Parcial S/.
Presupuestado S/.
18.36
18.36
18.36
18.36
15.39
13.84
15,624.64
729.70
2,348.17
91,281.79
26,379.24
116,233.90
15,631.15
731.29
2,380.92
91,270.46
26,373.78
116,175.30
252,597.45
252,562.90
MANO DE OBRA
hh
hh
hh
hh
hh
hh
851.0200
39.7400
127.9000
4,971.7800
1,714.0500
8,398.4000
MATERIALES
0201000004
0202000007
0202000008
0202000009
0202100015
0202100099
0203030048
0204000000
0204000006
0205000003
0205000005
0205000006
0205000007
0205020021
0212040042
0217040052
0221000000
0221030003
0221030007
0221030008
0221030009
0226050033
0226100065
0226860001
0226860002
0229500091
0229910023
0229910024
0230290038
0230460037
0230520000
0230990007
0230990066
0230990279
0230990281
0230990282
0234000000
0238000000
0238000001
0238000002
0239020005
0239020071
0239050000
0239060024
0243000024
gl
kg
kg
und
und
1.1300
120.0600
446.3700
1.0000
25.0000
22.90
4.40
4.40
65.00
7.50
25.79
528.25
1,964.01
65.00
187.50
24.54
540.27
1,960.55
65.00
187.50
kg
kg
801.7100
6,303.0200
3.81
2.49
3,054.50
15,694.53
3,063.82
15,667.51
m3
m3
m3
m3
m3
m3
m3
pza
und
590.3300
85.0500
87.1600
12.7400
8.1900
10.9200
14.5100
28.0000
7,188.5400
70.00
70.00
100.00
190.00
170.00
180.00
60.00
7.50
0.54
41,323.12
5,953.40
8,716.10
2,420.60
1,392.30
1,965.60
870.52
210.00
3,881.81
41,322.95
5,953.82
8,716.10
2,420.60
1,392.30
1,965.60
870.51
210.00
3,881.82
bol
pza
1,704.9600
25.0000
21.50
150.00
36,656.56
3,750.00
36,659.79
3,750.00
und
und
m2
pza
und
pza
pza
kg
est
est
24.0000
24.0000
24.0000
3.0000
1.0000
13.0000
5.0000
1.8900
1.0000
1.0000
150.00
54.00
25.19
11.90
12.20
27.00
27.00
14.50
15,000.00
12,000.00
3,600.00
1,296.00
604.56
35.70
12.20
351.00
135.00
27.41
15,000.00
12,000.00
3,600.00
1,296.00
604.56
35.70
12.20
351.00
135.00
27.41
15,000.00
12,000.00
kg
gl
kg
m
hja
pza
und
pza
gl
m3
m3
m3
pza
gl
m3
kg
p2
214.0700
16.7800
12.4900
8,500.7700
4.2000
2.0000
1.0000
3.0000
33.6300
30.1700
3.0600
15.6100
4.9100
0.0300
315.6800
1.0500
391.7600
14.00
45.00
13.19
0.50
2.50
150.90
60.00
105.50
11.00
16.80
70.00
75.00
3.50
22.00
4.50
5.00
3.50
2,996.99
755.25
164.78
4,250.38
10.50
301.80
60.00
316.50
369.92
506.89
213.89
1,171.01
17.19
0.66
1,420.54
5.25
1,371.16
2,996.99
768.78
164.91
4,250.39
10.50
301.80
60.00
316.50
370.55
507.60
213.89
1,171.01
17.19
0.66
1,422.62
5.25
1,371.18
0243010003
0243010080
0243010081
0243010082
0243160052
0243170001
0244000016
0244030023
0250030001
0250030002
0250030003
0250030004
0250030005
0250030006
0250030007
0250030008
0250030009
0251010041
0251010042
0251010044
0253010002
0253030027
0254010015
0254010016
0254020042
0254030000
0254060000
0254110090
0265020005
