You are on page 1of 8

7 solid Top reasons To avoid Arms Industries

Building the potency of the particular internal Industrial Base capabilities along with capacity to
fulfill long term security along with Economic wants of the UAE
UAE Industrial Base Strategy
Background:
This document will be conceptual in its nature, as well as outlines the particular have to provide an
even more robust industrial base within your UAE based on the existing political, geographical,
military along with economic environments that exist. Also, the particular need to give you the
present and future armed forces using the necessary supplies as well as systems in which might be
produced within the actual UAE, to always be positive the internal along with external security with
the UAE. the general premise is always to create the conditions, the actual policies, the particular
procedures, and also the national will; to become able to establish an interior industrial base more
than time to generate the particular essential military major end items, equipment as well as
sustainment supplies required to maintain a viable armed force.
General Analysis:
This document articulates the general need, desire, rationale, also as a quantity of the main tasks
that will would be needed so as in order to bring this type of a concept for you to fruition. The Actual
document also articulates the particular complexities with the tasks needed to deliver the particular
present industrial base towards the level of performance in which it could give an individual the
defense force the required supplies as well as equipment to ensure its really own security, with out
relying upon companies as well as the industrial base of some other nations. Additionally, it
addresses the massive integration strategies required for connecting the countless parts as well as
sectors in the UAE Society, to include; government ruling bodies and governmental agencies, your
armed forces, industries, the actual educational systems, industry associations, along with global,
and multinational industries, also as critical infrastructure requirements.
Adopting a new national strategy this complex throughout its nature, along with with the extended
timeline that will will be required, to become able to recognize the real institutionalization
associated with an industrial base capability as well as capacity for producing the proper types as
well as correct quantities regarding military equipment to ensure National Safety would require at a
minimum:
long term vision as well as political will
Long-term economic dedication
Tenacious adhere to via over many years
Superior organization and management
International staff regarding experts for you to negotiate as well as facilitate
Along With single agency manage at the highest quantity associated with a UAE government

This single agency would have to have complete treatments for your planning, execution,
integration, coordination, danger management and concluding decision authority pertaining to all
matters involving the commercial base; also as access to the highest levels associated with
government, to guarantee the continuity with most the political will and in addition the economic
realities, upon which crucial industrial base choices has to be based. Such since the capitalization
regarding key industrial base facilities, if it can end up being a joint use facility producing both
civilian and also military items, will it provide an export capability and is actually also there a new
globe or even regional market share that will may be penetrated; together with almost all the
competition analysis required for you to penetrate globe markets to become able to ensure the
economical success involving industrial base ventures.
Major good results factors and considerations:
In order to be able to accomplish a program regarding this magnitude, would require integral
planning and additionally the integration of the rational logical road-map that would link the
concepts as well as specifications in order to desired outcomes. The Particular use of a logic pyramid
represents an example of using your elements provided.
This pyramid represents the key alignment regarding goals, objectives, strategy and so forth
necessary to ensure success, along with represents a logical linkage among each of your elements
which gives continuity towards the strategy. for example, the general aim is to offer UAE your
indicates necessary to ensure its internal security, without relying heavily about others. Within order
with regard to this being accomplished you will find a pair of main goals which in turn will need to
be fulfilled. First, a unified industrial base, the base inside the UAE that is synchronized along with
specific to supply both within peace plus conflict your essential equipment to end up being able to
sustain the military inside meeting their particular military missions; although at exactly the
particular same period becoming in a position to create services and also goods that are marketable
about the entire world market. Second, can be self-sufficiency, this is obtaining the necessary raw
materials, labor, manufacturing facilities, management as well as planning, as well as engineering
assets inside the particular country, along with committed towards the country, in order to support
the industrial base as well as its efforts to guide each its civil and also military requirements.
In order to have each a unified industrial base as well as self-sufficiency, there offers to be several
strategies throughout place to facilitate each individuals ends. The Actual strategies contain national
partnerships; these are crucial partnerships along with nations and corporations prepared to
companion to build the actual internal capability of the UAE also to maintain that will base. These
kind of partnerships could consist of crucial elements involving technologies transfer, as well as
setting up of joint ventures with just about all the objective associated with institutionalizing the
actual technology and also manufacturing processes necessary for the growth involving the
commercial base. Additionally, we add the actual concept regarding self-development the location
where the expertise gain from the UAE educational systems, entrepreneurial systems along with
industrial innovation get together for you to generate new ideas, factories, along with production in
which assistance and sustained your specific industrial base.
As the particular strategies are usually place in place, you can find variety of tactics, that will we
could use in order to facilitate along with enhance the strength of your strategies. These kind of
tactics might include strategic alignments inside the commercial base along with inside your
companion base. This kind involving integration provides synergy of effort as well as much better
outcomes in which decrease costs thereby, creating efficiencies and also effectiveness within the
economic base. Some Other tactics involve process standardization as well as variance control
thereby, allowing the manufacturing processes being predictable and escalating top quality ranges

