You are on page 1of 7

MATERIAL

CREATE-GENERAL
CHANGE

FLAG FOR DELETION


DISPLAY
DISPLAY CHANGES

OTHER

MM01
MM11
MM02
MM12
MM13
MM06
MM16
MM03
MM19
MM04
MM14
MM17
MMAM
MMBE
MMPV
MMRV

IMMEDIETELY
SCHEDULE
IMMEDIETELY
SCHEDULE
ACTIVATE
IMMEDIETELY
SCHEDULE
DISPLAY CURRENT
DISPLAY AT KEY DATE
ACTIVE CHANGES
SCHEDULE CHANGES
MASS MAINTENANCE
CHANGE MATERIAL TYPE
STOCK OVERVIEW
CLOSE PERIOD
ALLOW POSTING TO
PREVIOUS PERIOD
INSTANT MATERIAL VIEW
ENTER STORAGE LOCATIONS
MATERIAL LIST
ARCHIVE/DELETE
DISPLAY ARCHIVE

MM50
MMSC
MM60
ARCHIVING(MATERIAL) MM71
MM72
BILL OF MATERIAL (MATERIAL BOM)
CS01
CREATE
CS02
CHANGE
CS03
DISPLAY
EXTRAS
CS28
ARCHIVING
CS20
MASS CHANGES
EVALUATION/BOM
CS11
BOM MULTILEVEL
EXPLOSION/MATERIAL
CS12
STRUCTURE MULTILEVEL
BOM
CS13
SUMMURISED BOM
WORK CENTRES
CR01
CREATE
CR02
CHANGE
CR03
DISPLAY
CA85
REPLACE
CAPACITY
CR11
CREATE
CR12
CHANGE
CR13
DISPLAY
HIERARCHY
CR21
CREATE
CR22
CHANGE
CR23
DISPLAY
LINE HIERARCHY
LDB1
CREATE
LDB2
CHANGE
LDB3
DISPLAY
REPORTING
CR60
W/C INFORMATION SYSTEM
CR05
W/C LIST
CR06
COST CENTRE ASSIGNMENT
CR07
W/C CAPACITIES
CR08
W/C HIERARCHY
WHERE USED
CA80
WORK CENTRE
CR15
CAPACITY
CR10
CHANGE DOCUMENTS
EXTRAS
CR09
STD. TEXTS TASK LIST
CR41
ARCHIVING

ROUTING
STAD. ROUTING

REF. OPERATION SETS

RATE ROUTING

REF. RATE ROUTING

EXTRAS
MASS CHANGES
DELETE TASK LIST
REPORTING
WHERE USED LIST

CA01
CA02
CA03
CA11
CA12
CA13
CA21
CA22
CA23
CA31
CA32
CA33
CA85
CA95
CA75
CA99
CA98
CA80
CA90
CA70

CREATE
CHANGE
DISPLAY
CREATE
CHANGE
DISPLAY
CREATE
CHANGE
DISPLAY
CREATE
CHANGE
DISPLAY
REPLACE W/C
REPLACE REF. OP. SET
REPLACE PRT
WITH ARCHIVING
W/O ARCHIVING
WORK CENTRE
REF. OP. SETS
PRODUCTION RESORCE TOOLS

OKKP
KS01
KZS2
KA01
KA06
KL01
KP26

MAINTAIN CONTROLLING AREA


CREATE COST CENTRE
CREATE COSTING SHEET
CREATE PRI. COST ELEMENT
CREATE SEC. COST ELEMENT
CREATE ACTIVITY TYPE
ACTIVITY TYPE/PRICE PLANNING

COST CENTRE

What is the T-Code for trigger point?


CO30
CO31
CO32
CO33

MENUCO30
SAPMCNSM
SAPMCNSM
SAPMCNSM

Standard trigger points


Create standard trigger point
Change standard trigger point
Display standard trigger point

What the tcodes to archieve/delete a material BOM? - by Jia


Look at this option to delete a material BOM
There are two ways of deleting BOMs:
- Using the Delete function.
- Using the Deletion indicator.
If you select the deletion indicator, the BOM is archived in the next reorganization run, and can
be deleted if required. In the BOM header, you set the indicator that controls physical deletion
after the archiving run. You can still process the BOM within its validity period.This also applies
if the deletion indicator is entered with reference to a change number with a valid-from date that
is after the date of the next reorganization run
You can use the below mentioned tcodes:

CS25/CS28
CS26
CS27

Archiving for BOMs


BOM deletion
Retrieval of BOMs

SALES AND OPERATIONS PLANNING


PRODUCT GROUP
MC84
MC86
MC85
GRAPHIC
MC91
MC92
PLANNING
MC81
FOR PRODUCT GROUP
MC82
MC83
MC75
FOR MATERIAL
MC87
MC88
MC89
MC74
MC9K
VERSION MANAGEMENT
MC78
MC80
FLEXIBLE PLANNING
MC93
PLANNING
MC94
MC95
MC9K
TOOLS/PLANNING TYPE MC8A
MACRO
MC8B
MC8C
EVENT
MC64
MC65
MC66
ROUGH CUT PLANNING
MC35
PROFILE
MC36
MC37
ENVIRONMENT
MC90
ACTIVITY REQT.
KSPP
KSBL
KSOP
CPBL
MC9C
SETTINGS
MC96
DISSAGGRIGATION
MC76
MC77
MC75
MC74
FORECASTING
INDIVIDUAL FORECAST MP30
MP31
MP32
TOTAL FORECAST
MP38
MP33
MP39
MPBT
MPDR

CREATE
CHANGE
DISPLAY
PRODUCT GROUP
OVERVIEW
CREATE
CHANGE
DISPLAY
TRANSFER PG TO PLANNING
CREATE
CHANGE
DISPLAY
TRANSFER MATERIALS TO DM
MATERIAL AVAILABILITY
COPY
DELETE
CREATE
CHANGE
DISPLAY
MATERIAL AVAILABILITY
CREATE
CHANGE
DISPLAY
CREATE
CHANGE
DISPLAY
CREATE
CHANGE
DISPLAY
TRANSFER MATERIALS TO DM
TRANSFER TO COST CENTRE
COST CENTRE OLANNING REPORT
TRANSFER TO ACTIVITY BASED COSTING
PLANNING REPORT PROCESSES
REPORTING
FORECAST PROFILE
BREAKDOWN PG PLAN
DISPLAY PG PLAN
TRANSFER PG TO PLANNING
TRANSFER MATERIALS TO DM
EXECUTE
CHANGE
DISPLAY
EXECUTE
REPROCESS
PRINT
EXECUTE BACKGROUND
PRINT BACKGROUND

DEMAND MANAGEMENT
PIR

MD61
CREATE
MD62
CHANGE
MD63
DISPLAY
MD65
REQTS. FOR SCINARIO
MD66
COPY SIMULATED DEPENDENT REQT.
MD70
COPY TOTAL FORE CAST
EVALUATION
MD73
DISPLAY TOTAL REQT.
MD79
EXCELL INTERFACE
MD4C
ORDER REPORT
MD72
CHARECTERISTICS PLANNING
CUSTOMER REQT.
MD81
CREATE
MD82
CHANGE
MD83
DISPLAY
REPETITIVE MANUFACTURING
MASTER DATA
C223
PRODUCTION VERTION
PRODUCT COST PLANNING
COSTING RUN
CKMATSEL
CREATE
SELECTION LIST
CKMATCON
Edit
CK40N
EDIT COSTING RUN
Material Requirement Planning
Menu Nodes
TransactionActivity
Master Data
MD25
Create planning calendar
MD26
Change planning calendar
MD27
Display planning calendar
MDSA
Display BOM explosion number
MDSP
Edit BOM explosion number
MEQ1
Maintain quota file
OPPP
Explode BOM by date
MDUS
Display project assignment
MDUP
Process project assignment
MDL1
Create production lot
MDL2
Change production lot
MDL3
Display production lot
Planning
MD20
Create planning file entry
MD21
Display planning file entry
MDAB
Set up planning file entry in background
MDRE
Check planning file entry
MD01
Total planning online
MDBT
Total planning in background
MD03
Single-item, single-level planning
MD02
Single-item, multi-level planning
MD43
Interactive single-item planning
MD50
Multi-level, make-to-order planning
MD51
Multi-level project planning
MF52
Display planning table
MF50
Change planning table
MF57
Planning table by MRP lists
MF51
Planning table by production list
Evaluations
MD04
Stock/requirements list
MD07
Collective access of stock/requirements lis
MD05
MRP list
MD06
Collective access of MRP lists
MDLD
Print MRP list
MD45
Planning result
MD46
Collective access of planning result
MD44
Planning situation for a material

Planned Order

LONG TERM PLANNING


PALNNING SCENARIO

MD47
MD48
MD4C
MD09
CO46
MD11
MD12
MD13
MD16
MD14
MD15
MDUM
CO40
CO41
CO48
COR7
COR7_PC
COR8
MDVP
MDAC

Planning situation for a product group


Cross-plant planning situation
Order report
Pegged requirements
Order progress
Create planned order
Change planned order
Individual access of planned order
Collective access of planned orders
Individual conversion of planned order into
Collective conversion of planned orders int
Convert planned order into purchase requisi
Convert individual planned order into produ
Collective conversion of planned orders int
Partial conversion of planned order into pr
Individual conversion of planned order into
Collective conversion of planned orders int
Partial conversion of planned order into pr
Collective availability check
Execute action for planned order

