Professional Documents
Culture Documents
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
Duracin:
de
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
CIE.EX.0079M
Anlisis:
Costo
Cantidad
Importe
10
M2
SUMINISTRO Y COLOCACION DE RECUBRIMIENTO DE LAMBRIN DE LOSETA CERAMICA, MCA. INTERCERAMIC O SIMILAR, LINEA
TINTORETO COLOR GRIS DE 20 x 30 CM. UNIONES A HUESO PEGADA CON CEMENTO CREST O SIMILAR, HASTA 1.80 M DE ALTURA .
AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES,
CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
CEM0070A
CEMENTO CREST
KG
$5.00
4.000000
$20.00
CEM0060
CEMENTO
TON
$1,280.00
0.001000
$1.28
SUB_SCCIV128
M2
$135.45
1.050000
$142.22
MATERIALES
$163.50
MANO DE OBRA
CMOCIV20
CUADRILLA MO CIV 20
JOR
CIVOFCA
JOR
$692.44
0.042553
$29.47
CIVOF1A
JOR
$508.61
0.425532
$216.43
CIVAYOP
JOR
$303.37
0.531915
$161.37
Importe:
$407.27
Rendimiento:
SUBTOTAL:
2.216745
MANO DE OBRA
$183.72
$183.72
EQUIPO Y HERRAMIENTA
%MO16004
HERRAMIENTA
(%)mo
$183.72
0.020000
$3.67
%MO14824
CONSUMIBLES
(%)mo
$183.72
0.020000
$3.67
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$7.34
Costo Directo:
INDIRECTOS
$354.56
25.5%
SUBTOTAL
FINANCIAMIENTO
$444.97
1.1283%
SUBTOTAL
UTILIDAD
$90.41
$5.02
$449.99
6.3%
$28.35
PRECIO UNITARIO
$478.34
OTROS CARGOS
$5.44
PRECIO DE VENTA
$483.78
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
Duracin:
de
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
20
CIE.EX.0080M
Anlisis:
Costo
M2
SUMINISTRO Y APLICACION DE RESINA EPOXICA POR ASPERSION, AGRADEC O SIMILAR DE 0.00 A 4.00 M DE ALTURA. AMPARADO
CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA
INCENDIO Y ALMACEN GENERAL
MATERIALES
RESINAE3002
M2
$19.31
1.050000
$20.28
SIMILAR
SUBTOTAL:
MATERIALES
$20.28
MANO DE OBRA
CMOCIV20
CUADRILLA MO CIV 20
JOR
CIVOFCA
JOR
$692.44
0.042553
$29.47
CIVOF1A
JOR
$508.61
0.425532
$216.43
CIVAYOP
JOR
$303.37
0.531915
$161.37
Importe:
$407.27
Rendimiento:
SUBTOTAL:
3.325200
MANO DE OBRA
$122.48
$122.48
EQUIPO Y HERRAMIENTA
%MO16004
HERRAMIENTA
(%)mo
$122.48
0.020000
$2.45
%MO14824
CONSUMIBLES
(%)mo
$122.48
0.020000
$2.45
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$4.90
Costo Directo:
$147.66
INDIRECTOS
25.5%
SUBTOTAL
$37.65
$185.31
FINANCIAMIENTO
1.1283%
SUBTOTAL
$2.09
$187.40
UTILIDAD
6.3%
$11.81
PRECIO UNITARIO
$199.21
OTROS CARGOS
$3.19
PRECIO DE VENTA
$202.40
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
Duracin:
de
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
30
CIE.EX.0081M
Anlisis:
Costo
M2
PISO DE LOSETA CERAMICA MCA. INTERCERAMIC O SIMILAR, GRUPO E TRAFICO INTENSO, DE 30 x 30 CM. ACABADO
ANTIDERRAPANTE, BOQUILLAS DE 6 MM EN COLOR DIAMANTE MODELO MAXIMA. INCLUYE SUMINISTRO Y COLOCACION DE
MATERIALES. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1,
LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV038
M2
$78.00
1.050000
$81.90
KG
$8.81
4.000000
$35.24
BOQUILLA
BOQUILLA
KG
$22.60
0.750000
$16.95
CEM0060
CEMENTO
TON
$1,280.00
0.001000
$1.28
SUBTOTAL:
MATERIALES
$135.37
MANO DE OBRA
CMOCIV10
CUADRILLA MO CIV 10
JOR
CIVOFCA
JOR
$692.44
0.047619
$32.97
CIVOF1A
JOR
$508.61
0.476190
$242.19
CIVAYOP
JOR
$303.37
0.476190
$144.46
Importe:
$419.62
Rendimiento:
SUBTOTAL:
2.660160
MANO DE OBRA
$157.74
$157.74
EQUIPO Y HERRAMIENTA
%MO14824
CONSUMIBLES
(%)mo
$157.74
0.020000
$3.15
%MO16004
HERRAMIENTA
(%)mo
$157.74
0.020000
$3.15
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$6.30
Costo Directo:
INDIRECTOS
$299.41
25.5%
SUBTOTAL
FINANCIAMIENTO
$375.76
1.1283%
SUBTOTAL
UTILIDAD
$76.35
$4.24
$380.00
6.3%
$23.94
PRECIO UNITARIO
$403.94
OTROS CARGOS
$4.65
PRECIO DE VENTA
$408.59
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
Duracin:
de
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
40
CIE.EX.0082M
Anlisis:
Costo
UNIDAD
PISO EPOXICO INDUSTRIAL DE 6 MM DE ESPESOR TIPO GAM-I-6 DE LA MARCA GAM-GEL O SIMILAR. INCLUYE SUMINISTRO Y
COLOCACION DE MATERIALES. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE
SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV039
M2
$455.50
1.000000
$455.50
KG
$8.81
4.000000
$35.24
BOQUILLA
BOQUILLA
KG
$22.60
0.750000
$16.95
CEM0060
CEMENTO
TON
$1,280.00
0.001000
$1.28
SUBTOTAL:
MATERIALES
$508.97
MANO DE OBRA
CMOCIV10
CUADRILLA MO CIV 10
JOR
CIVOFCA
JOR
$692.44
0.047619
$32.97
CIVOF1A
JOR
$508.61
0.476190
$242.19
CIVAYOP
JOR
$303.37
0.476190
$144.46
Importe:
$419.62
Rendimiento:
SUBTOTAL:
3.325200
MANO DE OBRA
$126.19
$126.19
EQUIPO Y HERRAMIENTA
%MO16004
HERRAMIENTA
(%)mo
$126.19
0.020000
$2.52
%MO14824
CONSUMIBLES
(%)mo
$126.19
0.020000
$2.52
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$5.04
Costo Directo:
INDIRECTOS
$640.20
25.5%
SUBTOTAL
FINANCIAMIENTO
$803.45
1.1283%
SUBTOTAL
UTILIDAD
$163.25
$9.07
$812.52
6.3%
$51.19
PRECIO UNITARIO
$863.71
OTROS CARGOS
$5.72
PRECIO DE VENTA
$869.43
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
Duracin:
de
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
50
CIE.EX.0083M
Anlisis:
Costo
M2
PISO CERAMICO TIPO PAVIMENTO GRES GEOMETRICO O SIMILAR DE 30 x 30 COLOR CAFE U8. INCLUYE SUMINISTRO Y
COLOCACION DE MATERIALES. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE
SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV035
M2
$150.00
1.050000
$157.50
KG
$8.81
4.000000
$35.24
BOQUILLA
BOQUILLA
KG
$22.60
0.750000
$16.95
CEM0060
CEMENTO
TON
$1,280.00
0.001000
$1.28
SUBTOTAL:
MATERIALES
$210.97
MANO DE OBRA
CMOCIV10
CUADRILLA MO CIV 10
JOR
CIVOFCA
JOR
$692.44
0.047619
$32.97
CIVOF1A
JOR
$508.61
0.476190
$242.19
CIVAYOP
JOR
$303.37
0.476190
$144.46
Importe:
$419.62
Rendimiento:
SUBTOTAL:
2.216745
MANO DE OBRA
$189.30
$189.30
EQUIPO Y HERRAMIENTA
%MO16004
HERRAMIENTA
(%)mo
$189.30
0.020000
$3.79
%MO14824
CONSUMIBLES
(%)mo
$189.30
0.020000
$3.79
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$7.58
Costo Directo:
INDIRECTOS
$407.85
25.5%
SUBTOTAL
FINANCIAMIENTO
$511.85
1.1283%
SUBTOTAL
UTILIDAD
$104.00
$5.78
$517.63
6.3%
$32.61
PRECIO UNITARIO
$550.24
OTROS CARGOS
$5.83
PRECIO DE VENTA
$556.07
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
Duracin:
de
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
60
CIE.EX.0084M
Anlisis:
Costo
M2
PISO DE AZULEJO ANTIDERRAPANTE DE 9 CUADROS DE 11 x 11 CM. COLOR BEIGE. INCLUYE SUMINISTROY COLOCACION DE
MATERIALES. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1,
LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
AZU0010
AZULEJO ANTIDERRAPANTE 9
M2
$45.00
1.050000
$47.25
TON
$1,280.00
0.002000
$2.56
CUADROS 11X11CM
CEM0060
CEMENTO
SUBTOTAL:
MATERIALES
$49.81
MANO DE OBRA
CMOCIV10
CUADRILLA MO CIV 10
JOR
CIVOFCA
JOR
$692.44
0.047619
$32.97
CIVOF1A
JOR
$508.61
0.476190
$242.19
CIVAYOP
JOR
$303.37
0.476190
$144.46
Importe:
$419.62
Rendimiento:
SUBTOTAL:
2.216745
MANO DE OBRA
$189.30
$189.30
EQUIPO Y HERRAMIENTA
%MO16004
HERRAMIENTA
(%)mo
$189.30
0.020000
$3.79
%MO14824
CONSUMIBLES
(%)mo
$189.30
0.020000
$3.79
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$7.58
BASICOS
B1000008.EX
MORTERO CEMENTO-ARENA
M3
$1,098.29
0.020000
$21.97
PROPORCION
SUBTOTAL:
BASICOS
$21.97
Costo Directo:
INDIRECTOS
$268.66
25.5%
SUBTOTAL
FINANCIAMIENTO
$337.17
1.1283%
SUBTOTAL
UTILIDAD
$68.51
$3.80
$340.97
6.3%
$21.48
PRECIO UNITARIO
$362.45
OTROS CARGOS
$5.32
PRECIO DE VENTA
$367.77
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
Duracin:
de
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
70
CIE.EX.0085M
Anlisis:
Costo
M2
SUMINISTRO Y COLOCACION DE RECUBRIMIENTO DE PASTA TEXTURIZADA ACABADO TIROL PLANCHADO CON COLOR
CHAMPAGNE INTEGRADO DE 0.00 A 4.00 M DE ALTURA. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS
DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
CEM0080
KG
$1.85
8.900000
$16.47
CEM0060
CEMENTO
TON
$1,280.00
0.002100
$2.69
SUBTOTAL:
MATERIALES
$19.16
MANO DE OBRA
CMOCIV08
CUADRILLA MO CIV 08
JOR
CIVOFCA
JOR
$692.44
0.038462
$26.63
CIVOF1A
JOR
$508.61
0.480769
$244.52
CIVAYOP
JOR
$303.37
0.480769
$145.85
Importe:
$417.00
Rendimiento:
SUBTOTAL:
9.393220
MANO DE OBRA
$44.39
$44.39
EQUIPO Y HERRAMIENTA
CMAQCIV08
HR
EQCAM050
HR
$255.58
0.034150
$8.73
EQAND010
ANDAMIOS
HR
$11.70
2.000000
$23.40
Importe:
$32.13
Rendimiento:
9.393220
$3.42
%MO16004
HERRAMIENTA
(%)mo
$44.39
0.020000
$0.89
%MO14824
CONSUMIBLES
(%)mo
$44.39
0.020000
$0.89
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$5.20
Costo Directo:
$68.75
INDIRECTOS
25.5%
SUBTOTAL
$17.53
$86.28
FINANCIAMIENTO
1.1283%
SUBTOTAL
$0.97
$87.25
UTILIDAD
6.3%
$5.50
PRECIO UNITARIO
$92.75
OTROS CARGOS
$1.23
PRECIO DE VENTA
$93.98
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
Duracin:
de
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
80
CIE.EX.0086M
Anlisis:
Costo
M2
REPELLADO DE MORTERO CEMENTO-ARENA 1:5 PARA RECIBIR LAMBRIN, COLOCACION A PLOMO Y NIVEL EN UN ESPESOR DE 2.5
CM HASTA 1.80 M DE ALTURA. INCLUYE SUMINISTRO DE MATERIALES. AMPARADO CON MINUTA DE TRAB. DE RIESGOS
CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
MAD0040
MADERA P/CIMBRA
SUBTOTAL:
MATERIALES
PT
$5.97
0.500000
$2.99
$2.99
MANO DE OBRA
CMOCIV10
CUADRILLA MO CIV 10
JOR
CIVOFCA
JOR
$692.44
0.047619
$32.97
CIVOF1A
JOR
$508.61
0.476190
$242.19
CIVAYOP
JOR
$303.37
0.476190
$144.46
Importe:
$419.62
Rendimiento:
SUBTOTAL:
5.541999
MANO DE OBRA
$75.72
$75.72
EQUIPO Y HERRAMIENTA
%MO16004
HERRAMIENTA
(%)mo
$75.72
0.020000
$1.51
%MO14824
CONSUMIBLES
(%)mo
$75.72
0.020000
$1.51
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$3.02
BASICOS
B1000009.EX
MORTERO CEMENTO-ARENA
M3
$1,028.32
0.025000
$25.71
PROPORCION
SUBTOTAL:
BASICOS
$25.71
Costo Directo:
INDIRECTOS
$107.44
25.5%
SUBTOTAL
FINANCIAMIENTO
$134.84
1.1283%
SUBTOTAL
UTILIDAD
$27.40
$1.52
$136.36
6.3%
$8.59
PRECIO UNITARIO
$144.95
OTROS CARGOS
$2.30
PRECIO DE VENTA
$147.25
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
Duracin:
de
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
90
CIE.EX.0087M
Anlisis:
Costo
M2
SUMINISTRO Y COLOCACION DE FALSO PLAFON LINEA DE SOMBRA A BASE DE PANELES DE 61 x 61 CM DISEADO CONTRA
FUEGO, ACUSTICO Y RESISTENTE A LA HUMEDAD MCA. EUROSTONE O SIMILAR MODELO PANTOMA, CON SUSPENSION VISIBLE
TIPO 1200 DE LA MISMA LINEA, EN LAMINA DE ACERO GALVANIZADO ACABADO EN ESMALTE COLOR BLANCO MATE. AMPARADO
CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA
INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV120
M2
$146.55
1.000000
$146.55
A BASE DE PANELES DE 61 X 61 CM
DISEADO CONTRA FUEGO,
ACUSTICO Y RESISTENTE A LA
HUMEDAD MCA. EUROSTONE O
SIMILAR MODELO PANTOMA, CON
SUSPENSIN VISIBLE TIPO 1200 DE
LA MISMA LINEA, EN LAMINA DE
ACERO GALVANIZADO ACABADO EN
ESMALTE COLOR BLANCO MATE.
SUBTOTAL:
MATERIALES
$146.55
MANO DE OBRA
CMOCIV20
CUADRILLA MO CIV 20
JOR
CIVOFCA
JOR
$692.44
0.042553
$29.47
CIVOF1A
JOR
$508.61
0.425532
$216.43
CIVAYOP
JOR
$303.37
0.531915
$161.37
Importe:
$407.27
Rendimiento:
SUBTOTAL:
2.054114
MANO DE OBRA
$198.27
$198.27
EQUIPO Y HERRAMIENTA
%MO16004
HERRAMIENTA
(%)mo
$198.27
0.020000
$3.97
%MO14824
CONSUMIBLES
(%)mo
$198.27
0.020000
$3.97
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$7.94
Costo Directo:
INDIRECTOS
$352.76
25.5%
SUBTOTAL
FINANCIAMIENTO
$442.71
1.1283%
SUBTOTAL
UTILIDAD
$89.95
$5.00
$447.71
6.3%
$28.21
PRECIO UNITARIO
$475.92
OTROS CARGOS
$5.73
PRECIO DE VENTA
$481.65
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
100
CIE.EX.0088M
Anlisis:
Costo
M2
MURO A BASE DE PLACAS DE CEMENTO DUROCK DE 10 CM DE ESPESOR MARCA YESO PANAMERICANO O SIMILAR CON
BASTIDOR A BASE DE CANALETAS Y POSTES DE LAMINA GALVANIZADA CAL. 26 EN SECCION DE 6.35 CM Y TABLEROS DUROCK DE
12.7 MM DE ESPESOR EN AMBAS CARAS. INCLUYE SUMINISTRO Y COLOCACION DE MATERIALES. HASTAUNA ALTURA DE 1.80 M.
AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES,
CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
CEMDUR3204
CEMENTO DUROCK
M3
$93.00
2.030000
$188.79
CLT0030
CANALETA CAL 26
ML
$27.00
2.000000
$54.00
LAM0045
M2
$56.00
1.050000
$58.80
SUBTOTAL:
MATERIALES
$301.59
MANO DE OBRA
CMOCIV10
CUADRILLA MO CIV 10
JOR
CIVOFCA
JOR
$692.44
0.047619
$32.97
CIVOF1A
JOR
$508.61
0.476190
$242.19
CIVAYOP
JOR
$303.37
0.476190
$144.46
Importe:
$419.62
Rendimiento:
SUBTOTAL:
0.900650
MANO DE OBRA
$465.91
$465.91
EQUIPO Y HERRAMIENTA
%MO16004
HERRAMIENTA
(%)mo
$465.91
0.020000
$9.32
%MO14824
CONSUMIBLES
(%)mo
$465.91
0.020000
$9.32
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$18.64
Costo Directo:
INDIRECTOS
$786.14
25.5%
SUBTOTAL
FINANCIAMIENTO
$986.61
1.1283%
SUBTOTAL
UTILIDAD
$200.47
$11.13
$997.74
6.3%
$62.86
PRECIO UNITARIO
$1,060.60
OTROS CARGOS
$13.25
PRECIO DE VENTA
$1,073.85
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
11
Duracin:
de
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
110
CIE.EX.0089M
Anlisis:
Costo
M2
APLANADO Y PERFILADO FINO DE MORTERO, CEMENTO-ARENA 1:5 COLOCACION A PLOMO Y NIVEL EN UN ESPESOR DE 2.5 CM.
DE 0.00 A 4.00 M DE ALTURA. INCLUYE SUMINISTRO DE MATERIALES. AMPARADO CON MINUTA DE TRAB. DE RIESGOS
CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
MAD0040
MADERA P/CIMBRA
SUBTOTAL:
MATERIALES
PT
$5.97
0.500000
$2.99
$2.99
MANO DE OBRA
CMOCIV08
CUADRILLA MO CIV 08
JOR
CIVOFCA
JOR
$692.44
0.038462
$26.63
CIVOF1A
JOR
$508.61
0.480769
$244.52
CIVAYOP
JOR
$303.37
0.480769
$145.85
Importe:
$417.00
Rendimiento:
SUBTOTAL:
4.433600
MANO DE OBRA
$94.05
$94.05
EQUIPO Y HERRAMIENTA
CMAQCIV08
HR
EQCAM050
HR
$255.58
0.034150
$8.73
EQAND010
ANDAMIOS
HR
$11.70
2.000000
$23.40
Importe:
$32.13
4.433600
$7.25
%MO16004
Rendimiento:
HERRAMIENTA
(%)mo
$94.05
0.020000
$1.88
%MO14824
CONSUMIBLES
(%)mo
$94.05
0.020000
$1.88
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$11.01
BASICOS
B1000009.EX
MORTERO CEMENTO-ARENA
M3
$1,028.32
0.025000
$25.71
PROPORCION
SUBTOTAL:
BASICOS
$25.71
Costo Directo:
INDIRECTOS
$133.76
25.5%
SUBTOTAL
FINANCIAMIENTO
$167.87
1.1283%
SUBTOTAL
UTILIDAD
$34.11
$1.89
$169.76
6.3%
$10.69
PRECIO UNITARIO
$180.45
OTROS CARGOS
$2.81
PRECIO DE VENTA
$183.26
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
120
CIE.EX.0090M
Anlisis:
Costo
M2
LIMPIEZA FINAL EN EDIFICACIONES (INTERIORES) . AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE
EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MANO DE OBRA
CMOCIV32
CUADRILLA MO CIV 32
JOR
CIVOFCA
JOR
$692.44
0.090909
$62.95
CIVOF1A
JOR
$508.61
0.545455
$277.42
CIVAYOP
JOR
$303.37
0.363636
$110.32
Importe:
$450.69
Rendimiento:
SUBTOTAL:
47.502857
MANO DE OBRA
$9.49
$9.49
EQUIPO Y HERRAMIENTA
%MO16004
HERRAMIENTA
(%)mo
$9.49
0.020000
$0.19
%MO14824
CONSUMIBLES
(%)mo
$9.49
0.020000
$0.19
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$0.38
Costo Directo:
INDIRECTOS
$9.87
25.5%
SUBTOTAL
FINANCIAMIENTO
$12.39
1.1283%
SUBTOTAL
UTILIDAD
$2.52
$0.14
$12.53
6.3%
$0.79
PRECIO UNITARIO
$13.32
OTROS CARGOS
$0.24
PRECIO DE VENTA
$13.56
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
130
CIE.EX.0091P
Anlisis:
Costo
MTS
CORTE DE CONCRETO CON MAQUINA DISCO A UNA PROFUNDIDAD MAXIMA DE 30 MM. Y UN ANCHO DE 6.3 MM. AMPARADO CON
PERMISOS DE TRABAJO EN AREAS DE SOLVENTES, LUBRICANTES, AMARRADORES, TANQUE LUMUS, ESFERICOS DE PROPANO,
VIAS FERREAS, RACK D-1, D-3, D-4, D-11, D-12 Y D-14, BOMBA DE TRANSFERENCIA.
