Professional Documents
Culture Documents
FACULTY OF ENGINEERING
MAY/JUNE 2013
PROGRAMME
MODULE NAME
DATE
Wastewater Engineering
Monday
MODULE CODE
20 May 2013
TIME
NO. OF
QUESTIONS SET
CIVE 4016
DURATION
NO. OF QUESTIONS
TO BE ATTEMPTED
INSTRUCTIONS TO CANDIDATES
Answer Any Four (4) Questions
All questions carry equal marks.
CIVE 3223(5)/
2 hours
(b)
(ii)
(iii)
[6 marks]
[6 marks]
[6 marks]
Year
Population:
(thousands)
(c)
1941
60
1951
65
1961
63
1971
72
1981
79
1991
89
2001
97
2011
120
What are the factors you would consider when determining the design period of
the proposed wastewater treatment plant in Q 1(b)?
[3 marks]
Question 2
(a)
The hydraulic design of sewers and drains is similar to that of the water
reticulation systems. However, flows in sewers and water supply pipes are
different. Briefly describe the major differences.
[5 marks]
(b)
For a particular sewer network, the minimum and maximum velocities of the
sewage circulating in the pipe have been specified. Why according to you the
velocities specified should be adhered to?
[5 marks]
(c)
As the design engineer on a particular sewer network, you will have to position
sewer accessories. List 4 such accessories you would consider implementing and
briefly describe their relative importance.
[8 marks]
(d)
What are the design parameters that the design engineer need to convey to the
contractor for the construction of the sewer network? Justify each data required.
[7 marks]
Page 1 of 3
Question 3
(a)
(b)
For the project outlined in Q3 (a) justify the type of screen you would select for
removing bigger suspended or floating matter from the sewage.
[5 marks]
(c)
Question 4
(a)
(b)
Design a rectangular sedimentation tank to treat 2.4 million litres of raw water per
day. The detention period may be assumed to be 3 hours.
[5 marks]
(c)
Micro-organisms are classified into four different groups, write short notes on any
two groups.
[5 marks]
(d)
For a municipal wastewater treatment plant draw the activated sludge process
diagram.
[5 marks]
(e)
Cesspool
(ii)
Seepage pit
[5 marks]
Page 2 of 3
Design a completely mixed activated sludge system to serve 60,000 people that
will give a final effluent that is nitrified and has 5-day BOD not exceeding
25 mg/L.
The following design data is available.
Sewage flow =9000 m3/day
BOD5 = 360 mg/L
BODu = 1.47 BOD5
Total kjeldahl nitrogen (TKN) = 53 mg/L
Phosphorus = 13.3 mg/L
Winter temperature in aeration tank = 18C
Yield coefficient Y = 0.6 ;
Decay constant Kd = 0.07 per day
Specific substrate utilization rate = (0.038 mg/L)-1 (h)-1 at 18C
Assume 30% raw BOD5 is removed in primary sedimentation, and BOD5 going to
aeration is, therefore, 252 mg/l (0.7 x 360 mg/L).
[15 marks]
(b)
(c)
Page 3 of 3