MADERA TORNILLO
MADERA TRATADA DE 1"
MADERA TRATADA DE 1"
MADERA NACIONAL
REGLA DE MADERA
PARANTES DE EUCALIPTO D=3" X 2.20M
MADERA TORNILLO CEPILLADA
TRIPLAY DE 4' X 8' X 8 MM
TAPA METALICA DE 0.60 X 0.60 M
TAPA METALICA DE 1.00 X 1.00 M
REJA METALICA DE 0.30X0.40M
TAPA METALICA DE 0.90 X 0.90 M
TAPA METALICA DE 0.40 X 0.30 M
TAPA METALICA 0.70 x 0.70 m. e= 1/8"
TAPA METALICA 0.50 x 0.60 m. e= 1/8"
TAPA METALICA DE 0.70 X 0.90 M
TAPA METALICA CIRCULAR =0.70
ANGULO DE ACERO 1" X 1" X 1/6"
ESCALINES
ANCLAJES
GRASA
THINER
IMPRIMANTE
IMPERMEABILIZANTE DE CONCRETO
PINTURA ESMALTE SINTETICO
PINTURA LATEX
PINTURA ANTICORROSIVA
PINTURA ESMALTE
CODO DE FIERRO GALVANIZADO 1" X 90
p2
p2
p2
p2
p2
und
p2
pln
und
und
und
und
und
und
und
und
und
pza
und
und
lb
gl
gl
kg
gl
gl
gl
gl
pza
14,290.1500
1.6000
1.0000
379.8500
41.5500
22.0000
70.0000
9.0000
3.0000
2.0000
2.0000
1.0000
1.0000
1.0000
4.0000
1.0000
1.0000
2.0000
11.0000
12.0000
2.2300
0.5300
6.5300
120.4400
1.5000
1.9600
0.5300
0.5300
3.0000
3.50
3.50
3.50
3.50
3.00
35.00
3.50
45.00
39.00
160.00
75.00
120.00
30.00
180.00
150.00
65.00
60.00
45.50
15.00
18.50
13.71
10.00
22.50
4.60
35.00
42.00
39.60
35.00
20.00
50,015.52
5.60
3.50
1,329.47
124.65
770.00
245.00
405.00
117.00
320.00
150.00
120.00
30.00
180.00
600.00
65.00
60.00
91.00
165.00
222.00
30.62
5.25
146.96
554.02
52.50
82.50
20.79
18.38
60.00
50,024.33
5.60
3.50
1,332.27
125.60
770.00
245.00
405.00
117.00
320.00
150.00
120.00
30.00
180.00
600.00
65.00
60.00
91.00
165.00
222.00
30.98
5.25
146.84
552.04
52.50
82.50
20.79
18.38
60.00
0265020007
pza
11.0000
16.50
181.50
181.50
0265140069
pza
2.0000
15.80
31.60
31.60
pza
pza
5.0000
2.0000
16.80
15.30
84.00
30.60
84.00
30.60
pza
pza
pza
1.0000
1.0000
11.0000
10.55
100.00
10.50
10.55
100.00
115.50
10.55
100.00
115.50
pza
3.0000
3.50
10.50
10.50
pza
3.0000
5.20
15.60
15.60
pza
pza
1.0000
2.0000
7.50
9.50
7.50
19.00
7.50
19.00
pza
pza
2.0000
2.0000
3.50
18.50
7.00
37.00
7.00
37.00
pza
pza
4.0000
3.0000
120.00
7.90
480.00
23.70
480.00
23.70
pza
2.0000
3.80
7.60
7.60
pza
pza
pza
pza
28.0000
10.0000
1.0000
2.0000
3.20
4.00
3.50
4.20
89.60
40.00
3.50
8.40
89.60
40.00
3.50
8.40
pza
1.2600
28.00
35.28
35.28
pza
0.0100
36.00
0.38
0.38
und
und
m
m
m
m
m
pza
9.0000
9.0000
0.0000
0.0000
1.0000
2.5200
1,913.1000
2.0000
60.00
185.00
2.90
8.50
2.83
6.17
5.60
4.00
540.00
1,665.00
0.00
0.00
2.83
15.55
10,713.36
8.00
540.00
1,665.00
0.00
0.00
2.83
15.55
10,713.36
8.00
0265140093
0265140095
0265140096
0265140097
0265140098
0265140099
0265140100
0265140105
0265140106
0265140107
0265140108
0265140109
0265380003
0265380009
0265380026
