ENGINEERING, PROCUREMENT, CONSTRUCTION, AND INSTALLATION

OF MILAA AND ASTIA PLATFORMS AND PIPELINES

ASTI-A PLATFORM
DESIGN BRIEF

PREPARED FOR
CNOOC SES Ltd.

by

CONSORTIUM
pt. RAGA PERKASA EKAGUNA - pt. REKA PATRIA EKAGUNA
pt. BAKRIE CONSTRUCTION
CLIENT

CNOOC SES Ltd.


EPCI CONTRACTOR

pt. RAGA PERKASA EKAGUNA


pt. REKA PATRIA EKAGUNA
ENGINEERS & CONSTRUCTORS

pt. BAKRIE CONSTRUCTIONS

Job No. : QCNA00

Contract No. : 332003460

Rev.

Date

12-Sep-13

B1

Description

Doc. No.:

-CONSORTIUMBy

Chk

App

3460-AST-RPS-101

Discipline Internal Check

ARD

IDA

PP

13-Sep-13

Issued for Review

ARD

IDA

PP

B2

22-Nov-13

Re-Issued for Review

AGU

IDA

PP

CNOOC SES Ltd. APPROVAL

11-Feb-14

Issued for Approval

ARD

IDA

PP

Sign

11-Dec-15

Re-Issued for Approval

AGU

IDA

PP

Date

Revision

: 1

EPCI MILAA AND ASTIA PLATFORMS AND PIPELINES


Design Brief for Asti-A Platform

REVISION LOG REGISTER


Revisions had been performed on following pages:

Pag
e

Date

10

22-Nov-13

Add Loadout analysis

11-Feb-14

Update the analysis results

All

11-Des-15

Update the analysis results

No

3460-AST-RPS-101 Rev. 1

Revision

Page 2 of 10

EPCI MILAA AND ASTIA PLATFORMS AND PIPELINES


Design Brief for Asti-A Platform

TABLE OF CONTENTS
Revision Log Register.................................................................................................................................. 2
TABLE OF CONTENTS............................................................................................................................... 3
1. Introduction............................................................................................................................................ 4
2. Scope.................................................................................................................................................... 4
3. Codes & Standards............................................................................................................................... 4
4. REFERENCE DOCUMENTS................................................................................................................ 4
5. ANALYSIS RESULT.............................................................................................................................. 5
5.1
General........................................................................................................................................ 5
5.2
In-place Analysis.......................................................................................................................... 5
5.3
Seismic Analysis.......................................................................................................................... 6
5.4
Fatigue Analysis........................................................................................................................... 7
5.
Lifting Analysis............................................................................................................................. 7
5.6
Transportation Strength Analysis................................................................................................. 8
5.7
Pile/Conductor Drivability Analysis............................................................................................... 8
5.8
Loadout Analysis........................................................................................................................ 10
6. CONCLUSION..................................................................................................................................... 10

3460-AST-RPS-101 Rev. 1

Page 3 of 10

EPCI MILAA AND ASTIA PLATFORMS AND PIPELINES


Design Brief for Asti-A Platform

1.

INTRODUCTION
COMPANY plans to develop Mila-A and Asti-A gas fields to supplement production to Banuwati-A,
called as BWA which is the existing main gas production platform in Central Area.
The Asti-A gas field is about 6.6 km away from Banuwati-A. New monopod well head platform is to
be developed for Asti-A including pipelines to deliver Asti-A production to Banuwati-A platform.
The CO2 content in the Mila-A well fluids will be 17.88-45.00% (mole), and the CO2 content in the
Asti-A well fluids will be in the order of estimated 32.68% (mole). The Mila-A and Asti-A gas
pipelines will tie-in to BWA platform independently by new risers.
Mila-A and Asti-A gas will flow into the production separator at BWA through independent subsea
pipeline and riser and then subsequently flow to TEG gas dehydration in the initial stage. During the
later years due to the depletion of the well head pressures the gas will be routed to the suction of
the compressors which are on Banuwati-K (BWK) gas compression platform which bridge
connected to the BWA platform. The BWK gas compression platform is a separate project and to be
installed and commissioned by 2013.

