Professional Documents
Culture Documents
(MRS)
BI-ANNUAL PERIOD
S.No.
01.
02.
03.
04.
05.
06.
07.
08.
09.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
TABLE OF CONTENTS
Chapter
Carriage
Loading, Unloading & Stacking
Earthwork (Excavation & Embankment)
Dismantling (Demolition)
Mortar.
Concrete
Brickwork
Stone Masonry
Roofing
Flooring.
Surface Rendering
Wood Work
Painting & Varnishing.
Lining of Canals
Sheet Piling
Protection & Diversion Work
Outlets
Road & Road Structure
Plumbing, Sanitary Installation & Gas Fittings
Surface Drainage.
Sewerage
Sinking of Wells
Tubewell & Water Supply
Electric Installation
Iron Work
Miscellaneous
Page Nos
3 to 23
24 to 26
27 to 33
34 to 38
39 to 40
41 to 50
51 to 56
57 to 59
60 to 65
66 to 70
71 to 74
75 to 84
85 to 90
91 to 92
93 to 94
95 to 104
105 to 106
107 to 111
112 to 117
118 to 119
120 to 124
125 to 127
128 to 139
140 to 152
153 to 158
159 to 162
1. CARRIAGE
Note:
Note:
2 For hilly areas 25% above the rates in the plain areas shall be allowed for total mileage (Km) covered.
Note:
3 In case of articles longer than 15 ft. (4.6 m) carried in trucks, the following rates shall be allowed:i) Above 15 ft. to 25 ft. (4.6 to 7.6 m) :- Total rates to be paid for 15 ft. to 25 ft. (4.6 to 7.6 m) length will be 1.5 times of the
rate given in the Composite Schedule of Rates.
ii) Above 25 ft. (7.6 m) :- The total rate to be paid for above 25 ft. (7.6 m) length will be 2 times of the rate given in the
Composite Schedule of Rates.
The length measured shall not be the actual length, but the length of the form of consignment as actually
received.
Note:
4 The term 'mile' (Km) whenever used is to mean statute mile (Km).
Note:
5 The rates include loading and unloading of material from the conveyance and stacking as directed.
Note:
6 The rates for carriage by boat or steamer shall be the same as by any other mechanical means on land.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
1
Description
Labour
Composite
Chain
"
"
1000 ft.
158.70
29.20
18.15
178.50
1st Km
2nd Km
3rd Km
4th Km
5th Km
6th Km
7th Km
8th Km
9th Km
10th Km
11th Kms to 200Kms
201 Kms to 250 Kms
251 Kms & susequent Kms
Chap-1 (Carriage)
30M
30M
30M
300 M
158.70
29.20
18.15
178.50
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
Km
177.25
81.40
60.00
40.00
36.60
35.85
32.85
32.40
29.95
27.40
19.65
3.25
2.00
Spec.
No.
Remarks
16.1
Page 3
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
2
Description
Labour
Composite
Spec.
No.
16.1
Chain
"
"
1000 Ft.
158.70
29.20
18.15
178.50
Mile
285.25
"
63.95
Mile
57.15
51.40
46.85
43.00
25.80
30M
30M
30M
300M
Km
Km
Km
Km
158.70
29.20
18.15
178.50
177.25
81.40
60.00
40.00
Km
36.60
Km
35.85
Km
32.85
Km
32.40
Km
29.95
Km
27.40
Km
Km
Km
19.65
3.25
2.00
Remarks
16.1
Chain
"
"
1000 ft
158.70
29.20
18.15
178.50
Mile
285.25
"
63.95
"
57.15
"
51.40
"
46.85
"
43.00
Chap-1 (Carriage)
30 M
30 M
30 M
300 M
Km
Km
Km
Km
158.70
29.20
18.15
178.50
177.25
81.40
60.00
40.00
Km
36.60
Km
35.85
Km
32.85
Km
32.40
Km
29.95
Page 4
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
10th Km
7th mile and subsequent miles
11th & subsequent Kms
Carriage of 1000 Nos. bricks 10"x5"x3" (250x125x75 mm)
or 1000 Nos. tiles 12"x6"x2" (300x150x50 mm) by truck or
any other means owned by the contractor :1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th & subsequent Kms
Carriage of 100 cft. (2.83 cu.m) of all material like stone,
aggregate, spawl, kankar lime(unslaked), surkhi, etc. or
150 cft. (4.25 cu.m) of timber, by means of material trolly.
1st chain (1st 30 m)
2nd chain to 10th chain (2nd 30 m to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th
Km
1st mile
5th
2ndKm
mile
6th
3rd Km
mile
7th Km
8th Km
9th
6th Km
mile
10th
Km and subsequent miles
7th mile
11th Kms to 200Kms
201 Kms to 250 Kms
251 Kms & susequent Kms
"
Labour
158.70
29.20
18.15
178.50
Mile
285.25
"
63.95
"
57.15
"
51.40
"
46.85
"
43.00
"
25.80
Mile
Km
27.40
Km
19.65
Spec.
No.
Remarks
25.80
Chain
"
"
1000 Ft
Chain
"
1000 Ft.
Composite
158.70
29.20
178.50
30 M
30 M
30 M
300 M
Km
Km
Km
Km
158.70
29.20
18.15
178.50
177.25
81.40
60.00
40.00
Km
36.60
Km
35.85
Km
32.85
Km
32.40
Km
29.95
Km
27.40
Km
19.65
233.95
30 M
30 M
300 M
Km
Km
Km
Km
158.70
29.20
178.50
145.40
107.75
54.20
40.95
76.75
Km
35.55
64.55
Km
34.05
43.00
Km
Km
Km
28.35
28.00
25.85
25.80
Km
23.65
Km
Km
Km
18.55
3.25
2.00
Chap-1 (Carriage)
ditto
16.1
Page 5
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
6
Description
Chain
"
0/00 Ft.
Chain
"
1000 Ft
Mile
Labour
Composite
158.70
29.20
178.50
64.55
30 M
30 M
300 M
Km
Km
Km
Km
Km
Km
158.70
29.20
178.50
145.40
107.75
54.20
40.95
35.55
34.05
51.40
Km
28.35
Km
Km
Km
Km
Km
Km
28.00
25.85
23.65
18.55
3.25
2.00
158.70
29.2
178.50
30 M
30 M
300 M
Km
Km
Km
Km
158.70
29.20
178.50
145.40
107.75
54.20
40.95
Km
35.55
Km
34.05
Km
28.35
Km
28.00
Km
25.85
Km
23.65
Km
18.55
Spec.
No.
Remarks
16.1
ditto
ditto
233.95
"
76.75
"
64.55
51.40
46.85
43.00
25.80
Chain
"
0/00 Ft.
158.70
29.20
178.50
Chap-1 (Carriage)
30 M
30 M
300 M
158.70
29.20
178.50
Page 6
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile subsequent miles
7th Km
4th mile
8th.
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th & subsequent Kms
9 Carriage of 1000 No. bricks, 9"x4"x3"
(225x113x75 mm) or 8"x4"x4" (200x100x100
mm) (nominal)
1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th & subsequent Kms
10 Carriage of 1000 No. tiles 9"x4"x1"
(225x113x38 mm).
1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
Labour
Mile
233.95
"
76.75
"
64.55
Composite
145.40
107.75
54.20
40.95
Km
35.55
Km
34.05
Km
28.35
Km
28.00
Km
25.85
Km
23.65
Km
18.55
Spec.
No.
Remarks
16.1
51.40
46.85
43.00
25.80
ditto
Chain
"
"
0/00 Ft.
130.03
27.75
14.90
146.14
Mile
233.85
"
52.40
"
48.35
"
42.15
"
38.40
"
35.20
"
21.15
30 M
30 M
30 M
300 M
Km
Km
Km
Km
130.03
27.75
14.90
146.14
145.30
66.60
49.15
33.00
Km
30.90
Km
30.10
Km
26.95
Km
26.55
Km
24.55
Km
22.45
Km
15.95
16.1
Chain
"
"
78.48
14.42
8.90
Chap-1 (Carriage)
30 M
30 M
30 M
78.48
14.42
8.90
16.1
Page 7
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
0/00 Ft.
88.28
Mile
141.15
"
31.65
"
28.05
"
25.45
"
23.15
"
21.30
"
12.75
Composite
88.28
87.70
40.30
29.70
19.75
Km
18.00
Km
17.65
Km
16.25
Km
16.05
Km
14.80
Km
13.60
Km
9.70
Chain
"
"
2.99
0.36
0.17
30 M
30 M
30 M
2.99
0.36
0.17
0/00 Ft.
1.76
300 M
1.76
Km
2.20
Mile
3.50
Km
1.45
"
1.00
Km
0.60
"
0.50
Km
0.35
Remarks
ditto
1st Km
1st mile
2nd Km
2nd mile
3rd Km
3rd mile subsequent miles
4th Km and subsequent kilometers.
12 Carriage of 100 Nos. empty cement bags including
bundling.
Spec.
No.
16.1
0/00 Ft.
"
43.79
5.45
Mile
8.60
Mile
1.95
"
3.15
300 M
300 M
43.79
5.45
Km
5.35
Km
4.60
Km
2.15
Km
1.75
ditto
Chap-1 (Carriage)
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Spec.
No.
Remarks
lead of carriage.
1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
Chain
"
"
64.93
29.20
8.90
30 M
30 M
30 M
64.93
29.20
8.90
0/00 Ft.
73.33
300 M
73.33
Km
81.70
Mile
125.50
Km
40.30
"
89.40
Km
29.70
"
74.25
Km
19.75
"
54.00
Km
18.00
"
44.45
Km
17.65
Km
16.25
Km
Km
Km
Km
16.05
14.80
13.60
9.70
Tonne
300 M
"
530.57
128.56
Km
174.40
Km
79.70
Km
52.30
Km
32.40
Km
30.25
Km
29.00
Km
24.85
Km
Km
24.40
23.55
1st Km
1st mile
2nd Km
2nd mile
3rd Km
3rd mile
4th Km
4th mile
5th Km
5th mile
6th Km
6th mile
7th Km
7th mile and subsequent miles
8th Km
9th Km
10th Km
11th Km & subsequent
14 Carriage of light machinery weighing upto 3 tonne
upto 1000 ft. (300 metre)
Exceeding 1000 to 5000 ft (300 to 1500metre)
1st Km
1st mile
2nd Km
2nd mile
3rd Km
3rd mile
4th Km
4th mile
5th Km
5th mile
6th Km
6th mile
7th Km
7th mile and subsequent miles
8th Km
9th Km
35.20
21.15
Ton
0/00 ft.
1000 ft.
530.57
128.56
Mile
280.65
"
50.55
"
47.45
"
37.85
"
38.10
"
29.20
"
20.20
Chap-1 (Carriage)
ditto
Page 9
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
10th Km
11th Km & susequent
ii)
Consignment/Mile
"
43.09
29.55
Consignment/
300 M
43.95
Consignment/ Km
43.09
29.55
27.30
16.65
7.80
"
"
5.20
a) Upto 5 Km
b) Above 5 to 13 Km
Each
Consignment
"
54.10
110.25
Each
Consignmen
"
54.10
110.25
Each
Consignment
"
"
"
"
"
10.85
16.45
20.80
26.00
45.95
82.25
Each
Consignmen
"
"
"
"
"
10.85
16.45
20.80
26.00
45.95
82.25
Each
Consignment
"
"
89.85
163.55
Each
Consignment
"
"
89.85
163.55
"
"
66.45
100.75
"
"
66.45
100.75
iv)
16.1
Consigment/
1000 ft.
1000 ft.
Remarks
18.35
14.75
Spec.
No.
Per
day
3000.00
Chap-1 (Carriage)
Per
day
3000.00
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
ii)
Labour
Composite
"
4352.00
"
1000.00
"
4352.00
"
800.00
Remarks
Per
Ton
"
"
46.80
Per
Tonne
"
29.10
"
7.35
30 M
30 M
30 M
300 M
Km
Km
Km
6.25
1.15
0.70
7.05
7.00
3.15
2.35
Km
1.55
Km
1.40
Km
1.35
Km
1.30
Km
1.20
Km
1.15
Km
1.05
Km
1.00
30 M
30 M
30 M
8.20
1.50
0.95
19.35
7.45
11.85
Chain
"
"
0/00 Ft.
6.25
1.15
0.70
7.05
Mile
11.25
"
2.50
"
2.25
"
2.05
"
1.85
"
1.70
"
1.00
Spec.
No.
Chain
"
"
8.20
1.50
0.95
Chap-1 (Carriage)
Page 11
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
0/00 Ft.
9.25
Mile
14.75
"
3.30
"
2.95
"
2.65
"
2.40
"
2.20
"
1.35
Composite
9.25
Km
9.15
Km
4.20
Km
3.05
Km
2.05
Km
1.85
Km
1.75
Km
1.65
Km
Km
Km
Km
1.60
1.50
1.35
1.30
30 M
30 M
30 M
300 M
Km
Km
Km
12.30
2.25
1.40
13.85
13.75
6.30
4.65
Km
3.10
Km
2.85
Km
2.75
Km
2.55
Km
2.40
Km
2.30
Km
Km
2.10
1.75
30 M
30 M
20.85
3.85
Spec.
No.
Remarks
iv)
Chain
"
"
0/00 Ft.
12.30
2.25
1.40
13.85
Mile
22.15
"
4.95
"
4.45
"
4.00
"
3.65
"
3.35
"
2.00
Chain
"
20.85
3.85
Chap-1 (Carriage)
Page 12
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
vi)
Labour
"
0/00 Ft.
2.40
23.45
Mile
37.45
"
8.40
"
7.50
"
6.75
"
6.15
"
5.65
"
3.40
Chain
"
"
0/00 Ft.
28
5.15
3.20
31.50
Mile
50.30
"
11.30
"
10.10
Mile
9.05
"
8.25
"
7.60
"
4.55
Chain
"
"
0/00 Ft.
Composite
36.40
6.70
4.15
40.95
Chap-1 (Carriage)
2.40
23.45
23.25
10.95
8.00
Km
5.30
Km
4.85
Km
4.75
Km
4.35
Km
4.15
Km
3.75
Km
Km
2.45
1.70
30 M
30 M
30 M
300 M
Km
Km
Km
28
5.15
3.20
31.50
31.25
14.25
10.45
Km
6.95
Km
6.35
Km
6.20
Km
5.90
Km
5.85
Km
5.40
Km
Km
5.00
3.55
30 M
30 M
30 M
300 M
36.40
6.70
4.15
40.95
Spec.
No.
Remarks
Page 13
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
1st Km
2nd Km
3rd Km
4th Km
1st mile
5th Km
2nd mile
6th Km
3rd mile
7th Km
4th mile
8th Km
5th mile
9th Km
6th mile
10th Km
7th mile and subsequent miles
11th Km & subsequent Kms
vii) 16" (400 mm) i/d pipes:1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
viii) 18" (450 mm) i/d pipes:1st chain (1st 30 m)
2nd chain (2nd 30 m)
3rd to 10th chain (60 to 300 m)
1000 to 3000 ft. (300 to 900 m)
Labour
Mile
65.40
"
14.65
"
13.10
"
11.80
"
10.75
"
9.85
"
5.90
Chain
"
"
0/00 Ft.
59.65
11.00
6.85
67.10
Mile
107.25
"
24.05
"
21.50
"
19.30
"
17.60
"
16.15
"
9.70
Chain
"
"
0/00 Ft.
Composite
76.65
14.10
8.80
86.25
Chap-1 (Carriage)
40.65
19.50
14.00
9.00
Km
8.25
Km
8.05
Km
7.40
Km
7.30
Km
6.70
Km
6.15
Km
4.45
30 M
30 M
30 M
300 M
Km
Km
Km
59.65
11.00
6.85
67.10
66.65
30.85
22.55
Km
15.00
Km
13.75
Km
13.45
Km
12.30
Km
12.15
Km
11.20
Km
Km
10.25
7.40
30 M
30 M
30 M
300 M
76.65
14.10
8.80
86.25
Spec.
No.
Remarks
Page 14
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
1st Km
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
Labour
Mile
137.80
"
30.90
"
27.60
"
24.85
"
22.65
"
20.80
"
12.45
ix)
81.40
14.95
9.30
91.55
Mile
146.30
"
32.80
"
29.30
"
26.35
"
24.05
"
22.05
"
13.25
x)
Chain
"
"
0/00 Ft.
Composite
90.15
16.60
10.30
101.45
Chap-1 (Carriage)
85.65
39.35
29.00
Km
19.35
Km
17.70
Km
17.35
Km
15.90
Km
15.70
Km
14.50
Km
Km
13.25
9.40
30 M
30 M
30 M
300 M
Km
Km
Km
81.40
14.95
9.30
91.55
90.90
41.75
30.75
Km
20.50
Km
18.75
Km
18.35
Km
16.85
Km
16.60
Km
15.35
Km
Km
14.05
10.20
30 M
30 M
30 M
300 M
Km
90.15
16.60
10.30
101.45
100.70
Spec.
No.
Remarks
Page 15
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
2nd Km
3rd Km
1st mile
4th Km
2nd mile
5th Km
3rd mile
6th Km
4th mile
7th Km
5th mile
8th Km
6th mile
9th Km
7th mile and subsequent miles
10th Km
11th Km & subsequent Kms
20 Carriage of PVC pipes B.S.S. Class 'B' including loading,
unloading and stacking (Rate per 1000 ft.) (300 metre) :i)
ii)
Labour
Mile
162.05
"
36.35
"
32.50
Mile
29.20
"
26.65
"
24.45
"
14.65
Chain
"
"
0/00 Ft.
12.30
2.25
1.40
13.80
Mile
22.10
"
4.95
"
4.40
"
4.00
Mile
3.65
"
3.35
"
2.00
Chain
"
Composite
18.90
3.50
Chap-1 (Carriage)
46.20
34.05
Km
23.20
Km
20.75
Km
20.35
Km
18.60
Km
18.35
Km
17.00
Km
Km
15.55
11.05
30 M
30 M
30 M
300 M
Km
Km
Km
12.30
2.25
1.40
13.80
13.75
6.30
4.65
Km
3.10
Km
2.80
Km.
2.75
Km
2.55
Km
2.50
Km
2.30
Km
Km
2.10
1.70
30 M
30 M
18.90
3.50
Spec.
No.
Remarks
Page 16
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
"
0/00 Ft.
2.15
21.30
Mile
34.00
"
7.65
"
6.80
"
6.15
"
5.60
"
5.15
"
3.10
Chain
"
"
0/00 Ft.
25.80
4.75
2.95
29.05
Mile
46.40
"
10.40
"
9.30
Mile
8.35
"
7.60
"
7.00
"
4.20
iv)
Composite
2.15
21.30
21.15
9.90
7.20
Km
4.70
Km
4.30
Km
4.20
Km
3.85
Km
3.80
Km
3.50
Km
Km
3.20
2.70
30 M
"
"
300 M
Km
"
"
25.80
4.75
2.95
29.05
28.85
13.40
9.90
"
6.65
Km.
5.90
"
5.75
"
5.25
Spec.
No.
Remarks
5.20
4.80
4.40
3.20
Chain
"
35.60
6.55
Chap-1 (Carriage)
30 M
30 M
35.60
6.55
Page 17
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
vi)
Labour
"
0/00 Ft.
4.05
40.00
Mile
63.95
"
14.35
"
12.80
"
11.50
"
10.50
"
9.65
"
5.80
Chain
"
"
0/00 Ft.
62.40
11.50
7.15
70.20
Mile
112.15
"
25.15
Mile
22.50
"
20.20
"
18.45
"
16.90
"
10.15
Chain
"
Composite
96.75
17.80
Chap-1 (Carriage)
4.05
40.00
39.75
18.25
13.45
Km.
8.95
Km.
8.20
Km.
8.05
Km.
7.35
Km.
7.25
Km.
6.70
Km.
Km.
6.15
4.40
30 M
30 M
30 M
300 M
Km
Km
Km
62.40
11.50
7.15
70.20
69.70
32.00
23.60
Km
15.75
Km
14.40
Km
14.10
Km
12.90
Km
12.75
Km
11.80
Km
Km
10.75
7.65
30 M
30 M
96.75
17.80
Spec.
No.
Remarks
Page 18
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
"
0/00 Ft.
11.10
108.85
Mile
173.95
"
39.00
"
34.85
"
31.35
"
28.60
"
26.25
"
15.75
Composite
11.10
108.85
108.10
49.65
36.60
Km
24.40
Km
22.30
Km
21.85
Km
20.05
Km
19.75
Km
18.30
Km
Km
16.75
12.05
30 M
30 M
30 M
300 M
Km
Km
Km
136.20
25.05
15.60
153.25
152.15
69.90
51.50
Km
34.35
Km
31.40
Km
30.75
Km
28.20
Km
27.80
Km
25.75
Km
Km
23.55
16.90
30 M
30 M
177.30
32.65
Spec.
No.
Remarks
Chain
"
"
0/00 Ft.
136.20
25.05
15.60
153.25
Mile
244.85
Mile
54.90
"
49.05
"
44.10
"
40.25
"
36.95
"
22.15
Chain
"
177.30
32.65
Chap-1 (Carriage)
Page 19
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
"
0/00 Ft.
20.30
199.45
Mile
318.70
"
71.45
"
63.85
Mile
57.40
"
52.35
"
48.05
"
28.85
Composite
20.30
199.45
198.05
90.95
67.00
Km
44.65
Km
40.90
Km
40.05
Km
36.70
Km
36.20
Km
33.45
Km
Km
30.65
22.05
30 M
30 M
30 M
300 M
Km
Km
Km
9.00
1.65
1.05
10.10
10.05
4.60
3.40
Km
2.25
Km
2.05
Km
2.05
Km
1.85
Km
1.80
Km
1.70
Km
Km
1.55
1.15
Spec.
No.
Remarks
ii)
Chain
"
"
0/00 Ft.
9.00
1.65
1.05
10.10
Mile
16.15
"
3.60
"
3.25
"
2.90
"
2.65
"
2.45
"
1.45
Page 20
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Chain
"
"
0/00 Ft.
13.95
2.55
1.60
15.70
Mile
25.10
"
5.65
"
5.05
"
4.50
"
4.15
"
3.80
"
2.25
Composite
13.95
2.55
1.60
15.70
15.60
7.20
5.35
Km
3.55
Km
3.25
Km
3.20
Km
2.90
Km
2.70
Km
2.60
Km
Km
2.35
1.75
30 M
30 M
30 M
300 M
Km
Km
Km
19.35
3.55
2.20
21.80
21.65
9.95
7.35
Km
4.90
Km
4.45
Km
4.40
Km
4.00
Km
3.95
Km
3.55
Km
Km
3.25
2.45
30 M
32.05
Spec.
No.
Remarks
Chain
"
"
0/00 Ft.
19.35
3.55
2.20
21.80
Mile
34.80
"
7.80
"
6.95
"
6.25
Mile
5.70
"
5.25
"
3.15
Chain
32.05
Chap-1 (Carriage)
Page 21
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
5.90
3.65
36.05
Mile
57.60
"
12.90
"
11.55
"
10.40
"
9.45
"
8.70
"
5.20
Composite
30 M
30 M
300 M
Km
Km
Km
5.90
3.65
36.05
35.80
16.45
12.10
Km
8.05
Km
7.40
Km
7.25
Km
6.70
Km
6.50
Km
6.00
Km
Km
5.45
4.10
30 M
30 M
30 M
300 M
Km
Km
Km
47.90
8.80
5.50
53.85
53.45
24.55
18.10
Km
12.05
Km
11.05
Km
10.80
Km
9.90
Km
9.80
Km
9.05
Km
Km
8.20
6.05
30 M
69.00
Spec.
No.
Remarks
vi)
Labour
"
"
0/00 Ft.
Chain
"
"
0/00 Ft.
47.90
8.80
5.50
53.85
Mile
86.05
"
19.30
"
17.25
"
15.50
"
14.15
13.00
7.80
Chain
69.00
Chap-1 (Carriage)
Page 22
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
"
"
0/00 Ft.
12.70
7.90
77.60
Mile
4th
2ndKm
mile
5th
Km
3rd mile
Composite
124.00
30 M
30 M
300 M
Km
Km
Km
12.70
7.90
77.60
77.05
35.40
26.05
27.80
Km
17.35
24.85
Km
15.90
6th
4th Km
mile
7th
5th Km
mile
22.35
Km
15.60
20.40
Km
14.30
8th mile
Km
6th
9th
7th Km
mile and subsequent miles
18.70
Km
14.10
11.20
Km
13.05
Km
Km
11.90
8.65
Each
No
"
"
Each
No/Km
162.90
294.85
398.05
473.70
Each
No.
"
"
Each
No/Km
94.45
156.55
206.45
247.80
10th Km
11th Km & subsequent Kms
22 Hand shunting loaded Railway wagons or
trucks:a)
b)
c)
d)
e)
upto mile / Km
upto mile / Km
upto mile / Km
upto 1 (1.6 Km) mile
2nd mile and subsequent miles/
2nd and subsequent kilometres
Each
No
"
"
Each
No/Mile
260.60
471.75
636.90
757.90
Each
No.
"
"
Each
No/Mile
151.15
250.45
330.30
396.45
427.15
Spec.
No.