MATERIALES
DIS0020
PZA
$4,676.27
0.000800
$3.74
MATERIALES
$3.74
MANO DE OBRA
CMOCIV51
CUADRILLA MO CIV 51
JOR
CIVOFCA
JOR
$692.44
0.166667
$115.41
CIVOF1A
JOR
$508.61
0.833333
$423.84
CIVAYOP
JOR
$303.37
1.000000
$303.37
Importe:
$842.62
Rendimiento:
SUBTOTAL:
44.695384
MANO DE OBRA
$18.85
$18.85
EQUIPO Y HERRAMIENTA
%MO16004
HERRAMIENTA
(%)mo
$18.85
0.020000
$0.38
%MO14824
CONSUMIBLES
(%)mo
$18.85
0.020000
$0.38
CMAQCIV51
HR
EQCOR010
HR
$81.97
22.164174
$1,816.80
S/CARRETILLA 36CM14"
Importe:
$1,816.80
Rendimiento:
SUBTOTAL:
44.695384
EQUIPO Y HERRAMIENTA
$40.65
$41.41
Costo Directo:
$64.00
INDIRECTOS
25.5%
SUBTOTAL
$16.32
$80.32
FINANCIAMIENTO
1.1283%
SUBTOTAL
$0.91
$81.23
UTILIDAD
6.3%
$5.12
PRECIO UNITARIO
$86.35
OTROS CARGOS
$1.33
PRECIO DE VENTA
$87.68
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
140
CIE.EX.0092P
Anlisis:
Costo
MTS
JUNTA DE CONSTRUCCION DE FEXPAN O SIMILAR DE 1.27 x 10 CM. INCLUYE SUMINISTRO DE MATERIALES. AMPARADO CON
PERMISOS DE TRABAJO EN AREAS DE SOLVENTES, LUBRICANTES, AMARRADORES, TANQUE LUMUS, ESFERICOS DE PROPANO,
VIAS FERREAS, RACK D-1, D-3, D-4, D-11, D-12 Y D-14, BOMBA DE TRANSFERENCIA.
MATERIALES
FEX127
M2
$160.71
0.130000
$20.89
ANCHO
SUBTOTAL:
MATERIALES
$20.89
MANO DE OBRA
CMOCIV10
CUADRILLA MO CIV 10
JOR
CIVOFCA
JOR
$692.44
0.047619
$32.97
CIVOF1A
JOR
$508.61
0.476190
$242.19
CIVAYOP
JOR
$303.37
0.476190
$144.46
Importe:
$419.62
Rendimiento:
SUBTOTAL:
23.241600
MANO DE OBRA
$18.05
$18.05
EQUIPO Y HERRAMIENTA
%MO16004
HERRAMIENTA
(%)mo
$18.05
0.020000
$0.36
%MO14824
CONSUMIBLES
(%)mo
$18.05
0.020000
$0.36
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$0.72
Costo Directo:
$39.66
INDIRECTOS
25.5%
SUBTOTAL
$10.11
$49.77
FINANCIAMIENTO
1.1283%
SUBTOTAL
$0.56
$50.33
UTILIDAD
6.3%
$3.17
PRECIO UNITARIO
$53.50
OTROS CARGOS
$0.56
PRECIO DE VENTA
$54.06
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
150
CIE.EX.0093P
Anlisis:
Costo
MTS
JUNTA DE CONSTRUCCION DE FEXPAN O SIMILAR DE 1.27 x 20 CM. INCLUYE SUMINISTRO DE MATERIALES. AMPARADO CON
PERMISOS DE TRABAJO EN AREAS DE SOLVENTES, LUBRICANTES, AMARRADORES, TANQUE LUMUS, ESFERICOS DE PROPANO,
VIAS FERREAS, RACK D-1, D-3, D-4, D-11, D-12 Y D-14, BOMBA DE TRANSFERENCIA.
MATERIALES
JUNTA3404
SUBTOTAL:
MATERIALES
M2
$21.00
0.210000
$4.41
$4.41
MANO DE OBRA
CMOCIV01
CUADRILLA MO CIV 01
JOR
CIVOFCA
JOR
$692.44
0.016393
$11.35
CIVOF1A
JOR
$508.61
0.491800
$250.13
CIVAYOP
JOR
$303.37
0.491800
$149.20
Importe:
$410.68
Rendimiento:
SUBTOTAL:
23.241600
MANO DE OBRA
$17.67
$17.67
EQUIPO Y HERRAMIENTA
CMAQCIV01
HR
EQCAM050
HR
$255.58
0.039024
Importe:
$9.97
$9.97
Rendimiento:
23.241600
$0.43
%MO16004
HERRAMIENTA
(%)mo
$17.67
0.020000
$0.35
%MO14824
CONSUMIBLES
(%)mo
$17.67
0.020000
$0.35
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$1.13
Costo Directo:
$23.21
INDIRECTOS
25.5%
SUBTOTAL
$5.92
$29.13
FINANCIAMIENTO
1.1283%
SUBTOTAL
$0.33
$29.46
UTILIDAD
6.3%
$1.86
PRECIO UNITARIO
$31.32
OTROS CARGOS
$0.48
PRECIO DE VENTA
$31.80
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
160
CIE.EX.0094P
Anlisis:
Costo
UNIDAD
SELLADO DE JUNTA DE EXPANSION HORIZONTAL 13 x 20 MM, CON ELASTOFEST O SIMILAR. INCLUYE SUMINISTRO DE
MATERIALES. AAMPARADO CON PERMISOS DE TRABAJO EN AREAS DE SOLVENTES, LUBRICANTES, AMARRADORES, TANQUE
LUMUS, ESFERICOS DE PROPANO, VIAS FERREAS, RACK D-1, D-3, D-4, D-11, D-12 Y D-14, BOMBA DE TRANSFERENCIA.
MATERIALES
FES0060
KG
$8.36
0.130000
$1.09
LTO
$1.47
0.100000
$0.15
FESTER
COM0060
PETROLEO DIAFANO
SUBTOTAL:
MATERIALES
$1.24
MANO DE OBRA
CMOCIV10
CUADRILLA MO CIV 10
JOR
CIVOFCA
JOR
$692.44
0.047619
$32.97
CIVOF1A
JOR
$508.61
0.476190
$242.19
CIVAYOP
JOR
$303.37
0.476190
$144.46
Importe:
$419.62
Rendimiento:
SUBTOTAL:
36.315000
MANO DE OBRA
$11.56
$11.56
EQUIPO Y HERRAMIENTA
%MO16004
HERRAMIENTA
(%)mo
$11.56
0.020000
$0.23
%MO14824
CONSUMIBLES
(%)mo
$11.56
0.020000
$0.23
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$0.46
Costo Directo:
$13.26
INDIRECTOS
25.5%
SUBTOTAL
$3.38
$16.64
FINANCIAMIENTO
1.1283%
SUBTOTAL
$0.19
$16.83
UTILIDAD
6.3%
$1.06
PRECIO UNITARIO
$17.89
OTROS CARGOS
$0.30
PRECIO DE VENTA
$18.19
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
170
CIE.EX.0095M
Anlisis:
Costo
M2
SUMINISTRO Y COLOCACIONDE FEXPAN O SIMILAR DE 1" x 20 CM DE ANCHO, EN JUNTAS DE MUROS CON ESTRUCTURAS
PRINCIPALES..INCLUYE SUMINISTRO DE MATERIALES. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS
DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
ALA0180
KG
$10.70
0.005000
$0.05
BAN0010A
M2
$160.71
0.210000
$33.75
DE ANCHO
SUBTOTAL:
MATERIALES
$33.80
MANO DE OBRA
CMOCIV10
CUADRILLA MO CIV 10
JOR
CIVOFCA
JOR
$692.44
0.047619
$32.97
CIVOF1A
JOR
$508.61
0.476190
$242.19
CIVAYOP
JOR
$303.37
0.476190
$144.46
Importe:
$419.62
Rendimiento:
SUBTOTAL:
16.626000
MANO DE OBRA
$25.24
$25.24
EQUIPO Y HERRAMIENTA
%MO16004
HERRAMIENTA
(%)mo
$25.24
0.020000
$0.50
%MO14824
CONSUMIBLES
(%)mo
$25.24
0.020000
$0.50
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$1.00
Costo Directo:
$60.04
INDIRECTOS
25.5%
SUBTOTAL
$15.31
$75.35
FINANCIAMIENTO
1.1283%
SUBTOTAL
$0.85
$76.20
UTILIDAD
6.3%
$4.80
PRECIO UNITARIO
$81.00
OTROS CARGOS
$0.80
PRECIO DE VENTA
$81.80
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Anlisis No.:
Unidad
Cantidad
Importe
180
CIE.EX.0096M
Anlisis:
Costo
PZA
SUMINISTRO E INSTALACION DE PUERTA ABATIBLE DE DOS HOJAS, FABRICADA CON PERFILES DE ALUMINIO ANODIZADO
DURANODICK, LINEA COMERCIAL DE 1.75, CON TABLEROS DE DUELA DE ALUMINIO DE 6 MM DE ESPESOR CON PASADORES
SUPERIOR E INFERIOR EN UNA HOJA, FIJO SUPERIOR DE 100 CM Y PUERTA DE 80 X 210 CM, EN UNA DE LAS HOJAS, CON LAS
SIGUIENTES MEDIDAS: 250 x 400 CM (CERRADURA D). VER DIB.No. N-F.20030-511-1-246B. AMPARADO CON MINUTA DE TRAB. DE
RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN
GENERAL
MATERIALES
SUB_SCCIV103A
PZA
###
1.000000
$15,389.30
250 X 400
CM (CERRADURA D).