0265380027
0265380028
0265390008
0265610009
0265610081
0265910001
0265920001
0272000026
0272000027
0272000028
0272000029
0272000030
0272000031
0272000032
0272000034
0272000035
0272000036
0272000037
0272000039
0272000040
0272000041
0272060042
0272060043
0272060046
0272060047
0272060048
0272060049
0272060050
0272060051
0272070081
0272070085
0272130074
0272130075
0272310001
0272310006
0272310016
0272320022
0272320023
0272760001
0272760004
0272760009
0272760011
0272760012
0272760013
0272760014
0272760017
0272760018
0272760019
0272760020
0277040035
0277040036
pza
m
und
m
und
pza
m
m
pza
pza
und
pza
pza
pza
pza
pza
pza
pza
m
m
8.0000
147.0000
24.0000
0.0000
218.0000
1.0000
25.2000
4,289.3400
5.0000
37.0000
24.0000
5.0000
5.0000
36.0000
4.0000
28.0000
8.4000
1.0000
126.0000
25.2000
2.50
2.60
5.50
6.83
7.20
4.80
2.30
3.50
2.20
2.20
0.50
9.00
7.50
2.20
41.90
2.50
7.50
5.20
7.60
75.00
20.00
382.20
132.00
0.00
1,569.60
4.80
57.96
15,012.71
11.00
81.40
12.00
45.00
37.50
79.20
167.60
70.00
63.00
5.20
957.60
1,890.00
20.00
382.20
132.00
0.00
1,569.60
4.80
58.08
15,033.13
11.00
81.40
12.00
45.00
37.50
79.20
167.60
70.00
63.04
5.20
957.60
1,890.00
pza
pza
pza
pza
pza
pza
pza
pza
und
pza
pza
pza
und
pza
pza
pza
und
pza
3.0000
28.0000
0.0000
0.0000
5.0000
1.0000
28.0000
28.0000
0.0000
0.0000
9.0000
1.0000
9.0000
28.0000
28.0000
2.0000
0.0000
1.0000
3.50
1.00
5.80
8.90
7.50
5.50
8.50
23.90
4.50
10.50
85.50
2.80
5.00
0.80
2.50
21.50
185.00
85.00
10.50
28.00
0.00
0.00
37.50
5.50
238.00
669.20
0.00
0.00
769.50
2.80
45.00
22.40
70.00
43.00
0.00
85.00
10.50
28.00
0.00
0.00
37.50
5.50
238.00
669.20
0.00
0.00
769.50
2.80
45.00
22.40
70.00
43.00
0.00
85.00
268,552.65
268,594.25
EQUIPOS
0337010001
0337900050
0348040023
HERRAMIENTAS MANUALES
EQUIPO DE PINTURA
CAMION VOLQUETE 4 X 2 140-210 HP 6 m3
%MO
hm
hm
0348950004
0348960005
0349030001
EQUIPO DE SOLDADURA
CIZALLA PARA CORTE DE FIERRO
COMPACTADOR VIBRATORIO TIPO
PLANCHA 4 HP
COMPACTADOR VIBRATORIO TIPO
PLANCHA 5.8 HP
RETROEXCAVADOR SOBRE LLANTAS 58
HP 1 yd3
MEZCLADORA DE CONCRETO TAMBOR 18
HP 11 p3
CAMION VOLQUETE 15 m3
NIVEL TOPOGRAFICO CON TRIPODE
TEODOLITO
0349030003
0349040008
0349100007
0349170002
0349190003
0349880003
0.7000
31.8000
7.50
65.00
9,290.15
5.25
2,066.68
9,290.15
5.25
2,066.70
hm
hm
hm
0.7000
63.6300
750.4400
5.53
1.60
15.00
3.87
101.81
11,256.53
3.86
120.05
11,252.99
hm
5.6900
15.00
85.34
85.35
hm
3.5400
120.00
424.84
424.70
hm
92.1100
15.00
1,381.66
1,382.24
hm
he
hm
31.8000
125.4000
125.4000
110.00
7.77
15.00
3,497.45
974.34
1,880.96
3,497.47
952.32
1,902.15
30,968.87
30,983.23
552,118.96
552,140.38
TOTAL
S/.
S/.
