Given datas
2
Provided beam size = 250*500 mm
Fy = 415 N/ mm
ratio =
6000
440
= 14
Hence it is safe.
CALCULATION OF LOAD
Dead load, D.L = 0.250*0.50*25 = 2.5KN/m
Live load, L.L = 5KN/m (from IS 875, part 2 )
Total load = 5+2.5 = 7.5 KN/m
Xumax
d
(1-0.42
Xumax
2
) fck*b d (from IS 456 page no. 96,
d
equation b )
= 0.138*fck*b d
Mu lim
6
2
120.48 * 10 = 0.138*20*250* d
(120.48106) /(0.13820250)
= 417 mm
Here effective depth required is less than that provided . Hence check for depth is safe.
2
= 0.138*fck*b d
Mu lim
= 0.87*fy*AST*d*(1-
Mu
)
AST415
25044020
120.48 * 10
= 0.87*415*AST*440* ( 1-
6
120.48 * 10
4
= 158862 AST ( 1- 2.37* 10 AST )
AST
- 120.48 * 10
AST
= 917.05 mm
Number of bars =
1 62
) = 20.06
4
mm2
917.05
201
= 4.6 5 nos.
2
Vu
bd
116.8410
25044 0
Percentage of steel =
2
= 1.06 N/ mm
100 Ast
bd
1001005.25
250440
c
= 0.9
2
=0.60 N/ mm ( from IS 456 page no. 73, table-19 )
v > c
There for shear reinforcement is must
)*bd
Asv =
0.4
0.87fy
2
8
4
) *2
2
= 101 mm
Spacing, Sv =
Asv0.87415
2500.4
= 362.97 mm
l
d <
l
d
6000
440
l
d
= 13.63
*Kt
*Kt =16.36
There for
l
d
l
< d
*Kt
DESIGN OF COLUMN
2
Dimension of column = 250*500 mm
= 500mm
Effective length
Least cross section dimension
2.34
0.25
= 9.36 < 12
2
= 250*500 = 125000 mm
Pu
= 1239.39.5 KN
Pu
3
= 1239.39 * 10 N
1239.39 * 10
= 0.4*20*(125000-ASC)+0.67*415*ASC
= 1000000 8ASC+278.05ASC
3
1239.39 * 10
- 1000000 = 270.05ASC
2
ASC = 1139.68 mm
Area of one
Total AST
1139.68
2
* 16 = 5.69 6 nos.
( )
4
2
Provided ASC = 6*200.96 = 1205.76 mm
0.8
2
100 *125000 = 1000 mm
6
100
2
* 125000 = 7500 mm
There for the provided ASC is between these two values, hence check is satisfied.
CALCULATION OF TIE REINFORCEMENT
Diameter of tie is 1 4
th
1 4 th *16 = 4mm
Hence provide minimum diameter is 6mm.
The spacing is least of 300 mm or 16 diameter = 16*16 = 256 or