SUBTOTAL:
MATERIALES
$15,389.30
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.319730
MANO DE OBRA
$1,322.49
$1,322.49
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.319730
$128.14
%MO14824
CONSUMIBLES
(%)mo
$1,322.49
0.020000
$26.45
%MO16004
HERRAMIENTA
(%)mo
$1,322.49
0.020000
$26.45
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$181.04
Costo Directo:
INDIRECTOS
$16,892.83
25.5%
SUBTOTAL
FINANCIAMIENTO
$4,307.67
$21,200.50
1.1283%
$239.21
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
SUBTOTAL
UTILIDAD
Importe
$21,439.71
6.3%
$1,350.70
PRECIO UNITARIO
$22,790.41
OTROS CARGOS
$111.55
PRECIO DE VENTA
$22,901.96
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
190
CIE.EX.0097M
Anlisis:
Costo
PZA
SUMINISTRO E INSTALACION DE PUERTA ABATIBLE DE UNA HOJA FABRICADA CON PERFILES DE ALUMINIO ANODIZADO
DURANODICK LINEA COMERCIAL DE 1.75", CON TABLEROS DE DUELA DE ALUMINIO DE 6 MM DE ESPESOR CON LAS SIGUIENTES
MEDIDAS: 100 x 210 CM (CERRADURA DA). VER DIB. No. N-F.20030-511-1-206A .AMPARADO CON MINUTA DE TRAB. DE RIESGOS
CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV110
PZA
$3,904.16
1.000000
$3,904.16
MATERIALES
$3,904.16
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.831300
MANO DE OBRA
$508.65
$508.65
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.831300
$49.28
%MO16004
HERRAMIENTA
(%)mo
$508.65
0.020000
$10.17
%MO14824
CONSUMIBLES
(%)mo
$508.65
0.020000
$10.17
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$69.62
Costo Directo:
INDIRECTOS
$4,482.43
25.5%
SUBTOTAL
FINANCIAMIENTO
$5,625.45
1.1283%
SUBTOTAL
UTILIDAD
$1,143.02
$63.47
$5,688.92
6.3%
$358.40
PRECIO UNITARIO
$6,047.32
OTROS CARGOS
$32.83
PRECIO DE VENTA
$6,080.15
DIRECTOR PROYECTOS PEMEX ING. ASCENCION MEDINA NIEVES
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
Importe
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Anlisis No.:
Unidad
Costo
Cantidad
Importe
200
CIE.EX.0098M
PZA
SUMINISTRO E INSTALACION DE PUERTA ABATIBLE DE DOS HOJAS, FABRICADA CON BASTIDOR DE PINO DE 38 x 25 MM, CON
PEINAZOS A CADA 30 CM, EN AMBOS SENTIDOS, FORRADA CON TRIPLAY DE PINO DE 6 MM DE ESPESOR AMBAS CARAS
RECUBIERTAS CON CHAPA DE LAMINADO PLASTICO COLOR PERGAMINO O SIMILAR, INCLUYE BISAGRAS DE LIBRO 3,
CERRADURA DE UNA DE LAS HOJAS INTERCOMUNICACION Y PASADORES SUPERIOR E INFERIOR EN CADA HOJA CON LAS
SIGUIENTES MEDIDAS: (CERRADURA C Y E), 180 x 250 CM, VER DIB. No. N-F.20030-511-1-208C .AMPARADO CON MINUTA DE TRAB.
DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN
GENERAL
MATERIALES
SUB_SCCIV104
PZA
$5,613.30
1.000000
$5,613.30
MATERIALES
$5,613.30
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.554199
MANO DE OBRA
$762.98
$762.98
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.554199
$73.93
%MO16004
HERRAMIENTA
(%)mo
$762.98
0.020000
$15.26
%MO14824
CONSUMIBLES
(%)mo
$762.98
0.020000
$15.26
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$104.45
Costo Directo:
INDIRECTOS
$6,480.73
25.5%
DIRECTOR PROYECTOS PEMEX ING. ASCENCION MEDINA NIEVES
$1,652.59
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
SUBTOTAL
FINANCIAMIENTO
$8,133.32
1.1283%
SUBTOTAL
UTILIDAD
Importe
$91.77
$8,225.09
6.3%
$518.18
PRECIO UNITARIO
$8,743.27
OTROS CARGOS
$48.03
PRECIO DE VENTA
$8,791.30
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Anlisis No.:
Unidad
Cantidad
Importe
210
CIE.EX.0099M
Anlisis:
Costo
PZA
SUMINISTRO E INSTALACION DE PUERTA ABATIBLE DE UNA HOJA FABRICADA CON BASTIDOR DE PINO DE 38 x 25 MM, CON
PEINAZOS A CADA 30 CM, EN AMBOS SENTIDOS, FORRADA CON TRIPLAY DE PINO DE 6 MM DE ESPESOR AMBAS CARAS
RECUBIERTAS CON CHAPA DE LAMINADO PLASTICO COLOR PERGAMINO O SIMILAR CON LAS SIGUIENTES MEDIDAS: (CERRADURA
C), 90 x 210 CM, VER DIB. No. N-F.20030-511-1-220C . AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE
EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV104A
PZA
$2,739.23
1.000000
$2,739.23
90 X 210 CM
MATERIALES
$2,739.23
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.755726
MANO DE OBRA
$559.51
$559.51
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.755726
$54.21
%MO16004
HERRAMIENTA
(%)mo
$559.51
0.020000
$11.19
%MO14824
CONSUMIBLES
(%)mo
$559.51
0.020000
$11.19
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$76.59
Costo Directo:
INDIRECTOS
$3,375.33
25.5%
SUBTOTAL
FINANCIAMIENTO
$4,236.04
1.1283%
SUBTOTAL
UTILIDAD
$860.71
$47.80
$4,283.84
6.3%
$269.88
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
Importe
PRECIO UNITARIO
$4,553.72
OTROS CARGOS
$28.34
PRECIO DE VENTA
$4,582.06
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Anlisis No.:
Unidad
Cantidad
Importe
220
CIE.EX.0100M
Anlisis:
Costo
PZA
SUMINISTRO E INSTALACION DE PUERTA ABATIBLE DE UNA HOJA FABRICADA CON BASTIDOR DE PINO DE 38 x 25 MM, CON
PEINAZOS A CADA 30 CM, EN AMBOS SENTIDOS, FORRADA CON TRIPLAY DE PINO DE 6 MM DE ESPESOR AMBAS CARAS
RECUBIERTAS CON CHAPA DE LAMINADO PLASTICO COLOR PERGAMINO O SIMILAR CON LAS SIGUIENTES MEDIDAS: (CERRADURA
C), 90 x 250 CM, VER DIB.No. N-F.20030-511-1-208C.AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE
EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV104B
PZA
$2,900.45
1.000000
$2,900.45
90 X
250 CM
SUBTOTAL:
MATERIALES
$2,900.45
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.755726
MANO DE OBRA
$559.51
$559.51
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.755726
$54.21
%MO16004
HERRAMIENTA
(%)mo
$559.51
0.020000
$11.19
%MO14824
CONSUMIBLES
(%)mo
$559.51
0.020000
$11.19
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$76.59
Costo Directo:
INDIRECTOS
$3,536.55
25.5%
SUBTOTAL
FINANCIAMIENTO
$4,438.37
1.1283%
SUBTOTAL
UTILIDAD
$901.82
$50.08
$4,488.45
6.3%
$282.77
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
Importe
PRECIO UNITARIO
$4,771.22
OTROS CARGOS
$29.14
PRECIO DE VENTA
$4,800.36
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Anlisis No.:
Unidad
Cantidad
Importe
230
CIE.EX.0101M
Anlisis:
Costo
PZA
SUMINISTRO E INSTALACION DE PUERTA ABATIBLE DE UNA HOJA FABRICADA CON BASTIDOR DE PINO DE 38 x 25 MM, CON
PEINAZOS A CADA 30 CM, EN AMBOS SENTIDOS, FORRADA CON TRIPLAY DE PINO DE 6 MM DE ESPESOR AMBAS CARAS
RECUBIERTAS CON CHAPA DE LAMINADO PLASTICO COLOR PERGAMINO O SIMILAR CON LAS SIGUIENTES MEDIDAS: (CERRADURA
C), 90 x 240 CM, VER DIB.No. N-F.20030-511-1-212D. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE
EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV104C
PZA
$3,025.20
1.000000
$3,025.20
MATERIALES
$3,025.20
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.755726
MANO DE OBRA
$559.51
$559.51
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.755726
$54.21
%MO16004
HERRAMIENTA
(%)mo
$559.51
0.020000
$11.19
%MO14824
CONSUMIBLES
(%)mo
$559.51
0.020000
$11.19
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$76.59
Costo Directo:
INDIRECTOS
$3,661.30
25.5%
SUBTOTAL
FINANCIAMIENTO
$4,594.93
1.1283%
SUBTOTAL
UTILIDAD
$933.63
$51.84
$4,646.77
6.3%
$292.75
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
Importe
PRECIO UNITARIO
$4,939.52
OTROS CARGOS
$29.77
PRECIO DE VENTA
$4,969.29
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Anlisis No.:
Unidad
Cantidad
Importe
240
CIE.EX.0102M
Anlisis:
Costo
PZA
SUMINISTRO E INSTALACION DE PUERTA ABATIBLE DE UNA HOJA FABRICADA CON BASTIDOR DE PINO DE 38 x 25 MM, CON
PEINAZOS A CADA 30 CM, EN AMBOS SENTIDOS, FORRADA CON TRIPLAY DE PINO DE 6 MM DE ESPESOR AMBAS CARAS
RECUBIERTAS CON CHAPA DE LAMINADO PLASTICO COLOR PERGAMINO O SIMILAR CON LAS SIGUIENTES MEDIDAS: (CERRADURA
C), 70 x 220 CM, VER DIB.No. N-F.20030-511-1-212D. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE
EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV104D
PZA
$3,512.06
1.000000
$3,512.06
MATERIALES
$3,512.06
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.831300
MANO DE OBRA
$508.65
$508.65
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.831300
$49.28
%MO16004
HERRAMIENTA
(%)mo
$508.65
0.020000
$10.17
%MO14824
CONSUMIBLES
(%)mo
$508.65
0.020000
$10.17
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$69.62
Costo Directo:
INDIRECTOS
$4,090.33
25.5%
SUBTOTAL
FINANCIAMIENTO
$5,133.36
1.1283%
SUBTOTAL
UTILIDAD
$1,043.03
$57.92
$5,191.28
6.3%
$327.05
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
Importe
PRECIO UNITARIO
$5,518.33
OTROS CARGOS
$30.87
PRECIO DE VENTA
$5,549.20
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Anlisis No.:
Unidad
Cantidad
Importe
250
CIE.EX.0103M
Anlisis:
Costo
PZA