Remarks
266.95
upto mile / Km
upto mile / Km
upto mile / Km
upto 1 mile / 1 Km
2nd mile and subsequent miles/
2nd and subsequent kilometres
209.75
Chap-1 (Carriage)
131.10
Page 23
The rate for loading into and unloading from mobile trucks, trollies and boats, etc. will be the same as for Railway wagons.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
100 Cft.
539.60
cu.m
190.60
1000 Nos.
674.50
1000 Nos.
674.50
ditto
539.60
ditto
539.60
Spec.
No.
Remarks
Composite
b)
100 Bags
674.50
100 Bags
674.50
100 Nos.
64.75
100 Nos.
64.75
100 Mds.
404.70
100 Kg
10.85
Per
Tonne
323.75
Per
Tonne
318.65
Each
40.45
Each
40.45
Each
20.25
Each
20.25
a)
b)
100 Nos.
1349.05
100 Nos.
1349.05
ditto
674.50
ditto
674.50
Chap-2 (Loading/Unloading)
Page 24
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Per
Ton
168.65
Per
Tonne
165.95
100 Mds.
1618.85
100 Kg
43.35
Per
Ton
269.80
Per
Tonne
265.55
100 Cft.
199.65
cu.m
70.50
100 Cft.
259.00
cu.m
91.50
Spec.
No.
Remarks
Composite
1000
Gallon
674.50
100
litres
14.85
b)
1000
Gallon
674.50
100
litres
14.85
c)
100 Cft.
86.35
cu.m
30.50
d)
Per
Ton
239.85
Per
Tonne
236.05
e)
100 Nos.
339.95
100 Nos.
339.95
100 Nos.
674.50
100 Nos.
674.50
100 Cft.
269.80
cu.m
95.30
f)
Kerosene oil (4 gallon tin)
16 Removing and stacking within one chain
(30 m) lead:
a)
b)
Bricks.
1000 Nos.
719.50
1000 Nos.
719.50
c)
100 Nos.
431.7
100 Nos.
431.7
d)
100 Nos.
256.95
100 Nos.
256.95
e)
Per
Ton
119.90
Per
Tonne
118.00
Chap-2 (Loading/Unloading)
Page 25
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
f)
Labour
Composite
Unit
Labour
100 No.
1439.00
100 No.
1439.00
Per
Ton
269.80
Per
Tonne
265.55
Per
Ton
154.20
Per
Tonne
151.75
100 Nos.
1079.25
100 Nos.
1079.25
100 Nos.
513.90
100 Nos.
513.90
100 Nos.
539.60
100 Nos.
539.60
100 Nos.
284.00
100 Nos.
284.00
100 Nos.
2158.45
100 Nos.
2158.45
100 Nos.
1079.25
100 Nos.
1079.25
Per
Ton
161.90
Per
Tonne
159.35
Chap-2 (Loading/Unloading)
Spec.
No.
Remarks
Composite
Page 26
Special allowances for the hardness, wetness and slush:The grant of allowances for hard, very hard, wet and slush will be subject to Superinteding Engineer's approval. Specific instructions regarding grant of such
allowances may be issued by the various Administrative Departments and Statutory Bodies. The earth requiring repeated blows of Kassi to break it and of
which dry bulk density is not less than 1.5, will be treated as hard.
Deduction for shrinkage from bank measurements:The following allowances should be provided for material which is not rammed, or equally consolidated:a) Deduction for shrinkage from the bank measurements when the earthwork is done by manual labour.......... 10%
b) Deduction for settlement from the bank measurement when the earthwork is done by machines................... 3 to 6%
Before the work is let out to be done by tractors, scrapers, etc. deduction ranging between 3% to 6% should be agreed to with the contractors.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
1000 Cft.
1000 Cft.
2,023.55
2,428.25
---
cu.m
cu.m
71.45
85.75
---
1000 Cft.
2,967.90
--
cu.m
104.85
--
1000 Cft.
1000 Cft.
3,777.30
4,085.70
---
cu.m
cu.m
133.40
144.30
---
1000 Cft.
1000 Cft.
3,777.30
4,640.70
---
cu.m
cu.m
133.40
163.90
---
6
7
Remarks
171 to 17.5
Spec.
No.
ditto
ditto
* 411-1 to
411-13 and
301-1 &
202-3
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
4,122.45
4,122.45
4,122.45
2,782.00
4,699.70
4,611.10
4,522.50
--
cu.m
cu.m
cu.m
cu.m
145.60
145.60
145.60
98.25
166.00
162.85
159.75
--
* 411-2
17.1 to
17.5
Chap-3 (Earthwork)
Page 27
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
Labour
4,730.15
5,593.55
6,510.85
10,956.85
Composite
4,807.40
5,670.80
6,588.15
11,034.15
cu.m
cu.m
cu.m
cu.m
167.05
197.55
229.95
387.00
12 a)
ditto
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
5,147.45
6,010.85
6,928.20
11,913.80
5,301.20
6,164.60
7,081.95
12,067.50
cu.m
cu.m
cu.m
cu.m
181.80
212.30
244.70
420.80
187.25
217.75
250.15
426.20
17.1 to 17.5
1000 Cft.
1000 Cft.
1000 Cft.
10,252.70
11,871.55
15,109.25
----
cu.m
cu.m
cu.m
362.15
419.30
533.65
----
ditto
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
4,338.05
5,201.45
6,118.80
10,834.55
-----
cu.m
cu.m
cu.m
cu.m
153.20
183.70
216.10
382.70
1000 Cft.
10,358.30
1000 Cft.
16,384.65
-16,975.05
cu.m
365.85
cu.m
578.70
-599.55
Remarks
169.80
200.30
232.70
389.75
Spec.
No.
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
9,991.85
10,710.50
12,806.90
14,223.55
10,582.25
11,694.50
13,987.70
15,601.15
Chap-3 (Earthwork)
cu.m
cu.m
cu.m
cu.m
352.90
378.30
452.35
502.40
373.75
413.05
494.05
551.05
Page 28
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
v) Grade V
vi) Grade VI
b)
1000 Cft.
1000 Cft.
Labour
15,744.45
16,891.25
Composite
17,318.85
18,662.45
556.10
596.60
Remarks
611.70
659.15
Spec.
No.
1000
1000
1000
1000
1000
1000
Cft.
Cft.
Cft.
Cft.
Cft.
Cft.
19,983.75
21,420.95
25,613.80
28,447.05
31,488.85
33,782.50
1000 Cft.
1000 Cft.
1,349.05
1,888.65
1000 Cft.
5,396.15
21,164.55
23,388.95
27,975.40
31,202.25
34,637.65
37,324.90
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m
705.85
756.60
904.70
1004.75
1112.20
1193.20
747.55
826.10
988.10
1102.05
1223.40
1318.30
---
cu.m
cu.m
47.65
66.70
---
ditto
--
cu.m
190.60
--
17.1 to 17.5
13 Rehandling of earthwork:
a)
b)
ditto
1000 Cft.
1000 Cft.
1000 Cft.
1000 Cft.
2,729.75
5,285.70
51.45
60.75
---
---
cu.m
cu.m
cu.m
cu.m
96.40
186.70
1.80
2.15
---
1000 Cft.
2,458.00
--
cu.m
86.80
--
1000 Cft.
32.90
--
cu.m
1.15
--
1000 Cft.
159.90
--
cu.m
5.65
--
1000 Cft.
141.85
--
cu.m
5.00
--
17.10 to 17.5
1000 Cft.
1000 Cft.
1000 Cft.
176.90
345.10
830.55
----
Chap-3 (Earthwork)
cu.m
cu.m
cu.m
6.25
12.20
29.35
---Page 29
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Spec.
No.
Remarks
19 Dowel dressing.
Per
Chain
161.80
--
Metre
5.30
--
ditto
20 a)
100Sft.
72.25
--
sq.m
7.75
--
ditto
100Sft.
128.10
--
sq.m
13.80
--
b)
17.1 to 17.5
Cft.
Cft.
Cft.
Cft.
4,877.65
5,697.65
6,377.45
40,877.75
---44,915.15
cu.m
cu.m
cu.m
cu.m
172.30
201.25
225.25
1443.80
1000 Cft.
692.45
951.20
cu.m
24.45
1000 Cft.
653.55
--
cu.m
23.10
--
1000 Cft.
809.40
--
cu.m
28.60
--
1000 Cft.
944.35
--
cu.m
33.35
--
1000 Cft.
1,079.25
--
cu.m
38.10
--
1000 Cft.
1,214.15
--
cu.m
42.90
--
c)
1000 Cft.
809.40
--
cu.m
28.60
--
d)
1000 Cft.
1,079.25
--
cu.m
38.10
--
1000
1000
1000
1000
b)
17.1 (a)
* 411-5 and The rate also includes hire charges of
Chap-3 (Earthwork)
Page 30
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Spec.
No.
202-3
i)
1000 Cft.
--
577.25
cu.m
20.40
ii)
1000 Cft.
--
488.65
cu.m
17.25
1000 Cft.
--
400.05
cu.m
14.15
Remarks
1000 Cft.
1,888.65
--
cu.m
66.70
1000 Cft.
4,316.95
--
cu.m
152.50
1000 Cft.
3,404.30
--
cu.m
120.25
ditto
512.65
--
Metre
16.80
ditto
1000 Cft.
4,856.55
--
cu.m
171.55
--
17.1 to 17.5
Per mile
2,072.50
--
Per
Km
1288.05
--
ditto
100Sft.
899.35
--
sq.m
96.75
--
ditto
100 Rft.
17.1 to 17.5
33 Berm cutting:a)
b)
1000 Cft.
2,428.25
--
cu.m
85.75
--
1000 Cft.
4,338.05
--
cu.m
153.20
--
17.1 to 17.5
Per Mile
Per Mile
Per Mile
6,330.70
8,881.40
13,845.50
----
Per Km.
Per Km.
Per Km.
3956.70
5550.90
8653.45
----
ditto
Per Acre
Per Acre
1,349.05
2,698.10
---
Per Hect.
Per Hect.
3333.55
6667.10
--ditto
in unploughed land:
Chap-3 (Earthwork)
Page 31
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Per Chain
Per Chain
683.30
916.95
---
Metre
Metre
22.40
30.10
---
Per Chain
Per Chain
704.55
938.20
---
Metre
Metre
23.10
30.75
---
Spec.
No.
Remarks
in ploughed land:
a) from 10.0 ft. to 20.0 ft. (3 to 6 m) wide.
b) from 20.1 ft. to 40.0 ft. (6.10 to 12 m) wide.
4,047.10
1,021.10
107.90
----
cu.m
cu.m
cu.m
142.95
36.05
3.80
----
1000 Cft.
1,888.65
--
cu.m
66.70
--
1000 Cft.
1,618.85
--
cu.m
57.20
--
17.1 to 17.5
1000 Cft.
3,777.30
--
cu.m
133.40
--
17.1 to 17.5
1000 Cft.
3,035.35
--
cu.m
107.20
--
ditto
cu.m
189.95
100Cft.
537.85
560.85
198.10
1000 Cft.
1000 Cft.
1000 Cft.
4,401.00
7,463.30
9,621.75
4,784.15
8,031.80
10,190.25
cu.m
cu.m
cu.m
155.45
263.60
339.85
169.00
283.70
359.90
ditto
13.5
1000 Cft.
1000 Cft.
1000 Cft.
6,058.15
7,573.65
11,360.45
8,542.35
10,625.90
14,582.00
Chap-3 (Earthwork)
cu.m
cu.m
cu.m
213.95
267.50
401.25
separately.
301.70
375.30
515.05
Page 32
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
1000 Cft.
4,057.70
--
cu.m
143.30
--
Each
Each
789.15
1,540.10
---
Each
Each
789.15
1540.10
Each
1,011.80
--
Each
1011.80
1000 Sft.
1000 Sft.
134.90
269.80
---
sq.m
sq.m
1.45
2.90
---
100Sft.
64.75
--
sq.m
6.95
--
Per
Acre
548.05
--
Per Hect.
1354.25
--
100Sft.
269.80
--
sq.m
29.05
--
100Sft.
233.65
--
sq.m
25.15
--
cu.m
--
Spec.
No.
Remarks
46 Uprooting stump and removing within 100 ft. (30 m) from 2 ft.
to 6 ft. (600 to 1800 mm) girth.
47 Jungle clearance and removing within 100 ft. (30 m).
a)
b)
light
thick
1000 Cft.
--
1519.00
53.65
Specification number correspond to Book of "Specification for Road & Bridge Construction, 1971".
Specification number correspond to Book of "Building & Roads Department Specification Vol. II, 1966 (Public Health Works).
Chap-3 (Earthwork)
Page 33
4. DISMANTLING (DEMOLITION)
1
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
The rates for dismantling roofs or upper storey floor, include the dismantling of all materials, except roof
supports such as beams and trusses.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Labour
Spec.
No.
Remarks
Composite
Stone Work
1
100Cft.
458.65
cu.m
162.00
18.1
100Cft.
674.50
cu.m
238.25
ditto
100Cft.
1,618.85
cu.m
571.80
ditto
a)
100Cft.
809.40
cu.m
285.90
ditto
b)
100Cft.
1,025.25
cu.m
362.10
ditto
100Cft.
1,349.05
cu.m
476.50
ditto
100Cft.
2,158.45
cu.m
762.35
ditto
1,079.25
cu.m
381.20
ditto
1,349.05
ditto
476.50
755.45
cu.m
266.85
a)
wooden crates
b)
wire crates
100Cft.
ditto
Brick Work
9 Dismantling mud/pise walling.
100Cft.
269.8
cu.m
95.3
18.1
100Cft.
674.5
cu.m
238.25
ditto
100Cft.
458.65
cu.m
162
ditto
100Cft.
944.35
cu.m
333.55
100Cft.
2293.35
cu.m
810
100Cft.
2,023.55
Chap-4 (Dismantling)
cu.m
714.70
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Labour
Spec.
No.
Remarks
Composite
100Cft.
539.60
cu.m
190.60
ditto
100Cft.
1,079.25
cu.m
381.20
ditto
100Cft.
1,483.95
cu.m
524.15
100Cft.
5,665.95
cu.m
2001.20
19 a)
100Cft.
2,967.90
cu.m
1048.25
ditto
4,856.55
ditto
1715.35
ditto
5,935.80
ditto
2096.55
ditto
1,618.85
ditto
571.80
ditto
809.40
ditto
285.90
100Cft.
9,713.10
cu.m
3430.65
ditto
100Sft.
323.75
sq.m
34.85
18.1
22 a)
100Sft.
809.40
sq.m
87.10
100Sft.
674.50
sq.m
72.60
ditto
100Sft.
422.65
sq.m
45.50
18.1
24 a)
100Sft.
sq.m
36.4
ditto
b)
100Sft.
sq.m
144.00
ditto
Concrete
b)
c)
d)
e)
Roofing
b)
338.15
1,338.15
Chap-4 (Dismantling)
Page 35
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Labour
Spec.
No.
Composite
100Sft.
1,079.25
sq.m
116.15
ditto
100Sft.
1,349.05
sq.m
145.15
ditto
27 a)
100Sft.
674.50
sq.m
72.60
b)
ditto
613.00
ditto
65.95
c)
ditto
746.35
ditto
80.30
100Sft.
1,079.25
sq.m
116.15
18.1
100Sft.
458.65
sq.m
49.35
18.1
100Sft.
674.50
sq.m
72.60
ditto
Remarks
Flooring
16.90
27.70
32.40
46.15
Metre
Metre
ditto
ditto
55.45
90.85
106.25
151.35
Per
No.
ditto
215.80
215.80
166.80
Per
No.
ditto
166.80
Per No.
87.25
Per No.
87.25
ditto
34 a)
Per No.
168.65
Per No.
168.65
ditto
32 a)
b)
WOOD WORK
Removing door with chowkat.
Removing windows and sky lights with chowkat.
Chap-4 (Dismantling)
18.1
Page 36
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
b)
Labour
Composite
Labour
Spec.
No.
Composite
ditto
269.80
ditto
269.80
100Sft.
301.90
sq.m
32.50
100Kg
947.90
%Kg
947.90
Per Lft.
24.00
Metre
78.70
ditto
100Kg
914.60
%Kg
914.60
18.1
100Kg
442.80
%Kg
442.80
ditto
Per Unit/
2 Seats
980.25
Per Unit/
2 Seats
980.25
ditto
Each per
inch bore
20.00
Each per
cm bore
8.00
ditto
35 a)
b)
Remarks
ditto
I ron work
41 a)
Each
6,542.60
Each
6542.60
ditto
Each
4,327.95
Each
4327.95
ditto
100Lft.
458.65
Metre
15.05
18.1
100Sft.
215.85
sq.m
23.25
18.1
100Sft.
404.70
sq.m
43.55
ditto
100Cft.
1,079.25
cu.m
381.20
ditto
100Cft.
1,440.80
cu.m
508.90
ditto
100Sft.
112.40
sq.m
12.10
ditto
100Sft.
224.85
sq.m
24.20
ditto
b)
M iscellaneous
Chap-4 (Dismantling)
Page 37
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
49 Scraping:-
18.1
a)
b)
100Sft.
134.90
sq.m
14.50
ditto
404.70
ditto
43.55
100Sft.
1,151.05
sq.m
123.85
18.1
51 Scraping boulders.
100Cft.
1,888.65
cu.m
667.05
18.1
100Cft.
944.35
cu.m
333.55
18.1
Per
point
36.70
37.20
Per
point
36.70
37.20
Per
point
31.45
31.90
Per
point
31.45
31.90
Per foot
Per foot
6.70
14.60
6.80
14.75
P.Mtr
P.Mtr
22.00
47.90
22.30
48.40
Electric Wiring
on surface
recessed in wall
Chap-4 (Dismantling)
Page 38
5. MORTAR
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Dry Material Required for
100 Cft. Wet (Ready) Mortar
S. No.
Ratio of Mortar
1
1
Lime
Putty
Cft.
4
Sand
Cft.
5
Cement
(50 Kg.)
Bag.
6
82
85
90
90
100
100
100
11.83
8.16
6.49
5.19
4.81
4.12
3.61
15.0
13.1
11.5
10.44
9.4
22.5
20.0
18.8
15.66
23.0
20.1
17.7
7.0
90
92
92
94
94
90
90
94
94
92
94
94
85
4.33
3.78
3.32
3.00
2.71
3.25
2.88
2.71
2.26
2.21
1.93
1.70
8.16
43
31
86
93
Lime
Putty
Cum
7
Sand
Cum.
8
Cement : Sand
1
1
1
1
1
1
1
Cement
(50 Kg)
Bag
3
:
:
:
:
:
:
:
2
3
4
5
6
7
8
33.48
23.11
18.37
14.70
13.61
11.68
10.21
12.25
10.70
9.39
8.52
7.67
9.19
8.16
7.67
6.39
6.26
5.47
4.82
23.11
0.82
0.85
0.90
0.90
1.00
1.00
1.00
0.15
0.13
0.12
0.10
0.09
0.23
0.20
0.19
0.16
0.23
0.20
0.18
0.07
0.90
0.92
0.92
0.94
0.94
0.90
0.90
0.94
0.94
0.92
0.94
0.94
0.85
0.43
0.31
0.86
0.93
Lime : Sand
1 : 2
1 : 3
Chap-5 (Mortar)
Page 39
5. MORTAR
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
S.
No.
Ratio of Mortar
Clay
Cft.
3
1
4
Mud
Lime : Surkhi
M3
3
49.00
40.75
30.30
73.5
81.5
91.0
0.49
0.41
0.30
0.74
0.82
0.91
40.50
40.5
40.5
0.41
0.41
0.41
0.57
57.0
57.0
M3
7
35.00
25.00
25.00
25.00
Cft
Cft
Cft
Cft
0.35
0.25
0.25
0.25
M3
M3
M3
M3
Stone M asonry :
a) Random rubble, uncoursed
i) Foundation and Plinth
ii) Superstructure
iii) Coursed
45.00 Cft
40.00 Cft
35.00 Cft
0.45
0.40
0.35
M3
M3
M3
30.00 Cft
20.00 Cft
0.30
0.20
M3
M3
(1) Cement
(2) Unslaked lime
(3) Slaked lime
1 Cft.
1.7 Cft.
2.5 Cft.
40 Kg
0.57
Brick M asonry :
a) Mud Mortar
b) Cement, Sand
c) Cement, Lime (Putty) Sand
d) Lime (Putty) Sand
b)
c)
Notes :
Cft.
7
Cinder
1.35
Clay
Lime : Cinder
1 : 1
Cinder
135
2 : 3
1 : 2
1 : 3
6
= 40.8233 Kg
= 37.3242 Kg
= 37.3242 Kg
Will yield 2.6 Cft. lime putty.
Chap-5 (Mortar)
Page 40
6. CONCRETE
1. Rates for all finished works include the removal of surplus debris, unused material and by products.
2. If concrete mixer or high frequency vibrator, etc. is supplied by the Government, all charges including depreciation will be recovered from the contractor.
3. Subsequent carriage of crushed stone aggregate / bajri will be paid according to the following:
a) The carriage for the whole distance to the site of work shall be calculated on the basis of the rates of the actual means of transport used in carriage, i.e. road and / or rail, as the case may be.
b) It shall be payable from the nearest approved quarry.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
100Cft
Labour
2972.65
Composite
5231.65
Unit
cu.m
Labour
1049.95
Spec.
No.
Remarks
Composite
1847.80
100Cft
2023.55
4135.55
cu.m
714.70
1460.70
mm) gauge.
20.1
-do-
(a) Ratio 1: 3: 6
100Cft
3914.15
14727.35
cu.m
1382.50
(b) Ratio 1: 4: 8
ditto
3914.15
12623.25
"
1382.50
5201.70
4458.55
ditto
3914.15
11506.30
"
1382.50
4064.05
ditto
3914.15
10662.35
"
1382.50
3765.95
(e) Ratio 1: 6: 18
ditto
3914.15
9798.95
"
1382.50
3461.00
ditto
3914.15
9390.80
"
1382.50
3316.85
(a) in bed
100Cft
1203.20
cu.m
424.95
(b) on slope
5
ditto
1778.70
"
628.25
Chap-6 (Concrete)
Page 41
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Cft
5231.95
28536.55
cu.m
1847.95
10079.10
(b) Ratio 1: 1: 1
ditto
5231.95
28187.35
"
1847.95
9955.75
(c) Ratio 1: 1: 3
ditto
5231.95
22913.35
"
1847.95
8093.00
(d) Ratio 1: 2: 3
ditto
5231.95
21891.55
"
1847.95
7732.10
(e) Ratio 1: 3: 3
ditto
5231.95
19509.05
"
1847.95
6890.60
7021.15
(f) Ratio 1: 2: 4
100Cft
5231.95
19878.65
cu.m
1847.95
(g) Ratio 1: 2: 6
ditto
5231.95
17634.80
"
1847.95
6228.60
(h) Ratio 1: 3: 6
ditto
5231.95
17038.75
"
1847.95
6018.10
(i) Ratio 1: 4: 8
ditto
5231.95
14977.85
"
1847.95
5290.20
20.4
extra.
Per Cft
121.70
401.80
cu.m
4298.45
14191.60
ditto
121.70
345.70
"
4298.45
12210.10
ditto
121.70
315.4
"
4298.45
11139.95
Per Cft
70.40
318.20
cu.m
2486.55
11238.80
ditto
70.40
257.25
"
2486.55
9086.05
ditto
70.40
226.90
"
2486.55
8014.10
Chap-6 (Concrete)
Page 42
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Cft
91.55
359.30
cu.m
3233.55
12690.50
ditto
91.55
302.80
"
3233.55
10694.90
ditto
91.55
272.90
"
3233.55
9638.85
Per Cft
41.35
50.50
cu.m
1460.50
1783.65
Per Cft
20.25
cu.m
715.25
--
* 851-1
to
cement in dry mix, and course sand, including all labour and
851-10
* 851-5
Per Rft
760.65
1055.40
Metre
2494.95
3461.70
Per Rft
883.50
1247.10
Metre
2897.90
4090.50
Per Rft
1070.35
1498.8
Metre
3510.75
4916.05
Per Rft
1316.90
1840.70
Metre
4319.45
6037.55
Per Cwt.
1393.90
4879.15
100 kg
2743.90
9604.65
ditto
1393.90
5810.55
"
2743.90
11438.10
* 851.5
Chap-6 (Concrete)
Page 43
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Cwt.
359.70
4025.50
100 kg
708.05
7924.20
ditto
359.70
5032.00
ditto
708.05
9905.50
ditto
359.70
5263.00
ditto
708.05
10360.30
Per Cft
46.35
195.40
cu.m
1637.10
6901.55
20.2
Per Cft
102.70
200.60
cu.m
3627.35
7085.20
20.2
Per Sft
28.80
54.00
sq.m
309.90
581.05
20.1 to
20.4
100Cft
2158.45
cu.m
762.35
100Cft
1349.05
cu.m
476.50
100Cft
539.60
cu.m
190.60
Each
359.70
Each
359.70
505.40
20.4
Per hole
863.30
Each
863.30
20.1
100Cft
3207.60
cu.m
1132.90
20.1
100Sft
305.70
sq.m
32.90
ditto
100.90
"
10.85
14 Extra labour for work of weirs, rail or road bridges, syphons, and
concreting in superstructure
15 Making reinforced cement concrete spout, including fixing in
505.40
Chap-6 (Concrete)
Page 44
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Sft
306.10
sq.m
32.95
ditto
440.60
"
47.40
ditto
143.90
"
15.50
100 Kg.
4444.70
4444.70
30634.15
* 811-1
to
drawing the H.T. wire through metal spacer plate, inserting in helix
811-11
100kg
2658.15
27726.60
%kg
2658.15
27726.60
providing M.S. shear bars, spacers and lift hooks, male and
female anchorage, tie down, struts, stressing cables, maintaining
basis of payment.