which usually increase the actual danger for product more marketable upon the world markets,
creating higher industry share, and greater returns on investments. Additionally, encouraging
improve investments inside the UAE industrial base, that will have the effect of stabilizing the
economic base and the economy, whilst from the identical period growing capacity.
Throughout your design and buildup associated with the industrial base there must be a new normal
applied for you to every one associated with the engineering efforts in order to ensure stability as
well as consistency not only involving the person production elements, but within addition the
integration of the industry's elements into 1 synergistic effort. for this logic pyramid, we now have
employed the particular regular engineering concepts which additionally apply to processes and
style that might immediately affect the commercial base they will are:
Simplification: looks to simplify processes, designs, along with manufacturing layouts and also
routines in order to maximize efficiencies and to produce Lean Manufacturing.
Standardization: permits the general process and also initiative in order to utilize economies
simply by performing like things exactly the same way. This kind of cuts down on the time it will take
to standup new or even such as process using exactly the same plans, tools, and also processes.
Standardization also enables the use of statistical methods, such as 6 sigma, which usually increase
quality, minimizes waste, along with increases profits.
Integration: brings synergies to the industrial base via the actual combination of just like
industries, similar to processes, along with inside the reduction associated with production steps
which usually eliminates possibilities for error within the manufacturing processes. Reduced
variation increases reliability that reduces costs.
Elimination: involving non-value-added actions within the economic base or perhaps inside
manufacturing processes. Reduction throughout procedure actions reduces the danger and
opportunities for errors.
Automation: creating manufacturing as well as industrial base reliance through detaching the
"man within the loop" manufacturing; by automating these processes along with steps within the
particular manufacturing and industrial base processes. Automation enhances simplification and
standardization also as integration. Almost All regarding which in turn increases reliability as well as
reduces costs
In order for you to ensure smart application of virtually any initiative inside the economic base, the
standardize methodology requirements to be proven to supply structure for the all round process.
one such methodology is actually based on 4 steps which are; design, deploy, operate, along with
sustain. This kind of structure can be layed out a lot more fully, as well as discussed within more
detail later on within this paper.
In supplement to some construction methodology, there offers to become a steady management
approach that has as the absolute minimum a opportunity to design, plan, control, and also evaluate
the total industrial base initiative its direction as well as its effectiveness. With a minimum, their
needs being portfolio and pipeline management, source management and also program/ project
control.
A national industrial base strategy that's this huge and also complex, requirements to be deeply
rooted within the political base in the UAE, to get just about any hope of your measure involving
good results that may give a person the return upon investment (ROI) then return in equity (ROE)

which is expected or even required. Additionally, financial as well as economic measures like money
budgeting techniques, along with risks/return tradeoffs, in inclusion to operating leverage
considerations, will must deployed and also used within the overall UAE governmental budgeting
process, also as commercial financial markets.
The government may also need to regulate, control, and also comply with international law
throughout regards for you to arms/military manufacturing along with sales; as well as international
treaties dealing within arms trafficking and weapons of mass destruction (WMD's).
The economic dedication that will is going to be required from the nation for you to ensure
successful implementation of your military/civilian industrial base complex inside your UAE will be
significant and also long-term. In Order To attain the overall stated objective regarding UAE Safety
through an interior unified industrial base with self-sufficiency within the output of the actual goods
as well as services to be able to support the Armed Forces; the UAE resolve for a new multigenerational occasion frame initiative is not simply imperative, however paramount.
A major aspect inside the achievement associated with this type of huge national strategic initiative,
is likely to be your management and also control construction that's throughout destination to
ensure completeness and correctness of every one regarding the efforts related for you to this
endeavor. the management cycle briefly defined here, provides the cursory look at just a quantity of
the main elements that will be necessary to always be able to establish, manage as well as perform
national strategy to integrate military production into the industrial base. This particular
management cycle consists associated with 6 major steps, almost all of which has to become able to
be accomplished if successful as well as efficient management is to adopt place. Each As Well As
Every step lays the inspiration for your succeeding steps, which supplies a new mechanism for your
overall success. a note ought in order to be produced here, that will the method is only of the
particular exact same quality as the people who are involved within the process, and also for a
national strategic initiative as important as a new modernization involving the commercial base very
qualified as well as devoted leadership and also management that will use a long-term commitment
and a vision regarding achievement is likely to be required.
The 1st step, is to establish the actual management as well as cultural environment essential to set
the actual groundwork for your strategic initiative. This specific step will be realized at the highest
amount UAE Government, using key political as well as economic leaders making a obvious vision
and framework required to establish a key strategic initiative to go the commercial base via its
present state towards the desired long term state. key activities would contain total as well as
comprehensive assessment involving existing UAE industrial base and also its capabilities and
capacities. Additionally, assessment within the long term wants must be accomplished that
establishes the particular present along with future threat circumstances and the capabilities in
which are required to meet those threats and also have these specifications translated straight into
weapons along with methods that require to be produced through the industrial base. These
assessments are generally accustomed to set up a definite vision associated with the road ahead,
and also the assignment regarding missions and methods as well as goals, tasks, and also objectives
required to accomplish the specified outcomes and changes inside the industrial base.
Additionally, with this time and IO campaign has for you to be initiated stating the need for adjust
and also soliciting executive monetary sector and also management support for the strategic
initiative, to include source allocation in order to initiate the perceived strategic effort and to
execute the actual macro planning process, and furthermore the establishment of the agency and its
key leadership. When this can be been completed, as well as the significant plan strategy continues
to be mapped, to become able to include a obvious critical path set up along with milestones as well

as timelines assigned, we have been ready in order to proceed to step two.


The 2nd step, will end up being the establishment of the methodology as well as the assistance
systems needed to start implementation of the national strategy. Important elements include: the
composing of policies, your organization of communications and also tracking systems, as well as the
setting involving standards. This particular requires assembling the proper team associated with
people, with most the proper training, and also experience, to organize and execute your vision and
also missions previously developed. The Actual effort needs to become able to fill out the corporation
throughout its important leadership positions that will will probably be responsible for the
implementation with the strategy. From now it is vital as well, to assigned equipment and also
methods that will will most likely be utilized within the implementation. This can be paramount for
you to make certain that crucial systems as well as equipment necessary for your management, info
flow, along with data management, always be online and accessible to ensure orderly, as well as
timely flow, of information, data, and communications. a important element will be changes inside
the educational systems in the elementary, secondary, and university or college level in these
programs as finance, business, management, as well as engineering, which will produce compared
to subsequent generation of technical as well as management experts to continue the actual
implementation all through your a prolonged time for you to come. A New key component will even
be your institution associated with curriculum and an educational system which concentrates on
producing experts throughout acquisition, procurement as well as life-cycle custom modeling
rendering specifically to military weapons as well as systems. they will supply the backbone with
regard to military acquisition management system as well as the interface for the national industrial
base. Acquisition as well as procurement will give a critical hyperlink in the strategic initiative as
well as will demand an entire review as well as realignment as well as integration in to a material
acquisition management program which will provide for and control, management, education, along
together with a complete lifestyle cycle regarding things that the economic base will produce.
Throughout order to be successful it shall need thorough coordination and input via many sectors in
the UAE governmental along with industrial complex.
Step three, moves for the management involving work, as well as the establishment with the
executive board's and sector advisory boards from the different gov departments and also business
associations necessary to interface using the initiative. Your key element is also your portfolio
steering team as well as committee which could be your determining entire body that will
determines which applications, weapons, and systems, that will be integrated to the program in the
strategic industrial base and offers authority regarding plan start-up. An further important part of
step three will be pipeline control. This pipeline management may end up being the controlling of,
the actual when and where, programs and tasks key in into the national industrial base strategy, for
you to ensure that the serious quantities of effort is best aligned using similar to goods or perhaps
services, your existing manufacturing capability and capacity, and have the best mix associated with
partnering, joint ventures, monetary and political support, marketing and also advertising analysis
and finished life-cycle management plans.

Portfolio throughout pipeline management provides your apex inside the management of most
aspects of your critical industrial base infrastructure. The idea is thru the particular portfolio and
pipeline the which the executive as well as management team can greatest utilize and implement
your sources obtainable towards the UAE with just about any certain point inside time as well as
power to maximize output, investments, monetary manage along with planning factors, too as
maximizing the particular synergies involving multiple industrial complexes, crossing multiple
sectors over extended intervals involving time. Its aim can be simple, to put the right products, in
the best places, in the correct industries, associated with the right time, for you to stay away from
duplication, rework, along with increases throughout cycle occasion essential to bring production
capability and also capacity online.
Step four, may end up being the execution associated with plans created from the applications and
projects, as well because the integration of the pipeline manage plans into implementation action,
which are the management systems, enterprise practices and also processes, every one regarding
the tools, techniques, training, automated operation, along with expert methods required also as
becoming a formal reporting structure to incorporate metrics. Step four represents the actual
significant execution associated with work, alongside having its every day management metrics,
performance standards, as well as the Details Information Systems, needed for you to ensure
effectiveness as well as efficiency inside the execution in the plans, developed via the actual
portfolio stirring group the particular pipeline management efforts. This requires in depth planning,
along with cross coordination in order to ensure multiple company sectors, together with multiple
market sectors as well as governmental agencies can be synchronized as well as coordinated. This
can depend on a complex internal info technologies network in which all important players have got
Buy Guns Online visibility over, and an knowledge of the entire strategy throughout its existing and
also future implementation status, thereby providing real time decision capability towards the
agency and also key leaders and management.
Step five, is the evaluation associated with performance, including any review of your applied
metrics regarding all of the applications and also projects, the effectiveness of the pipeline
integration, the general effectiveness of the portfolio inside meeting the particular national security
requirements; and the continuing overview of very best practices, available to ensure effectiveness

and inefficiencies within your national strategy. This particular can always be a crucial step in
making certain and knowledge as well as data is for sale in realtime to the national leadership, also
because the program leadership detailing overall movement any shun progress divides a new
window associated with constant review as well as approval in the intended portfolio and also
pipeline choices as well as their effectiveness within a replication. The idea enables course
correction inside steady review, as well as the achievable elimination of programs which are not
meeting the actual potentials as initially assessed or to modify along with redirect, modernize as well
as update as the circumstances require. This particular provides leadership whatsoever amounts
along with effective method of managing in order to make positive that products presently underway
are increasingly being considered as well as implemented as well as continually reviewed, pertaining
to relevancy appropriateness as well as meeting the particular criteria of cost, quality, as well as
delivery.
Step six, may always be the feedback loop which consists associated with all of the reporting and
briefings towards the national leadership, shareholders and partners, as well as the review and also
refinement regarding the general strategic initiative and its movement toward the assigned vision,
mission, as well as objectives. This specific step offers a critical link in between every one regarding
the steps of the process, and supplies to find a constant improvement path to ensure that most
enterprise elements remain concentrated about the vision and also the national will. Step six
supplies a high quality manage loop that ensures the other five steps are contributing towards the
all round process. It provides for the fine tuning of the procedure and systems to management of
facets of perform and provides the lessons discovered vehicle for you to ensure that all involved in
the general strategic process comprehend where the process wants to become improved to produce
the specified efficiencies.
Step six, furthermore offers a validation for that systems details along with information
appropriateness and usefulness to the plan throughout providing the data required for successful
management and also control. This specific results inside the smart upgrades along with safety
required to make specific that the info systems applied to the strategic initiative remain secure
although providing the data along with data necessary for that day-to-day choice making process.
For everyone of your steps and all in the sub-steps as discussed in the Management Cycle, as well
because the processes and systems, it needs a life-cycle methodology to end up being able to
manage and also execute just about all in the micro areas of the actual management actions with
regard to danger management also to ensure completeness. the 4 crucial phases or elements
associated with this lifestyle cycle technique include:
design
Deploy
operate
Sustain
Enablers about bat roosting 4 main operating spheres involving influence include: planning,
technical solutions, education and learning and also metrics.
The application of every with the actions with the life-cycle method helps ensure, that the product,
service, systems, as well as application can be sufficient, and has the actual utility required, inside
meeting whatever performance objectives assigned.

Linking all associated with the actions together into one industrial base, is really a strategic
formation template. This specific template, can be used to hyperlink your strategic formation with a
logic Pyramid which usually represents almost all of the main actions as well as considerations
required for completion, and supplies the actual macro activities that really needs to become
considered. This is linked to the management cycle, that outlines your steps what requirements to be
managed along with implemented to ensure success. Each the actual logic pyramid as well as the
management cycle are usually executed by the considerations contained inside the life-cycle
approach which gives the actual total scope methodology in order to ensure just about all
considerations tend to be made for everyone of the particular actions and also activities previously
outlined. Since these management techniques and also processes tend to be executed, critical
aspects are identified and also may then be stratified straight into critical good results factors,
which may be analyzed to identify breakthrough objectives as well as goals which enable the
management team in order to prioritize actions which usually provide the greatest return about
investment or elevated National Security. While this can be completed coordinating together with
executives and also staff related to those breakthrough objectives and goals can then be
manufactured for you to realize your synergies of effort for the major reason that capabilities as well
as capacities necessary to satisfy the future security as well as economic needs of the UAE.
This Linking or perhaps interconnecting methodology is a management method to make particular
that your program remains focus, streamlined, and effective throughout its existence cycle.
Additionally, it provides a new common understanding along with template, to be able to that almost
all parties connected using the strategic initiative can be familiar, causing a lot more successful and
also timely communication with all get-togethers involved. The idea provides the particular unifying
road-map which usually assists folks remain targeted about the ultimate aim as well as objective of
securing UAE security through the economic base, as well as its power to satisfy the needs of the
armed forces.
Summary
In summary, the actual concept of creating a national industrial base strategy using the purpose
associated with infusing industrial capabilities into the manufacture associated with goods as well as
services to fulfill military specifications inside the actual UAE industrial base will be sound.
Producing the actual capacity being self-sufficient inside providing for the security involving the
nation is actually a major risk decreasing strategy. However, the execution with the concept is quite
complex using a myriad involving interrelated and contending interests as well as activities;
involving any diverse population associated with both military as well as civilian's, governments,
corporations, associations, industries as well as philosophies. Therefore, good results will demand
strong leadership, excellent vision, tenacity, superb planning along with management and the
majority of all a structured system which has the actual essential authority, duty as well as ability to
affect your necessary changes required to implement a UAE military/civilian industrial based
national strategy.

You might also like