SUMINISTRO E INSTALACION DE PUERTA ABATIBLE CONTRA FUEGO DE UNA HOJA CONSTRUIDA TIPO TAMBOR DE DOBLE PAO
DE LAMINA LISA CAL. 16 REFORZADA CON BASTIDOR TUBULAR CAL. 10, ESPESOR TOTAL DE 4.2 CM CON EMPAQUE INTERIOR DE
LANA MINERAL CON SELLO PERIMETRAL CONTRA HUMO Y UMBRAL INFERIOR CON SELLO INTEGRADO DE NEOPRENO, BISAGRAS
USO PESADO, RECUBRIMIENTO DE PINTURA ANTICORROSIVA, BARRA DE PANICO A PRUEBA DE FUEGO, DE ACERO INOXIDABLE
DE 260 x 140 CM, DIB.N-F.20030-511-1-202H. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE
EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV098A
PZA
$9,199.96
1.000000
$9,199.96
MATERIALES
$9,199.96
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.207825
MANO DE OBRA
$2,034.60
$2,034.60
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
0.207825
$197.14
%MO14824
Rendimiento:
CONSUMIBLES
(%)mo
$2,034.60
0.020000
$40.69
%MO16004
HERRAMIENTA
(%)mo
$2,034.60
0.020000
$40.69
SUBTOTAL:
EQUIPO Y HERRAMIENTA
Costo Directo:
$278.52
$11,513.08
INDIRECTOS
25.5%
DIRECTOR PROYECTOS PEMEX ING. ASCENCION MEDINA NIEVES
$2,935.84
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
SUBTOTAL
FINANCIAMIENTO
$14,448.92
1.1283%
SUBTOTAL
UTILIDAD
Importe
$163.03
$14,611.95
6.3%
$920.55
PRECIO UNITARIO
$15,532.50
OTROS CARGOS
$99.24
PRECIO DE VENTA
$15,631.74
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Anlisis No.:
Unidad
Cantidad
Importe
260
CIE.EX.0104M
Anlisis:
Costo
PZA
SUMINISTRO E INSTALACION DE PUERTA ABATIBLE CONTRA FUEGO DE DOS HOJAS CONSTRUIDA TIPO TAMBOR DE DOBLE PAO
DE LAMINA LISA CAL. 16 REFORZADA CON BASTIDOR TUBULAR CAL. 10 ESPESOR TOTAL DE 4.2 CM CON EMPAQUE INTERIOR DE
LANA MINERAL CON SELLO PERIMETRAL CONTRA HUMO Y UMBRAL INFERIOR CON SELLO INTEGRADO DE NEOPRENO, BISAGRAS
USO PESADO, RECUBRIMIENTO DE PINTURA ANTICORROSIVA, BARRA DE PANICO A PRUEBA DE FUEGO DE ACERO INOXIDABLE
DE 260 x 240 CM, DIB.N-F.20030-511-1-202H. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE
EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV098B
PZA
###
1.000000
$12,681.36
MATERIALES
$12,681.36
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.207825
MANO DE OBRA
$2,034.60
$2,034.60
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
0.207825
$197.14
%MO16004
Rendimiento:
HERRAMIENTA
(%)mo
$2,034.60
0.020000
$40.69
%MO14824
CONSUMIBLES
(%)mo
$2,034.60
0.020000
$40.69
SUBTOTAL:
EQUIPO Y HERRAMIENTA
Costo Directo:
$278.52
$14,994.48
INDIRECTOS
25.5%
DIRECTOR PROYECTOS PEMEX ING. ASCENCION MEDINA NIEVES
$3,823.59
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
SUBTOTAL
FINANCIAMIENTO
$18,818.07
1.1283%
SUBTOTAL
UTILIDAD
Importe
$212.32
$19,030.39
6.3%
$1,198.91
PRECIO UNITARIO
$20,229.30
OTROS CARGOS
$116.64
PRECIO DE VENTA
$20,345.94
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
270
CIE.EX.0105M
Anlisis:
Costo
PZA
SUMINISTRO E INSTALACION DE CORTINA ARTICULADA TIPO EUROPEO 100 mm, CON HOJA A BASE DE LAMINA GALVANIZADA
ZINTRO CAL. No 22 ACCIONADA CON CADENA, MARC VALSAN O SIMILAR , ASEGURADA CON CHAPA Y PASADORES LATERALES
INTERIORES, CON LAS SIGUIENTES MEDIDAS:400 x 400 CM, VER DIB.No. N-F.20030-511-1-246B. AMPARADO CON MINUTA DE TRAB.
DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN
GENERAL
MATERIALES
SUB_SCCIV076
PZA
###
1.000000
$18,540.00
MATERIALES
$18,540.00
MANO DE OBRA
CMOCIV06
CUADRILLA MO CIV 06
JOR
CIVOFCA
JOR
$692.44
0.038462
$26.63
CIVOF1A
JOR
$508.61
0.480769
$244.52
CIVAYOP
JOR
$303.37
0.480769
$145.85
Importe:
$417.00
Rendimiento:
SUBTOTAL:
0.207825
MANO DE OBRA
$2,006.50
$2,006.50
EQUIPO Y HERRAMIENTA
CMAQCIV06
HR
EQCAM050
HR
$255.58
0.034150
Importe:
$8.73
$8.73
Rendimiento:
0.207825
$42.01
%MO16004
HERRAMIENTA
(%)mo
$2,006.50
0.020000
$40.13
%MO14824
CONSUMIBLES
(%)mo
$2,006.50
0.020000
$40.13
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$122.27
Costo Directo:
INDIRECTOS
$20,668.77
25.5%
SUBTOTAL
FINANCIAMIENTO
$25,939.31
1.1283%
SUBTOTAL
UTILIDAD
$5,270.54
$292.67
$26,231.98
6.3%
PRECIO UNITARIO
$1,652.61
$27,884.59
OTROS CARGOS
$143.68
DIRECTOR PROYECTOS PEMEX ING. ASCENCION MEDINA NIEVES
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
PRECIO DE VENTA
Importe
$28,028.27
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
280
CIE.EX.0106M
Anlisis:
Costo
PZA
VENTANA FIJA FABRICADA CON PERFILES DE ALUMINIO ANODIZADO NATURAL LINEA DE BOLSA DE 2 x 1.25" CON TABLEROS DE
CRISTAL INASTILLABLE GRIS FILTRA SOL CLARO DE 6 MM. DE ESPESOR. 550 x 100 CM, VER DIB.No. N-F.20030-511-1-220C .
AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES,
CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV179
PZA
$7,976.55
1.000000
$7,976.55
PERFILES DE ALUMINIO
ANODIZADO NATURAL LNEA DE
BOLSA DE 2 X 1.25" CON TABLEROS
DE CRISTAL INASTILLABLE CLARO
DE 6 MM. DE ESPESOR. 550 X
100CM VER DIB.No. N-F.
20030-511-1-220C
SUBTOTAL:
MATERIALES
$7,976.55
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.554199
MANO DE OBRA
$762.98
$762.98
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.554199
$73.93
%MO16004
HERRAMIENTA
(%)mo
$762.98
0.020000
$15.26
%MO14824
CONSUMIBLES
(%)mo
$762.98
0.020000
$15.26
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$104.45
Costo Directo:
INDIRECTOS
$8,843.98
25.5%
SUBTOTAL
FINANCIAMIENTO
$11,099.19
1.1283%
SUBTOTAL
UTILIDAD
$2,255.21
$125.23
$11,224.42
6.3%
$707.14
PRECIO UNITARIO
$11,931.56
OTROS CARGOS
$59.85
PRECIO DE VENTA
$11,991.41
DIRECTOR PROYECTOS PEMEX ING. ASCENCION MEDINA NIEVES
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
Importe
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
290
CIE.EX.0107M
Anlisis:
Costo
PZA
VENTANA FIJA FABRICADA CON PERFILES DE ALUMINIO ANODIZADO NATURAL LINEA DE BOLSA DE 2 x 1.25" CON TABLEROS DE
CRISTAL INASTILLABLE CLARO DE 6 MM. DE ESPESOR. 150 x 100 CM, VER DIB.No. N-F.20030-511-1-212D . AMPARADO CON MINUTA
DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y
ALMACEN GENERAL
MATERIALES
SUB_SCCIV005
PZA
$2,263.75
1.000000
$2,263.75
PERFILES DE ALUMINIO
ANODIZADO NATURAL LNEA DE
BOLSA DE 2 X 1.25" CON TABLEROS
DE CRISTAL INASTILLABLE CLARO
DE 6 MM. DE ESPESOR. 150 X 100
VER DIB.No. N-F.20030-511-1-212D
SUBTOTAL:
MATERIALES
$2,263.75
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.978000
MANO DE OBRA
$432.35
$432.35
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
0.978000
$41.89
%MO16004
Rendimiento:
HERRAMIENTA
(%)mo
$432.35
0.020000
$8.65
%MO14824
CONSUMIBLES
(%)mo
$432.35
0.020000
$8.65
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$59.19
Costo Directo:
INDIRECTOS
$2,755.29
25.5%
SUBTOTAL
FINANCIAMIENTO
$3,457.89
1.1283%
SUBTOTAL
UTILIDAD
$702.60
$39.02
$3,496.91
6.3%
$220.31
PRECIO UNITARIO
$3,717.22
OTROS CARGOS
$22.64
PRECIO DE VENTA
$3,739.86
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
300
CIE.EX.0108M
Anlisis:
Costo
PZA
VENTANA FIJA FABRICADA CON PERFILES DE ALUMINIO ANODIZADO NATURAL LINEA DE BOLSA DE 2 x 1.25" CON TABLEROS DE
CRISTAL INASTILLABLE COLOR BRONCE DE 6 MM. DE ESPESOR. 360 x 180 CM, VER DIB.No. N-F.20030-511-1-212D. AMPARADO CON
MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA
INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV178
PZA
$8,734.75
1.000000
$8,734.75
PERFILES DE ALUMINIO
ANODIZADO NATURAL LNEA DE
BOLSA DE 2 X 1.25" CON TABLEROS
DE CRISTAL INASTILLABLE CLARO
DE 6 MM. DE ESPESOR. 360 X 180
VER DIB.No. N-F.20030-511-1-212D
SUBTOTAL:
MATERIALES
$8,734.75
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.875052
MANO DE OBRA
$483.22
$483.22
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
0.875052
$46.82
%MO16004
Rendimiento:
HERRAMIENTA
(%)mo
$483.22
0.020000
$9.66
%MO14824
CONSUMIBLES
(%)mo
$483.22
0.020000
$9.66
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$66.14
Costo Directo:
INDIRECTOS
$9,284.11
25.5%
SUBTOTAL
FINANCIAMIENTO
$11,651.56
1.1283%
SUBTOTAL
UTILIDAD
$2,367.45
$131.46
$11,783.02
6.3%
$742.33
PRECIO UNITARIO
$12,525.35
OTROS CARGOS
$56.32
PRECIO DE VENTA
$12,581.67
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
310
CIE.EX.0109M
Anlisis:
Costo
PZA
VENTANA FIJA FABRICADA CON PERFILES DE ALUMINIO ANODIZADO NATURAL LINEA DE BOLSA DE 2 x 1.25" CON TABLEROS DE
CRISTAL INASTILLABLE COLOR BRONCE DE 6 MM. DE ESPESOR. 260 x 180 CM, VER DIB.No. N-F.20030-511-1-212D. AMPARADO CON
MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA
INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV175
PZA
$7,456.30
1.000000
$7,456.30
PERFILES DE ALUMINIO
ANODIZADO NATURAL LNEA DE
BOLSA DE 2 X 1.25" CON TABLEROS
DE CRISTAL INASTILLABLE COLOR
BRONCE DE 6 MM. DE ESPESOR.
