Subject: Design Analysis of water Distribution
10
8
80
150
liters
12,000
0.14
L/day
L/sec
0.21
L/sec
0.34722
L/sec
0.01
L/sec
0.021
L/sec
11
L/sec
11.243
L/sec
11.21
L/sec
A = 3.14 D2/ 4
and D can be solved
0.009
Adopted a 100-150mm diameter for the primary pipe
The following data are gather during the recent compution for water ditribution:
Q = Design Flow of Distribution System = 14.063 Li/sec
14.063
by: LCSAWAL/2013
1.575
5 / P0.2
PSF * F
7.875
3
159.85
44.40
Q = 0.278 CiA
LPD
LPS
Q =A* V
V = 1 /n R2/3S1/2
C-11
WHERE:
R = d/4
S = 0.030
*n =0.013
Q = _____ d8/3
Then d can be determine as your initial diameter of your sewage design
prepared by:
LCSAWAL
20
Discharge
27
4
4
3
3
3
3
3
30
Computation:
A.
Q = A*V
Q = QT
Name of Street :
No. of Lots:
Increment (Population):
where:
B.
R = d/4
"D" can be solved
E.
QD
Checking of Q
QT
Q = 0.278CiA
Q1 = ____________ cu.m/s
____________ L/sec
C.
LCSAWAL
Design Computations
LOCATION
Street
1
Ray-Road
DM-Road
The Rest
of the
Data
should
encode
Manually
Manhole
From
2
1
3
2
7
11
To
3
2
2
6
11
15
ENCODE HERE
Maximum Storm Water
Tributary Area
(sq.m)
Flow (LPS)
Increment
4
5.00
2.50
1.25
1,630
1,643
Total
5
5.00
2.50
8.75
1,639
3,282
Q1=0.278CiA
6
LINK
OTHER
TABLE
Total
8
32.00
16.00
56.00
88
120
DESIGN
Total
Flow
(LPS) Dia (mm)
10
11
300
in the
300
other
300
Table
350
350
Flow
(LPS)
9
Design Computations
DESIGN
Slope
12
0.4
0.052
0.56
0.01
0.01
Velocity
Capacity
(M/s)
13
14
PROFILE
Length
(m)
15
5
7.5
4.5
15
20
Upper
Elev
16
20
18.89
18.50
48.56
48.57
LOCATION
Lower
Elev.
17
18
18.50
16.00
48.67
48.62
Street
Manhole
From
1
2
Ray-Road
1
3
DM-Road
2
7
11
To
3
2
2
6
11
15
LINK FORM
Maximum Storm Wa
Tributary Area
(sq.m)
Increment
4
5
3
1
1,630
1643
Q1=0.278CiA
6
0.023
0.012
0.041
7.593
15.205
Total
8
32
16
56
88
120
Flow
(LPS)
9
0.250
0.125
0.438
0.356
0.486
DESIGN
Total
Flow Dia
(LPS)
(m)
10
11
0.273
0.30
0.137
0.30
0.478
0.30
7.949
0.35
15.6916 0.35
Slope
12
0.4
0.052
0.56
0.01
0.01
H6 = population
150 = water consumptio
5= safety factor which range (2.5-5)
0.90 or 90% is the percentage of waste-water
discharge for low cost
PROFILE
Length
(m)
15
5
7.5
4.5
15
20
Upper
Lower
Elev
Elev.
16
17
Based on the projected plan
20
18
18.89
18.50
18.50
16.00
48.56
48.67
48.57