La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est utilizando
552,140.38
Fecha :
04/02/2015 01:53:43 PM
PROYECTO:
MEJORAMIENTO, AMPLIACION DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO DE DESAGUE DE LA
LOCALIDAD DE SINAI, DISTRITO DE CHIRIMOTO - RODRIGUEZ DE MENDOZA - AMAZONAS
Recurso
Unidad
Cantidad
pza
8.0000
gl
1.1300
kg
6,303.0200
pza
0.0000
pza
28.0000
pza
3.0000
AGUA
m3
315.6800
und
1.0000
kg
120.0600
kg
446.3700
ANCLAJES
und
12.0000
pza
2.0000
ARENA FINA
m3
590.3300
ARENA GRUESA
m3
85.0500
pza
3.0000
und
9.0000
CAJA DE PASO
pza
28.0000
und
24.0000
pza
4.0000
pza
1.0000
CANDADO
pza
5.0000
pza
13.0000
bol
1,704.9600
kg
801.7100
pza
3.0000
pza
11.0000
CODO PVC DE 45
und
24.0000
pza
5.0000
pza
5.0000
pza
5.0000
pza
28.0000
pza
37.0000
pza
36.0000
pza
4.0000
COLA SINTETICA
gl
0.0300
pza
1.0000
pza
CORDEL
ESCALINES
und
11.0000
FLETE
est
1.0000
GASOLINA 84 OCTANOS
gl
33.6300
GRASA
lb
2.2300
m3
8.1900
m3
10.9200
m3
12.7400
kg
214.0700
HORMIGON
m3
30.1700
1.0000
8,500.7700
IMPERMEABILIZANTE DE CONCRETO
kg
120.4400
IMPRIMANTE
gl
6.5300
und
7,188.5400
LIJA
pza
4.9100
hja
4.2000
MADERA ANDAMIAJE
p2
391.7600
MADERA NACIONAL
p2
379.8500
MADERA TORNILLO
p2
14,290.1500
p2
70.0000
p2
1.6000
p2
1.0000
MATERIAL AFIRMADO
m3
3.0600
MATERIAL FILTRANTE
m3
15.6100
m2
24.0000
est
1.0000
pza
3.0000
pza
3.0000
pza
1.0000
pza
2.0000
pza
11.0000
pza
2.0000
pza
2.0000
pza
2.0000
pza
28.0000
pza
28.0000
pza
2.0000
pza
1.0000
pza
5.0000
OCRE
kg
12.4900
und
22.0000
gl
16.7800
und
25.0000
und
1.0000
m3
87.1600
PIEDRA GRANDE
m3
14.5100
PINTURA ANTICORROSIVA
gl
0.5300
PINTURA ESMALTE
gl
0.5300
gl
1.5000
PINTURA LATEX
gl
1.9600
PUERTA METALICA
und
1.0000
pza
0.0000
pza
28.0000
REGLA DE MADERA
p2
41.5500
und
2.0000
SOLDADURA
kg
1.8900
pza
25.0000
und
24.0000
und
4.0000
und
1.0000
und
1.0000
und
1.0000
und
3.0000
und
1.0000
und
1.0000
und
2.0000
TAPA ROSCA
und
0.0000
und
9.0000
pza
2.0000
pza
8.4000
pza
1.0000
THINER
gl
0.5300
pln
9.0000
25.2000
1.0000
2.5200
und
25.2000
126.0000
4,289.3400
147.0000
0.0000
1,913.1000
0.0000
pza
0.0100
pza
1.2600
TUBO DE CACHIMBA
und
24.0000
pza
2.0000
pza
1.0000
pza
3.0000
pza
2.0000
pza
1.0000
pza
28.0000
pza
10.0000
pza
28.0000
pza
9.0000
und
0.0000
pza
2.0000
pza
3.0000
pza
2.0000
und
9.0000
pza
1.0000
WAYPE INDUSTRIAL
kg
1.0500
pza
0.0000
pza
5.0000
0.0000
218.0000
CLCULO DE FLETE
PROYECTO:
Unidad
bls
kg
kg
kg
kg
u
p2
gal
gal
pl
UNIDAD DE TRANSPORTE
CAPACIDAD DE TRANSPORTE
N DE VIAJES DE MATERIALES
COSTO POR VIAJE
COSTO DE TRANSPORTE POR KG.
TRANSPORTE DE MATERIALES
2. POR VOLUMEN
Unidad
m3
m3
m3
m3
m3
m3
m3
Materiales
ARENA FINA
PIEDRA CHANCADA DE 1/2"
PIEDRA GRANDE T. MAX = 6"
AFIRMADO
ARENA GRUESA
HORMIGON (PUESTO EN OBRA)
AGUA
VOLUMEN TOTAL
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO
COSTO POR VIAJE
TRANSPORTE DE MATERIALES
3. FLETE TERRESTRE
El flete de los materiales se considera un viaje con camin de 11,000 kg. Equivalente a un costo de 2,000.00 Nuevos Soles
La compra de materiales se realizara en la Distrito de Chachapoyas, que se encuentra a 2.00 hrs. de la zona del proyecto.