2.

SCOPE
This report presents the detail engineering results of the braced monopod ASTI-A platform. The
results of the following analysis are included:
Inplace Analysis
Seismic Analysis
Fatigue Analysis
Lifting Analysis
Transportation Analysis
Pile/Conductor drivability & stick-up analysis
Loadout Analysis

3.

CODES & STANDARDS

4.

Basis of Design
Doc No.3460-AST-BDS-101
AISC
Manual of Steel Construction Allowable Stress Design
(AISC 360-05, 2005)
API RP 2A WSD
Planning, Designing and Constructing Fixed
Offshore Platforms (Latest Edition)
AWS D1.1 Structural Welding Code.

REFERENCE DOCUMENTS

Basis of Design
Inplace Analysis Report
Seismic Analysis Report
Fatigue Analysis Report
Lifting Analysis Report
Transportation Analysis Report for
sub-structure
Transportation Analysis Report for
Topside
Pile/Conductor Drivability Analysis
Loadout Analysis

3460-AST-RPS-101 Rev. 1

3460-AST-BDS-101
3460-AST-RPS-103
3460-AST-RPS-104
3460-AST-RPS-105
3460-AST-RPS-108
3460-AST-RPS-107-B

Rev. 1
Rev. 2
Rev. 2
Rev. 1
Rev. 2
Rev. 1

3460-AST-RPS-107-A

Rev. B6

3460-AST-RPS-109
3460-AST-RPS-120

Rev. 3
Rev. 3

Page 4 of 10

EPCI MILAA AND ASTIA PLATFORMS AND PIPELINES


Design Brief for Asti-A Platform

5. ANALYSIS RESULT
4.1

General
The analyses for in-service condition and pre-service condition are performed in detail engineering
design. In-service analyses include in-place analysis for operating and storm conditions, seismic
analysis and fatigue analysis. Pre-service analyses include lifting analysis, transportation analysis
and pile/conductor drivability & stick-up analysis. The allowable stress increased involved in
various analysis are generally listed in following table:

Load Condition
Increase Factors for Allowable Stress
Inplace with 1-year operating condition
1.00
Inplace with 100-year storm condition
1.33
Seismic
1.70
Fatigue
Not applicable
Lifting
1.00
Transportation
1.33
Table 5.1 Allowable Stress for Analyses
The minimum factors of safety for pile design in various analyses are generally listed as follows:
Load Condition
Minimum Factor of Safety
Inplace
with
1-year
operating
2.00
condition
Inplace with 100-year storm condition
1.50
Seismic Strength
1.50
Seismic Ductility
1.00
Fatigue
Not applicable
Table 5.2 Minimum Safety Factor for Analyses
The analysis results are introduced briefly as following section. Detailed results are described in
relevant reports.

1 4.2

In-place Analysis
The appropriate load conditions that will bring the most severe effects on the structure are adopted
in the design. They are obtained by the combination of various simultaneous design loads in
operating or storm environmental condition. The braced monopod is simulated to be a threedimensional rigid frame with an appropriate boundary condition. The member stress levels and the
ratio of these stresses are compared with allowable stress levels established by appropriate
design codes. Inplace analysis indicates that all members satisfy the requirements. Maximum
member U.C is 0.98 (member L004-L027). All piles were checked against the requirement of
API RP2A as well as AISC for operating, storm and up-lift condition and minimum pile axial
safety factor is 1.75. The minimum safety factor is found in storm condition as tabulated below.

3460-AST-RPS-101 Rev. 1

Page 5 of 10

EPCI MILAA AND ASTIA PLATFORMS AND PIPELINES


Design Brief for Asti-A Platform

Table 5.3 Inplace Analysis Pile Check Results


The following table presents the maximum stress ratio of piles below the mudline.

