You are on page 1of 3

Commissioning Service Department

Commissioning Standard Test Formats


Description: CBP GE-C70 Relay
Equip. No: CPM1

PANEL NAME : +CBP3


DATE:11/12/13

Contractor : ALGIHAZ CO.LTD

Tested by: Er. GANESAN SELVAM


Name
Signature & Date:

CLIENT
Substation

: NATIONAL GRID S.A


:132/33/13.8kV SHARURAH TOWN PP1 SS

Witnessed by: Er. AAMER KHAN


Name
Signature & Date:

Commissioning Service Department


Commissioning Standard Test Formats
Description: CBP GE-C70 Relay
Equip. No: CPM1

PANEL NAME : +CBP3


DATE:11/12/13

CLIENT

Contractor : ALGIHAZ CO.LTD

: NATIONAL GRID S.A

Substation

:132/33/13.8kV SHARURAH TOWN PP1 SS

GENERAL DATA AND INFORMATION:

1.

Panel no
Panel Name
Make
Type
: C70
Phase CT Ratio
Phase VT Ration
Ground CT Ratio
Ground VT Ration
Aux Voltage
S.No

: +CBP-3
: 13.8 KV Capacitor Bank Protection Panel
: GE
: 800/1 A
: 13.8KV/3/0.110/3
: 10/1 A
: 13.8KV/3/0.10/3
: 125-250VDC/100-240 VAC
:

MECHANICAL CHECKS AND VISUAL INSPECTION:

2.

ITEM
1
2
3
4

DESCRIPTION
Inspect for physical damage / defects.
Verify connections as per approved drawings.
Check tightness of all connections.
Check Ferrules.

CHECKED
OK
OK
OK
OK

3 SECONDARY INJECTION MEASUREMENT:


a)

Current Measurement:

Phases

Secondary Injected
Current(A)

Expected Primary
Current (A )

Measured Primary Current


from the Relay (A )

Ia

800

797.672

Tested by: Er. GANESAN SELVAM


Name
Signature & Date:

Witnessed by: Er. AAMER KHAN


Name
Signature & Date:

Error%

Commissioning Service Department


Commissioning Standard Test Formats
Description: CBP GE-C70 Relay
Equip. No: CPM1

PANEL NAME : +CBP3


DATE:11/12/13

Contractor : ALGIHAZ CO.LTD

Tested by: Er. GANESAN SELVAM


Name
Signature & Date:

CLIENT
Substation

: NATIONAL GRID S.A


:132/33/13.8kV SHARURAH TOWN PP1 SS

Witnessed by: Er. AAMER KHAN


Name
Signature & Date: