You are on page 1of 6

CGV-00-MDC-FAT-001

Pag
e:
Rev.
:

CLIENT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

PROJECT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X

DESCRIPTION

1
0

DOCUMENT NUMBERING SYSTEM

DOCUMENT NUMBERING SYSTEM

0
REV

15.04.2016
DATE

FIRST ISSUE
DESCRIPTION

xxx
AUTHOR

xxx
REVISED

xxx
APPROVED

CGV-00-MDC-FAT-001

Pag
e:
Rev.
:

CLIENT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

PROJECT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X

DESCRIPTION

DOCUMENT NUMBERING SYSTEM

TABLE OF CONTENTS

1.
2.
3.
4.
5.
6.

Purpose
Scope
Definitions
Responsibilities
Coding System
Table

2
0

CGV-00-MDC-FAT-001

Pag
e:
Rev.
:

CLIENT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

PROJECT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X

DESCRIPTION
1.

3
0

DOCUMENT NUMBERING SYSTEM

PURPOSE:
The purpose of this procedure is to establish the coding system of the documents
related with different Project.

2.

SCOPE:
This system will apply the entire document related with the Project.

3.

DEFINITION:
It is the action and effect of identifying a document by means of a series of letters and
numbers, applying the criteria established and detailed below.

4.

RESPONSIBILITIES:
The respective Project Areas are responsible for coding the documents that they issue
within the scope of their specialty, in accordance with that specified in this procedure.
Consequently each Area is responsible for including the coding instructions in the
contracts and orders of its specialty that the suppliers and contractors have to follow.
The Project Manager/Head of Engineering will assure the coherence between the
different areas and appropriate correspondence with the Coding System established
and the defined work formats.

5.

DOCUMENT NUMBERING SYSTEM:


The following coding system, specific to the project, will be used in any document
related to the project.
The coding system to apply is established below according to the characteristics of
each document:
The structure of the code will have the form:
AAA BB C1C2C3 DDD EEE
Where:
AAA: It is constant for the all document. It is short form of the company (CGV). For all
document it shall be identify as CGV
BB: It identifies the group, unit or area of the plant for which the document is
applicable. The digits to apply are:
00

Document applicable to general issues.

CGV-00-MDC-FAT-001

Pag
e:
Rev.
:

CLIENT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

PROJECT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X

DESCRIPTION
01

4
0

DOCUMENT NUMBERING SYSTEM

Project Number

C1: It identifies the Division/Business vertical of the Company. It is explained in Table


-1-DIVISION KEY (C1)
C2C3: It identifies the issuing discipline of the document. It is explained in Table-2DISCIPLINE KEYS (C2C3)
DDD: It identifies the document types. It is explain in Table-3-Document type
(DDD)
EEE: It is the consecutive serial number of the Document type
EXAMPLE:
For CNG Station
Foundation Drawing
For Document
Numbering System

CGV-01-GCE-LAY-001

CGV-00-MDC-FAT-001

Table -1-Division Keys (C1)


KEY
M
G
D
M

DESCRIPTION
Management Consultancy & Technical Advisory Services (MC &
TCA)
Global Execution Centre(GEC)
Design Outsourcing (DOS)
Miscellaneous

Table -2-Discipline Keys (C2C3)


KEY
AD
AR
CE
ME
EE
SE
PE
PM
QA
HS
CI
EN
PL

DESCRIPTION
Administration
Architectural
Civil Engineering
Mechanical Engineering
Electrical Engineering
Structural Engineering
Proposal Engineering
Project Management
Quality Assurance
Safety Engineering
Control & Instrumentation
Environmental
Planning

CGV-00-MDC-FAT-001

Pag
e:
Rev.
:

CLIENT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

PROJECT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X

DESCRIPTION
EC
PP
PL
PR
FI
HR
IT
DC

DOCUMENT NUMBERING SYSTEM


Erection & Commissioning
Piping
Pipe Line
Process Engineering
Finance
Human Resource
Information Technology
Document Control

Table-3-Document type (DDD)


Key
PFD
PID
DBR
DCR
TSP
SFD
EQL
VAL
LIL
MAN
DPR
DFR
FAT
GAD
SAL
ISO
IFC
TDS
INL
BER
GEN
LAY

DESCRIPTION
Process Flow Diagram
Piping & Instrumentation Diagram
Design Basis Report
Design Calculation Report
Technical Specification
System Functional Description
Equipment List
Valve List
Line List
Manual
Detail Project Report
Detail Feasibility Report
Form & Template
General Arrangement Drawing
Symbol & Legend
Isometric
Issued for Construction
Technical Data Sheet
Instrumentation List
Bid Evaluation Report
General Document
General Layout

5
0

CGV-00-MDC-FAT-001

Pag
e:
Rev.
:

CLIENT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

PROJECT

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X

DESCRIPTION

DOCUMENT NUMBERING SYSTEM

6
0

You might also like