* 811-1
to
811-11
complete
i)
100Cft
1681.00
cu.m
593.75
ii)
100Cft
2392.90
cu.m
845.15
100Cft
3210.50
cu.m
1133.95
iv)
100Cft
4161.80
cu.m
1469.95
v)
100Cft
5132.55
cu.m
1812.80
Chap-6 (Concrete)
Page 45
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Sft.
28.35
66.70
sq.m.
305.05
717.70
Per Rft.
13.95
90.85
Metre
45.75
298.00
Per Rft.
14.30
74.45
Metre
46.90
244.20
Per Rft.
12.75
89.65
Metre
41.80
294.05
ditto
12.75
93.25
"
41.80
305.85
Per Sft.
14.40
102.15
Sq.m
154.95
1099.15
Per Rft.
4.70
60.95
Metre
15.40
199.90
Per Rft.
19.10
67.10
Metre
62.65
220.05
11.00
49.70
25 Providing and fixing 1/8" (3 mm) thick 3" (75 mm) wide aluminium
strip on horizontal and vertical expansion joints in walls, columns,
ceilings and floors etc., including cost of clips/screws etc.,
complete in all respects:a) On interior surface (without mastic strip)
b) On exterior surface (with mastic strip)
26 Providing and fixing 1/16" (1.5 mm) thick copper flashing on
expansion joints complete in all respects.
27 Providing and fixing 6 in (150 mm). wideG.I. sheet 18SWG.
stopper to expansion joint.
28 Providing embeding 10" (250 mm) wide " (6 mm) thick
rubber water stopper in expansion joints of R.C.C. roof
slab complete in all respects.
29 Filling expansion joints with bitumen. sand & saw dust in
ratio 1:2:2.
Per Rft
per inch
P.Metre/
3.35
15.15 Per 25 mm
width
30 Filling expansion joints with bitumen.
Per Rft.
Width
49.70
Chap-6 (Concrete)
Metre
163.00
Page 46
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Metre
154.80
Spec.
No.
Remarks
Composite
Per Rft.
47.20
Per Sft.
5.75
11.25
Sq.m
61.85
121.05
ditto
5.75
15.15
"
61.85
163.00
b)
100Sft
1347.35
4281.10
sq.m
145.00
460.65
100Sft
1347.35
4842.90
sq.m
145.00
521.10
100Sft
1398.30
6123.10
sq.m
150.45
658.85
100Sft
1347.35
4513.10
sq.m
145.00
485.60
100Sft
1347.35
5074.35
sq.m
145.00
546.00
100Sft
1398.30
6354.55
sq.m
150.45
683.75
100Sft
1270.95
2718.20
sq.m
136.75
292.50
100Sft
1270.95
3009.15
sq.m
136.75
323.80
Chap-6 (Concrete)
Page 47
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Sft
1270.95
2812.65
sq.m
136.75
302.65
100Sft
1270.95
3120.70
sq.m
136.75
335.80
100Sft
1270.95
2967.65
sq.m
136.75
319.30
100Sft
1270.95
3402.60
sq.m
136.75
366.10
100Sft
1270.95
2831.80
sq.m
136.75
304.70
100Sft
1270.95
3122.95
sq.m
136.75
336.05
100Sft
1270.95
2927.25
sq.m
136.75
314.95
100Sft
1270.95
3235.35
sq.m
136.75
348.10
100Sft
1270.95
3162.20
sq.m
136.75
340.25
100Sft
1270.95
3623.55
sq.m
136.75
389.90
100Sft
1270.95
2637.85
sq.m
136.75
283.85
100Sft
1270.95
2929.25
sq.m
136.75
315.20
100Sft
1270.95
2732.75
sq.m
136.75
294.05
100Sft
1270.95
3040.80
sq.m
136.75
327.20
Chap-6 (Concrete)
Page 48
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Sft
1270.95
2967.65
sq.m
136.75
319.30
100Sft
1270.95
3429.00
sq.m
136.75
368.95
100Sft
1270.95
2831.70
sq.m
136.75
304.70
100Sft
1270.95
3122.95
sq.m
136.75
336.05
100Sft
1270.95
2926.45
sq.m
136.75
314.90
100Sft
1270.95
3234.55
sq.m
136.75
348.05
100Sft
1270.95
3161.50
sq.m
136.75
340.20
100Sft
1270.95
3622.70
sq.m
136.75
389.80
100Cft
5984.20
cu.m.
2113.60
100Sft
168.15
sq.m
18.10
100Cft
2192.20
cu.m
774.30
per No.
66.05
per No.
66.05
100Cft.
1686.30
cu.m
595.60
ditto
1888.65
"
667.05
ditto
2192.20
"
774.30
ditto
2529.45
"
893.40
metre
170.90
Per Rft
52.10
94.00
308.30
Chap-6 (Concrete)
Page 49
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
100Cft
Labour
1686.30
Composite
Unit
cu.m.
Labour
595.60
Spec.
No.
Remarks
Composite
-
43 Breaking stone ballast screened and stacked:(a) 2" ring (50 mm)
100Cft.
1888.65
cu.m.
667.05
ditto
2192.20
"
774.30
ditto
2529.45
"
893.40
ditto
3372.60
"
1191.20
ditto
5733.40
"
2025.05
100Cft.
539.60
cu.m.
190.60
100Cft.
539.60
cu.m.
190.60
Each
292.25
Each
292.25
Specification numbers correspond to book of standard specification of Road and Bridge Construction, "1971"
Chap-6 (Concrete)
Page 50
7. BRICK WORK
1
2
Rates for all finsihed works include the removal of surplus debris, unused material and byproducts.
The rates apply to all sizes of bricks, including the modular bricks of size 8"x4"x4" (200x100x100 mm) nominal.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100Cft.
ditto
2615.85
3461.20
16623.15
17468.50
cu.m
ditto
923.90
1222.50
Remarks
5871.30
6169.85
21.1
to
21.4
100Cft.
ditto
ditto
ditto
692.45
1537.80
2383.15
3804.00
-----
cu.m
ditto
ditto
ditto
244.55
543.15
841.75
1343.55
first floor
second floor
third floor
fourth & subsequent floors
100Cft.
ditto
3566.35
692.45
17573.65
--
cu.m
ditto
1259.65
244.60
ditto
21.1
ii)
6207.00
-
21.1 to
21.4
1:2
1:3
1:4
1:5
1:6
1:7
1:8
100Cft.
ditto
ditto
ditto
ditto
ditto
ditto
3440.30
3440.30
3440.30
3440.30
3440.30
3440.30
3440.30
22667.90
21402.50
20643.30
20137.10
19756.85
19507.70
19289.25
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
1215.05
1215.05
1215.05
1215.05
1215.05
1215.05
1215.05
8006.30
7559.35
7291.20
7112.40
6978.10
6890.10
6812.95
1:1:6
1:1:7
1:1:8
1:1:9
1:1:10
100Cft.
ditto
ditto
ditto
ditto
3440.30
3440.30
3440.30
3440.30
3440.30
20034.55
19769.25
19554.20
19374.05
19239.10
cu.m
ditto
ditto
ditto
ditto
1215.05
1215.05
1215.05
1215.05
1215.05
7076.20
6982.50
6906.55
6842.90
6795.25
100Cft.
3440.3
18773.25
cu.m
1215.05
6630.7
chapter-7(Brickwork)
ditto
ditto
Page 51
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Unit
Labour
ii)
1:2
1:3
1:4
1:5
1:6
1:7
1:8
100Cft.
ditto
ditto
ditto
ditto
ditto
ditto
4555.45
4555.45
4555.45
4555.45
4555.45
4555.45
4555.45
23783.05
22517.65
21758.40
21252.25
20872.00
20622.85
20403.05
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
1609.00
1609.00
1609.00
1609.00
1609.00
1609.00
1609.00
Remarks
Composite
ditto
Ratio
Ratio
Ratio
Ratio
Ratio
Ratio
Ratio
8400.15
7953.25
7685.05
7506.30
7372.00
7284.00
7206.35
1:1:6
1:1:7
1:1:8
1:1:9
1:1:10
100Cft.
ditto
ditto
ditto
ditto
4555.45
4555.45
4555.45
4555.45
4555.45
21149.70
20887.05
20669.35
20489.20
20354.65
cu.m
ditto
ditto
ditto
ditto
1609.00
1609.00
1609.00
1609.00
1609.00
7470.05
7377.30
7300.40
7236.80
7189.25
100Cft.
4555.45
19888.35
cu.m
1609.00
7024.55
100Cft.
ditto
ditto
ditto
692.45
1537.80
2383.15
3804.00
-----
cu.m
ditto
ditto
ditto
244.55
543.15
841.75
1343.55
Composite
Spec.
No.
Labour
first floor
second floor
third floor
fourth & subsequent floors
ii)
21.1
to
21.5
1:2
1:3
1:4
1:5
1:6
1:7
1:8
100Cft.
ditto
ditto
ditto
ditto
ditto
ditto
3967.40
3967.40
3967.40
3967.40
3967.40
3967.40
3967.40
23195.00
21929.60
21170.35
20664.20
20283.90
20034.80
19816.30
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
1401.30
1401.30
1401.30
1401.30
1401.30
1401.30
1401.30
8192.45
7745.55
7477.35
7298.60
7164.25
7076.30
6999.10
1:1:6
1:1:7
1:1:8
1:1:9
100Cft.
ditto
ditto
ditto
3967.40
3967.40
3967.40
3967.40
20561.60
20296.30
20081.30
19901.05
chapter-7(Brickwork)
cu.m
ditto
ditto
ditto
1401.30
1401.30
1401.30
1401.30
7262.35
7168.65
7092.70
7029.05
Page 52
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Ratio 1:1:10
Labour
Composite
Unit
Labour
Spec.
No.
Composite
ditto
3967.40
19766.15
ditto
1401.30
6981.40
100Cft.
3967.40
19300.30
cu.m
1401.30
6816.85
100Cft.
692.45
--
cu.m
244.55
100Cft.
1186.95
--
cu.m
419.25
100Cft.
764.30
cu.m
269.95
100Cft.
262.90
--
cu.m
92.85
100Cft.
100Cft.
343.20
692.45
---
cu.m
cu.m
121.20
244.55
1600.70
Remarks
ditto
21.5
565.35
21.1
to
21.4
13 Extra for face work (half brick thick) using special bricks
instead of first class bricks.
100Cft.
Per Cft.
113.20
100 Nos.
ditto
2017.75
1008.85
1973.15
cu.m
696.90
294.00
cu.m
3998.95
10384.10
% Nos.
ditto
2017.75
1008.85
mud mortar
ii)
1:2
1:3
1:4
1:5
1:6
1:7
21.1
to
21.4
100 Sft.
1727.90
5234.80
Sqm.
185.90
563.25
100 Sft.
ditto
ditto
ditto
ditto
ditto
2283.25
2283.25
2283.25
2283.25
2283.25
2283.25
7095.25
6778.55
6589.05
6462.55
6373.60
6304.60
sq.m.
ditto
ditto
ditto
ditto
ditto
245.70
245.70
245.70
245.70
245.70
245.70
763.45
729.35
709.00
695.35
685.80
678.40
chapter-7(Brickwork)
Page 53
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Ratio 1:8
ditto
Labour
2283.25
Composite
6253.85
Unit
ditto
Labour
Spec.
No.
Composite
245.70
672.90
iv)
Remarks
1:1:6
1:1:7
1:1:8
1:1:9
1:1:10
100Sft.
100Sft.
100Sft.
100Sft.
100Sft.
2283.25
2283.25
2283.25
2283.25
2283.25
6436.90
6369.45
6319.50
6271.05
6242.40
sq.m
sq.m
sq.m
sq.m
sq.m
245.70
245.70
245.70
245.70
245.70
692.60
685.35
680.00
674.75
671.70
100Sft.
2283.25
6118.90
sq.m
245.70
658.40
100Sft.
ditto
ditto
ditto
349.30
765.85
1194.60
1828.80
sq.m
ditto
ditto
ditto
37.60
82.40
128.55
196.80
ditto
17 Add extra labour on item No. 16 for pacca brick work in:i)
ii)
iii)
iv)
first floor
second floor
third floor
fourth & subsequent floors
mud mortar
ii)
21.1
to
21.4
100Sft.
2444.50
9448.15
sq.m
263.05
1016.60
1:2
1:3
1:4
1:5
1:6
1:7
1:8
100 Sft.
ditto
ditto
ditto
ditto
ditto
ditto
3428.90
3428.90
3428.90
3428.90
3428.90
3428.90
3428.90
13042.70
12410.00
12030.40
11777.30
11599.50
11461.05
11353.45
sq.m
ditto
ditto
ditto
ditto
ditto
ditto
368.95
368.95
368.95
368.95
368.95
368.95
368.95
1403.40
1335.30
1294.45
1267.25
1248.10
1233.20
1221.65
1:1:6
1:1:7
1:1:8
1:1:9
1:1:10
100Sft.
ditto
ditto
ditto
ditto
3428.90
3428.90
3428.90
3428.90
3428.90
11726.05
11590.15
11485.95
11395.80
11329.65
sq.m
ditto
ditto
ditto
ditto
368.95
368.95
368.95
368.95
368.95
1261.70
1247.10
1235.90
1226.20
1219.05
100Sft.
3428.90
11094.15
sq.m
368.95
1193.75
100Sft.
ditto
ditto
ditto
519.35
1153.35
1787.35
2853.00
-----
sq.m
ditto
ditto
ditto
183.45
407.35
631.30
1007.65
Ratio
Ratio
Ratio
Ratio
Ratio
Ratio
Ratio
iii) lime, cement, sand mortar:Ratio
Ratio
Ratio
Ratio
Ratio
iv)
ditto
first floor
second floor
third floor
fourth & subsequent floors
chapter-7(Brickwork)
Page 54
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Cft.
42.75
ii)
100Cft.
692.45
637.00
--
cu.m
1509.25
ditto
244.60
22498.65
4" (113 mm) thick walling with hoop iron, bonding 6"
(150 mm) apart.
ii) 4" (113 mm) thick walling with hoop iron, bonding
12" (300 mm) apart.
iii) 3" (75 mm) thick walling with hoop iron, bonding 6"
(150 mm) apart.
iv) 3" (75 mm) thick walling with hoop iron, bonding 12"
(300 mm) apart.
21.1
to
21.2
21.19
100Sft.
1897.30
9835.40
sq.m
204.15
1058.30
100Sft.
1690.45
9175.20
sq.m
181.90
987.25
ditto
1502.55
7233.10
ditto
161.65
778.30
ditto
1202.05
6429.10
ditto
129.35
691.75
100Cft.
3483.60
11274.15
cu.m
1230.40
3982.05
21.18
100Cft.
2113.30
15883.30
cu.m
746.40
5610.00
21.1
100Cft.
2946.00
4519.80
cu.m
1040.55
1596.40
21.16
100Cft.
1701.20
cu.m
600.85
21.17
--
21.1 to 21.2
Rft.
ditto
ditto
21.55
24.40
16.90
52.95
110.90
131.35
Metre
ditto
ditto
70.70
80.05
55.45
173.70
363.75
430.85
1 brick
2 bricks
3 bricks
4 bricks
21.1 to 21.2
Rft.
ditto
ditto
ditto
24.40
35.95
47.95
60.35
1,000
Nos
944.35
1,000
Nos
1780.75
100Cft.
224.85
Remarks
41.70
88.60
135.35
189.30
Metre
ditto
ditto
ditto
80.05
117.90
157.30
197.95
--
1,000
Nos
944.35
--
1,000
Nos
1780.75
cu.m
79.40
1544.85
chapter-7(Brickwork)
136.80
290.60
443.95
620.90
545.65
Page 55
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
31 Providing and laying 2" (50 mm) thick and 15" (375 mm)
projected tile band, laid in 1:2 cement sand mortar, with
hoop iron 1" (25 mm) wide 18 gauge flat iron sheet 9"
apart.
Rft.
Labour
Composite
89.95
149.70
Unit
Metre
Labour
Spec.
No.
Composite
295.05
491.00
1:3
1:4
100Sft.
ditto
1690.45
1690.45
Per Sft.
47.95
Each No.
36.70
Each No.
239.80
Per Lft.
19.10
37 Maroo corners
Each
Corner
122.30
38 Providing and laying Fair Face Gutka, clading laid with 1:3 cement / red
% Sft
20546.45
Remarks
10178.50
9874.80
sq.m
ditto
181.90
181.90
1095.20
1062.55
--
sq.m
515.95
45.30
Each
36.70
45.30
320.60
Each
239.80
320.60
--
Metre
62.65
--
Each
Corner
122.30
23440.05
P.Sqm
2210.80
chapter-7(Brickwork)
2522.15
Page 56
8. STONE MASONRY
1
The composite rates do not include the carriage of stone or spawl which will be paid separately by road and/or rail whichever means of
transport is adopted. The supply and carriage to site of work of all other materials is included in the composite rates.
The payment of carriage of stone or spawl will be made on the basis of the actual stack measurement (without any reduction factor) of the
stone or spawl carried.
Where the stone or spawl is issued from stock and the contractor is paid for its carriage and/or labour only; or where the stone or spawl is
supplied, carried or handled by the contractor in which no laying is required, the actual stack measurement (without any reduction factor)
shall form the basis of the payment of supply or carriage of stone or spawl. The quantity of finished and completed item of work shall form
the basis of laying.
Rates for all finished work include the removal of surplus debris, unused material and byproducts.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
i)
ii)
iii)
iv)
Unit
Labour
dry masonry
in mud mortar
in lime, sand mortar 1:2
in cement, sand mortar
ratio 1:3
ratio 1:4
ratio 1:6
ratio 1:8
i)
ii)
iii)
iv)
dry masonry
in mud mortar
in lime, sand mortar 1:2
in cement, sand mortar:
ratio 1:3
ratio 1:4
ratio 1:6
ratio 1:8
22.10,
22.11
100 Cft.
100 Cft.
100 Cft.
3552.10
4446.75
6780.20
4356.10
5555.85
9593.00
cu.m
cu.m
cu.m
1254.60
1570.60
2394.75
1538.60
1962.35
3388.25
100 Cft.
100 Cft.
100 Cft.
100 Cft.
6780.20
6780.20
6780.20
6780.20
13872.50
12733.60
11430.20
10709.00
cu.m
cu.m
cu.m
cu.m
2394.75
2394.75
2394.75
2394.75
4899.75
4497.50
4037.15
3782.40
22.8
100 Cft.
100 Cft.
100 Cft.
4316.40
6105.65
7528.60
5120.40
7214.75
10117.45
cu.m
cu.m
cu.m
1524.55
2156.50
2659.10
1808.55
2548.25
3573.50
100 Cft.
100 Cft.
100 Cft.
100 Cft.
7528.60
7528.60
7528.60
7528.60
14210.20
13197.90
12038.90
11401.70
cu.m
cu.m
cu.m
cu.m
2659.10
2659.10
2659.10
2659.10
5019.05
4661.50
4252.15
4027.10
dry masonry
in mud mortar
Remarks
Composite
Composite
Spec.
No.
Labour
22.10
100 Cft.
100 Cft.
3934.25
5341.40
4738.25
6450.50
chapter-8(Stone masonary)
cu.m
cu.m
1389.60
1886.60
1673.55
2278.30
Page 57
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
c)
d)
i)
ii)
iii)
iv)
4
i)
ii)
iii)
iv)
dry masonry
in mud mortar
in lime, sand mortar 1:2
in cement, sand mortar:
ratio 1:3
ratio 1:4
ratio 1:6
ratio 1:8
Remarks
Composite
100 Cft.
7337.55
10150.35
cu.m
2591.60
3585.10
100 Cft.
100 Cft.
100 Cft.
100 Cft.
7337.55
7337.55
7337.55
7337.55
14429.85
13291.00
11987.55
11266.35
cu.m
cu.m
cu.m
cu.m
2591.60
2591.60
2591.60
2591.60
5096.60
4694.40
4234.00
3979.30
22.8
100 Cft.
100 Cft.
100 Cft.
5035.80
7544.45
8439.10
5839.80
8640.00
11027.95
cu.m
cu.m
cu.m
1778.65
2664.70
2980.70
2062.60
3051.65
3895.05
100 Cft.
100 Cft.
100 Cft.
100 Cft.
8439.10
8439.10
8439.10
8439.10
15120.70
14108.35
12949.35
12312.15
cu.m
cu.m
cu.m
cu.m
2980.70
2980.70
2980.70
2980.70
5340.65
4983.05
4573.70
4348.65
22.5
&
22.6
100 Cft.
21877.70
24368.60
cu.m
7727.20
8607.00
100 Cft.
100 Cft.
100 Cft.
21877.70
21877.70
21877.70
27221.85
26462.60
25602.10
cu.m
cu.m
cu.m
7727.20
7727.20
7727.20
9614.75
9346.60
9042.65
100 Cft.
38826.50
41091.95
cu.m
13713.50
14513.70
100 Cft.
100 Cft.
100 Cft.
38826.50
38826.50
38826.50
42518.55
42138.50
41716.70
cu.m
cu.m
cu.m
13713.50
13713.50
13713.50
15017.55
14883.30
14734.35
100 Cft.
100 Cft.
100 Cft.
100 Cft.
973.05
2136.70
3327.35
5223.00
cu.m
cu.m
cu.m
cu.m
343.70
754.70
1175.20
1844.75
100 Cft.
845.35
cu.m
298.60
22.3
(A) to
(C) &
22.4
Labour
Unit
Composite
Spec.
No.
Labour
first floor
second floor
third floor
fourth floor
chapter-8(Stone masonary)
Page 58
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
100 Cft.
Labour
2374.05
Composite
Unit
cu.m
Labour
838.50
Spec.
No.
Composite
-
hammer dressed
rough tooled dressed
chisel dressed
fine dressed
22.12
22.7
100 Cft.
100 Rft.
11005.65
11005.65
cu.m
Rm.
3887.20
361.00
11 Dressing stones:a)
b)
c)
d)
Remarks
22.2
100 Sft.
100 Sft.
100 Sft.
100 Sft.
4406.15
8272.70
10035.15
20429.40
100 Sft.
8742.45
Per Cft.
Per Cft.
sq.m
sq.m
sq.m
sq.m
474.10
890.15
1079.80
2198.20
14611.50
sq.m
940.70
1572.20
407.95
438.05
cu.m
14408.80
15471.95
229.75
262.85
cu.m
8114.75
9283.85
chapter-8(Stone masonary)
22.13
Page 59
9. ROOFING
Rates for all finished works include the removal of surplus debris unused material and byproducts.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100Sft.
6170.30
11612.40
sq.m
663.90
1249.50
23.1
100Sft.
4787.40
8618.90
sq.m
515.10
927.40
23.2
100Sft.
260.35
865.30
sq.m
28.00
479.60
2243.15
sq.m
51.60
241.35
915.40
251.75
1284.30
850.50
98.50
27.10
138.20
91.50
100Sft.
1500.10
6353.65
161.40
683.65
a)
b)
c)
Jack arch roofing 4" (113 mm) thick laid in 1:5 cement
mortar, including an average depth of 4" (100 mm) cement
concrete in haunches and over crown, with 3" (75 mm)
earth and 1" (25 mm) plaster, soffits of arches cement
plaster 1:6 and " (13 mm) thick. The rate also includes
bitumen coating, centring, laying skew bricks in cement
mortar (1:3), and encasing exposed flanges of the joints
with fine cement concrete 1:2:4 using stone aggregate:-
sq.m
Remarks
ditto
ditto
23.3 to
23.5
ditto
chapter-9(Roofing)
Page 60
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
a)
b)
7
100Sft.
ditto
Labour
6783.75
6783.75
Composite
17357.95
18680.45
Unit
sq.m
ditto
Labour
729.95
729.95
Spec.
No.
Composite
1867.70
2010.00
Jack arch roofing 4" (113 mm) thick laid in 1:5 cement
mortar, including an average depth of 4" (100 mm) cement
concrete in haunches and over crown, with " (13 mm)
cement plaster 1:6 on top (except earth filling mud plaster
and gobri) soffit of arches cement plastered. The rate also
includes bitumen coating, centring, laying skew bricks in
cement sand mortar (1:3), and encasing exposed flanges
of the joints with fine cement concrete 1:2:4 using stone
aggregate:a)
b)
23.3
to
23.5
100Sft.
ditto
5515.75
5515.75
100Sft.
1222.85
100Sft.
7918.00
16580.90
17129.80
15674.70
sq.m
ditto
593.50
593.50
1784.10
1843.15
sq.m
131.60
sq.m
852.00
1686.60
ditto
23.3
to
23.5
23.1
to
23.3
a)
3" (75 mm) thick earth filling and 1" (25 mm) mud
plaster
100Sft.
680.30
1013.70
sq.m
73.20
109.05
b)
100Sft.
892.40
1293.60
sq.m
96.00
139.20
100Sft.
89.20
104.00
sq.m
9.60
11.20
ditto
100Sft.