Table 5.4 Inplace Analysis Pile Unity Check Results


All tubular joints have been code checked to API RP 2A requirements and the maximum joint
check is joint V016 with UC load 0.047 and UC strength 0.911. Maximum joint deflections are not
more than criteria, L/240 of the free span between supports. The maximum deflection of jacket
structure is occurred at riser with deflection ratio 488.8. The maximum deflection at topside is
occurred at member M344-M050 on Mezzanine deck with deflection ratio 1953.6.
1

4.3

Seismic Analysis
Seismic analysis was performed in accordance with the API RP 2A-WSD guidelines. Pile ultimate
capacities have been extracted from SACS output listing. The pile safety factor for Strength and
Ductility Level are tabulated below.

Table 5.5 Seismic Analysis Pile Check Results

Table 5.6 DLE pile unity check

Table 5.7 SLE pile unity check


The results satisfy the pile safety factors specified in the basis of design i.e. 1.50 for SLE and 1.00
for DLE and thus the foundation has adequate capacity to resist the loads from the structure in
seismic conditions. The maximum unity checks of the caisson and piles are satisfactory.
The structural members have been checked against the requirements of API RP 2A and AISC for
seismic conditions. For the strength requirement, the basic allowable stresses for members are
increased by 70%. No member stresses are found to exceed the allowable stresses; the highest
3460-AST-RPS-101 Rev. 1

Page 6 of 10

EPCI MILAA AND ASTIA PLATFORMS AND PIPELINES


Design Brief for Asti-A Platform

member utilization is 0.71 for SLE (Member M147-M166). Similarly, for DLE, all members are
found to remain in elastic condition; the highest member utilization is 0.78 (Member M050-M068).
Thus, all members satisfy the code checking requirements.
For the strength level earthquake, twice times dynamic load are combined with one time gravity
load to performed punching shear stress check. The basic allowable stresses for joints were
increased by 70%. No tubular joints are found to exceed the allowable stresses; the highest joint
utilization is 0.906 (Joint V021). Thus, all tubular joints satisfy the code checking requirements.
CASE
SLE
SLE
SLE
CASE
DLE
DLE
DLE

4.4

Joint
V018
L036
V017
Joint
V021
V018
T149

Load Unity Check


0.049
0.889
0.044
Load Unity Check
0.012
0.016
0.884

Strength Unity Check


0.894
0.587
0.887
Strength Unity Check
0.906
0.896
0.863

Fatigue Analysis
All primary joints on the monopod had been checked for fatigue service life of 10 years with the
design factor of 5.0. All joint have fatigue life as per the requirement. Subsequently, chord can of
62OD x 2.5 were provided to the chord members. These joints required profile welding with toe
grinding as per result below, all joints have fatigue life as per the required. For joint with the
lowest fatigue life is summarized below.

Minimum joint fatigue life use S-N curve welded joint with no weld improvement
Joint
No.

Chord
Member

Brace
Member

Fatigue Life
(years)

Section

Remarks

301L

301L-311L

301L-304L

7.22

Chord can 62
OD x 2.5

FAIL

Minimum joint fatigue life use S-N curve welded joint with weld toe burr grind
Joint
No.

Chord
Member

Brace
Member

Fatigue Life
(years)

Section

Remarks

301L

301L-311L

301L-304L

14.75

Chord can 62
OD x 2.5

PASS

The fatigue lives listed have included a safety factor of 5.0 (i.e. if the listed life is 10.0 years, the
computed fatigue life is 5*10 years).
4.5
1

Lifting Analysis
Lifting Analysis for the topside module and guardian sleeve are performed. The topside consists of
two parts, the topside module which includes the main deck and mezzanine deck and the cellar
deck module which includes the cellar deck and subcellar deck.
For the loadout condition, the module is pushed from fabrication yard to the barge by using
hydraulic jack-up. And for installation condition, the modules are lifted from the barge to the
substructure by four lifting points with one hook point on the derrick.
The analysis results indicate that all members satisfy the requirements, and all joint cans satisfy
the requirements. Load factor 2.0 are applied to member directly connected with sling, others are
factored by 1.35. Maximum member (Member M166-U072) UC with load factor 2.0 is 0.92.