260 X 180 CM VER DIB.No.
N-F.20030-511-1-212D
SUBTOTAL:
MATERIALES
$7,456.30
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.554199
MANO DE OBRA
$762.98
$762.98
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.554199
$73.93
%MO16004
HERRAMIENTA
(%)mo
$762.98
0.020000
$15.26
%MO14824
CONSUMIBLES
(%)mo
$762.98
0.020000
$15.26
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$104.45
Costo Directo:
INDIRECTOS
$8,323.73
25.5%
SUBTOTAL
FINANCIAMIENTO
$10,446.28
1.1283%
SUBTOTAL
UTILIDAD
$2,122.55
$117.87
$10,564.15
6.3%
$665.54
PRECIO UNITARIO
$11,229.69
OTROS CARGOS
$57.25
PRECIO DE VENTA
$11,286.94
DIRECTOR PROYECTOS PEMEX ING. ASCENCION MEDINA NIEVES
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
Importe
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
320
CIE.EX.0110M
Anlisis:
Costo
PZA
VENTANA FIJA FABRICADA CON PERFILES DE ALUMINIO ANODIZADO NATURAL LINEA DE BOLSA DE 2 x 1.25" CON TABLEROS DE
CRISTAL INASTILLABLE COLOR BRONCE CLARO DE 6 MM. DE ESPESOR. 270 x 180 CM, VER DIB.No. N-F.20030-511-1-212D.
AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES,
CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV174
PZA
$7,743.09
1.000000
$7,743.09
PERFILES DE ALUMINIO
ANODIZADO NATURAL LNEA DE
BOLSA DE 2 X 1.25" CON TABLEROS
DE CRISTAL INASTILLABLE COLOR
BRONCE CLARO DE 6 MM. DE
ESPESOR. 270 X 180 CM VER
DIB.No. N-F.20030-511-1-212D
SUBTOTAL:
MATERIALES
$7,743.09
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.554199
MANO DE OBRA
$762.98
$762.98
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.554199
$73.93
%MO16004
HERRAMIENTA
(%)mo
$762.98
0.020000
$15.26
%MO14824
CONSUMIBLES
(%)mo
$762.98
0.020000
$15.26
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$104.45
Costo Directo:
INDIRECTOS
$8,610.52
25.5%
SUBTOTAL
FINANCIAMIENTO
$10,806.20
1.1283%
SUBTOTAL
UTILIDAD
$2,195.68
$121.93
$10,928.13
6.3%
$688.47
PRECIO UNITARIO
$11,616.60
OTROS CARGOS
$58.68
PRECIO DE VENTA
$11,675.28
DIRECTOR PROYECTOS PEMEX ING. ASCENCION MEDINA NIEVES
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
Importe
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
330
CIE.EX.0111M
Anlisis:
Costo
PZA
VENTANA FIJA FABRICADA CON PERFILES DE ALUMINIO ANODIZADO NATURAL LINEA DE BOLSA DE 2 x 1.25" CON UN MODULO
CORREDIZO Y TABLEROS DE CRISTAL INASTILLABLE CLARO DE 6 MM. DE ESPESOR. 170 x 140 CM, VER DIB.No. N-F.
20030-511-1-208C . AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1,
LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV176
PZA
$3,835.76
1.000000
$3,835.76
PERFILES DE ALUMINIO
ANODIZADO NATURAL LNEA DE
BOLSA DE 2 X 1.25" CON UN
MODULO CORREDIZO Y TABLEROS
DE CRISTAL INASTILLABLE CLARO
DE 6 MM. DE ESPESOR. 170 X 140
CM VER DIB.No.N-F.
20030-511-1-208C
SUBTOTAL:
MATERIALES
$3,835.76
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.755726
MANO DE OBRA
$559.51
$559.51
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.755726
$54.21
%MO16004
HERRAMIENTA
(%)mo
$559.51
0.020000
$11.19
%MO14824
CONSUMIBLES
(%)mo
$559.51
0.020000
$11.19
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$76.59
Costo Directo:
INDIRECTOS
$4,471.86
25.5%
SUBTOTAL
FINANCIAMIENTO
$5,612.18
1.1283%
SUBTOTAL
UTILIDAD
$1,140.32
$63.32
$5,675.50
6.3%
$357.56
PRECIO UNITARIO
$6,033.06
OTROS CARGOS
$33.82
PRECIO DE VENTA
$6,066.88
DIRECTOR PROYECTOS PEMEX ING. ASCENCION MEDINA NIEVES
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
Importe
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
340
CIE.EX.0112M
Anlisis:
Costo
PZA
VENTANA FIJA FABRICADA CON PERFILES DE ALUMINIO ANODIZADO NATURAL LINEA DE BOLSA DE 2 x 1.25" CON TABLEROS DE
CRISTAL INASTILLABLE COLOR BRONCE CLARO DE 6 MM. DE ESPESOR. 50 x 50 CM, VER DIB.No. N-F.20030-511-1-212D. AMPARADO
CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA
INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV179A
PZA
$732.89
1.000000
$732.89
PERFILES DE ALUMINIO
ANODIZADO NATURAL LNEA DE
BOLSA DE 2 X 1.25" CON TABLEROS
DE CRISTAL INASTILLABLE COLOR
BRONCE CLARO DE 6 MM. DE
ESPESOR. 50X50 CM
SUBTOTAL:
MATERIALES
$732.89
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.923667
MANO DE OBRA
$457.78
$457.78
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
0.923667
$44.36
%MO16004
Rendimiento:
HERRAMIENTA
(%)mo
$457.78
0.020000
$9.16
%MO14824
CONSUMIBLES
(%)mo
$457.78
0.020000
$9.16
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$62.68
Costo Directo:
INDIRECTOS
$1,253.35
25.5%
SUBTOTAL
FINANCIAMIENTO
$1,572.95
1.1283%
SUBTOTAL
UTILIDAD
$319.60
$17.75
$1,590.70
6.3%
$100.21
PRECIO UNITARIO
$1,690.91
OTROS CARGOS
$15.65
PRECIO DE VENTA
$1,706.56
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
350
CIE.EX.0113M
Anlisis:
Costo
PZA
VENTANA FIJA FABRICADA CON PERFILES DE ALUMINIO ANODIZADO NATURAL LINEA DE BOLSA DE 2 x 1.25" CON TABLEROS DE
CRISTAL INASTILLABLE COLOR BRONCE CLARO DE 6 MM. DE ESPESOR. 360 x 60 CM, VER DIB.No. N-F.20030-511-1-212D.
AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES,
CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV005A
PZA
$4,005.15
1.000000
$4,005.15
PERFILES DE ALUMINIO
ANODIZADO NATURAL LNEA DE
BOLSA DE 2 X 1.25" CON TABLEROS
DE CRISTAL INASTILLABLE COLOR
BRONCE CLARO DE 6 MM. DE
ESPESOR. 360 X 60 CM VER DIB.No.
N-F.20030-511-1-212D
SUBTOTAL:
MATERIALES
$4,005.15
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.755726
MANO DE OBRA
$559.51
$559.51
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.755726
$54.21
%MO16004
HERRAMIENTA
(%)mo
$559.51
0.020000
$11.19
%MO14824
CONSUMIBLES
(%)mo
$559.51
0.020000
$11.19
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$76.59
Costo Directo:
INDIRECTOS
$4,641.25
25.5%
SUBTOTAL
FINANCIAMIENTO
$5,824.77
1.1283%
SUBTOTAL
UTILIDAD
$1,183.52
$65.72
$5,890.49
6.3%
$371.10
PRECIO UNITARIO
$6,261.59
OTROS CARGOS
$34.67
PRECIO DE VENTA
$6,296.26
DIRECTOR PROYECTOS PEMEX ING. ASCENCION MEDINA NIEVES
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
Importe
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
360
CIE.EX.0114M
Anlisis:
Costo
PZA
VENTANA FIJA FABRICADA CON PERFILES DE ALUMINIO ANODIZADO NATURAL LINEA DE BOLSA DE 2 x 1.25" CON TABLEROS DE
CRISTAL INASTILLABLE COLOR BRONCE CLARO DE 6 MM. DE ESPESOR. 260 x 60 CM, VER DIB.No. N-F.20030-511-1-212D.
AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES,
CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV178A
PZA
$2,952.04
1.000000
$2,952.04
PERFILES DE ALUMINIO
ANODIZADO NATURAL LNEA DE
BOLSA DE 2 X 1.25" CON TABLEROS
DE CRISTAL INASTILLABLE COLOR
BRONCE CLARO DE 6 MM. DE
ESPESOR. 260 X 60 CM
SUBTOTAL:
MATERIALES
$2,952.04
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.831300
MANO DE OBRA
$508.65
$508.65
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
0.831300
$49.28
%MO16004
Rendimiento:
HERRAMIENTA
(%)mo
$508.65
0.020000
$10.17
%MO14824
CONSUMIBLES
(%)mo
$508.65
0.020000
$10.17
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$69.62
Costo Directo:
INDIRECTOS
$3,530.31
25.5%
SUBTOTAL
FINANCIAMIENTO
$4,430.54
1.1283%
SUBTOTAL
UTILIDAD
$900.23
$49.99
$4,480.53
6.3%
$282.27
PRECIO UNITARIO
$4,762.80
OTROS CARGOS
$28.07
PRECIO DE VENTA
$4,790.87
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Anlisis No.:
Unidad
Cantidad
Importe
370
CIE.EX.0115M
Anlisis:
Costo
PZA
MAMPARA SANITARIA FIJA PARA W.C. DE 1.50 M DE FONDO POR 1.60 M DE ALTO DE ACERO BONDERIZADO CAL. 22 ESMALTADO
EN COLOR AZUL REY MODELO CLASICO CON REFUERZO SUPERIOR DE ACERO INOXIDABLE, MARCA SANIMODUL O SIMILAR,
INCLUYE BRAKETS Y HERRAJES DE ACERO INOXIDABLE 304 CALS. 12 Y 10, VER DIB.No. N-F.20030-511-1-212D, 206A, 208C, 212D Y
246B. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES,
CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV023
PZA
$2,993.28
1.000000
$2,993.28
MATERIALES
$2,993.28
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.831300
MANO DE OBRA
$508.65
$508.65
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.831300
$49.28
%MO16004
HERRAMIENTA
(%)mo
$508.65
0.020000
$10.17
%MO14824
CONSUMIBLES
(%)mo
$508.65
0.020000
$10.17
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$69.62
Costo Directo:
INDIRECTOS
$3,571.55
25.5%
SUBTOTAL
FINANCIAMIENTO
$4,482.30
1.1283%
SUBTOTAL
UTILIDAD
$910.75
$50.57
$4,532.87
6.3%
$285.57
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
Importe
PRECIO UNITARIO
$4,818.44
OTROS CARGOS
$28.28
PRECIO DE VENTA
$4,846.72
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Anlisis No.:
Unidad
Cantidad
Importe
380
CIE.EX.0116M
Anlisis:
Costo
PZA
MAMPARA SANITARIA PARA W.C. CON PUERTA DE 0.90 M DE ANCHO POR 1.60 M DE ALTO Y PUERTA DE 0.60 M DE ANCHO, DE
ACERO BONDERIZADO CAL. 22 ESMALTADO EN COLOR AZUL REY MODELO CLASICO CON REFUERZO SUPERIOR DE ACERO
INOXIDABLE, MARCA SANIMODUL O SIMILAR, INCLUYE BRAKETS, JALADERAS Y HERRAJES DE ACERO INOXIDABLE 304 CALS. 12 Y
10, VER DIB.No. N-F.20030-511-1-212D, 206A, 208C, 212D Y 246B. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN
AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV024
PZA
$1,795.97
1.000000
$1,795.97
MATERIALES
$1,795.97
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.831300
MANO DE OBRA
$508.65
$508.65
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.831300
$49.28
%MO16004
HERRAMIENTA
(%)mo
$508.65
0.020000
$10.17
%MO14824
CONSUMIBLES
(%)mo
$508.65
0.020000
$10.17
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$69.62
Costo Directo:
INDIRECTOS
$2,374.24
25.5%
SUBTOTAL
FINANCIAMIENTO
$605.43
$2,979.67
1.1283%
$33.62
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
SUBTOTAL
UTILIDAD
Importe
$3,013.29
6.3%
$189.84
PRECIO UNITARIO
$3,203.13
OTROS CARGOS
$22.29
PRECIO DE VENTA
$3,225.42
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
390
CIE.EX.0117M
Anlisis:
Costo
PZA
MAMPARA SANITARIA FIJA PARA MINGITORIO DE 0.50 M DE FONDO POR 1.60 M DE ALTO DE ACERO BONDERIZADO CAL. 22
ESMALTADO EN COLOR AZUL REY MODELO CLASICO CON REFUERZO SUPERIOR DE ACERO INOXIDABLE, MARCA SANIMODUL O
SIMILAR, INCLUYE BRAKETS Y HERRAJES DE ACERO INOXIDABLE 304 CALS. 12 Y 10, VER DIB.No. N-F.20030-511-1-212D, 206A, 208C,
212D Y 246B. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1,
LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV022
PZA
$997.76
1.000000
$997.76
MATERIALES
$997.76
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.831300
MANO DE OBRA
$508.65
$508.65
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.831300
$49.28
%MO16004
HERRAMIENTA
(%)mo
$508.65
0.020000
$10.17
%MO14824
CONSUMIBLES
(%)mo
$508.65
0.020000
$10.17
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$69.62
Costo Directo:
INDIRECTOS
$1,576.03
25.5%
SUBTOTAL
FINANCIAMIENTO
$1,977.92
1.1283%
SUBTOTAL
UTILIDAD
$401.89
$22.32
$2,000.24
6.3%
PRECIO UNITARIO
$126.02
$2,126.26
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
Importe
OTROS CARGOS
$18.30
PRECIO DE VENTA
$2,144.56
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
400
CIE.EX.0118M
Anlisis:
Costo
PZA
CERRADURA "A". CERRADURA MARCA PHILLPS, MOD. 525 AN O SIMILAR INCLUYE BISAGRAS HIDRAULICAS EN PISO, INCLUYE
SUMINISTRO DE MATERIALES. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE
SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV011
$1,960.90
1.000000
$1,960.90
MATERIALES
$1,960.90
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
1.662600
MANO DE OBRA
$254.32
$254.32
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
1.662600
$24.64
%MO16004
HERRAMIENTA
(%)mo
$254.32
0.020000
$5.09
%MO14824
CONSUMIBLES
(%)mo
$254.32
0.020000
$5.09
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$34.82
Costo Directo:
INDIRECTOS
$2,250.04
25.5%
SUBTOTAL
FINANCIAMIENTO
$2,823.80
1.1283%
SUBTOTAL
UTILIDAD
$573.76
$31.86
$2,855.66
6.3%
$179.91
PRECIO UNITARIO
$3,035.57
OTROS CARGOS
$16.46
PRECIO DE VENTA
$3,052.03
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
410
CIE.EX.0119M
Anlisis:
Costo
PZA
CERRADURA "B". CERRADURA MARCA PHILLIPS, MOD. 525 AN O SIMILAR INCLUYE BISAGRAS HIDRAULICAS EN PISO Y BARRA DE
EMPUJE INTERIOR Y EXTERIOR, INCLUYE SUMINISTRO DE MATERIALES. AMPARADO CON MINUTA DE TRAB. DE RIESGOS
CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV011B
PZA
$2,260.90
1.000000
$2,260.90
MATERIALES
$2,260.90
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
1.662600
MANO DE OBRA
$254.32
$254.32
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
1.662600
$24.64
%MO16004
HERRAMIENTA
(%)mo
$254.32
0.020000
$5.09
%MO14824
CONSUMIBLES
(%)mo
$254.32
0.020000
$5.09
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$34.82
Costo Directo:
INDIRECTOS
$2,550.04
25.5%
SUBTOTAL
FINANCIAMIENTO
$3,200.30
1.1283%
SUBTOTAL
UTILIDAD
$650.26
$36.11
$3,236.41
6.3%
$203.89
PRECIO UNITARIO
$3,440.30
OTROS CARGOS
$17.96
PRECIO DE VENTA
$3,458.26
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
420
CIE.EX.0120M
Anlisis:
Costo
PZA
CERRADURA "C". CERRADURA CILINDRICA DE POMO MARCA PHILLIPS O SIMILAR MOD. TORINO 6076 DL, BISAGRAS DE LIBRO
LATONADAS DE 3", INCLUYE SUMINISTRO DE MATERIALES. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN
AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV012
PZA
$120.00
1.000000
$120.00
MATERIALES
$120.00
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
1.662600
MANO DE OBRA
$254.32
$254.32
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
1.662600
$24.64
%MO16004
HERRAMIENTA
(%)mo
$254.32
0.020000
$5.09
%MO14824
CONSUMIBLES
(%)mo
$254.32
0.020000
$5.09
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$34.82
Costo Directo:
INDIRECTOS
$409.14
25.5%
SUBTOTAL
FINANCIAMIENTO
$513.47
1.1283%
SUBTOTAL
UTILIDAD
$104.33
$5.79
$519.26
6.3%
$32.71
PRECIO UNITARIO
$551.97
OTROS CARGOS
$7.26
PRECIO DE VENTA
$559.23
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
430
CIE.EX.0121M
Anlisis:
Costo
PZA
CERRADURA "D". CERRADURA MARCA PHILLIPS O SIMILAR MOD 575 JM ADK, INCLUYE SUMINISTRO DE MATERIALES. AMPARADO
CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA
INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV013
PZA
$325.50
1.000000
$325.50
575 JM ADK
SUBTOTAL:
MATERIALES
$325.50
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
1.662600
MANO DE OBRA
$254.32
$254.32
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
1.662600
$24.64
%MO16004
Rendimiento:
HERRAMIENTA
(%)mo
$254.32
0.020000
$5.09
%MO14824
CONSUMIBLES
(%)mo
$254.32
0.020000
$5.09
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$34.82
Costo Directo:
INDIRECTOS
$614.64
25.5%
SUBTOTAL
FINANCIAMIENTO
$771.37
1.1283%
SUBTOTAL
UTILIDAD
$156.73
$8.70
$780.07
6.3%
$49.14
PRECIO UNITARIO
$829.21
OTROS CARGOS
$8.28
PRECIO DE VENTA
$837.49
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
440
CIE.EX.0122M
Anlisis:
Costo
PZA
CERRADURA "E". CERRADURA MARCA PHILLIPS O SIMILAR MOD 6000 DCL, INCLUYE SUMINISTRO DE MATERIALES. AMPARADO
CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA
INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV014
PZA
$257.50
1.000000
$257.50
MATERIALES
$257.50
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
1.662600
MANO DE OBRA
$254.32
$254.32
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
1.662600
$24.64
%MO14824
CONSUMIBLES
(%)mo
$254.32
0.020000
$5.09
%MO16004
HERRAMIENTA
(%)mo
$254.32
0.020000
$5.09
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$34.82
Costo Directo:
INDIRECTOS
$546.64
25.5%
SUBTOTAL
FINANCIAMIENTO
$686.03
1.1283%
SUBTOTAL
UTILIDAD
$139.39
$7.74
$693.77
6.3%
$43.71
PRECIO UNITARIO
$737.48
OTROS CARGOS
$7.94
PRECIO DE VENTA
$745.42
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
450
CIE.EX.0123M
Anlisis:
Costo
PZA
CIERRAPUERTAS HIDRAULICO MODELO 606 MCA. DORMA O SIMILAR, ACABADO EN ALUMINIO ANODIZADO NATURAL, INCLUYE
SUMINISTRO DE MATERIALES. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE
SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV014A
CIERRAPUERTAS HIDRULICO
PZA
$1,354.60
1.000000
$1,354.60
MATERIALES
$1,354.60
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
1.662600
MANO DE OBRA
$254.32
$254.32
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
1.662600
$24.64
%MO16004
HERRAMIENTA
(%)mo
$254.32
0.020000
$5.09
%MO14824
CONSUMIBLES
(%)mo
$254.32
0.020000
$5.09
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$34.82
Costo Directo:
INDIRECTOS
$1,643.74
25.5%
SUBTOTAL
FINANCIAMIENTO
$2,062.89
1.1283%
SUBTOTAL
UTILIDAD
$419.15
$23.28
$2,086.17
6.3%
$131.43
PRECIO UNITARIO
$2,217.60
OTROS CARGOS
$13.43
PRECIO DE VENTA
$2,231.03
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
460
CIE.EX.0124M
Anlisis:
Costo
PZA
CELOSIA DE HOJAS FIJAS DE ALUMINIO CAL. 20 A PRUEBA DE TORMENTA, CON MALLA MOSQUITERO GALVANIZADO, INCLUYE
CELOSIAS A PRUEBA DE TORMENTAS, BOTA AGUAS EN PARTE SUPERIOR E INFERIOR, 280 x 90 CM, VER DIB. No. N-F.