539.60
1695.05
sq.m
58.05
182.40
23.1
13 Providing & Fixing corrugated galvanized iron sheets with G.I. bolts,
nuts, limpet and bitumen washers, wind ties, complete in
all respects without valleys and ridges:20 BWG
22 BWG
24 BWG
a)
b)
c)
Remarks
23.7
100Sft.
100Sft.
100Sft.
959.2
959.2
959.2
13316.55
11422.8
9293.85
sq.m
sq.m
sq.m
103.2
103.2
103.2
1432.85
1229.1
1000
Rft.
68.45
91.10
Metre
224.50
298.80
chapter-9(Roofing)
ditto
ditto
23.10
Page 61
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Each
258.25
432.85
Each
Each
432.85
23.10
Each
258.25
840.45
Each
258.25
840.45
23.10
Per Rft.
Per Rft.
52.85
52.85
152.15
173.10
Metre
Metre
173.35
173.35
499.05
567.75
Per Sft.
52.85
125.20
sq.m
568.65
1347.15
19 Providing and fixing 1/16" (1.5 mm) thick lead flashing over
roof expansion joint complete in all respects.
Per Sft.
15.30
81.70
Sq.m
164.65
879.10
a)
b)
23.11
Per Rft.
Per Rft.
47.95
47.95
210.60
186.70
Metre
Metre
157.30
157.30
690.75
612.40
Each
198.30
505.65
Each
198.30
505.65
22 Shoes, bends or offsets for cast iron rain water down pipe,
including fixing and painting.
Each
71.95
314.25
Each
71.95
314.25
Each
220.30
335.75
Each
220.30
335.75
23.10
100Sft.
5080.70
18675.00
sq.m
546.70
2009.45
26.1
100Sft.
100Sft.
3071.00
3071.00
14542.60
13117.65
sq.m
sq.m
330.45
330.45
1564.80
1411.45
23.60
100Sft.
2113.30
6019.90
sq.m
227.40
647.75
23.8
chapter-9(Roofing)
Page 62
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
--
sq.m
27.50
Metre
81.85
Spec.
No.
Remarks
Composite
ridges, etc).
27 Extra labour for erection of GI sheets, flat sheet or
asbestos sheet roofing, above 20' (6.10 m) height in
difficult position, including lifting with care and special
scaffolding along live electric wires.
100Sft.
255.40
Per Rft.
24.95
74.40
23.6
244.05
23.6
Per Rft.
66.10
216.80
1230.15
Per Rft.
86.35
283.25
1225.25
Per Rft.
86.35
283.25
1423.85
Per Rft.
43.15
141.55
512.00
Each
959.20
Each
959.20
1591.20
Each
287.75
Each
287.75
33 Making drip course 2"x" (50x13 mm) under RCC slab edges
in outer opening, in cement, sand mortar 1:2.
Per Rft.
12.35
13.75
Metre
40.50
45.10
Per Sft.
36.20
282.45
sq.m
389.50
3039.15
100Sft.
100Sft.
100Sft.
2317.60
2317.60
2321.40
7247.00
7373.00
7502.85
sq.m
sq.m
sq.m
249.35
249.35
249.80
779.80
793.35
807.30
14.40
298.15
Metre
47.25
977.95
b)
c)
23.8
1591.20
--
23.11
23.10
Rft.
chapter-9(Roofing)
Page 63
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
15.30
26.30
17.30
29.95
Metre
Metre
50.20
86.25
56.75
98.25
i)
Each
63.70
70.30
Each
63.70
70.30
ii)
Each
30.55
33.75
Each
30.55
33.75
Each
278.80
Each
278.80
Each
41.10
Each
41.10
Each
Each
Each
Each
Each
39.85
55.75
69.70
92.95
111.50
Each
Each
Each
Each
Each
39.85
55.75
69.70
92.95
111.50
Each
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
111.50
139.40
185.85
214.45
232.30
253.45
278.80
309.75
398.25
428.90
464.65
Each
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
111.50
139.40
185.85
214.45
232.30
253.45
278.80
309.75
398.25
428.90
464.65
Each
ditto
ditto
86.55
192.35
230.80
Each
ditto
ditto
86.55
192.35
230.80
chapter-9(Roofing)
Page 64
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
iv)
v)
vi)
vii)
viii)
Labour
ditto
ditto
ditto
ditto
ditto
288.55
314.75
346.25
432.80
692.45
Each
383.70
Composite
Unit
ditto
ditto
ditto
ditto
ditto
288.55
314.75
346.25
432.80
692.45
Each
383.70
638.50
P.Sqm
P.Sqm
P.Sqm
37.70
37.70
37.70
638.50
Labour
Spec.
No.
Remarks
Composite
1" thick
1-1/2" thick
2" thick
% Sft
% Sft
% Sft
350.45
350.45
350.45
5,516.45
8,162.45
10,556.45
chapter-9(Roofing)
593.55
878.30
1,135.90
Page 65
10. FLOORING
Rates for all finished works include the removal of surplus debris, unused material and byproducts
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100 Sft.
2756.15
4025.50
sq.m
296.55
433.15
100 Sft.
945.30
1284.30
sq.m
101.70
138.20
100 Cft.
2161.10
4411.10
cum.
763.30
1558.00
100 Sft.
1715.35
2223.40
sq.m
184.55
239.25
24.2
100 Sft.
873.35
4550.05
sq.m
93.95
489.60
24.12
100 Sft.
1579.90
7054.80
sq.m
170.00
759.10
24.12
100 Sft.
855.90
1369.75
sq.m
92.10
147.40
100 Sft.
1548.35
6094.30
sq.m
166.60
655.75
24.4
100 Sft.
1,971.00
8,620.75
sq.m
212.10
927.60
24.4
10
100 Sft.
1,935.45
4,191.55
sq.m
208.25
451.00
ditto
100 Sft.
2,126.50
6,049.80
sq.m
228.80
650.95
24.4
100 Sft.
1,271.35
6,291.40
sq.m
136.80
676.95
24.7
11
12
chapter-10(Flooring)
Remarks
24.1
Page 66
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
mortar 1:2.
13
14
15
16
24.8
100 Sft.
ditto
ditto
1,271.35
1,271.35
1,271.35
4,424.00
5,665.30
8,111.40
sq.m
ditto
ditto
136.80
136.80
136.80
476.00
609.60
872.80
100 Sft.
1,271.35
6,320.90
sq.m
136.80
680.15
100 Sft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
1,362.70
1,362.70
1,735.00
1,735.00
2,107.30
2,174.75
2,479.60
2,479.60
2,479.60
2,630.55
2,911.75
3,565.30
3,859.80
4,580.55
4,910.10
5,415.65
5,789.10
6,116.20
sq.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
146.65
146.65
186.70
186.70
226.75
234.00
266.80
266.80
266.80
100 Sft.
ditto
ditto
2,021.80
2,021.80
2,585.15
3,804.05
3,992.90
4,839.45
sq.m
ditto
ditto
217.55
217.55
278.15
409.30
429.65
520.75
1,002.10
sq.m
51.60
107.85
sq.m
43.55
17
100 Sft.
479.60
18
100 Sft
404.70
19
24.9
24.10
283.05
313.30
383.65
415.30
492.85
528.35
582.70
622.90
658.10
24.7
24.5
100 Sft.
ditto
4,162.25
4,162.25
5,825.55
6,082.90
chapter-10(Flooring)
sq.m
ditto
447.85
447.85
626.85
654.50
Page 67
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
20
Unit
Labour
24.10
100 Sft.
ditto
ditto
1,731.20
1,355.70
995.50
11,804.90
6,508.35
3,674.25
sq.m
ditto
ditto
186.30
145.85
107.10
1270.20
700.30
395.35
100 Sft.
ditto
6,159.50
6,159.50
8,861.15
9,096.95
sq.m
ditto
662.75
662.75
953.45
978.85
Remarks
Composite
22
Composite
Spec.
No.
21
Labour
100 Sft.
ditto
6,159.50
6,159.50
9,059.90
9,637.35
sq.m
ditto
662.75
662.75
974.85
1037.00
23
100 Sft.
3,533.25
7,697.45
sq.m
380.20
828.25
24.8
24
100 Sft.
4,577.10
11,178.00
sq.m
492.50
1202.75
24.7
25
100 Sft.
4,577.10
11,726.30
sq.m
492.50
1261.75
ditto
26
100 Sft.
1,291.20
1,424.90
sq.m
138.95
153.30
27
100 Sft.
1,375.35
1,511.75
sq.m
148.00
162.65
chapter-10(Flooring)
Page 68
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
28
100 Sft.
183.45
229.00
sq.m
19.75
24.65
24.6
29
100 Sft.
3,821.40
35,962.25
sq.m
411.20
3869.55
24.13
30
100 Sft.
4,316.40
40,899.10
sq.m
464.45
4400.75
ditto
31
100 Sft.
3,671.80
47,182.10
sq.m
395.10
5076.80
ditto
32
100 Sft.
3,979.15
41,071.55
sq.m
428.15
4419.30
24.13
33
100 Sft.
3,671.80
79,480.30
sq.m
395.10
8552.10
ditto
34
254.80
254.80
2749.25
1525.70
ditto
100 Sft.
Per Inch
thickness
ditto
2,368.10
2,368.10
25,550.70
14,179.20
sq.m
per cm
thickness
ditto
100 Sft.
ditto
2,077.95
3,390.10
7,535.95
10,778.55
sq.m
ditto
223.60
364.80
810.85
1159.75
100 Sft.
2,528.65
3,184.85
sq.m
272.10
342.70
36
Remarks
chapter-10(Flooring)
Page 69
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
ditto
ditto
2,528.65
168.65
2,990.75
436.30
ditto
ditto
272.10
18.15
321.80
46.95
37
100 Sft.
5,633.75
12,234.65
sq.m
606.20
1316.45
24.7
38
100 Sft.
5,633.75
12,765.55
sq.m
606.20
1373.55
ditto
39
100 Sft.
ditto
7,399.90
7,399.90
8,813.15
9,695.45
sq.m
ditto
796.25
796.25
948.30
1043.25
100 Sft.
ditto
7,399.90
7,399.90
9,702.25
10,014.00
sq.m
ditto
796.25
796.25
1043.95
1077.50
17.75
80.65
sq.m
191.00
867.80
Remarks
Per Sft.
41
Per Rft.
4.20
Metre
13.80
42
6.60
4.60
Metre
ditto
21.65
15.10
74.20
84.30
106.95
Sq.m
Sq.m
Sq.m
24.14
Providing and laying Tuff pavers, having 7000 PSI, crushing strength
of approved manufacturer, over 2" to 3" sand cushion i/c grouting
with sand in joints i/c finishing to require slope . complete in all
respect.
(50% Grey / 50% Coloured)
a)
b)
c)
50-mm thick
60-mm thick
80-mm thick
P.Sft
P.Sft
P.Sft
12.35
12.35
12.35
chapter-10(Flooring)
132.75
132.75
132.75
798.35
906.80
1,150.85
Page 70
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Unit
Labour
25.7
100 Sft.
ditto
401.80
566.25
487.45
737.60
sq.m
ditto
43.25
60.95
52.45
79.35
ditto
a)
100 Sft.
362.60
448.25
sq.m
39.00
48.25
b)
ditto
362.60
533.95
ditto
39.00
57.45
100 Sft.
1138.35
1313.20
sq.m
122.50
141.30
b)
ditto
1138.35
1487.90
ditto
122.50
160.10
ditto
100 Sft.
ditto
1138.35
1138.35
1604.05
1884.00
sq.m
ditto
122.50
122.50
172.60
202.70
100 Sft.
2938.10
5788.85
sq.m
316.15
622.90
ditto
ditto
100 Sft.
ditto
ditto
964.70
964.70
964.70
2698.45
2579.25
2510.60
sq.m
ditto
ditto
103.80
103.80
103.80
290.35
277.55
270.15
25.1 to 25.6
a)
Remarks
Composite
a)
b)
Composite
Spec.
No.
Labour
100 Sft.
ditto
ditto
1138.35
1138.35
1426.15
1794.60
1989.45
2738.60
sq.m
ditto
ditto
chapter-11(Surface Rendering)
122.50
122.50
153.45
193.10
214.05
294.65
25.1
to
25.6
Page 71
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
1:2
1:3
1:4
ditto
100 Sft.
ditto
ditto
1138.35
1138.35
1426.15
1600.50
1754.55
2350.40
sq.m
ditto
ditto
122.50
122.50
153.45
172.20
188.80
252.90
ditto
100 Sft.
ditto
ditto
1138.35
1138.35
1426.15
1548.00
1659.80
2238.80
sq.m
ditto
ditto
122.50
122.50
153.45
166.55
178.60
240.90
ditto
100 Sft.
ditto
ditto
1291.20
1291.20
1291.20
2077.95
1883.20
1830.70
sq.m
ditto
ditto
138.95
138.95
138.95
223.60
202.65
197.00
100 Sft.
ditto
ditto
1138.35
1138.35
1426.15
1502.55
1580.70
2154.55
sq.m
ditto
ditto
122.50
122.50
153.45
161.65
170.10
231.85
100 Sft.
ditto
ditto
1138.35
1138.35
1426.15
1437.65
1535.25
2024.70
sq.m
ditto
ditto
122.50
122.50
153.45
13
100 Sft.
649.55
909.25
sq.m
69.90
14
100 Sft.
850.60
971.15
sq.m
91.55
104.50
25.8
15
100 Sft.
1291.20
1411.75
sq.m
138.95
151.90
ditto
16
25.1 to 25.6
a)
b)
Remarks
Composite
12
Labour
a)
b)
c)
11
Unit
10
Composite
Spec.
No.
Labour
ditto
154.70
165.20
217.85
97.85 25.4 to 25.6
ditto
100 Sft.
ditto
1138.35
1138.35
1629.55
1515.35
sq.m
ditto
chapter-11(Surface Rendering)
122.50
122.50
175.35
163.05
Page 72
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
17
18
19
ratio 1:2
ratio 1:3
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100 Sft.
850.60
1341.80
sq.m
91.55
144.40
100 Sft.
ditto
1291.20
1291.20
1782.40
1668.20
sq.m
ditto
138.95
138.95
191.80
179.50
ditto
25.8
100 Sft.
ditto
1021.40
1021.40
1182.15
1398.40
sq.m
ditto
109.90
109.90
127.20
150.45
100 Sft.
ditto
1902.65
1902.65
2063.40
2279.60
sq.m
ditto
204.75
204.75
222.00
245.30
20
100 Sft.
611.40
sq.m
65.80
ditto
21
100 Sft.
305.70
sq.m
32.90
ditto
22
100 Sft.
115.10
122.75
sq.m
12.40
23
Distempering:a)
b)
24
b)
25
13.20
100 Sft.
ditto
ditto
122.60
181.35
240.10
203.80
287.15
370.50
sq.m
ditto
ditto
13.20
19.50
25.85
21.95
30.90
39.85
100 Sft.
ditto
112.40
181.35
169.00
237.95
sq.m
ditto
12.10
19.50
18.20
25.60
25.10
100 Sft.
ditto
105.75
158.60
134.45
200.55
sq.m
ditto
11.40
17.05
14.45
21.60
100 Sft.
ditto
105.75
158.60
123.50
187.70
sq.m
ditto
11.40
17.05
13.30
20.20
White washing:a)
25.11
ditto
Colour washing:a)
Remarks
25.9
100 Sft.
ditto
105.75
158.60
129.20
193.70
sq.m
ditto
chapter-11(Surface Rendering)
11.40
17.05
13.90
20.85
Page 73
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
iii)
b)
26
three coats
old surface:i)
one coat
ii)
two coats
Labour
Composite
Unit
Labour
Spec.
No.
Composite
ditto
205.40
252.10
ditto
22.10
27.15
100 Sft.
ditto
105.75
158.60
123.30
187.85
sq.m
ditto
11.40
17.05
13.25
20.20
Gobri leeping:a)
b)
on walls
over roofs
25.7
100 Sft.
ditto
125.35
107.00
129.65
111.30
sq.m
ditto
13.50
11.50
13.95
12.00
27
100 Sft.
152.85
sq.m
16.45
28
100 Sft.
208.30
sq.m
22.40
29
100 Sft.
575.50
936.70
sq.m
61.90
100.80
30
100 Sft.
575.50
608.05
sq.m
61.90
65.45
31
100 Sft.
191.05
291.55
sq.m
20.55
31.35
32
1291.20
1291.20
1753.35
1907.40
sq.m
ditto
138.95
138.95
188.65
205.25
Rft.
9.10
38.70
Metre
29.85
126.95
Each
Each
201.45
402.85
255.75
511.55
Each
Each
201.45
402.85
255.75
511.55
i)
ii)
33
34
Single
Double
Remarks
25.8
Each
420.40
565.45
Each
420.40
565.45
36
Each
210.20
282.65
Each
210.20
282.65
37
Each
420.40
536.35
Each
420.40
536.35
38
100 Sft.
Per
coat
17.65
sq.m
Per
coat
1.90
chapter-11(Surface Rendering)
Page 74
No extra rate is to be paid for sawing as the rates are inclusive of these.
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Deodar wood
Shisham wood
Deodar wood
Shisham wood
Labour
26.1
Per Cft.
ditto
672.55
764.30
3738.35
3140.55
cu.m
ditto
23754.45
26995.10
132038.50
110924.25
26.1
Per Cft.
ditto
435.65
435.65
3553.50
2881.50
cu.m
ditto
15387.15
15387.15
125509.60
101774.60
26.1
to
26.3
&
26.7
Per Sft.
ditto
ditto
116.15
116.15
116.15
1466.15
1369.10
1274.30
sq.m
ditto
ditto
1249.75
1249.75
1249.75
15775.75
14731.50
13711.45
26.8
to
26.10
teak wood framing 1" (45 mm) thick with wire gauze
fixed in position:i) without springs or spring hinges.
Remarks
Composite
Unit
Composite
Spec.
No.
Labour
Per Sft.
21.25
597.35
sq.m
228.65
6427.50
ditto
21.25
601.00
ditto
228.65
6466.75
Per Sft.
ditto
21.25
21.25
551.10
555.30
sq.m
ditto
228.65
228.65
5929.85
5975.05
chapter-12(Wood Work)
Page 75
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
c)
Per Sft.
38.2
186.95
sq.m
411.05
2011.6
d)
Per Sft.
35.85
576.45
sq.m
385.75
6202.60
Per Sft.
47.75
296.70
sq.m
513.80
3192.50
Per Sft.
47.75
434.90
sq.m
513.80
4679.50
26.1 to
26.3 & 26.7
Per Sft.
ditto
ditto
113.25
113.25
113.25
1025.90
960.90
915.65
sq.m
ditto
ditto
1218.55
1218.55
1218.55
11038.70
10339.40
9852.40
Remarks
26.1, 26.2
& 26.4
Per Sft.
127.40
682.80
sq.m
1370.80
7346.95
ditto
117.60
592.00
ditto
1265.40
6369.90
Per Sft.
145.20
400.00
sq.m
1562.35
4304.00
1476.25
26.1, 26.2
26.4 to
7195.20
26.6
Per Sft.
137.20
668.70
sq.m
chapter-12(Wood Work)
Page 76
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Engineer incharge:i)
ii)
b)
i)
ii)
Per Sft.
ditto
59.70
65.70
533.40
563.80
sq.m
ditto
642.35
706.95
b)
c)
-ditto-
Per Sft.
ditto
59.70
65.70
251.25
281.60
sq.m
ditto
642.35
706.95
2703.45
3030.00
26.8 to
26.10
Per Sft.
ditto
63.70
63.70
447.80
451.95
sq.m
ditto
685.40
685.40
4818.35
4863.00
Per Sft.
ditto
63.70
63.70
417.55
420.25
sq.m
ditto
685.40
685.40
4492.85
4521.90
Per Sft.
47.75
156.60
sq.m
513.80
1685.00
Per Sft.
71.65
391.15
sq.m
770.95
4208.75
Per Sft.
106.15
456.50
sq.m
1142.15
4911.95
Per Sft.
25.45
135.40
sq.m
273.85
1456.90
5739.40
6066.50
Remarks
26.1
26.2
chapter-12(Wood Work)
Page 77
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
b)
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Sft.
25.45
104.15
sq.m
273.85
1120.65
Per Sft.
ditto
39.35
46.15
117.25
135.60
sq.m
ditto
423.40
496.55
1261.60
1459.05
Per Sft.
door area
3.65
31.75
sq.m
door area
39.25
341.65
Each
76.45
228.85
Each
76.45
228.85
Each
ditto
ditto
ditto
71.65
71.65
71.65
71.65
134.05
176.05
174.85
332.05
Each
ditto
ditto
ditto
71.65
71.65
71.65
71.65
134.05
176.05
174.85
332.05
Per Sft.
2.20
12.50
sq.m
23.65
134.50
ditto
2.20
10.00
ditto
23.65
107.60
Each
229.30
440.50
Each
229.30
440.50
Each
318.45
509.25
Each
318.45
509.25
Per Sft.
47.75
232.45
sq.m
513.80
2501.15
ditto
47.75
322.05
ditto
513.80
3465.25
single rebate
double rebate
26.2
chapter-12(Wood Work)
Page 78
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
23 a)
b)
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Sft.
152.85
1460.85
sq.m
1644.75
15718.90
Per Sft.
114.65
520.25
sq.m
1233.55
5597.80
Per Sft.
91.35
368.75
Sq.m
982.95
3967.95
ii)
Remarks
Per Sft.
176.35
718.20
sq.m
1897.75
7727.85
ditto
171.95
876.40
ditto
1850.30
9430.25
Per Sft.
68.40
599.80
Sq.m
736.20
6453.95
Per Sft.
ditto
33.95
21.25
500.70
335.55
Sq.m
ditto
365.50
228.45
5387.80
3610.40
Teak wood
Deodar wood
chapter-12(Wood Work)
Page 79
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
c)
Shisham wood
ditto
Labour
Composite
25.50
184.65
Unit
ditto
Labour
274.10
Spec.
No.
Composite
1987.05
26.1
26.2
Sft.
ditto
ditto
38.20
38.20
38.20
289.35
226.50
163.95
sq.m
ditto
ditto
411.20
411.20
411.20
3113.15
2437.10
1763.85
ditto
Sft.
ditto
ditto
38.20
38.20
38.20
289.35
414.75
540.15
sq.m
ditto
ditto
411.20
411.20
411.20
3113.15
4462.45
5811.75
Each
45.85
122.55
Each
45.85
122.55
b)
Each
61.15
100.35
Each
61.15
100.35
c)
Each
6.35
59.50
Each
6.35
59.50
d)
Each
2.05
10.95
Each
2.05
10.95
30 a)
Shisham wood
Teak wood
Remarks
26.1 and
26.2
ditto
Per Rft.
ditto
175.15
129.95
333.30
697.70
Metre
ditto
574.50
426.15
1093.20
2288.50
Per Rft.
64.95
227.15
Metre
213.10
745.10
100Sft.
ditto
764.28
1019.04
sq.m
ditto
82.25
109.65
100Sft.
ditto
450.93
677.65
sq.m
ditto
48.50
72.90
26.1
26.2
Soft wood
Hard wood
chapter-12(Wood Work)
Page 80
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Sft.
53.50
354.55
sq.m
575.65
3815.00
Per Sft.
63.70
135.55
sq.m
685.40
1458.50
Each
229.30
6882.10
Each
229.30
6882.10
Per Rft.
16.40
--
Metre
53.75
Per Rft.
252.65
2208.60
Metre
828.70
7244.30
100Sft.
ditto
ditto
1194.20
1194.20
1194.20
11902.50
13414.50
13666.50
sq.m
ditto
ditto
128.50
128.50
128.50
1280.70
1443.40
1470.50
100Sft.
ditto
ditto
1433.05
1433.05
1433.05
13557.55
23898.90
17085.55
sq.m
ditto
ditto
154.20
154.20
154.20
1458.80
2571.50
1838.40
100Sft.
ditto
ditto
ditto
2341.65
2341.65
2341.65
2341.65
9928.35
12568.35
12448.35
11848.35
sq.m
ditto
ditto
ditto
251.95
251.95
251.95
251.95
1068.30
1352.35
1339.45
1274.90
36 Making and fixing 1" (25 mm) thick kail or chir wooden
notice board with frame.
Remarks
26.1
ditto
ditto
-26.1
b)
Hard board
Chip board
Ply wood " (6 mm) thick
Masonite
b)
In case of acoustic
Thermopore sheet, the
composite rate will be
increased by Rs.9.00 per Sft.
100Sft.
ditto
2622.60
2622.60
9370.65
9445.85
sq.m
ditto
282.20
282.20
1008.30
1016.35
chapter-12(Wood Work)
Page 81
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
100Sft.
ditto
2622.60
2622.60
Each
Composite
Unit
Labour
Spec.
No.
Composite
6948.15
7074.15
sq.m
ditto
282.20
282.20
747.60
761.20
359.70
Each
359.70
ditto
sq.m
179.85
293.70
61.40
43 a)
b)
44 a)
ditto
Per Sft.
179.85
27.30
b)
Per Sft.
34.40
91.75
sq.m
370.05
987.05
Per Sft.
51.20
108.15
sq.m
550.85
1163.75
46 a)
Per Sft.
19.10
20.20
sq.m
205.60
217.60
Per Sft.