3460-AST-RPS-101 Rev. 1

Page 7 of 10

EPCI MILAA AND ASTIA PLATFORMS AND PIPELINES


Design Brief for Asti-A Platform

Maximum member (Member M147-M166) UC with load factor 1.35 is 0.82. Maximum joint (Joint
V071) U.C is 0.918.
The maximum static sling load for ASTI-A Deck is 313.79 KIPS and The maximum static sling load
for ASTI-A Guardian Sleeve is 55.94 KIPS.
This section includes the design calculation for lifting padeye, shackle and sling dimension. For
stress check for calculation is according to API RP 2A WSD and AISC.
For Topside
Sling Dimension : 6x37 Class, with IWRC; Drawn Galvanized and Uncoated Cable with
3.75 rope diameter with Maximum Breaking Load 585 MT.
Shackle Dimension
: Use G-2140 Alloy wide body shackle with 4.75 pin diameter
and 200 tons shackle working load limit.
For Guardian Sleeve
Sling Dimension : 6x37 Class, with IWRC; Drawn Galvanized and Uncoated Cable with
1.375 rope diameter with Maximum Breaking Load 87.1 MT.
Shackle Dimension
: Use G-2130 or S2130 Alloy wide body shackle with 2.04 pin
diameter and 25 tons shackle working load limit.
4.6

Transportation Strength Analysis


In transportation strength analysis, the results indicate that the topside and guardian sleeve
basically satisfies API RP 2A-WSD requirements. Maximum member U.C is 0.93, located at below
mezzanine deck. Several joints in guardian sleeve have strength unity check more than 1 as
tabulated below.

Member

Group
ID

Location

Condition

Combined
Load Case

Maximum
UC

T140-M094

T06

Tubular brace under


mezzanine deck

Transportation

16

0.93

T150-T149

T10

Tubular brace under


mezzanine deck

Transportation

14

0.91

SP32-SP31

SP3

Guardian Sleeve
Transportation
Table 5.8 Maximum Member Unity Check

21

0.232

Condition

Location

Joint ID

Load UC

Strength UC

Load Case

Transportation

Topside

V016

0.093

0.912

14

Transportation

Guardian
Sleeve

B200

0.006

0.688

21

Table 5.6 Punching Shear Check


4.7

Pile/Conductor Drivability Analysis


The caisson and pile drivability analysis satisfies the API RP 2A-WSD requirements. The analysis
results indicate that its possible to drive the caisson penetration into target depth 245 feet by using
the IHC S-280 and IHC S-500 hydro hammer, the pile target depth penetration 205 feet by using
the IHC S-90 and S-280 hydro hammer, and conductors target depth penetration 185 feet by using
the IHC S-90, S-280 and S-500 hydro hammer.

3460-AST-RPS-101 Rev. 1

Page 8 of 10

EPCI MILAA AND ASTIA PLATFORMS AND PIPELINES


Design Brief for Asti-A Platform

Table 2.2 Expected Blow Counts and Maximum Stress using IHC-S90

Table 2.3 Expected Blow counts and Maximum Stress using IHC-S280

Table 2.4 Expected Blow counts and Maximum Stress using IHC-S500
The static pile stresses and strength checks were performed in accordance to the criteria outlined in the
API RP 2A. The effective length factor, K, is taken as 2.10.

3460-AST-RPS-101 Rev. 1

Page 9 of 10

EPCI MILAA AND ASTIA PLATFORMS AND PIPELINES


Design Brief for Asti-A Platform

Table 2.5 Pile Section Stress Check using IHC-S90

Table 2.6 Pile Section Stress Check using IHC-280

Table 2.7 Pile Section Stress Check using IHC-S500

4.8
1

Loadout Analysis
Results from the analysis indicate that the deck structure is adequate under loadout conditions.
The members and joints have been checked according to AISC ASD9th Edition and API RP 2A
21st Edition design requirements. One third increase in basic allowable stress is applicable for
loadout extreem conditions. The summary of the analysis results is member 0032-M333 with U.C
0.90 and joint punching shear maximum is joint V021 with U.C 0.869.

6. CONCLUSION
From the analysis above, all the structure members and joints can satisfy the requirements.

3460-AST-RPS-101 Rev. 1

Page 10 of 10