MS31
CREATE
MS32
CHANGE
MS33
DISPLAY
PLANNING RUN
MS01
ON LINE
MSBT
SA BACKGROUND JOB
MS02
SINGLE ITEM - MULTI LEVEL
MS03
SINGLE ITEM - SINGLE LEVEL
MS50
SINGLE ITEM - SALES ORDER
MS51
SINGLE ITEM PLANNING, PROJECT
MFSO
PLANNING TABLE
EVALUTIONS
MS05
MRP LIST MATERIAL
MS06
MRP LIST COLLECTIVE DISPLAY
MSLD
PRINT MRP LIST
MS04
STOCK/REQUIREMENTS LIST
MS07
STOCK/REQUIREMENT LIST COLLECTIVE DISPLAY
MS44
PLANNING SITUATION MATERIAL
MS47
SITUATION PRODUCT GROUP
MPS-MASTER SCHEDULE ITEMS
TOTAL PLANNING
MD40
ON LINE
MDBS
SA BACKGROUND JOB
MD41
SINGLE ITEM - MULTI LEVEL
MD42
SINGLE ITEM - SINGLE LEVEL
MD43
SINGLE ITEM - INTERACTIVE
MD50
SINGLE ITEM - SALES ORDER
MD51
SINGLE ITEM PLANNING, PROJECT
*** EVALUTION IS SIMILAR TO MRP
PRODUCTION CONTROL
ORDER - CREATE
CO01
WITH MATERIAL
CO07
WITHOUT MATERIAL
CO40
FROM PLANNED ORDER
CO41
COLLECTIVE CONVERTION OF PLANNED ORDER
CO08
FOR SALES ORDER
CO10
FOR PROJECT
CO02
CHANGE
CO03
DISPLAY
CONTROL
MD04
STOCK/REQUIREMENTS LIST

GOODS MOVEMENT
MATERIAL STAGING

CONFIRMATION
FOR OPERATION

TOOLS-ARCHIVING
CAPACITY PLANNING
EVALUTION

COHV
COMAC
CO05N
CO04N
CO09
MF65
MF68
MB1A
MB31
COWBPACK
CO1V
CO14
CO13
CO1L
CO1P
CO78
KOAA

MASS PROCESSING
COLLECTIVE AVAILABILITY CHECK
COLLECTIVE RELEASE
PRINT
AVAILABILITY OVER VIEW
STOCK TRANSFER FOR RESERVATION
LOG
GOODS ISSUE
GOODS RECEIPT
PACK MATERIAL
TIME TICKET
DISPLAY
CANCEL
REQUESTED CONFIRMATIONS
PREDEFINED PROCESSES
ORDER
SETTELMENT DOCUMENTS

CM01

LOAD

WORK CENTER VIEW

CM02
CM03
CM04
CM05
CM07
EXTENDED EVALUTION
CM50
CM51
CM52
LEVELLING
CM21
WORK CENTER VIEW
CM22
INDIVIDUAL CAPACITY VCM27
CM28
ORDER VIEW
CM31
CM32
AVAILABLE CAPACITY
CR12
CAPACITY
CR13
OP4A
OP43

ORDERS
POOL
BACKLOG
OVERLOAD
VARIABLE
WORK CENTER VIEW
INDIVIDUAL CAPACITY VIEW
ORDER VIEW
PLANNING TABLE (GRAPHICAL)
PLANNING TABLE (TABULAR)
PLANNING TABLE (GRAPHICAL)
PLANNING TABLE (TABULAR)
PLANNING TABLE (GRAPHICAL)
PLANNING TABLE (TABULAR)
CHANGE
DISPLAY
SHIFT SEQUENCE
FACTORY CALENDER

Where shall we maintain number range for planned orders?


To maintain number range for planned order. Go to:
MM-->CBP-->NUMBER RANGE-->DEFINE NUMBER RANGE FOR PLANNING RUN.
Don't allow External Number Assignment.
What is t.code for planning calendar and factory calendar?
Planning Calendar--MD25
Factory Calender--SCAL
Menu Path
SPRO-->Materials Management-->Master Data-->Maintain Planning
SPRO-->Calendar--md25

SPRO-->General Settings-->Currencies-->Expiring Currencies-->Maintain


SPRO-->Calendar-->SCAL

You might also like