13Oct200812:49
WMStagingSupplyareatoProductionprder
ThisquestionhasbeenAnswered.
HiGurus,
Ihaveaquestion,IhavecustimozedWMinmyIDES.
IfImake"Staging"thematerialatProductionOrder.MaterialcomewithoutPorblemtoProduction
Supplyarea.
ThematerialisstillonProductionsupplyarea.howwillbethematerialtransferredtoProduction
order?
BestRegards
Emre
CorrectAnswer
byCsabaSzommeronOct14,20085:53PM
HiYasar,
I'mnotsurewhatyourproblemis.
1.Youdidthematerialstaging,andyourmaterialinproductionsupplyarea100+dynamicbin.
2.YoudidGI,andthematerialwasconsumedfrominterimstoragetype914+dynamicbins.
Pleasetrytocheckyoursettings:
http://help.sap.com/saphelp_47x200/helpdata/en/c6/f840fb4afa11d182b90000e829fbfe/frameset.htm
Regards,
Csaba
Pleasedothis:
1.DefineProductionSupplyArea(SPRO>LE>WM>Interfaces>DefineProduction)please
takeofgivivngtheproperSLoc
2.AssignthisProductionSupplyAreatoyourworkcenter(CR02)
3.Assignmovevementtype319tothebeforedefinedProductionSupplyArea
4.Createcontrolcycleforyourmaterial(componentspickpart),transactionLPK1
5.SetProductionView(SPRO>LE>WM>Interfaces>DefineProduction)>Chooseproperplant
productionschedulingprofilecomination,andset'1'inthe'WMRequest'field
6.Ensure,whthertheproperprioductionschedulingprofileisassignedtoyourFG(material
master,workschedulingprofile)
7.CheckwhetherinWhseManagementView(SPRO>LE>WM>Interfaces>DefineProduction)
PPinterfaceisactive
Afterthesesettings,issueaPrdOrd,dothematerialstagingandmakeconfirmationinCO15/
CO11N.Isetitandworksfine.
Editedby:CsabaSzommeronOct14,200812:23PM
Communications
Actions
Editedby:CsabaSzommeronOct14,20085:44PM
Editedby:CsabaSzommeronOct14,20085:53PM
10859Views
AverageUserRating
(0ratings)
Re:WMStagingSupplyareatoProductionprder
Hi,
Areyousayingthatyourcomponentsareinthedynamic/fixedbinofproductionsupplyarea(thatis
'100'instandardsystem)?
Inthiscaseyoucanconsumethembymakingconfirmationagainstyourproductionorder(CO15/
CO11N)componentswillbeconsumeddirectlyfromthementionedbins(inIMyouwillseethese
moveemntsbymvt261,inWMtherewillbenomovement,juststockreduction>littlebitsimilarto
interimstoragetypes).
Regards,
Csaba
Editedby:CsabaSzommeronOct13,20081:49PM
Like(0)
Re:WMStagingSupplyareatoProductionprder
HiCsaba,
Imadeconformationwithmov.typ261.
LS24
10000600036683333PC14.10.2008
100000
91400600036683333PC
100000
AfterIconfirmedtheTO
10000600036683333PC14.10.2008
ZEKU00
Andthematerialsarestillon100/0060003499.intheProductionOrderdeliveredmaterialisstill0.
WhydidtheProductionOrderconsumethismaterials?
Bestregards
Emre
Like(0)
CorrectAnswer Re:WMStagingSupplyareatoProductionprder
HiYasar,
I'mnotsurewhatyourproblemis.
1.Youdidthematerialstaging,andyourmaterialinproductionsupplyarea100+dynamicbin.
2.YoudidGI,andthematerialwasconsumedfrominterimstoragetype914+dynamicbins.
Pleasetrytocheckyoursettings:
http://help.sap.com/saphelp_47x200/helpdata/en/c6/f840fb4afa11d182b90000e829fbfe/frameset.htm
Regards,
Csaba
Pleasedothis:
1.DefineProductionSupplyArea(SPRO>LE>WM>Interfaces>DefineProduction)please
takeofgivivngtheproperSLoc
2.AssignthisProductionSupplyAreatoyourworkcenter(CR02)
3.Assignmovevementtype319tothebeforedefinedProductionSupplyArea
4.Createcontrolcycleforyourmaterial(componentspickpart),transactionLPK1
5.SetProductionView(SPRO>LE>WM>Interfaces>DefineProduction)>Chooseproper
plantproductionschedulingprofilecomination,andset'1'inthe'WMRequest'field
6.Ensure,whthertheproperprioductionschedulingprofileisassignedtoyourFG(material
master,workschedulingprofile)
7.CheckwhetherinWhseManagementView(SPRO>LE>WM>Interfaces>Define
Production)PPinterfaceisactive
Afterthesesettings,issueaPrdOrd,dothematerialstagingandmakeconfirmationinCO15/
CO11N.Isetitandworksfine.
Editedby:CsabaSzommeronOct14,200812:23PM
Editedby:CsabaSzommeronOct14,20085:44PM
Editedby:CsabaSzommeronOct14,20085:53PM
Like(0)
Re:WMStagingSupplyareatoProductionprder
Pleasedothis:
1.DefineProductionSupplyArea(SPRO>LE>WM>Interfaces>DefineProduction)pleasetake
ofgivivngtheproperSLoc
DONE
2.AssignthisProductionSupplyAreatoyourworkcenter(CR02)
DONE
3.Assignmovevementtype319tothebeforedefinedProductionSupplyArea
DONE
4.Createcontrolcycleforyourmaterial(componentspickpart),transactionLPK1
DONE
5.SetProductionView(SPRO>LE>WM>Interfaces>DefineProduction)>Chooseproperplant
productionschedulingprofilecomination,andset'1'inthe'WMRequest'field
DONE
6.Ensure,whthertheproperprioductionschedulingprofileisassignedtoyourFG(materialmaster,
workschedulingprofile)
DONE
7.CheckwhetherinWhseManagementView(SPRO>LE>WM>Interfaces>DefineProduction)
PPinterfaceisactive
DONE
Afterthesesettings,issueaPrdOrd,dothematerialstagingandmakeconfirmationinCO15/CO11N.
Isetitandworksfine.
*Ihadaproblemwithaccount.itriedtobookGIinMigo(MvTyp261)forPrdOrd.
Ihadtocreateanaccount400000asCostElement.itworksnow.*
Like(1)
Re:WMStagingSupplyareatoProductionprder
ThankYou,Csaba
VeryHelpful.
Like(0)