28.65
46.15
sq.m
308.40
496.40
b)
Remarks
660.75
26.12
26.12
47 Glazing with plate glass 1/4" (6 mm) thick including the cost
of deodar wood fillets and putty:a)
Per Sft.
43.95
108.60
sq.m
472.85
1168.50
b)
Per Sft.
43.95
108.80
sq.m
472.85
1170.60
Per Sft.
163.35
655.55
sq.m
1757.45
7053.70
Per Sft.
163.35
612.95
sq.m
1757.45
6595.25
49 Providing and fixing 1" (40 mm) thick hollow flush doors
and windows with commercial ply (3 ply) on both faces of
deodar wood shutter frame 1" (30 mm) thick and partal
wood braces at about 3" (75 mm) apart and deodar wood
lipping 1"x3/8" (40 mmx10 mm) fixed with M.S. chowkat
(frame) including chromium plated fittings, etc. complete
in all respects (without sliding bolt or lock):i)
Per Sft.
113.25
542.50
chapter-12(Wood Work)
sq.m
1218.30
5837.45
Page 82
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
ii)
50 Providing and fixing 1" (40mm) thick solid flush door shutter
(Approved Factory Manufactured) with commercial ply (5 mm thick)
on both sides double pressed and deodar wood lipping
1"x3/8" (40mm x 10mm) around shutter including
chromium plated fitting, iron hinges with aluminium kick
plate 22 SWG on both sides & finger plate complete in all
respect.
Per Sft.
Labour
113.25
Composite
511.30
Unit
sq.m
Labour
1218.30
Spec.
No.
Remarks
Composite
5501.40
Per Sft.
62.40
354.90
sq.m
671.30
3818.95
Per Sft.
106.80
313.35
sq.m
1148.95
3371.35
Per Rft.
22.95
36.70
Metre
75.20
120.35
Per Rft.
9.55
124.35
Metre
31.35
407.95
Per Sft.
55.05
180.05
sq.m
592.10
1937.60
Per Sft.
19.45
62.75
sq.m
209.35
675.25
Per Sft.
ditto
23.90
23.90
112.45
63.55
sq.m
ditto
257.00
257.00
1210.15
683.75
Rate shall be paid as per surface
area of dolly frame
e-g 0.75' x (3.5' + (2 x 7))
chapter-12(Wood Work)
Page 83
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Sft.
ditto
58.80
58.80
314.55
308.40
sq.m
ditto
632.60
632.60
3384.55
3318.35
Per Sft.
ditto
10.75
10.75
69.95
36.80
sq.m
ditto
115.50
115.50
752.70
395.90
Per Sft
Per Sft
Per Sft
Per Sft
124.35
124.35
124.35
124.35
538.45
590.05
588.75
640.35
sq.m
sq.m
sq.m
sq.m
1338.00
1338.00
1338.00
1338.00
5793.75
6348.95
6335.05
6890.30
chapter-12(Wood Work)
Page 84
The rates for all finished works include the removal of surplus debris, unused material and by products
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
a)
100 Sft.
134.90
169.30
sq.m
14.50
18.20
b)
100 Sft.
89.95
137.85
sq.m
9.70
14.85
27.7
100 Sft.
269.80
--
sq.m
29.05
27.3
100 Sft.
1079.25
--
sq.m
116.15
27.9
b)
e)
f)
316.55
239.80
494.30
330.55
sq.m
ditto
34.05
25.80
53.20
35.55
100 Sft.
ditto
191.85
163.05
286.35
240.15
sq.m
ditto
20.65
17.55
30.80
25.85
100 Sft.
ditto
316.55
239.80
498.00
377.80
sq.m
ditto
34.05
25.80
53.60
40.65
100 Sft.
ditto
191.85
163.05
286.35
240.15
sq.m
ditto
20.65
17.55
30.80
25.85
100 Lft.
ditto
163.05
115.10
257.55
192.20
Metre
ditto
5.35
3.80
8.45
6.30
d)
100 Sft.
ditto
c)
27.1
27.3 &
27.9
Remarks
Page 85
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
i) first coat
ii) each subsequent coat
g)
Composite
Unit
Labour
Spec.
No.
Composite
100 Nos.
ditto
466.45
423.90
644.20
518.40
100 Nos.
ditto
466.45
423.90
644.20
518.40
100 Nos
ditto
1066.20
629.45
1595.65
894.20
100 Nos
ditto
1066.20
629.45
1595.65
894.20
100 Sft.
ditto
463.10
163.35
693.75
384.60
sq.m
ditto
49.85
17.60
74.65
41.40
100 Sft.
ditto
196.05
138.15
355.75
263.65
sq.m
ditto
21.10
14.85
38.30
28.35
i) priming coat.
ii) each subsequent coat of paint.
100 Sft.
ditto
463.10
163.35
690.05
384.60
sq.m
ditto
49.85
17.60
74.25
41.40
100 Sft.
ditto
305.75
138.15
443.45
263.65
sq.m
ditto
32.90
14.85
47.70
28.35
100 Lft.
ditto
244.60
92.10
348.80
195.25
Metre
ditto
8.00
3.00
11.45
6.40
100 Nos.
ditto
719.4
352.20
1270.65
790.95
100 Nos.
ditto
719.4
352.20
1270.65
790.95
c)
d)
e)
f)
27.1
27.2 &
27.9
b)
Remarks
Labour
Page 86
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
g)
h)
Composite
Unit
Labour
Spec.
No.
100 Nos.
ditto
2012.00
607.00
2912.30
1393.70
100 Sft.
30.55
46.25
100 Nos.
ditto
sq.m
2012.00
607.00
2912.30
1393.70
3.30
5.00
first coat
second coat
27.10
100 Sft.
ditto
239.80
193.95
423.75
312.25
sq.m
ditto
25.80
20.85
45.60
33.60
2350.75
1258.90
2418.95
1295.45
sq.m
ditto
252.95
135.45
260.30
139.40
100 Sft.
ditto
ditto
191.85
71.95
71.95
325.35
173.10
152.10
sq.m
ditto
ditto
20.65
7.75
7.75
35.00
18.65
16.35
100 Sft.
ditto
ditto
224.85
215.85
178.05
915.95
570.25
532.50
sq.m
ditto
ditto
24.20
23.25
19.15
98.55
61.35
57.30
Per No.
9.60
10.25
Per No.
9.60
10.25
27.1
Per Letter
9.60
9.95
Per Letter
9.60
9.95
27.1
11.00
11.90
ditto
on new work
on old work
27.6
100 Sft.
ditto
Remarks
Composite
Labour
first coat
second coat
third coat
per inch
per 25 mm
height
height
ditto
11.00
11.90
ditto
13 Coaltar painting:
a)
b)
100 Sft.
ditto
201.75
122.30
740.20
465.95
sq.m
ditto
21.70
13.15
79.65
50.15
27.8
to
27.11
Page 87
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
14 Solignum painting:a)
b)
27.8
100 Sft.
ditto
168.15
254.75
195.30
298.20
sq.m
ditto
18.10
27.40
21.00
32.10
15 Creosote painting:a)
b)
ditto
100 Sft.
ditto
201.75
305.70
319.65
503.40
sq.m
ditto
21.70
32.90
34.40
54.15
100 Sft.
746.35
761.95
sq.m
80.30
82.00
27.3
100 Sft.
269.80
277.55
sq.m
29.05
29.85
ditto
Each
47.95
54.85
Each
47.95
54.85
27.1
Per Rft.
95.90
314.60
358.40
ditto
Per Lft.
47.95
157.30
170.95
27.1
Per Lft.
146.85
481.75
503.65
22 a)
b)
c)
ditto
Each
ditto
102.75
179.85
150.60
256.70
Each
ditto
102.75
179.85
150.60
256.70
27.1
Each
ditto
13.70
24.00
19.35
33.90
Each
ditto
13.70
24.00
19.35
33.90
Each
ditto
115.10
189.90
146.15
242.80
Each
ditto
115.10
189.90
146.15
242.80
100 Sft.
539.60
sq.m
58.05
Remarks
Khanki paint
Aluminium paint
27.12
27.1
100 Sft.
ditto
1079.25
1079.25
sq.m
ditto
116.15
116.15
Page 88
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
per letter
per inch
height
15.35
100 Sft.
809.40
851.40
100 Sft.
1079.25
100 Sft.
Unit
Labour
Spec.
No.
Composite
15.35
15.35
27.1
sq.m
87.10
91.60
27.9
27.10
1111.65
sq.m
116.15
119.60
27.12
899.35
914.75
sq.m
96.75
98.45
100 Sft.
269.80
291.50
sq.m
29.05
31.35
27.9
Each
191.05
199.15
Each
191.05
199.15
27.3
first coat
2nd and each subsequent coat
27.12
100 Sft.
ditto
234.15
179.85
421.35
327.15
sq.m
ditto
25.20
19.35
45.35
35.20
27.12
new surface:
i) 1st coat
ii) 2nd and subsequent coat
b)
Remarks
100 Sft.
ditto
234.15
179.85
322.65
257.20
sq.m
ditto
25.20
19.35
34.70
27.70
100 Sft.
ditto
234.15
179.85
271.15
216.20
sq.m
ditto
25.20
19.35
29.20
23.25
i) 1st coat
ii) 2nd coat
%sft
%sft
845.35
460.90
1320.30
667.90
sq.m
sq.m
90.95
49.60
142.05
71.85
old surface:
%sft
460.90
667.90
sq.m
49.60
71.85
1.45
2.35
Metre
4.70
7.65
old surface:
i) 1st coat
ii) 2nd and subsequent coat
b)
new surface:
33 Painting traffic lane 5" (125 mm) wide, with road marking
enamel.
Per Rft.
Page 89
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Rft.
1.60
9.85
Metre
5.25
32.30
Per Job
54.60
88.20
Job
54.60
88.20
Per Job
127.40
247.95
Job
127.40
247.95
Per Rft.
ditto
ditto
1.15
2.35
3.90
3.80
4.30
6.85
Metre
ditto
ditto
3.80
7.65
12.75
7.65
14.20
22.55
Per Job
25.20
73.50
Job
25.20
73.50
100 Sft.
per coat
86.35
sq.m
9.30
AASHTO
M248-91
(2000)
Page 90
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
The rates also include curing for specified period wherever necessary.
Nominal dimension of tile or brick shall be taken for the purpose of measurement and payment.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
in bed
on slope
in bed
on slope
in bed
on slope
in bed
on slope
in bed
on slope
100Sft.
ditto
600.55
820.00
100Sft.
1395.50
sq.m
ditto
64.60
88.25
1957.70
sq.m
150.15
Composite
210.65
in bed
b)
on slope
100Sft.
ditto
1021.75
1260.60
1297.90
1536.75
sq.m
ditto
109.95
135.65
139.65
165.35
ditto
100Sft.
ditto
1021.75
1260.60
1509.20
1748.05
sq.m
ditto
109.95
135.65
162.40
188.10
ditto
100Sft.
ditto
1260.60
1548.35
2427.80
2715.55
sq.m
ditto
135.65
166.60
100Cft.
ditto
5809.00
6674.60
16589.50
17455.05
cu.m
ditto
261.25
292.20
2051.75
2357.45
100Cft.
5809.00
18209.20
cu.m
2051.75
ditto
6674.60
19074.80
ditto
2357.45
6737.20
in bed
on slope
ditto
ditto
Remarks
28.1 to 28.3
Labour
Unit
Composite
Spec.
No.
Labour
28.2
100Cft.
ditto
5809.00
6674.60
22151.50
23017.05
cu.m
ditto
chapter-14(Lining of canal)
2051.75
2357.45
7823.90
8129.65
Page 91
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Composite
Unit
Labour
Spec.
No.
in bed
on slope
ditto
100Cft.
ditto
5809.00
6674.60
23771.20
24636.80
cu.m
ditto
2051.75
2357.45
8396.00
8701.70
20.1, 28.1
& 28.3
b)
Remarks
Composite
10
Labour
100Cft.
ditto
ditto
5231.95
5231.95
5231.95
19878.65
17038.75
14977.85
cu.m
ditto
ditto
1847.95
1847.95
1847.95
7021.15
6018.10
5290.20
100Cft.
ditto
ditto
6027.45
6027.45
6027.45
20674.15
17834.25
15773.35
cu.m
ditto
ditto
2128.90
2128.90
2128.90
7302.10
6299.05
5571.15
chapter-14(Lining of canal)
Page 92
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
2
3
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per
cut
152.85
Per
cut
152.85
29.129.3
Per cut
226.25
Per cut
226.25
ditto
100Sft.
3677.80
sq.m
395.75
ditto
Driving steel piles,more than 15' (4.6 m) and less than 25'
(7.5 m).
100Sft.
3524.95
sq.m
379.30
ditto
ditto
100Sft.
2607.80
sq.m
280.60
ditto
ditto
Dolleying piles.
Each
230.20
Each
230.20
ditto
Each
21.00
Each
21.00
ditto
Per Ft.
3446.95
Metre
11306.05
ditto
Turning Machine, 90
Per
Job
5143.80
Per
Job
5143.80
29.1 to
29.3
10
Per
Job
6366.60
Per
Job
6366.60
ditto
11
Per
Job
8668.70
Per
Job
8668.70
29.1 to
29.3
12
Per
Chain
10242.40
30 M.
10242.40
ditto
o.
chapter-15(Sheet piling)
Page 93
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
13
Ton
199.65
Tonne
14
Each
21086.10
15
Each
24330.15
16
per
chain
4163.55
Labour
Spec.
No.
Composite
196.50
ditto
Each
21086.10
ditto
Each
24330.15
ditto
30 M
4163.55
ditto
chapter-15(Sheet piling)
Remarks
Page 94
3
4
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
The composite rates of the items in which stone, boulders, shingle spawl are used do not contain the carriage
of the these stone materials, which will be paid separately by road, and/or rail, whichever means of transport is
adopted. The supply and carriage to site of work of all other material required in the item, is included in the
composite rates.
The carriage of stone or spawl will be paid on the basis of actual stack measurement (without any reduction
factor) of the stone, boulders, shingle or spawl carried.
Where stone, boulder or spawl is issued from stock and contractor is paid for its carriage and/or labour only;
or where such stone product is supplied, carried or handled by the contractor in which no laying is required,
the actual stack measurement (without any reduction factor) shall from the basis of payment of supply or
carriage of the stone, boulder or spawl, etc. The quantity of finished and completed item of work shall form the
basis of laying.
In case of the items in which the rates include carriage of stakes, bushing, Pilchi, sarkanda or farash, etc. within
one mile (1.6 Km.)
i)
the cost of the carriage within one mile (one Km) shall not be deducted from the carriage charges to follow thereafter
from the point of supply.
ii)
if the site of work happens to be within one mile (one Km.) of the source of supply, the materials will be collected
and measured at site of work and no extra carriage would be admissible in such cases.
iii) where the site of the work is situated at more than one mile (one Km.) distance from the source of supply, the point
of supply will be fixed carefully by the Engineer-in-charge in such a way that the carriage charges would
be arrived at, most economically. Extra carriage will be admissible from the place of supply of the
material which will be considered its starting point. The demarcation of the place of supply will be
pre-determined before calling the tenders.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
100Cft.
1025.25
cu.m
362.05
Weaving matresses.
100Cft.
1942.60
cu.m
686.05
a)
Per
Bag
30.35
45.20
Per Baq
30.35
45.2
b)
ditto
47.20
62.10
Per Baq
47.20
62.1
Per
Bag
72.65
126.10
Per
Bag
72.65
126.10
ditto
103.75
157.20
ditto
103.75
157.20
4.00 a)
b)
Remarks
Page 95
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100 Nos
269.80
b)
Per chain
per 100
Nos
97.15
ditto
37.75
c)
Labour
% Nos
269.80
Per 30 m
97.15
ditto
37.75
a)
b)
c)
100 Nos
1079.25
% Nos
1079.25
per chain
per 100Nos
377.75
Per 30 m
per %Nos
377.75
ditto
145.70
ditto
145.70
100Sft.
607.05
sq.m
65.30
b)
100Sft.
1011.80
sq.m
108.85
c)
ditto
1180.40
ditto
127.00
100 Nos
944.35
980.15
% Nos
944.35
980.15
100Cft.
1315.30
1418.50
cu.m
464.55
501
100Cft.
647.55
cu.m
228.70
Page 96
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Cft.
1953.40
cu.m
689.85
b)
ditto
1305.85
ditto
461.15
c)
ditto
1548.70
ditto
546.90
Each
84.30
129.20
Each
84.30
129.2
100Sft.
ditto
ditto
1007.15
1079.10
1079.10
1339.80
2159.10
2772.55
sq.m
ditto
ditto
108.35
116.10
116.10
144.15
232.30
298.35
100Sft.
ditto
ditto
1294.90
1438.80
1438.80
1794.95
3055.55
3973.55
sq.m
ditto
ditto
139.35
154.80
154.80
193.15
328.80
427.55
100Cft.
674.50
1004.50
cu.m
238.20
354.75
100Cft.
ditto
ditto
1180.40
1180.40
910.60
1642.40
1510.40
1966.60
cu.m
ditto
ditto
416.85
416.85
321.65
580
533.4
694.60
b)
stone or boulder
shingle or spawl
brick bats
stone or boulder
shingle or spawl
brick bats
100Cft.
ditto
ditto
2113.30
2113.30
1843.50
2575.30
2443.30
2899.50
cu.m
ditto
ditto
746.45
746.45
651.15
909.6
863.00
1024.10
100Cft.
1641.15
2697.15
cu.m
579.65
952.65
100Cft.
1978.40
17278.40
cu.m
698.80
6102.75
Page 97
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
i)
ii)
stone or boulder
shingle or spawl
Labour
100Cft.
ditto
2248.20
2248.20
100Cft.
Composite
Unit
Labour
Spec.
No.
Composite
2710.20
2578.20
cu.m
ditto
794.05
794.05
237.45
cu.m
83.85
100Cft.
1187.15
cu.m
419.30
100Sft.
674.50
1184.50
sq.m
72.60
127.45
30.1
100Sft.
1686.30
1737.30
sq.m
181.45
186.95
ditto
100Sft.
4030.80
5140.35
sq.m
433.70
553.10
100Sft.
1324.15
1427.35
sq.m
142.50
100Sft.
2266.20
2388.60
sq.m
243.85
257
100Cft.
1438.80
2167.80
cu.m
508.20
765.65
100Cft.
3743.20
4391.20
cu.m
1322.10
1550.95
100Cft.
ditto
3170.00
2832.70
3818.00
3480.70
cu.m
ditto
1119.65
1000.50
1348.5
1229.4
Remarks
957.25
910.65
153.60
one slope
on level
on level
100Cft.
865.60
1165.60
cu.m
305.75
411.70
b)
on slope
ditto
1041.35
1341.35
ditto
367.80
473.75
Page 98
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Cft.
ditto
ditto
4136.35
3799.05
2226.45
6885.65
6548.40
5056.80
cu.m
ditto
ditto
1460.95
1341.85
786.40
2432.00
2312.90
1786.05
100Sft.
ditto
1461.25
1231.90
5650.80
3333.20
sq.m
ditto
157.25
132.55
608.05
358.65
100Sft.
490.10
1150.10
sq.m
52.75
123.75
100Cft.
843.15
1743.15
cu.m
297.80
615.7
100Cft.
2994.65
cu.m
1057.70
100Cft.
1079.25
cu.m
381.20
100Cft.
865.60
1765.60
cu.m
305.75
623.60
100Cft.
865.60
1465.60
cu.m
305.75
517.65
100Cft.
809.40
cu.m
285.90
Each
27.80
Each
27.80
b)
ditto
31.25
ditto
31.25
c)
Each
41.65
ditto
41.65
d)
ditto
104.15
ditto
104.15
Page 99
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
a)
b)
Composite
100 Nos
1349.05
100 Nos
575.50
iii) Driving pegs 3.5' (1.07 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.0' (300 mm) below the available bed
or ground (average).
100 Nos
856.00
Per Chain
of One
Row
67.45
98.65
ditto
950.40
100 Nos
86.85
100 Nos
575.50
iii) Driving pegs 4' (1.20 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.0' (300 mm) below the available bed
or ground (average).
100 Nos
1005.35
Per
Chain of
one row
67.45
Labour
ditto
2450.60
100 Nos
108.60
100 Nos
606.10
1381.60
Unit
Labour
Spec.
No.
Composite
% Nos
1349.05
100 Nos
575.50
100 Nos
856.00
Per 30
Metre
of one
row
67.45
98.65
1125.25
ditto
950.40
1125.25
123.85
100 Nos
86.85
123.85
100 Nos
575.50
100 Nos
1005.35
Per
30 M of
one row
67.45
154.95
Remarks
1381.60
ditto
2450.60
100 Nos
108.60
154.95
100 Nos
606.10
Page 100
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Unit
100 Nos
100 Nos
1151.05
Per
Chain of
one row
67.45
98.65
Per chain
of one row
1146.40
1391.00
100 Nos
2698.10
100 Nos
iii) Driving pegs 6' (1.8 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.75' (530 mm) below the available
bed or ground (average).
iv) Tying pegs with Munj, Patha ban (one line,
incuding tying around the pegs).
Composite
iii) Driving pegs 5' (1.5 m) long, 3" to 6" (75 to 150
mm) dia (driven 1.5' (450 mm) below the available bed
or ground (average).
Labour
Per
30 M
of one
row
Labour
1151.05
Spec.
No.
Composite
-
67.45
98.65
Per 30 M
of one row
1146.40
1391.00
2753.70
100 Nos
2698.10
2753.7
721.20
100 Nos
721.20
100 Nos
1381.25
100 Nos
1381.25
Per
Chain of
one row
67.45
Per Chain
98.65 of one row
67.45
98.65
ditto
2787.85
3084.90
ditto
2787.85
3084.90
100 Nos
2023.55
2138.90
100 Nos
2023.55
2138.90
100 Nos
920.85
100 Nos
920.85
100 Nos
1523.35
100 Nos
1523.35
Remarks
Page 101
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Per chain
of one row
Composite
67.45
Unit
84.75 Per 30 M
of one row
Labour
Spec.
No.
Remarks
Composite
67.45
84.75
Per 30 M
of one row
3170.00
3519.45
Per
Chain of
one row
3170.00
3519.45
100 Nos
7200.00
100 Nos
7200.00
100 Nos
805.75
100 Nos
805.75
100 Nos
1669.00
100 Nos
1669.00
iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
Munj, Patha Ban, two lines, including tying around
the Bamboos.
Per
Chain of
one row
101.20
150.15
Per 30 M
of one
Row
101.20
150.15
ditto
3889.40
4343.20
ditto
3889.40
4343.20
10800.00
100 Nos
100 Nos
100 Nos
920.85
100 Nos
920.85
100 Nos
1811.10
100 Nos
1811.10
iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
S.W.G. No. 10 wire, two lines, including tying around
the Bamboos and third tie around the top end only.
Per chain
of one
row
337.25
Per 30 M
1146.00 of one Row
337.25
10800
1146.00
Page 102
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
d)
4754.95
Composite
Unit
5331.55
ditto
11400.00
100 Nos
Labour
4754.95
5331.55
100 Nos
1035.95
100 Nos
1035.95
100 Nos
2071.85
100 Nos
2071.85
iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
S.W.G. No. 10 wire, two lines, including tying around
the Bamboos and third tie around the top end only.
Per chain
of one row
337.25
ditto
5620.55
100 Nos
100 Nos
1151.05
100 Nos
1151.05
100 Nos
2302.10
100 Nos
2302.10
Per Chain
of one
Row
337.25
1146.00
Per 30 M
of one
Row
337.25
1146.00
ditto
6474.85
7243.65
ditto
6474.85
7243.65
13200.00
100 Nos
100 Nos
100 Nos
1381.25
6284.60
ditto
12600.00
100 Nos
100 Nos
11400.00
337.25
1146.00
5620.55
6284.60
1381.25
Remarks
Composite
100 Nos
Per 30 M
1146.00 of one row
Spec.
No.
ditto
Labour
12600.00
13200.00
Page 103
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
100 Nos
2762.50
Spec.
No.
Remarks
Composite
100 Nos
2762.50
iv) Tying Bamboos 2" to 5" (63 to 125 mm) dia with
S.W.G. No. 10 wire, two lines, including tying around
the Bamboos and third tie around the top end only.
Per Chain
of one
row
337.25
1146.00
Per 30 M
of one
row
337.25
1146.00
ditto
8116.00
9094.40
ditto
8116.00
9094.40
100Cft.
337.25
407.00
cu.m
119.10
143.75
100Cft.
269.80
cu.m
95.30
Per
Chain
647.55
Per
30 M
647.55
46 a)
b)
100Sft.
100Sft.
