A dynamic professional

4 years of cross cultural experience in shift engineer,mechanical &

operation & maintenances Engineering, Project Management and Team Management in power
plant as erection and commission and 15MW operation plant.

Presently associated Dubai Union paper Mill as Shift Engineer in Boiler


Expertise in planning & controlling the operations and maintenances. Skills in conceptualizing and
effecting process initiatives to enhance the operational efficiency.
Adept in swiftly ramping up projects in close co-ordination with contract cell, materials, consultants,
architects, engineers & contractors and ensuring on time deliverables.
An effective communicator with excellent relationship management skills and strong analytical,
problem solving & organizational abilities. Possess a flexible & detail oriented attitude.
Areas of Expertise
Operation Engineering
Controlled and Supervised boilers, turbines, generators, and auxiliary equipment in

power generating plants

Maintained pneumatic and motor operated valves and actuators


Performed equipment inspection, maintenance tasks, troubleshooting and diagnoses
of plant equipment and systems.
Project Planning & Management
Completed project goals and monitored status while being aware of overall program
goals Monitoring projects with respect to budgeted cost, demand forecasts, time over-runs to
ensure timely execution of projects.
Performed trade studies on hydraulic system components and potential vendors .
Coordinating with other disciplines for preparation of layouts.
Troubleshot the problems that arose in the plant initial and ongoing operations.

Conducted fitness-for-service assessments and coordinated external engineering


supports.
Site & Management
Supervising all Mechanical equipments including providing technical inputs for methodologies of
Erection & commission with site management activities.
Leading and motivating large teams of workers and professionals and handling allocation of tasks
within teams based on skills profile.
Identifying & developing a vendor source for achieving cost effective purchase of equipment,
accessories & timely delivery so as to minimize project cost.
Team Management
Directing, leading & motivating workforce and imparting continuous on job training for
accomplishing greater operational effectiveness/ efficiency.
Working on succession planning of the workforce, shift management activities, appraising the
members performance & providing feedback.
Career Contour
Apr2007 - jan2009 with Astro Bio Energy,Madurai
As Maintenances Engineer
Key Projects Handled:

Client: Boiler make : Thermodyne Technologies, Chennai, India & Turbine make :
Triveni Engg, Bangalore, India & Esp : Ets Elex India and Condenser make : Baharpur

cooling towers, Kolkatta, India


Owner: Auro Mira Bio Energy power generation Groups
Responsibilities: Involved in the following activities:
o Handling Ash Conveyor Pre- assembly and erection work ( Leanth 80 mtrs).
o

Heat exchanger coils Pre-assembly and erection activities

Equipment erection and alignment activities like as Heat exchangers, Fans, Pumps, Turbines .

Compressor shelter, Pipe Racks and platform structures, pre-assembly & erection activities.

Punch points clearance activities for equipments and structures.

Quality control and quality assurance documentation preparation, submittal, JSA and Lifting
plan preparational activities for structures and equipments
Attending the clients meeting, highlighting the site constraints and Issues needing decision
from the clients / project team
Providing input to Project Manager & Head Office for better decision making and lease with
the client / consultant for successful implementation of the project objectives.
Handling super heating coils erection work.

o
o
o
o

Executing Pipe pre-fabrication and erection, structures erection and alignment activities

Responsible for day to day execution of the Site work and to provide effective supervision.

Co-ordinating with sub contractor and subordinates for achieving production targets.

Ensuring quality control and quality assurance documentation preparation and submittal
activities for structures and equipments.
Carrying out the Mechanical pre-commissioning and commissioning work.

o Preparing mobilization schedules for manpower, equipment & personnel with respect to
Baseline Master Schedule.
o Reporting periodically on the progress of work & on the issues needing decisions from client /
project team to the Project Manager.
Jan2009 Nov2010 Auro Mira Bio Energy Power Plant Sipcot Industrial Complex
As Shift Engineer
Role:

Safely Operation of boiler and its auxiliaries. Making sure that Operators and
technicians are not making any mistakes during the plant operation.

Giving the priority to personnel safety and machine safety for reducing
unnecessary plant down time while during the plant operations.

Maintaining all the process parameters with in the limit. (like steam, flue gas,
water, air its pressure and temperature) and trying to improve the overall
efficiency of the plant.

Optimum usage of the fuel, water and other sources and trying to improve the
overall efficiency of the palnt.

In order to identify the heat loss of the boiler and turbine, preparing the heat
and mass balance sheets for turbine and boiler.

Determining the overall efficiency of the plant periodically.

Taking periodic plant shut down for conducting maintenance work for keeping
the equipment efficiency with in limit.

Maintenance of steam turbine, compressors, conveyors (belt, screw, chain) air


cooled condensers, electro static precipitators, boiler and its auxiliaries.

November 2010 Till date Dubai Union paper Mill as Shift Engineer in Boiler

Role:

Responsibilities of safety operation @ maintenances for 6 boiler


(3-oil fire boiler-100 tons, 1- biogas boiler-14 ton, 2-bio massboiler - 36 tons)
Total - 150 tons boiler capacity)

using of latest technology hydraulic moving floor, Dynamic water


cooled step grate ,fuel langing system,compound water tube and fire
tube boiler,3pass smoke tube boiler,chipper machine,heat exchanger etc

Maintenance of multicyclone screw conveyor,bag filter,left and right screw


conveyor etc.

periodic plant shut down for conducting maintenance work for keeping the
equipment efficiency with in limit.

Giving the priority to personnel safety and machine safety for reducing
unnecessary plant down time while during the plant operations.

Additional Skills
Successfully handled the power plant Project :
o

Working as a MR Assistant for implementation ISO 9000 2001 in Auro Mira company,
Pudukkottai.

Improving process of capability of M1 brake block component


manufacturing by using SIX SIGMA Concepts.

Skill Used

By implementing Define analysis measurements improvement


and control (Damic) Technique in brake assembly section .

Education
B.E in Mechanical Engineering from sudharasan Engineering College, pudukkottai, Tamilnadu in
April - 2007 (Secured 65%).
IT Skills
Well versed with MS Office - 2008,Auto Cad
Personal Details

D.O.B
Fathers Name
Nationality
Religion
Marital Status
Languages
Address (India)

:
:
:
:
:
:
:

19.09.1984
Indian.
Hindu
Bachelor.
English, Tamil (read& write).

You might also like