UNIDAD DE TRANSPORTE
TRANSPORTE DE MATERIALES POR PESO
TRANSPORTE DE MATERIALES POR VOLUMEN
DE FLETE
Peso Unt.
42.50
1.00
1.00
1.00
1.00
5.00
2.25
3.42
4.50
10.00
PESO TOTAL
Viajes
Cantidad
590.33
87.16
46.36
18.67
85.05
30.17
315.68
1,173
10
117
118
150.00
S/. 17,700.00
Peso Parcial
72,460.80
120.06
446.37
801.71
6,303.02
5.00
34,052.31
118.88
127.76
90.00
114,525.90
28.63
S/. 24,857.87
S10
Pgina :
0401001
Fecha
Lugar
01/01/2015
010602
Cdigo
Recurso
Unidad
Cantidad
0337010001
HERRAMIENTAS MANUALES
%MO
0337900050
EQUIPO DE PINTURA
hm
0.7000
0348040023
hm
0348950004
EQUIPO DE SOLDADURA
0348960005
Precio S/.
Parcial S/.
Presupuestado S/.
9,290.15
9,290.15
7.50
5.25
5.25
31.8000
65.00
2,066.68
2,066.70
hm
0.7000
5.53
3.87
3.86
hm
63.6300
1.60
101.81
120.05
0349030001
hm
750.4400
15.00
11,256.53
11,252.99
0349030003
hm
5.6900
15.00
85.34
85.35
0349040008
hm
3.5400
120.00
424.84
424.70
0349100007
hm
92.1100
15.00
1,381.66
1,382.24
0349170002
CAMION VOLQUETE 15 m3
hm
31.8000
110.00
3,497.45
3,497.47
0349190003
he
125.4000
7.77
974.34
952.32
0349880003
TEODOLITO
hm
125.4000
15.00
1,880.96
1,902.15
30,968.87
30,983.23
552,118.96
552,140.38
TOTAL
S/.
S/.
La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est utilizando
552,140.38
Fecha :
04/02/2015 01:53:43 PM
CLCULO DE FLETE
ECOPERU
CONSULTORES & CONTRATISTAS GENERALES
PROYECTO: MEJORAMIENTO, AMPLIACION DEL SERVICIO DE AGUA POTABLE E INSTALACION DEL SERVICIO
DE MENDOZA - AMAZ
101.A
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
A.
ITEM
1
2
3
Total de Viajes
Duracin del Viaje Ida (hm)
F.R.V: Factor de Retorno al vacio (D.S N 010-2006-MTC)
Costo Alquiler de Equipo
MOVILIZACION DE EQUIPO TRANSPORTADO
DESMOVILIZACION DE EQUIPO TRANSPORTADO
SUB TOTAL
SEGUROS DE TRANSPORTE (10%)
RUTA
Chachapoyas - Obra
B.
VEHICULOS
La relacin de equipo no es limitativa debiendo el Contratista compatibilizarla con la de su propuesta, a fin de poder terminar la obra
El Seguro de Transporte cubre la movilizacin y desmovilizacin de los equipos transportados
Los equipos de Topografa ser transportado en las camionetas
CLCULO DE FLETE
DO
PESO (TN)
0.16
0.16
1.50
CANTIDAD
PESO
TN
TOTAL
2.00
1.00
2.00
CAMA BAJA
25 Tn
max=25*.7=17.5
1.00
2.00
1.00
2.00
1.40
220.53
-
Velocidad (Km/h)
50
Distancia
100.00
CAMA BAJA
18 Tn
max=18*.7=12.6
Tiempo
4.00
2.00
###
215.00
2,408.00
2,408.00
4,816.00
481.60
Tiempo Total
(Horas)
2.00
2.00
100.00
CANTIDAD
2.00
2.00
PRECIO HM
(S/.)
350.00
220.00
DISTANCIA
(KM)
100.00
100.00
VELOCIDAD
45.00
60.00
HORAS
2.22
1.67
5,297.60
5,035.56
10,333.16
E CHIRIMOTO - RODRIGUEZ
CAMION
PLATAFORMA
19 Tn
max=19*.7=13.3
2.00
1.40
210.64
-
SEMI TRAYLER
35 Tn
max=35*.7=24.5
2.00
1.40
207.31
5,297.60
PARCIAL
(S/.)
TOTAL
(S/.)
1,555.56
733.33
2,288.89
2,288.89
4,577.78
457.78
5,035.56