3507.50
2967.90
Sq.m
Sq.m
377.40
319.35
Page 104
17. OUTLETS
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Job
1124.20
Job
1124.20
b)
Job
1483.95
Job
1483.95
c)
Job
2248.40
Job
2248.40
d)
Job
3035.35
Job
3035.35
e)
Job
4496.80
Job
4496.80
Dismantling outlets:-
17.1
to
17.5
18.1
a)
Each
1124.20
Each
1124.20
b)
ditto
1686.30
ditto
1686.30
c)
ditto
2248.40
ditto
2248.40
d)
ditto
2810.50
ditto
2810.50
e)
ditto
1686.30
ditto
1686.30
f)
ditto
2248.40
ditto
2248.40
g)
ditto
2810.50
ditto
2810.50
Each
474.80
Each
474.80
Job
998.20
Job
998.20
18.1, 21.1
& 21.2
Each
998.20
Each
998.20
18.1, 21.1
& 21.2
854.30
Remarks
17.1
to
17.2
chapter-17(Outlet)
Page 105
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
a)
b)
Labour
Each
ditto
2698.10
3642.40
Composite
Unit
Labour
Each
ditto
2698.10
3642.40
Each
541.05
1068.25
Each
541.05
Each
1056.65
1917.65
Each
1056.65
for channel
for channel
for channel
for channel
for channel
depth of
depth of
depth of
depth of
depth of
5.0'. (1.5 m)
4.0'. (1.2 m)
3.0'. (900 mm)
2.0'. (600 mm)
less than 2.0'. (600 mm)
1294.10
1006.35
833.65
686.10
538.50
Each
ditto
ditto
ditto
ditto
1151.05
863.30
690.60
575.50
460.40
1294.10
1006.35
833.65
686.10
538.50
Each
474.80
680.30
Each
474.80
680.30
Per Lft.
23.00
Metre
75.55
Each
548.60
to
1124.20
Each
394.20
12
Each
548.60
to
1124.20
13
Each
394.20
14
ditto
21.1, 21.2
& 17.1 to
17.5
At the discretion of the
Engineer-in-charge depending upon
the distance and source of supply.
17.1 to 17.5
& 21.1 to
21.2
Rft.
ditto
102.65
43.90
112.20
53.45
Metre
ditto
336.85
144.10
368.15
175.35
16
1151.05
863.30
690.60
575.50
460.40
11
15
Composite
Each
ditto
ditto
ditto
ditto
Remarks
10
a)
b)
Spec.
No.
Rft.
ditto
89.95
33.75
Rft.
ditto
122.60
61.30
Metre
ditto
295.05
110.65
Metre
ditto
402.25
201.15
433.55
232.4
17.1
to
17.5
132.15
70.85
chapter-17(Outlet)
Page 106
Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction 1971".
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
The rates include the provision and maintenance of field test laboratory, pay of laboratory staff, cost of material for testing, etc.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Cft.
3163.35
17733.75
cu.m
1117.30
6263.55
521-1
to
521-6
100Cft.
2350.55
3838.55
cu.m
830.20
1355.80
501-1
to
501-6
a)
i)
ii)
ditto
100Cft.
100Cft.
2350.55
2350.55
2818.55
3502.55
100Cft. of
consolidated
sub-base
cu.m
cu.m
830.2
830.2
995.5
1237.1
1) The carriage of the whole distance
to the site of work shall be
calculated on the basis of the rates
of the actual means of transport
used in carriage, i.e. road and/or rail,
as the case may be.
Page 107
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
aggregate for payment of carriage shall
be taken as per actual loose volume but
not more than 120 Cft.
a)
b)
100Cft.
2732.70
5829.90
cu.m
965.20
2059.10
501-1
to
501-6
100Cft. of
consoledated
base
Providing and laying road edging of 3" (75 mm) wide and
9" (225 mm) deep brick on end, complete in all respects.
Per Rft.
7.65
37.00
Metre
25.10
121.45 552-1 to
552-5
100Sft.
134.90
692.25
sq.m
14.50
74.50 601-1 to
601-6
100Sft.
134.90
456.55
sq.m
14.50
49.15 611-1 to
611-5
612-1 to
612-6
Page 108
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
1) 1st coat:i) 40 lbs. bitumen, and 5.5 Cft. bajri of nominal size 1" (25
100Sft.
120.85
1748.50
Sq.m
13.00
188.15
100Sft.
120.85
1524.05
Sq.m
13.00
164.00
100Sft.
92.95
1092.35
Sq.m
10.00
117.55
100Sft.
92.95
813.10
Sq.m
10.00
87.50
100Sft.
63.60
621.95
sq.m
6.85
66.90
sq.metre.
ii) 18 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8"
(10 mm) per %Sft. or 0.89 Kg bitumen and 0.006 cu.metre
b)
100Cft.
cu.m
Page 109
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
a)
11
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
612-1
to
612-6
100Sft.
80.55
962.00
sq.m
8.65
103.50
ii) 20 lbs. bitumen, and 2.0 Cft. bajri of nominal size 3/8"
(10 mm) per % Sft. or 0.79 Kg bitumen and 0.006
cu.metre bajri per sq.metre.
100Sft.
80.55
873.75
sq.m
8.65
94.00
100Cft.
cu.m
per inch
thickness
per 100Sft.
-do-do-do-do-do-do-do100Cft.
per 25mm
thickness
per Sq.m
-do-do-do-do-do-do-docu.m
b)
10
Labour
783.70
783.70
783.70
783.70
783.70
783.70
783.70
2329.70
2526.20
2722.70
2919.15
3115.50
3312.15
3508.60
100Sft.
224.85
Per Rft.
118.45
641-1 to
642-6
84.35
84.35
84.35
84.35
84.35
84.35
84.35
250.75
271.90
293.05
314.20
335.35
356.50
377.65
Sq.m
24.20
Metre
388.60
I ncidental Construction
12
885.95
2906.60
901-1
to
901-4
Page 110
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
13
14
Each Set
of one
end
15
Per
Cu. Inch
16
Per Rft.
17
Each
18
19
Labour
Per Rft. of
3 rows of
Pipes
92.85
Composite
Unit
Labour
304.55
Spec.
No.
Composite
696.45
Metre
2285.00
2400.00
Each set
of one
end
18.00
cu.cm
76.45
174.15
Metre
250.75
571.35 921-1 to
921-4
38.20
342.60
Each
38.20
342.60 931-1 to
933-4
1.10
ditto
Each
Each
Each
2274.20
110.80
214.65
4589.30
339.35
554.20
Each
Each
Each
2274.20
110.80
214.65
a) Mandatory.
b) Warning/Direction/Informatory.
Each
Each
730.50
707.50
4502.45
4237.80
Each
Each
730.50
707.50
4502.45
4237.80
100Cft.
2889.35
17459.75
cu.m
1020.50
6166.80
ditto
2400.00 911-1 to
911-6
Remarks
Page 111
Rates for all finished works include the removal of surplus debris, unused material & by products.
The material used shall conform to Schedule of Rates, Vol. I, Part I, (Specifications for Materials of
Construction, 1964, and the work will be executed according to Buildings & Roads Department Specifications,
Vol II, 1966 (Public Health Works).
The rates include cutting and making good of the surface of walls, roof, floor, etc. where necessary.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Unit
Labour
Remarks
Composite
white
coloured
Each
Each
382.15
382.15
2,111.50
2,297.50
Each
Each
382.15
382.15
2,111.50
2,297.50
Each
Each
4.00
4.00
334.00
232.00
Each
Each
4.00
4.00
334.00
232.00
Each
Each
275.40
275.40
1,189.75
1,393.75
Each
Each
275.40
275.40
1,189.75
1,393.75
Composite
Spec.
No.
Labour
bakelite
plastic
white
coloured
Each
275.40
2,027.40
Each
275.40
2,027.40
Each
275.40
613.75
Each
275.40
613.75
Each
Each
Each
Each
359.70
359.70
317.55
317.55
2,465.70
2,651.70
1,721.55
1,769.55
Each
Each
Each
Each
359.70
359.70
317.55
317.55
2,465.70
2,651.70
1,721.55
1,769.55
Providing and fixing stainless steel sink with drain board, size
120x60 cm (48"x24") including bracket set, waste pipe and
waste coupling.
Each
317.55
4,409.75
Each
317.55
4,409.75
Each
317.55
1,109.95
Each
317.55
1,109.95
Page 112
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
60x45 cm (24"x18")
37.5x45 cm (15"x18")
10
11
Unit
Labour
Remarks
Composite
white
coloured
Each
Each
317.55
317.55
1,687.05
1,507.05
Each
Each
317.55
317.55
1,687.05
1,507.05
Each
191.05
893.95
Each
191.05
893.95
Each
Each
317.55
317.55
1,317.35
1,395.35
Each
Each
317.55
317.55
1,317.35
1,395.35
Each
Each
317.55
317.55
1,155.35
1,155.35
Each
Each
317.55
317.55
1,155.35
1,155.35
Each
317.55
1,342.30
Each
317.55
1,342.30
Each
Each
336.65
336.65
2,459.40
1,619.40
Each
Each
336.65
336.65
2,459.40
1,619.40
Each
19.10
191.15
Each
19.10
191.15
Each
Each
19.10
19.10
479.15
227.15
Each
Each
19.10
19.10
479.15
227.15
Each
25.50
410.80
Each
25.50
410.80
Each
Each
25.50
25.50
355.55
295.55
Each
Each
25.50
25.50
355.55
295.55
white
coloured
13
Providing and fixing white enameled cast iron low down flushing
cistern 13.63 litres (3 gallons) capacity, including bracket
set, copper connection, etc.
14
15
16
white
coloured
17
18
19
Composite
Spec.
No.
12
Labour
Each
47.75
379.9
Each
47.75
379.9
Page 113
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
20
Composite
Each
Each
59.70
38.20
382.65
83.80
Each
Each
59.70
38.20
382.65
83.80
White
Coloured
Each
Each
59.70
59.70
937.05
1,069.05
Each
Each
59.70
59.70
937.05
1,069.05
Each
Each
Each
Each
19.10
25.50
25.50
25.50
158.80
223.60
247.60
429.20
Each
Each
Each
Each
19.10
25.50
25.50
25.50
158.80
223.60
247.60
429.20
Each
Each
25.50
25.50
541.50
697.50
Each
Each
25.50
25.50
541.50
697.50
Each
Each
25.50
25.50
277.50
181.50
Each
Each
25.50
25.50
277.50
181.50
Each
37.45
491.85
Each
37.45
491.85
Each
Each
25.50
25.50
349.50
331.50
Each
Each
25.50
25.50
349.50
331.50
Each
25.50
451.50
Each
25.50
451.50
Each
Each
25.50
25.50
331.50
409.50
Each
Each
25.50
25.50
331.50
409.50
24
Labour
23
Unit
Remarks
22
Composite
Spec.
No.
21
Labour
2 cm (")
1.5 cm (")
2 cm (")
1.5 cm (")
25
26
27
28
1.5x10 cm ("x4")
2x15 cm ("x6")
Page 114
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
29
30
31
30 mm (1") dia
40 mm(1") dia
50 mm(2") dia
65 mm(2") dia
80 mm(3") dia
Each
Labour
31.85
Composite
1,555.85
Each
Each
Each
Each
Each
38.20
38.20
38.20
38.20
38.20
440.20
590.20
818.20
1,286.20
1,898.20
Each
Each
Each
Each
Each
38.20
38.20
38.20
38.20
38.20
440.20
590.20
818.20
1,286.20
1,898.20
Each
Each
Each
25.50
38.20
50.95
373.50
638.20
776.95
Each
Each
Each
25.50
38.20
50.95
373.50
638.20
776.95
Each
Each
25.50
25.50
145.50
229.50
Each
Each
25.50
25.50
145.50
229.50
Each
Each
76.45
76.45
394.05
394.05
Each
Each
76.45
76.45
394.05
394.05
Each
Each
63.70
63.70
461.05
131.05
Each
Each
63.70
63.70
461.05
131.05
Each
95.55
707.00
Each
95.55
707.00
Per foot
Per foot
32.20
12.90
229.40
97.30
Metre
Metre
105.65
42.25
752.45
319.15
Per foot
Per foot
7.10
2.85
148.15
81.60
Metre
Metre
23.30
9.35
485.85
267.60
13 mm (") dia
20 mm (") dia
34
1,555.85
Unit
Remarks
33
31.85
Composite
Spec.
No.
32
Each
Labour
10x5 cm (4"x2")
10x7.5 cm (4"x3")
35
36
ii)
Page 115
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
37
Composite
60 (2)" mm i/d
80 (3") mm i/d
100 (4") mm i/d
150 (6") mm i/d
Per foot
Per foot
Per foot
Per foot
5.70
6.30
7.10
9.50
30.35
71.25
106.10
132.00
26.25
16.00
154.50
114.90
Composite
Metre
Metre
Metre
Metre
18.65
20.75
23.30
31.10
99.60
233.70
348.00
433.05
Kg
Kg
26.25
16.00
154.50
114.90
Each
Each
Each
38.20
38.20
62.20
194.20
866.20
1,466.20
Each
Each
Each
38.20
38.20
62.20
194.20
866.20
1,466.20
Per foot
16.10
64.10
Metre
52.85
210.25
i)
single way
ii) two way
iii) three way
Each
Each
Each
25.50
38.20
50.95
199.50
302.20
494.95
Each
Each
Each
25.50
38.20
50.95
199.50
302.20
494.95
42
Each
19.10
50.00
Each
19.10
50.00
43
4.00
144.75
94.00
106.00
Each
Each
4.00
144.75
94.00
106.00
Each
Each
6.35
6.35
84.35
126.35
Each
Each
6.35
6.35
84.35
126.35
Each
382.15
Each
382.15
40
41
a)
b)
15 mm (") dia
20 mm (") dia
45
Remarks
44
Labour
39
Unit
Spec.
No.
38
Labour
15 mm (") dia
20 mm (") dia
Replacement
1
Page 116
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
i)
ii)
2
38.20
38.20
122.20
128.20
Each
Each
38.20
38.20
122.20
128.20
3 cm (1")
4 cm (1")
Each
Each
1.55
1.55
48.35
55.55
Each
Each
1.55
1.55
48.35
55.55
3 cm (1")
4 cm (1")
Each
Each
19.10
19.10
45.50
51.50
Each
Each
19.10
19.10
45.50
51.50
3 cm (1")
4 cm (1")
Each
Each
17.00
17.00
43.40
49.40
Each
Each
17.00
17.00
43.40
49.40
3 cm (1") i/d
4 cm (1")
Each
Each
38.20
38.20
554.20
674.20
Each
Each
38.20
38.20
554.20
674.20
Each
Each
38.20
38.20
167.80
184.60
Each
Each
38.20
38.20
167.80
184.60
Each
Each
15.30
15.30
47.70
86.10
Each
Each
15.30
15.30
47.70
86.10
Each
Each
Each
Each
Each
Each
31.85
31.85
31.85
31.85
31.85
31.85
235.85
301.85
361.85
391.85
547.85
925.85
Each
Each
Each
Each
Each
Each
31.85
31.85
31.85
31.85
31.85
31.85
235.85
301.85
361.85
391.85
547.85
925.85
Each
Each
Composite
Labour
Unit
Remarks
Composite
Spec.
No.
3 cm (1")
4 cm (1")
Labour
Page 117
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
B)
Labour
Composite
17.1
100Rft
ditto
1,089.45
1,089.45
4,406.95
4,209.75
Metre
ditto
35.75
35.75
144.55
138.10
100Rft
ditto
1,633.95
1,633.95
6,415.95
6,117.40
ditto
ditto
53.60
53.60
210.45
200.65
ratio 1:3
ratio 1:5
ratio 1:6
17.1
100Sft.
ditto
ditto
1,605.90
1,605.90
1,605.90
6,223.60
5,907.60
5,818.70
Sqm.
ditto
ditto
172.80
172.80
172.80
669.65
635.65
626.10
Unit
ratio 1:3
ratio 1:5
ratio 1:6
17.1
100Sft.
ditto
ditto
2,276.75
2,276.75
2,276.75
9,237.75
8,730.95
8,604.80
Sqm.
ditto
ditto
245.00
245.00
245.00
994.00
939.45
925.90
Remarks
Composite
Spec.
No.
Labour
ratio 1:3
ratio 1:5
ratio 1:6
17.2
100Sft.
ditto
ditto
1,548.35
1548.35
1548.35
6,166.10
5850.05
5761.15
chapter-20(Surface Drainage)
Sqm.
ditto
ditto
166.60
166.6
166.6
663.45
629.45
619.9
Page 118
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Unit
Labour
ratio 1:3
ratio 1:5
ratio 1:6
Type I
Type II
Type III
Type IV
Type V
Type VI
Type VII
Type VIII
Type IX
Type X
Type XI
Type XII
Laying R.C.C hume pipes in position, including jointing:a) 6" to 12" (150 mm to 300 mm ) dia
b) 12" to 24" (300 mm to 600 mm) dia
c) 24" to 36" (600 mm to 900 mm) dia
Remarks
Composite
17.2
100Sft.
ditto
ditto
2,402.70
2,402.70
2,402.70
9,363.75
8,856.90
8,730.75
Sqm.
ditto
ditto
258.55
258.55
258.55
1,007.55
953.00
939.45
Composite
Spec.
No.
Labour
17.1
Per Rft
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
36.95
73.90
97.60
116.35
153.90
177.10
196.30
219.20
294.40
323.30
361.15
385.00
95.10
178.20
232.90
277.95
379.10
434.90
479.60
539.20
760.65
833.85
927.25
984.45
Metre
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
121.20
242.45
320.05
381.60
504.85
580.85
643.80
719.05
965.60
1,060.45
1,184.60
1,262.85
311.90
584.40
763.90
911.75
1,243.45
1,426.40
1,573.05
1,768.55
2,494.85
2,735.05
3,041.45
3,229.00
Per Lft.
ditto
ditto
69.25
109.70
138.50
72.80
116.85
149.20
Metre
ditto
ditto
227.15
359.90
454.25
238.80
383.25
489.45
chapter-20(Surface Drainage)
Page 119
21. SEWERAGE
1
2
Specification No. correspond to Book of Specification of B&R Department Vol. II, 1966 (Public Health Works).
Rate for all finished works include the removal of surplus debris, unused material and byproducts.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Composite
Unit
Labour
Spec.
No.
Chapter - 8
Rft.
Rft.
Rft.
18.45
22.20
43.05
86.60
130.55
334.70
Metre
Metre
Metre
60.50
72.80
141.20
284.05
428.20
1097.80
ditto
Rft.
Rft.
Rft.
Rft.
Rft.
13.80
16.65
26.75
28.70
29.15
54.00
72.65
98.50
117.65
129.05
Metre
Metre
Metre
Metre
Metre
45.25
54.60
87.75
94.15
95.60
177.10
238.30
323.10
385.90
423.30
Remarks
Composite
Labour
ditto
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
43.85
55.10
66.30
82.95
95.50
141.65
169.85
211.60
260.35
338.75
638.5
882.5
1122.7
1761.15
2186.35
402.55
494.25
539.90
690.05
824.05
1140.10
1223.90
1430.20
1912.85
2479.95
3317.25
4161.5
4766
5768.8
6558.30
chapter-21(Sewerage)
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
143.85
180.75
217.45
272.10
313.25
464.60
557.10
694.05
853.95
1111.1
2094.3
2894.6
3682.45
5776.55
7171.25
1320.35
1621.15
1770.85
2263.35
2702.90
3739.55
4014.40
4691.05
6274.15
8134.25
10880.6
13649.7
15632.5
18921.65
21511.20
Page 120
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Composite
Unit
Labour
Remarks
Chapter-8
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
43.85
55.10
66.30
82.95
95.50
141.65
169.85
211.60
260.35
338.75
648.35
896.30
1139.95
1788.75
2220.85
499.20
613.85
764.15
931.70
1083.35
1292.30
1560.50
1747.00
2279.40
2938.65
3645.00
4598.65
5666.50
7400.85
9167.75
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
143.90
180.65
217.45
272.05
313.25
464.60
557.20
694.00
854.00
1111.10
2126.65
2939.90
3738.95
5867.10
7284.40
1637.40
2013.45
2506.40
3056.00
3553.40
4238.75
5118.45
5730.15
7476.45
9638.75
11955.60
15083.55
18586.10
24274.80
30070.20
Spec.
No.
Composite
Labour
Chapter - 8
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
43.85
55.10
66.30
82.95
95.50
141.65
169.85
211.60
260.35
338.75
648.35
896.30
1139.95
1788.75
2220.85
589.85
737.85
885.85
1038.10
1225.80
1583.20
1827.60
2045.65
2819.60
3461.05
4345.55
5649.40
7109.05
9359.85
11126.75
chapter-21(Sewerage)
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
143.90
180.65
217.45
272.05
313.25
464.60
557.20
694.00
854.00
1111.10
2126.40
2940.10
3738.95
5867.10
7284.40
1934.70
2420.15
2905.65
3404.90
4020.70
5192.85
5994.70
6709.75
9248.30
11352.25
14253.40
18530.00
23317.70
30700.20
36495.70
Page 121
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Composite
Unit
Labour
Spec.
No.
Rft of
laid sewer
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
Metre of
273.15 laid sewer
510.2
ditto
880.55
ditto
1278.4
ditto
1794.55
ditto
2219
ditto
2653.35
ditto
3046.40
ditto
3282.35
ditto
3788.60
ditto
4219.20
ditto
4681.90
ditto
Remarks
Composite
Labour
895.9
1673.45
2888.15
4193.25
5886.05
7278.35
8702.95
9992.20
10766.20
12426.65
13839.00
15356.70
16.2
a)
Each
771.10
3248.55
Each
771.10
3248.55
b)
ditto
771.10
3023.55
ditto
771.10
3023.55
Each
2319.10
8865.70
Each
2319.10
8865.70
ditto
100Sft.
954.40
1493.25
Sq.m
102.70
160.65
14.4
10
100Sft.
1396.00
3401.45
Sq.m
150.20
366.00
13.1
11
100Sft.
846.65
2260.50
Sq.m
91.10
243.25
13.1
12
13.1
a)
Carpetted road, with 2" (50 mm) carpet and 10" (250
mm) depth of stone metal for sub-base and base.
100Sft.
2213.80
6613.45
Sq.m
238.20
711.60
b)
Carpeted road, with 1" (38 mm) carpet and 6" (150
mm) depth of stone metal, for sub-base and base.
100Sft.
1568.10
4849.45
Sq.m
168.75
521.80
c)
100Sft.
866.80
3325.80
Sq.m
93.25
357.85
chapter-21(Sewerage)
Page 122
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
13
Labour
Composite
Unit
Labour
Spec.
No.
Composite
14.7
Each
81.65
223.85
Each
81.65
223.85
14
Per
set
216.65
Per
set
216.65
ditto
15
Per
set
141.85
2974.80
Per
set
141.85
2974.80
ditto
Per
set
305.45
4211.15
Per
set
305.45
4211.15
Per
set
273.60
2384.40
Per
set
273.60
2384.40
ditto
17
Per
set
227.45
3668.30
Per
set
227.45
3668.30
ditto
18
100Cft.
770.90
825.15
cum
272.30
291.45
16.2
19
14.6
b)
Remarks
Per Cwt
ditto
ditto
ditto
216.40
240.45
259.70
271.70
2677.00
2707.95
2725.45
2737.85
%kg
ditto
ditto
ditto
426.00
473.30
511.20
534.85
5269.75
5330.55
5365.10
5389.45
Per Cwt
ditto
ditto
ditto
192.45
207.40
222.05
267.30
2649.35
2663.65
2678.10
2723.20
%kg
ditto
ditto
ditto
378.85
408.25
437.15
526.20
5215.25
5243.40
5271.85
5360.60
chapter-21(Sewerage)
Page 123
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
c)
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
20
Labour
Per Cwt
ditto
ditto
171.10
220.00
256.70
Per well
Per well
6002.70
11915.65
2628.75
2674.65
2710.60
%kg
ditto
ditto
336.85
433.10
505.30
5174.70
5265.05
5335.80
chapter-21(Sewerage)
Per well
Per well
6002.70
11915.65
Page 124
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
Well curbs to be laid at spring level or as deep as possible.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
b)
c)
1000 Cft.
cu.m
ditto
ditto
ditto
ditto
4009.35
4187.40
4710.85
5406.95
ditto
ditto
ditto
ditto
141.60
147.90
166.40
190.95
1000 Cft.
ditto
ditto
ditto
4883.55
5104.75
5579.65
6275.75
cu.m
ditto
ditto
ditto
172.50
180.30
197.05
221.65
1000 Cft.
ditto
ditto
ditto
10533.30
10911.05
11375.10
12211.50
cu.m
ditto
ditto
ditto
372.05
385.40
401.75
431.30
1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
21584.65
26980.80
32376.95
37773.10
43169.30
48565.45
53961.60
59357.75
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
762.35
952.95
1143.55
1334.15
1524.75
1715.35
1905.90
2096.50
1000 Cft.
ditto
ditto
ditto
ditto
29678.90
35075.05
40471.20
45867.35
51263.50
cu.m
ditto
ditto
ditto
ditto
1048.25
1238.85
1429.45
1620.05
1810.65
in hard soil
i) from 0' to 5'(0 to 1.5 metre) depth
ii) from 5.1' to 10'(1.5 to 3.0 metre) depth
iii) from 10.1' to 15'(3.0 to 4.5 metre) depth
iv) from 15.1' to 20'(4.5 to 6.0 metre) depth
in hard strata, such as shingle, gravel, etc.
i) from 0' to 5'(0 to 1.5 metre) depth
ii) from 5.1' to 10'(1.5 to 3.0 metre) depth
iii) from 10.1' to 15'(3.0 to 4.5 metre) depth
iv) from 15.1' to 20'(4.5 to 6.0 metre ) depth
Labour
b)
chapter-22(Sinking of Wells)
Page 125
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Remarks
Composite
ditto
ditto
ditto
56659.70
62055.85
67452.00
ditto
ditto
ditto
2001.20
2191.80
2382.40
1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
40471.20
45867.35
51263.50
51938.05
62055.85
67452.00
72848.15
78244.30
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
1429.45
1620.05
1810.65
1834.45
2191.80
2382.40
2573.00
2763.60
1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
32798.10
69696.00
85779.70
111513.60
123904.00
139392.00
142966.15
146728.40
159305.15
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
1158.45
2461.65
3029.75
3938.65
4376.30
4923.35
5049.55
5182.45
5626.65
1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
44818.80
56023.50
67228.20
89637.55
103427.95
112046.95
122233.05
126845.60
134456.35
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
* 841-1
to
841-9
* 841-1
to
841-9
* 841-1
to
Unit
Composite
Spec.
No.
Labour
1583.00
1978.75
2374.50
3166.00
3653.10
3957.50
4317.25
4480.20
4749.00
Page 126
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Ratio 1:1:3
ratio 1:2:4
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
841-9
1000 Cft.
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
61116.55
74698.00
89637.55
122233.05
134456.35
149395.95
156344.60
160067.10
176916.25
cu.m
ditto
ditto
ditto
ditto
ditto
ditto
ditto
ditto
2158.65
2638.35
3166.00
4317.25
4749.00
5276.65
5522.10
5653.55
6248.70
83687.85
Per Cft.
920.10
2369.40
cu.m
32497.40
Each
305.70
Each
305.70
* 841-1
to
841-9
Per Cft.
ditto
200.45
200.45
409.70
379.60
cu.m
ditto
7079.15
7079.15
14470.70
13407.30
100Kg
719.40
9877.90
100Kg
719.40
9877.90
10
100Cft.
6521.35
21490.55
cu.m
2303.35
7590.45
841-1 to
841-9
21.1 to
The rate includes dismantling of false
21.5 & 18.1 masonry, scraping bricks obtained
from dismantling and credit of
byproducts.
Specification No. correspond to Book of "Standard Specification for Road and Bridge Construction, 1971".
chapter-22(Sinking of Wells)
Page 127
Specification No. correspond to Book of "Specification for B&R Department, 1966, Vol. II (Public Health Works)".
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Unit
Labour
Remarks
Composite
Chap. 2
Per Rft.
of bore
ditto
ditto
ditto
ditto
ditto
ditto
ditto
191.05
260.65
472.70
718.45
936.55
1184.35
1284.65
1934.45
2052.25
Composite
Spec.
No.
Labour
ditto
Per Rft.
of bore
ditto
ditto
ditto
ditto
ditto
795.40
1119.50
1269.50
1451.35
1576.75
2270.20
2387.95
ditto
Per Rft.
of bore
ditto
ditto
ditto
ditto
ditto
1111.40
1433.45
1600.45
1804.40
1908.70
2494.20
2616.05
Chap. 2
Rft of bore
chapter-23(Tubewell)
1933.40
Page 128
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
b)
c)
d)
e)
5
10"
12"
15"
18"
ditto
ditto
ditto
ditto
Composite
658.35
692.05
930.25
934.00
Unit
Labour
of bore
ditto
ditto
ditto
Spec.
No.
2159.45
2269.85
3051.30
3063.45
ditto
Per Rft.
of bore
ditto
446.35
641.90
Per Metre
of bore
ditto
1464.00
2105.50
Rft
of bore
ditto
446.35
641.90
Per Metre
of bore
ditto
1464.00
2105.50
ditto
Per Rft.
of bore
ditto
1006.65
1361.45
Per Metre
of bore
ditto
3301.80
4465.55
ditto
ditto
1006.65
1361.45
ditto
ditto
3301.80
4465.55
Job for
complete bore
704.20
10940.20
Job for
complete bore
704.20
10940.20
Per Set
of 2
bottles
118.80
170.70
Per Set
of 2
bottles
118.80
170.70
Remarks
Composite
Labour
ditto
Chap. 2
ditto
Per Rft.
Per Rft.
28.20
28.20
chapter-23(Tubewell)
92.50
92.55
2537.80
3719.05
Page 129
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)
o)
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Labour
37.60
42.65
47.00
55.20
67.45
67.45
76.20
76.20
77.45
89.10
89.10
105.45
106.70
Composite
1420.45
1674.35
1794.20
2149.95
2768.05
2823.70
2909.10
3680.85
4189.25
5160.60
5864.10
6477.90
7437.80
Unit
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Labour
123.40
139.90
154.25
181.05
221.20
221.20
249.95
249.95
254.00
292.25
292.25
345.85
349.90
Spec.
No.
Composite
4659.15
5491.85
5885.05
7051.80
9079.20
9261.70
9541.85
12073.20
13740.70
16926.80
19234.25
21247.50
24395.90
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
129.75
129.75
216.55
216.55
292.40
292.40
360.35
360.35
360.35
432.50
432.50
520.15
565.75
565.75
597.80
788.75
1509.65
1895.10
2393.20
2772.10
3075.90
3409.75
4348.65
5228.45
6429.20
7332.30
8133.25
8944.05
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
129.75
129.75
216.55
216.55
292.40
292.40
360.35
360.35
360.35
432.50
432.50
520.15
565.75
565.75
597.80
788.75
1509.65
1895.10
2393.20
2772.10
3075.90
3409.75
4348.65
5228.45
6429.20
7332.30
8133.25
8944.05
Remarks
Chap. 2
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
20.80
23.70
25.15
29.45
40.20
41.15
41.15
Per Rft.
14.55
121.60
178.50
241.15
317.45
760.20
1133.15
1517.15
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
68.20
77.80
82.45
96.65
131.80
134.90
134.90
398.85
585.55
790.95
1041.25
2493.40
3716.65
4976.15
47.70
177.6
chapter-23(Tubewell)
Page 130
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
b)
c)
d)
e)
f)
g)
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
14.90
15.00
20.80
23.65
25.15
45.50
60.50
91.80
186.40
292.45
427.15
615.50
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
48.80
49.25
68.25
77.55
82.40
149.30
198.35
301.15
611.45
959.25
1401
2018.9
Each
Each
Each
Each
Each
Each
Each
Each
10.50
11.80
12.85
16.75
19.90
21.00
24.45
24.45
63.30
83.80
124.45
181.15
353.50
489.00
660.45
684.45
Each
Each
Each
Each
Each
Each
Each
Each
10.50
11.80
12.85
16.75
19.90
21.00
24.45
24.45
63.30
83.80
124.45
181.15
353.50
489.00
660.45
684.45
Each
Each
Each
Each
Each
Each
Each
7.15
7.55
7.85
10.50
11.80
12.85
16.75
34.75
48.35
67.85
90.90
118.60
166.45
217.15
Each
Each
Each
Each
Each
Each
Each
7.15
7.55
7.85
10.50
11.80
12.85
16.75
34.75
48.35
67.85
90.90
118.60
166.45
217.15
a)
b)
c)
d)
e)
f)
g)
h)
ii)
a)
b)
c)
d)
e)
f)
g)
Chap.
2
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
78.10
78.10
97.70
97.70
139.45
139.45
162.70
162.70
162.70
195.25
195.25
239.10
257.70
257.70
259.00
337.90
443.05
785.90
953.05
1088.65
1340.10
1513.90
1935.10
2280.25
2801.50
3479.45
3858.10
4218.10
chapter-23(Tubewell)
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
256.15
256.15
320.45
320.45
457.40
457.40
533.65
533.65
533.65
640.40
640.40
784.25
845.25
845.25
849.55
1108.30
1453.20
2577.80
3126.00
3570.75
4395.60
4965.60
6347.15
7479.20
9188.90
11412.55
12654.50
13835.40
Page 131
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Remarks
ditto
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
27.40
31.00
32.45
38.90
51.80
54.00
64.50
61.40
127.30
181.75
242.15
332.30
503.60
756.00
1043.70
1233.20
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
89.85
101.70
106.40
126.20
169.85
177.15
211.55
201.40
417.50
596.15
794.20
1088.55
1651.75
2479.70
3423.35
4044.95
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
17.20
17.55
18.60
23.55
31.00
32.45
39.70
52.30
63.45
88.80
178.35
288.40
418.55
595.90
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
56.50
57.55
61.10
77.30
101.70
106.40
130.25
171.60
208.10
291.35
585.05
945.95
1372.80
1954.55
ii)
786.15
32.00
953.10
Per
Hour
ditto
86.15
cu.m
786.15
953.10
1130.25
3042.80
a)
b)
c)
d)
e)
f)
g)
h)
Chap.
2
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
53.55
66.35
83.35
98.30
118.10
178.80
209.85
270.60
chapter-23(Tubewell)
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
1) Pipes to be supplied by
Government.
2) Providing and installing specials
and valves is not included in the
rate, which is payable separately.
175.60
217.60
273.40
322.45
387.40
586.40
688.40
887.50
Page 132
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
i)
Labour
Per Rft.
Composite
Unit
Labour
Spec.
No.
Composite
1168.55
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
24.20
26.75
38.10
41.95
49.25
68.40
80.20
110.55
140.80
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
11.65
13.30
17.10
19.15
26.15
33.00
39.25
56.15
67.25
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
a)
b)
c)
d)
e)
f)
g)
h)
i)
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
1) Pipes to be supplied by
Government.
2) Providing and installing specials
and valves is not included in the
rate, which is payable separately.
Chap. 2
1) Pipes to be supplied by
Government.
2) Providing and installing specials
and valves is not included in the
rate, which is payable separately.
38.25
43.55
56.10
62.90
85.70
108.30
128.75
184.25
220.60
Chap.
2
Light Quality
" i/d (15 mm) 2mm thick
" i/d (20 mm) 2.35mm thick
1" i/d (25 mm) 2.65mm thick
1" i/d (32 mm) 2.65mm thick
1" i/d (40 mm) 2.9mm thick
2" i/d (50 mm) 2.9mm thick
2" i/d (65 mm) 3.25mm thick
3" i/d (75 mm) 3.25mm thick
4" i/d (100 mm) 3.65mm thick
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
9.70
10.55
11.90
12.00
12.10
13.55
14.15
16.30
17.55
57.35
78.25
107.75
137.80
173.55
216.05
292.35
342.40
477.75
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
31.75
34.55
39.00
39.30
39.65
44.45
46.40
53.50
57.55
188.15
256.60
353.45
452.00
569.20
708.60
958.85
1123.05
1566.95
ditto
79.35
87.80
125.00
137.65
161.60
224.30
263.05
362.40
461.80
Remarks
Per Rft.
Per Rft.
9.70
10.55
chapter-23(Tubewell)
31.75
34.55
222.20
279.90
Page 133
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
c)
d)
e)
f)
g)
h)
i)
j)
k)
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
11.9
12.00
12.30
13.55
14.15
16.30
17.55
20.30
20.65
123.7
156.90
180.25
247.25
314.20
402.70
572.45
768.65
904.55
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
39
39.30
40.35
44.45
46.40
53.50
57.55
66.65
67.65
405.65
514.65
591.15
811.00
1030.65
1320.90
1877.70
2521.10
2966.95
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
9.70
10.55
11.90
12.00
12.30
13.55
14.15
16.30
17.55
20.30
20.65
93.65
121.15
178.10
228.50
259.15
354.75
443.90
570.25
775.35
958.75
1131.75
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
31.80
34.55
39.00
39.30
40.35
44.45
46.40
53.50
57.55
66.65
67.65
307.1
397.45
584.1
749.55
850
1163.6
1456.05
1870.45
2543.2
3144.7
3712.2
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
PS 428 &
ISO 160
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
13.15
13.90
19.05
26.25
34.15
43.45
50.15
56.60
66.75
78.45
93.45
99.45
108.95
122.40
220.10
286.95
453.75
759.70
1034.55
1367.10
1970.10
2501.80
3116.85
3833.60
5289.40
8405.70
9620.95
14824.30
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
43.10
45.60
62.45
86.05
111.95
142.55
164.55
185.65
218.95
257.25
306.50
326.20
357.35
401.55
721.85
941.25
1488.25
2491.85
3393.25
4484.15
6461.90
8205.85
10223.20
12574.20
17349.15
27570.65
31556.70
48623.75
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
13.15
13.90
19.05
26.25
34.15
43.45
50.15
220.10
315.10
543.10
857.60
1196.10
1664.55
2869.70
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
43.10
45.60
62.45
86.05
111.95
142.55
164.55
721.85
1033.60
1781.30
2813.00
3923.20
5459.75
9412.70
chapter-23(Tubewell)
PS 428 &
ISO 160
Page 134
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Rft.
Per Rft.
Per Rft.
Per Rft.
56.60
66.75
78.45
94.70
3665.80
4497.50
5351.35
7533.00
Per Metre
Per Metre
Per Metre
Per Metre
185.65
218.95
257.25
310.55
12023.85
14751.80
17552.45
24708.15
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
13.15
13.90
19.05
26.25
34.15
43.45
50.15
56.60
66.75
78.45
220.10
357.95
650.80
1148.95
1695.50
2472.40
4136.55
5342.70
6431.40
7848.30
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
43.10
45.60
62.45
86.05
111.95
142.55
164.55
185.65
218.95
257.25
721.85
1174.10
2134.60
3768.50
5561.20
8109.45
13567.95
17524.00
21095.05
25742.45
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
3.90
4.95
6.10
6.40
9.10
12.00
14.85
19.15
3.15
3.85
4.90
6.00
6.30
105.80
158.75
219.95
305.65
469.90
728.05
1013.65
1214.40
74.75
161.75
267.45
399.80
573.65
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
12.80
16.30
19.95
21.00
29.75
39.35
48.75
62.85
10.40
12.65
16.15
19.70
20.70
b)
Per Kg.
Per Kg.
Per Kg.
21.60
11.80
8.90
120.15
110.30
107.45
Per Kg
Per Kg
Per Kg
21.60
11.80
8.90
PS 428 &
ISO 160
Chap
2
ditto
9.1
347.05
520.65
721.50
1002.60
1541.30
2388.00
3324.75
3983.20
245.25
530.55
877.30
1311.40
1881.55
Remarks
120.15
110.30
107.45
chapter-23(Tubewell)
Page 135
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
flanged joints:i)
3" to 6" (75 to 150 mm) i/d
ii) 8" to 12" (200 to 300 mm) i/d
iii) 15" to 18" (375 to 450 mm) i/d
c)
Per Kg
Per Kg
Per Kg
8.90
2.35
3.95
107.45
100.90
100.90
Per Kg
Per Kg
Per Kg
8.90
2.35
3.95
107.45
100.90
100.90
Per Kg
Per Kg
Per Kg
12.00
12.00
12.00
110.55
110.55
110.55
Per Kg
Per Kg
Per Kg
12.00
12.00
12.00
110.55
110.55
110.55
9.1
Per Kg
Per Kg
Per Kg
12.15
6.30
5.05
110.70
104.85
103.60
Per Kg
Per Kg
Per Kg
12.15
6.30
5.05
110.70
104.85
103.60
9.1
Each
Each
Each
Each
Each
Each
Each
Each
Each
779.55
848.35
1527.05
1627.90
1900.75
3237.65
3638.25
4825.50
5553.85
6683.55
7868.35
9687.05
13027.90
22780.75
29397.65
38018.25
58825.50
119553.85
Each
Each
Each
Each
Each
Each
Each
Each
Each
779.55
848.35
1527.05
1627.90
1900.75
3237.65
3638.25
4825.50
5553.85
6683.55
7868.35
9687.05
13027.90
22780.75
29397.65
38018.25
58825.50
119553.85
9.1
Each
Each
Each
Each
Each
Each
Each
Each
428.45
520.45
649.00
1051.45
1344.35
1596.70
1884.55
2226.60
5468.45
6280.45
10609.00
19051.45
24024.35
29796.70
57084.55
101826.60
Each
Each
Each
Each
Each
Each
Each
Each
428.45
520.45
649.00
1051.45
1344.35
1596.70
1884.55
2226.60
5468.45
6280.45
10609.00
19051.45
24024.35
29796.70
57084.55
101826.60
Each
58.30
4738.30
Each
58.30
4738.30
9.1
chapter-23(Tubewell)
Page 136
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
ditto
a)
single
Each
123.80
3363.80
Each
123.80
3363.80
b)
double
Each
123.80
7623.80
Each
123.80
7623.80
ditto
a)
Per Kg
33.50
110.55
Per Kg
33.50
110.55
b)
Per Kg
21.05
98.05
Per Kg
21.05
98.05
c)
Per Kg
17.90
94.90
Per Kg
17.90
94.90
55.60
69.45
63.95
Per cm i/d
of pipe
ditto
ditto
Per Inch
i/d of pipe
ditto
ditto
22.25
27.80
25.55
ii)
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
17.40
17.40
18.55
18.65
21.65
24.60
24.65
264.20
359.10
448.40
573.25
779.65
963.00
1135.20
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
57.10
57.10
60.85
61.15
71.05
80.75
80.90
866.55
1177.90
1470.75
1880.25
2557.30
3158.55
3723.50
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
19.85
18.65
20.95
21.00
24.25
27.40
27.55
205.80
277.20
352.05
448.90
638.10
854.45
1004.30
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
65.10
61.10
68.70
68.85
79.50
89.90
90.40
675.10
909.20
1154.80
1472.35
2093.00
2802.65
3294.15
chapter-23(Tubewell)
Page 137
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
ii)
Each
Each
Each
Each
92.00
104.85
131.05
135.15
218.00
374.85
659.05
904.35
Each
Each
Each
Each
92.00
104.85
131.05
135.15
218.00
374.85
659.05
904.35
Each
Each
Each
Each
Each
Each
Each
61.60
65.95
70.90
92.00
104.85
131.05
135.15
95.20
101.95
142.90
279.20
540.45
1127.05
1551.15
Each
Each
Each
Each
Each
Each
Each
61.60
65.95
70.90
92.00
104.85
131.05
135.15
95.20
101.95
142.90
279.20
540.45
1127.05
1551.15
Each
Each
Each
Each
138.00
159.15
193.75
202.75
618.00
1095.15
2065.75
2158.75
Each
Each
Each
Each
138.00
159.15
193.75
202.75
618.00
1095.15
2065.75
2158.75
Each
Each
Each
Each
Each
Each
Each
93.95
99.20
105.85
138.00
159.15
193.75
202.75
225.95
258.80
315.85
600.00
1095.15
2053.75
2122.75
Each
Each
Each
Each
Each
Each
Each
93.95
99.20
105.85
138.00
159.15
193.75
202.75
225.95
258.80
315.85
600.00
1095.15
2053.75
2122.75
Each
Each
Each
Each
Each
Each
Each
Each
64.30
77.15
96.40
100.55
145.05
169.75
196.65
220.20
148.30
227.15
306.40
388.55
793.05
1909.75
4276.65
3460.20
Each
Each
Each
Each
Each
Each
Each
Each
64.30
77.15
96.40
100.55
145.05
169.75
196.65
220.20
148.30
227.15
306.40
388.55
793.05
1909.75
4276.65
3460.20
Each
38.55
61.35
Each
38.55
61.35
ii)
ii)
chapter-23(Tubewell)
Page 138
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Each
Each
Each
Each
Each
Each
42.85
47.80
64.30
77.15
96.40
100.55
74.05
98.20
219.10
362.75
624.40
1024.55
Each
Each
Each
Each
Each
Each
42.85
47.80
64.30
77.15
96.40
100.55
74.05
98.20
219.10
362.75
624.40
1024.55
Each
Each
Each
Each
Each
Each
Each
Each
92.00
104.85
131.05
135.15
191.20
215.90
252.05
275.60
134.00
158.85
199.45
216.75
326.80
389.90
465.65
543.20
Each
Each
Each
Each
Each
Each
Each
Each
92.00
104.85
131.05
135.15
191.20
215.90
252.05
275.60
134.00
158.85
199.45
216.75
326.80
389.90
465.65
543.20
Each
Each
Each
61.60
65.95
70.90
82.00
93.55
105.70
Each
Each
Each
61.60
65.95
70.90
82.00
93.55
105.70
ii)
Connection
ditto
ction
ditto
ditto
ditto
ditto
Per
1540.10
1944.80
2742.95
3754.75
4603.45
5969.35
7172.20
chapter-23(Tubewell)
Connection
ditto
ction
ditto
ditto
ditto
ditto
1540.10
1944.80
2742.95
3754.75
4603.45
5969.35
7172.20
Page 139
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
15 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
80 mm i/d
38.4
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
18.65
18.65
18.65
23.30
23.30
27.75
35.30
65.45
79.60
102.35
131.90
158.95
196.65
305.70
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
61.15
61.15
61.15
76.45
76.45
91.00
115.80
214.60
261.15
335.70
432.70
521.35
645.05
1,002.75
Remarks
15 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
80 mm i/d
38.3
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
27.95
27.95
29.15
29.15
31.75
43.70
69.90
72.00
87.60
112.00
137.00
166.00
211.85
340.40
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
91.70
91.70
95.55
95.55
104.20
143.30
229.30
236.15
287.30
367.30
449.45
544.55
694.85
1,116.50
16 mm i/d
20 mm i/d
25 mm i/d
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
12.95
12.95
12.95
12.95
14.55
17.90
34.10
39.60
45.05
49.60
62.55
76.40
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
42.45
42.45
42.45
42.45
47.75
58.80
111.80
129.90
147.70
162.75
205.20
250.65
38.3 &
38.7
Per Rft.
Per Rft.
Per Rft.
24.95
24.95
27.95
47.20
52.15
59.75
Per Metre
Per Metre
Per Metre
chapter-24(Electric Installation)
81.90
81.90
91.70
154.80
171.10
195.95
Page 140
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
iv)
v)
vi)
3
Per Metre
Per Metre
Per Metre
95.55
99.70
104.20
Composite
215.85
253.80
298.15
12 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
38.3 &
38.5
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
22.55
23.30
25.90
27.95
29.15
30.40
33.20
36.50
43.25
51.55
61.30
74.40
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
73.95
76.45
84.90
91.70
95.55
99.70
108.85
119.70
141.85
169.10
201.10
244.10
12 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
5.85
5.85
5.85
6.65
6.65
8.05
17.15
19.60
25.00
33.20
43.25
60.20
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
19.10
19.10
19.10
21.85
21.85
26.35
56.30
64.30
82.00
108.90
141.90
197.45
12 mm i/d
20 mm i/d
25 mm i/d
32 mm i/d
40 mm i/d
50 mm i/d
80 mm i/d
38.4
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
15.25
16.25
16.85
20.35
22.20
24.40
32.55
60.35
77.20
102.25
125.00
141.15
182.95
350.25
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
50.00
53.35
55.20
66.70
72.75
80.05
106.70
198.00
253.25
335.45
409.95
463.00
600.05
1,148.80
Supply and erection PVC pipe for recessed wiring (main and
sub-main) purpose, including bends, specials, etc. in floor,
wall or trenches:i)
ii)
iii)
65.80
77.35
90.90
Labour
29.15
30.40
31.75
Unit
Remarks
Per Rft.
Per Rft.
Per Rft.
Composite
Spec.
No.
32 mm i/d
40 mm i/d
50 mm i/d
Labour
50 mm i/d
80 mm i/d
100 mm i/d
38.2 &
38.3
Per Rft.
Per Rft.
Per Rft.
30.40
34.95
34.95
76.10
97.40
123.10
Per Metre
Per Metre
Per Metre
99.70
114.65
114.65
249.65
319.50
403.70
Supply and erection of PVC pipe for surface wiring (main and
sub-main) including clamps, inspection boxes, pull boxes
bends etc., complete with all specials:-
chapter-24(Electric Installation)
Page 141
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
i)
ii)
iii)
50 mm i/d
80 mm i/d
100 mm i/d
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Rft.
Per Rft.
Per Rft.
8.05
11.65
13.30
54.95
90.80
114.70
Per Metre
Per Metre
Per Metre
26.35
38.20
43.65
180.20
297.90
376.20
Per Rft.
2.35
4.65
Per Metre
7.65
15.20
38.8
Per Rft.
2.35
13.90
Per Metre
7.65
45.55
38.8
38.1
b)
Remarks
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
19/1.32 mm (19/0.052")
19/1.63 mm (19/0.064")
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
4.65
4.65
4.65
5.20
5.85
7.15
16.65
19.40
11.10
11.50
15.35
22.30
31.50
74.80
122.15
166.45
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
15.30
15.30
15.30
17.00
19.10
23.50
54.60
63.70
36.35
37.75
50.40
73.15
103.30
245.30
400.70
546.00
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
5.20
5.20
5.20
5.50
6.15
7.05
11.60
12.05
15.90
22.60
31.80
74.65
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
17.00
17.00
17.00
18.00
20.10
23.15
38.05
39.45
52.05
74.15
104.35
244.90
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
4.65
4.65
4.65
5.20
5.85
10.65
13.65
17.95
25.30
35.35
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
15.30
15.30
15.30
17.00
19.10
34.95
44.75
58.80
82.95
115.95
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
chapter-24(Electric Installation)
Page 142
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
vi)
7/1.63 mm (7/0.064")
Per Rft.
Labour
7.15
Composite
68.35
Unit
Per Metre
Labour
23.50
Spec.
No.
Composite
224.25
7/1.63 mm (7/0.064")
19/1.32 mm (19/0.052")
19/1.63 mm (19/0.064")
19/2.11 mm (19/0.083")
37//1.83 mm (37/0.072")
37/2.11 mm (37/0.083")
37/2.62 mm (37/0.103")
38.1 to
38.7
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
7.05
7.75
8.45
9.30
16.05
19.40
27.40
77.00
128.55
173.30
329.25
458.05
574.55
880.85
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
23.15
25.50
27.80
30.55
52.70
63.70
89.90
252.50
421.60
568.50
1,080.00
1,502.40
1,884.50
2,889.25
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
5.20
5.20
5.20
5.50
6.15
7.05
18.45
25.30
33.85
48.70
68.60
135.05
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
17.00
17.00
17.00
18.00
20.10
23.15
60.50
82.95
111.00
159.75
225.05
442.90
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
5.50
5.50
5.50
6.15
6.45
7.40
26.90
37.60
50.40
73.10
103.50
207.85
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
18.00
18.00
18.00
20.10
21.25
24.25
88.15
123.25
165.35
239.70
339.55
681.70
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
Per Rft.
5.85
5.85
6.15
6.15
6.45
7.40
10.35
34.05
46.90
63.75
93.45
133.60
270.15
503.20
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
19.10
19.10
20.10
20.10
21.25
24.25
33.95
111.75
153.85
209.15
306.45
438.20
886.05
1,650.45
d)
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
c)
ditto
b)
Remarks
3/0.74 mm (3/0.029")
3/0.91 mm (3/0.036")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
7/1.63 mm (7/0.064")
19/1.32 mm (19/0.052")
chapter-24(Electric Installation)
Page 143
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
19/1.32 mm (19/0.052")
19/1.63 mm (19/0.064")
19/1.83 mm (19/0.072")
19/2.11 mm (19/0.083")
37//1.83 mm (37/0.072")
37/2.11 mm (37/0.083")
37/2.36 mm (37/0.093")
37/2.62 mm (37/0.103")
10.35
11.10
11.65
12.60
12.95
15.55
18.65
23.30
560.85
748.85
1,013.45
1,417.35
1,929.65
2,439.05
2,972.70
3,699.85
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
33.95
36.40
38.20
41.30
42.45
50.95
61.15
76.45
1,839.50
2,456.30
3,324.05
4,649.00
6,329.20
8,000.05
9,750.45
12,135.60
10 x 10 cm (4"x4")
17.5 x 10 cm (7"x4")
22.5 x 10 cm (9"x4")
20 x 25 cm (8"x10")
25 x 30 cm (10"x12")
30 x 35 cm (12"x14")
38.1
to
38.7
Each
Each
Each
Each
Each
Each
76.45
95.55
127.40
152.85
191.05
254.75
146.75
193.95
248.10
357.45
470.85
612.25
Each
Each
Each
Each
Each
Each
76.45
95.55
127.40
152.85
191.05
254.75
146.75
193.95
248.10
357.45
470.85
612.25
Each
21.85
35.15
Each
21.85
35.15
17.5 x 10 cm (7"x4")
22.5 x 10 cm (9"x4")
20 x 25 cm (8"x10")
25 x 30 cm (10"x12")
30 x 35 cm (12"x14")
Remarks
38.1
38.1
Each
Each
Each
Each
Each
30.55
30.55
33.95
38.20
43.65
87.65
100.00
117.00
158.50
214.65
Each
Each
Each
Each
Each
30.55
30.55
33.95
38.20
43.65
87.65
100.00
117.00
158.50
214.65
Each
Each
Each
Each
Each
30.55
30.55
33.95
38.20
43.65
67.25
85.80
100.90
121.25
143.40
Each
Each
Each
Each
Each
30.55
30.55
33.95
38.20
43.65
67.25
85.80
100.90
121.25
143.40
17.5 x 10 cm (7"x4")
22.5 x 10 cm (9"x4")
20 x 25 cm (8"x10")
25 x 30 cm (10"x12")
30 x 35 cm (12"x14")
38.1
double pole:
i)
15/20 Amp.
Each
509.50
1,563.40
Each
chapter-24(Electric Installation)
509.50
1,563.40
Page 144
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
ii)
iii)
iv)
b)
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Each
Each
Each
509.50
764.30
764.30
1,853.85
2,428.15
2,984.35
Each
Each
Each
509.50
764.30
764.30
1,853.85
2,428.15
2,984.35
Each
Each
764.30
509.50
2,145.70
2,323.55
Each
Each
764.30
509.50
2,145.70
2,323.55
Each
Each
Each
509.50
764.30
1,001.20
2,496.60
3,172.90
3,922.80
Each
Each
Each
509.50
764.30
1,001.20
2,496.60
3,172.90
3,922.80
triple pole:
i)
ii)
c)
30/35 Amp.
60/65 Amp.
100 Amp.
Labour
15/20 Amp.
30/35 Amp.
30/35 Amp.
60/65 Amp.
100 Amp.
38.1
Each
Each
Each
Each
Each
Each
Each
764.30
1,001.20
1,001.20
2,292.85
2,292.85
3,248.20
3,439.25
3,217.15
4,492.30
6,057.05
9,907.20
11,316.25
15,275.70
19,275.15
Each
Each
Each
Each
Each
Each
Each
764.30
1,001.20
1,001.20
2,292.85
2,292.85
3,248.20
3,439.25
3,217.15
4,492.30
6,057.05
9,907.20
11,316.25
15,275.70
19,275.15
ditto
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
254.75
254.75
254.75
254.75
254.75
254.75
254.75
254.75
254.75
254.75
254.75
382.15
382.15
382.15
382.15
382.15
382.15
662.35
662.35
736.50
798.30
841.55
897.20
946.65
1,002.25
1,082.60
1,144.40
1,200.00
789.75
795.90
857.70
925.70
968.95
1,036.95
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
chapter-24(Electric Installation)
254.75
254.75
254.75
254.75
254.75
254.75
254.75
254.75
254.75
254.75
254.75
382.15
382.15
382.15
382.15
382.15
382.15
662.35
662.35
736.50
798.30
841.55
897.20
946.65
1,002.25
1,082.60
1,144.40
1,200.00
789.75
795.90
857.70
925.70
968.95
1,036.95
Page 145
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Each
Each
Each
Labour
382.15
382.15
382.15
Composite
1,092.55
1,142.00
1,228.50
Unit
Each
Each
Each
Labour
382.15
382.15
382.15
Spec.
No.
Composite
1,092.55
1,142.00
1,228.50
21 Supply and erection of bus bars, for 500 volts 3 phase A.C.
supply with four copper bars, including glazed porcelain
bridges, on angle iron board, fixed with rag bolts and M.S.
sheet box 1.5 mm thick, etc. complete:i)
ii)
38.1
Each
910.45
3,017.85
Each
910.45
3,017.85
Each
910.45
3,017.85
Each
910.45
3,017.85
Each
1,438.80
3,645.10
Each
1,438.80
3,645.10
Each
1,719.65
3,925.90
Each
1,719.65
3,925.90
Each
1,101.55
3,915.50
Each
1,101.55
3,915.50
Each
15.90
108.05
Each
15.90
108.05
Per Rft.
--
1.65
Per Metre
--
38.1
5.45
Each
31.85
241.10
Each
31.85
241.10
38.1
Each
47.95
390.90
Each
47.95
390.90
ditto
Each
49.60
113.25
Each
49.60
113.25
ditto
Each
68.50
429.25
Each
68.50
429.25
ditto
Each
11.00
50.40
Each
11.00
50.40
ditto
Each
47.95
233.30
Each
47.95
233.30
38.1
chapter-24(Electric Installation)
Remarks
Page 146
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Each
9.55
212.05
Each
9.55
212.05
38.1
Each
15.90
35.95
Each
15.90
35.95
ditto
Each
Each
Each
Each
Each
Each
Each
15.30
15.30
15.30
15.30
21.20
21.20
21.20
32.85
32.85
27.65
50.15
50.40
44.20
45.45
Each
Each
Each
Each
Each
Each
Each
15.30
15.30
15.30
15.30
21.20
21.20
21.20
32.85
32.85
27.65
50.15
50.40
44.20
45.45
ditto
open type
piano type
ring type, recessed
plate type, recessed
double control, open type
double control, ring type recessed
double control, piano type
open type
recessed type
ditto
Each
Each
15.30
15.30
42.00
51.90
Each
Each
15.30
15.30
42.00
51.90
Each
15.30
79.10
Each
15.30
79.10
ditto
Each
15.30
54.35
Each
15.30
54.35
ditto
open type
recessed type
ditto
Each
Each
15.30
15.30
48.20
85.25
Each
Each
15.30
15.30
48.20
85.25
5 Amp
10/15 Amp
37 Supply and erection of 3 pin 10/15 Amp. wall socket with shoe,
open type.
ditto
Each
Each
15.30
15.30
68.75
94.45
Each
Each
15.30
15.30
68.75
94.45
Each
15.30
147.05
Each
15.30
147.05
open type
recessed type
ditto
Each
Each
8.50
8.50
35.20
41.40
Each
Each
8.50
8.50
35.20
41.40
ditto
38.1
Each
Each
9.55
9.55
28.85
41.20
Each
Each
9.55
9.55
28.85
41.20
Each
12.75
44.40
Each
12.75
44.40
chapter-24(Electric Installation)
ditto
Page 147
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Each
Labour
8.50
Composite
29.05
Unit
Each
Labour
8.50
Spec.
No.
Composite
29.05
15/20 Amp
30/35 Amp
60/65 Amp
100 Amp
200 Amp
300 Amp
400 Amp
500 Amp
Each
Each
Each
Each
Each
Each
Each
Each
15.55
16.95
25.90
29.15
33.30
33.30
44.05
44.05
48.00
49.40
72.25
118.75
160.00
320.70
399.40
575.55
Each
Each
Each
Each
Each
Each
Each
Each
15.55
16.95
25.90
29.15
33.30
33.30
44.05
44.05
48.00
49.40
72.25
118.75
160.00
320.70
399.40
575.55
38.1
i)
Per set
275.40
1,233.55
ii)
single rod (40 watts) with one choke and one starter.
ditto
220.30
iii) round tube, 32 watt, with one choke and one starter,
without cover.
Each
iv)
ditto
Per set
275.40
1,233.55
659.35
ditto
220.30
659.35
220.30
717.45
Each
220.30
717.45
183.60
804.35
ditto
183.60
804.35
44 Providing and fixing M.S. iron box for housing main switches,
made of 1.5 mm (1/16") thick M.S. sheet, with locking
arrangement, including painting:i)
ii)
iii)
iv)
60x35x15 cm (24"x14"x6")
95x40x20 cm (38"x16"x8")
105x52.5x22.5 cm (42"x21"x9")
135x70x27.5 cm (54"x28"x11")
ditto
ditto
round tube, 32 watt with one chock and one starter, with
cover.
Remarks
ditto
Each
Each
Each
Each
574.65
829.90
1,262.05
1,388.15
2,039.50
2,539.15
3,523.55
4,884.75
Each
Each
Each
Each
574.65
829.90
1,262.05
1,388.15
2,039.50
2,539.15
3,523.55
4,884.75
Each
36.70
151.65
Each
36.70
151.65
38.1
&
38.10
Each
47.95
905.80
Each
47.95
905.80
ditto
Each
51.40
1,232.25
Each
51.40
1,232.25
38.1
chapter-24(Electric Installation)
Page 148
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Each
68.50
514.85
Each
68.50
514.85
49 Supply and erection of 3/8" (10 mm) dia M.S. bar fan hook,
placed at the time of casting of slab.
Each
19.60
36.90
Each
19.60
36.90
ditto
Each
616.90
2,475.45
Each
616.90
2,475.45
38.12
Each
Each
136.50
159.25
583.10
1,278.75
Each
Each
136.50
159.25
583.10
1,278.75
Per Rft.
9.20
22.95
Per Metre
30.20
75.30
38.14
Per Rft.
13.30
35.80
Per Metre
43.65
117.40
ditto
Per Rft.
58.25
261.15
Per Metre
191.05
856.50
Per Rft.
53.70
254.70
Per Metre
176.10
835.45
Each
287.75
2,512.55
Each
287.75
2,512.55
Each
36.05
202.90
Each
36.05
202.90
38.12
Each
36.05
85.45
Each
36.05
85.45
ditto
Per Kg
18.70
1,073.05
Per Kg
18.70
1,073.05
38.1
Per Kg
18.70
133.70
Per Kg
18.70
133.70
ditto
chapter-24(Electric Installation)
Page 149
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
3/0.74 mm (3/0.029")
7/0.74 mm (7/0.029")
7/0.91 mm (7/0.036")
7/1.12 mm (7/0.044")
Remarks
38.12
Per Rft.
ditto
ditto
ditto
4.85
4.85
4.85
4.85
12.90
21.25
27.90
37.05
Per Metre
ditto
ditto
ditto
16.00
16.00
16.00
16.00
42.25
69.65
91.45
121.45
Per Rft.
8.95
22.25
Per Metre
29.40
73.00
Each
239.80
998.60
Each
239.80
998.60
Each
ditto
479.60
479.60
2,902.15
3,285.30
Each
ditto
479.60
479.60
2,902.15
3,285.30
Each
ditto
183.60
220.30
1,110.60
2,012.50
Each
ditto
183.60
220.30
1,110.60
2,012.50
Each
8,062.20
22,832.20
Each
8,062.20
22,832.20
38.13
Each
7,805.35
34,116.50
Each
7,805.35
34,116.50
38.13
38.1
G.E.C. design
Philips design
chapter-24(Electric Installation)
Page 150
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Job
1,056.65
Composite
Unit
Labour
Job
1,056.65
Spec.
No.
Remarks
Composite
4,179.60
4,179.60
38.11
Per Rft.
ditto
10.95
25.75
56.45
72.40
Per Metre
ditto
35.95
84.55
185.20
237.45
ditto
G.I. wire:
i)
ii)
Per Rft.
ditto
4.65
4.65
11.30
6.45
Per Metre
ditto
15.30
15.30
37.10
21.10
Per Rft.
ditto
4.65
4.65
12.00
7.50
Per Metre
ditto
15.30
15.30
39.30
24.55
Per Rft.
17.55
22.20
Per Metre
57.55
72.80
38.11
Each
704.45
4,567.65
Each
704.45
4,567.65
ditto
Per Rft.
ditto
25.75
25.75
267.25
317.60
Per Metre
ditto
84.55
84.55
876.60
1,041.75
Job
479.60
2,815.65
Job
479.60
2,815.65
b)
8 SWG
16 SWG
Copper wire:
i)
ii)
16 SWG
20 SWG
38.1
single phase:
i)
Each
191.05
2,327.05
Each
chapter-24(Electric Installation)
191.05
2,327.05
Page 151
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
ii)
b)
Labour
Composite
Unit
Labour
Spec.
No.
Composite
ditto
191.05
2,327.05
ditto
191.05
2,327.05
Each
ditto
ditto
382.15
550.75
550.75
6,137.35
6,305.95
6,305.95
Each
ditto
ditto
382.15
550.75
550.75
6,137.35
6,305.95
6,305.95
370.90
413.10
988.50
1,136.35
Each
ditto
370.90
413.10
988.50
1,136.35
Remarks
254.75
254.75
683.25
764.20
Each
ditto
254.75
254.75
683.25
764.20
Each
305.70
887.45
Each
305.70
887.45
Each
47.75
109.55
Each
47.75
109.55
38.1
Each
38.20
62.95
Each
38.20
62.95
ditto
Each
47.75
171.35
Each
47.75
171.35
ditto
Each
95.55
208.85
Each
95.55
208.85
Each
184.80
223.00
Each
184.80
223.00
chapter-24(Electric Installation)
Page 152
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
100Lft.
1785.75
Metre
58.55
100Lft.
591.00
Metre
19.40
100Lft.
4646.40
Metre
152.40
Each
4474.15
Each
4474.15
Each
Point
490.10
Each
Point
490.10
Each
573.35
Each
573.35
100 Nos
5407.05
100 Nos
5407.05
100 Nos
680.50
100 Nos
680.50
Per Cwt
2832.70
7735.50
100 Kg
5576.20
15227.35
Per Cwt
1012.95
5672.75
100 Kg
1994.05
11166.85
Per Cwt
319.75
100 Kg
629.40
100 Sft.
1151.05
sq.m
123.85
Per Cwt
556.95
100 Kg
1096.35
I RON WORK
9
chapter-25(Iron work)
Page 153
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Cwt
338.75
100 Kg
666.85
Per Cwt
164.50
100 Kg
323.85
Per Cwt
2178.00
100 Kg
4287.40
Per Cut
Per Cut
215.80
318.35
Per Cut
Per Cut
215.80
318.35
Per
Cut
102.75
Per Cwt
Cut
102.75
Per
Bend
109.90
Per
Bend
109.90
20 Drilling holes, in plates upto " (13 mm) thick, per inch
dia, (25mm) or part thereof.
Per
Hole
43.30
Per
Hole
43.30
21 Extra for drilling holes in plates over " (13 mm) thick, per
inch dia, (25 mm) or part thereof.
Per
Hole
24.10
Per
Hole
24.10
100 Nos
573.10
100 Nos
573.10
100 Nos
1831.50
100 Nos
1831.50
Per Lft.
71.95
Metre
236.00
Per bar
41.10
Per bar
41.10
Each
Cut
22.55
Each
Cut
22.55
488.40
28.80
Per
Notch
sq.m
488.40
Per
Notch
Per Sft.
Per Sft.
16.95
sq.m
182.15
Per Sft.
177.85
684.45
sq.m
1913.90
7364.55
Per Sft.
184.70
784.15
sq.m
1987.30
8437.60
7702.45
Remarks
15162.30
361.80
656.40
chapter-25(Iron work)
361.80
656.40
309.65
Page 154
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Sft.
71.10
329.50
sq.m
764.85
3545.45
Per Rft.
345.60
795.60
Metre
1133.90
2610.20
Per Rft.
177.95
516.85
Metre
583.80
1695.65
Per Rft.
128.60
549.95
Metre
421.92
1804.30
Per Sft.
259.35
659.15
sq.m
2790.45
7092.40
Per Sft.
57.15
216.70
sq.m
614.80
2331.80
Per Rft.
27.00
134.45
Metre
88.50
441.05
chapter-25(Iron work)
-do-
Page 155
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
39 Providing and fixing stair railing of 2" (63 mm) i/d G.I.
pipe, welded with 5/8"x5/8" (16x16 mm) square M.S. bars
2'-9" (838 mm) high, fixed in each step, complete in all
respects, including painting, polishing three coats.
Per Rft.
152.20
652.15
Metre
499.30
2139.60
Per Sft.
25.50
64.05
sq.m
274.10
689.30
a)
65.75
65.75
65.75
65.75
65.75
306.65
309.15
312.85
319.00
331.40
sq.m
ditto
ditto
ditto
ditto
707.25
707.25
707.25
707.25
707.25
3299.60
3326.20
3366.10
3432.60
3565.60
b)
Per Sft.
ditto
ditto
ditto
ditto
92.40
92.40
92.40
92.40
92.40
371.55
374.00
377.70
383.90
396.25
sq.m
ditto
ditto
ditto
ditto
994.20
994.20
994.20
994.20
994.20
3997.75
4024.35
4064.25
4130.75
4263.75
Per Sft.
60.05
318.45
Sq.m
646.00
3426.30
ditto
58.15
198.50
ditto
625.45
2135.65
Remarks
chapter-25(Iron work)
Page 156
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Sft.
68.10
396.80
Sq.m
732.60
4269.65
Per Sft.
85.50
462.60
Per Sft.
919.90
4977.75
Each
573.20
612.75
Each
573.20
612.75
Per Sft.
110.15
215.20
sq.m
1185.25
2315.70
Per Lft.
47.95
Metre
157.30
Per Rft.
80.55
730.60
Metre
264.30
2397.05
100Rft.
1762.05
9725.40
Metre
57.80
319.10
100Rft.
2895.05
12359.10
Metre
95.00
405.50
chapter-25(Iron work)
Remarks
Page 157
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Remarks
Composite
Per Sft
94.10
531.35
sq. m
1012.50
5717.35
Per Sft
135.50
428.20
sq. m
1458.00
4607.45
1.6 mm thick
2 mm thick
Per Sft
Per Sft
91.90
91.90
660.70
747.15
chapter-25(Iron work)
Sqm
Sqm
988.85
988.85
7109.15
8039.35
Page 158
26. MISCELLANEOUS
Rates for all finished works include the removal of surplus debris, unused material and byproducts.
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
Unit
Labour
Spec.
No.
Composite
Per Sft.
62.40
72.90
Per
sq.m
671.30
784.60
Each
79.60
Each
79.60
100Lft.
Remarks
6,552.75
23,808.85
L.m.
215.00
781.15
Each
39.80
169.60
Each
39.80
169.60
100Nos.
127.40
145.05
100Nos.
127.40
145.05
Supplying wooden pegs for levelling, 1" (40 mm) dia, 6"
(150mm) long.
6
100Nos.
305.70
509.65
100Nos.
305.70
509.65
Per Lft.
71.95
80.85
Per
L.M.
236.00
265.20
Each
47.95
cost of hooks.
8
Each
47.95
Each
211.35
377.60
Each
211.35
377.60
Per cut
47.95
Per cut
47.95
chapter-26( Misc)
Page 159
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
11
12
Threading pipe ends, 1" (40 mm) to 4" (100 mm) dia.
13
14
a)
b)
c)
in ordinary soil
in clay
in shingle
15
16
Per cut
Labour
Composite
87.25
Unit
Per cut
Labour
Spec.
No.
Remarks
Composite
87.25
Each
End
60.70
Each
End
60.70
100Lft.
222.00
Per Metre
7.30
Per Lft.
Per Lft.
Per Lft.
78.15
154.00
229.89
Per Metre
Per Metre
Per Metre
256.30
505.30
754.25
Per Lft.
34.60
Per Metre
113.60
Each
152.85
Each
152.85
Per bed
505.90
537.05
Per bed
505.90
537.05
18
Washing Durries.
100Sft.
674.50
748.70
sq.m
72.60
80.60
19
Recaning chairs:
office chairs, single caning seat only.
office chairs, double canning seat only.
office chairs, single caning back only.
office chairs, double caning back only.
easy chairs, single caning seat only.
easy chairs, double caning seat only.
easy chairs, single caning only, back and seat in one
piece.
viii) easy chairs, double caning back & seat in one piece
or couches with caned area about 16 Sft (1.5 Sqm).
Each
Each
Each
Each
Each
Each
Each
267.50
343.95
191.05
305.70
191.05
535.00
764.30
303.20
394.35
193.35
325.05
239.00
606.45
1,058.45
Each
Each
Each
Each
Each
Each
Each
267.50
343.95
191.05
305.70
191.05
535.00
764.30
303.20
394.35
193.35
325.05
239.00
606.45
1,058.45
Each
1,146.40
1,860.85
Each
1,146.40
1,860.85
20
Each
137.55
500.95
Each
137.55
500.95
21
Weaving charpoy.
Each
496.80
Each
496.80
22
Sweeping chimney.
Each
112.40
113.70
Each
112.40
113.70
23
Per Lft.
39.35
107.30
Per LM
129.15
352.05
24
100Kg
150.55
100Kg
150.55
25
100Kg
315.35
100Kg
315.35
i)
ii)
iii)
iv)
v)
vi)
vii)
chapter-26( Misc)
Page 160
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
26
27
28
Supplying manure.
29
30
Washing:a)
b)
table cloth
napkins, dusters, etc.
Labour
Composite
100Kg of
Charcoal
509.65
100Cft.
1,382.75
Cart
Load
Unit
Labour
Spec.
No.
Composite
100Kg of
Charcoal
509.65
1,385.90
cu.m
488.40
489.50
168.65
304.60
Cart
Load
168.65
304.60
Each
152.85
Each
152.85
Each
Each
38.20
25.50
Each
Each
38.20
25.50
31
Each
No.
60.15
Each
No.
60.15
32
Each
No.
68.55
Each
No.
68.55
33
Dredging Sumps.
Per
Shift
2,529.45
Per
Shift
2,529.45
34
Each
183.60
Each
183.60
35
cu.m
ditto
71.45
7.95
14.05
Per Nos.
119.90
a)
b)
by hand
by pump
36
37
38
Laying 2" (50 mm) thick sand and bitumen carpet, on top
of foundation of oil tank.
39
1000 Cft.
1000 Cft.
2,023.56
224.80
Per Nos.
119.90
Remarks
1.15
2.30
2.75
3.65
sq.m
sq.m
12.35
24.65
29.50
39.05
100Sft.
1,330.35
5,124.20
sq.m
143.15
551.35
Per
Hole
205.55
Per
Hole
205.55
chapter-26( Misc)
Page 161
MRS, BI-ANNUAL PERIOD (1st JULY, 2016 TO 31st DECEMBER, 2016) MURREE
Sr.
No.
Description
Labour
Composite
40
Per
Plank
179.85
41
Per hole
per inch
depth
67.45
42
100Sft. of
each
spray
76.45
214.80
43
24,282.75
26,794.25
i)
ii)
100Rft.
100Rft.
chapter-26( Misc)
Unit
Labour
Spec.
No.
Composite
Per
Plank
179.85
Per hole
per c.m
depth
27.00
sq.m of
each
spray
8.20
23.10
255.15
280.70
796.45
878.85
Per Metre
Per Metre
Remarks
Page 162