20030-511-1-246B , INCLUYE SUMINISTRO DE MATERIALES. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN
AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV5001
PZA
$3,160.15
1.000000
$3,160.15
MATERIALES
$3,160.15
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.755726
MANO DE OBRA
$559.51
$559.51
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.755726
$54.21
%MO16004
HERRAMIENTA
(%)mo
$559.51
0.020000
$11.19
%MO14824
CONSUMIBLES
(%)mo
$559.51
0.020000
$11.19
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$76.59
Costo Directo:
INDIRECTOS
$3,796.25
25.5%
SUBTOTAL
FINANCIAMIENTO
$4,764.29
1.1283%
SUBTOTAL
UTILIDAD
$968.04
$53.76
$4,818.05
6.3%
$303.54
PRECIO UNITARIO
$5,121.59
OTROS CARGOS
$30.44
PRECIO DE VENTA
$5,152.03
DIRECTOR PROYECTOS PEMEX ING. ASCENCION MEDINA NIEVES
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
Importe
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
470
CIE.EX.0125M
Anlisis:
Costo
PZA
CELOSIA DE HOJAS FIJAS DE ALUMINIO CAL. 20 A PRUEBA DE TORMENTA, CON MALLA MOSQUITERO GALVANIZADO, INCLUYE
BOTA AGUAS EN PARTE SUPERIOR E INFERIOR, 247 x 90 CM, VER DIB.No. N-F.20030-511-1-246B , INCLUYE SUMINISTRO DE
MATERIALES. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1,
LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV5002
PZA
$2,513.00
1.000000
$2,513.00
MATERIALES
$2,513.00
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.536322
MANO DE OBRA
$788.41
$788.41
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.536322
$76.39
%MO16004
HERRAMIENTA
(%)mo
$788.41
0.020000
$15.77
%MO14824
CONSUMIBLES
(%)mo
$788.41
0.020000
$15.77
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$107.93
Costo Directo:
INDIRECTOS
$3,409.34
25.5%
SUBTOTAL
FINANCIAMIENTO
$4,278.72
1.1283%
SUBTOTAL
UTILIDAD
$869.38
$48.28
$4,327.00
6.3%
$272.60
PRECIO UNITARIO
$4,599.60
OTROS CARGOS
$33.20
PRECIO DE VENTA
$4,632.80
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
480
CIE.EX.0126M
Anlisis:
Costo
PZA
CELOSIA DE HOJAS FIJAS DE ALUMINIO CAL. 20 A PRUEBA DE TORMENTA, CON MALLA MOSQUITERO GALVANIZADO, INCLUYE
BOTA AGUAS EN PARTE SUPERIOR E INFERIOR, 245 x 90 CM, VER DIB.No. N-F.20030-511-1-246B, INCLUYE SUMINISTRO DE
MATERIALES.AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1,
LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV5003
PZA
$2,513.00
1.000000
$2,513.00
MATERIALES
$2,513.00
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.536322
MANO DE OBRA
$788.41
$788.41
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
0.536322
$76.39
%MO16004
Rendimiento:
HERRAMIENTA
(%)mo
$788.41
0.020000
$15.77
%MO14824
CONSUMIBLES
(%)mo
$788.41
0.020000
$15.77
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$107.93
Costo Directo:
INDIRECTOS
$3,409.34
25.5%
SUBTOTAL
FINANCIAMIENTO
$4,278.72
1.1283%
SUBTOTAL
UTILIDAD
$869.38
$48.28
$4,327.00
6.3%
$272.60
PRECIO UNITARIO
$4,599.60
OTROS CARGOS
$33.20
PRECIO DE VENTA
$4,632.80
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Par: 2
Unidad
Anlisis No.:
Cantidad
Importe
490
CIE.EX.0127M
Anlisis:
Costo
PZA
CELOSIA DE HOJAS FIJAS DE ALUMINIO CAL. 20 A PRUEBA DE TORMENTA, CON MALLA MOSQUITERO GALVANIZADO, INCLUYE
BOTA AGUAS EN PARTE SUPERIOR E INFERIOR, 170 x 90 CM, VER DIB.No. N-F.20030-511-1-246B,INCLUYE SUMINISTRO DE
MATERIALES. AMPARADO CON MINUTA DE TRAB. DE RIESGOS CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1,
LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
SUB_SCCIV5004
PZA
$1,714.59
1.000000
$1,714.59
MATERIALES
$1,714.59
MANO DE OBRA
CMOCIV03
CUADRILLA MO CIV 03
JOR
CIVOFCA
JOR
$692.44
0.058824
$40.73
CIVOF1A
JOR
$508.61
0.470590
$239.35
CIVAYOP
JOR
$303.37
0.470590
$142.76
Importe:
$422.84
Rendimiento:
SUBTOTAL:
0.923667
MANO DE OBRA
$457.78
$457.78
EQUIPO Y HERRAMIENTA
CMAQCIV03
HR
EQCAM050
HR
$255.58
0.160293
Importe:
$40.97
$40.97
Rendimiento:
0.923667
$44.36
%MO16004
HERRAMIENTA
(%)mo
$457.78
0.020000
$9.16
%MO14824
CONSUMIBLES
(%)mo
$457.78
0.020000
$9.16
SUBTOTAL:
EQUIPO Y HERRAMIENTA
$62.68
Costo Directo:
INDIRECTOS
$2,235.05
25.5%
SUBTOTAL
FINANCIAMIENTO
$2,804.99
1.1283%
SUBTOTAL
UTILIDAD
$569.94
$31.65
$2,836.64
6.3%
$178.71
PRECIO UNITARIO
$3,015.35
OTROS CARGOS
$20.56
PRECIO DE VENTA
$3,035.91
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Anlisis No.:
Costo
Cantidad
Importe
500
CIE.EX.0128M
PZA
SUMINISTRO E INSTALACION DE W.C. COLOR BLANCO MARCA IDEAL STANDAR MODELO OLIMPICO PARA FLUXOMETRO, O
SIMILAR, (INCLUYE SALIDAS HIDROSANITARIAS, FLUXOMETRO Y ASIENTO). AMPARADO CON MINUTA DE TRAB. DE RIESGOS
CONTROLADOS EN AREAS DE EDIFICIO DE SUPERVICION 1, LUBRICANTES, CENTRAL CONTRA INCENDIO Y ALMACEN GENERAL
MATERIALES
JUN0010
JUNTA PROHEL
PZA
$7.21
1.000000
$7.21
WC-0010
PZA
$2,428.31
1.000000
$2,428.31
PZA
$135.96
1.000000
$135.96
TANQ. 10.5L
ASI0010
COB2640
$160.69
0.800000
$128.55
COL0010
PZA
$320.12
0.200000
$64.02
GASOLINA
LT
$5.35
2.500000
$13.38
COM0050
GRASA COMUN
KG
$16.38
0.100000
$1.64
EST0050
ESTOPA ALQUITRANADA
KG
$37.60
1.000000
$37.60
FOF0180
CODO FO FO 45 GRADOS Y 5 CM
PZA
$33.62
0.800000
$26.90
FOF0250
PZA
$91.02
0.200000
$18.20
DERECHA Y 10 CM
FOF0280
CODO FO FO 90 GRADOS Y 10 CM
PZA
$64.78
0.200000
$12.96
FOF1040
PZA
$215.49
0.200000
$43.10
BRONCE 10CM
FOF1140
PZA
$25.00
0.200000
$5.00
FOF1170
PZA
$29.00
0.200000
$5.80
FOF1330
$101.00
0.700000
$70.70
COB0080
PZA
$42.40
0.400000
$16.96
COB0180
PZA
$50.03
0.800000
$40.02
COB0520
PZA
$14.15
0.400000
$5.66
FOF1340
$128.00
1.200000
$153.60
COB0140
PZA
$2.98
0.400000
$1.19
COB0130
PZA
$1.32
0.400000
$0.53
SEL0020
SELLADOR ROSCAS TF
KG
$14.87
0.200000
$2.97
PLO0010
KG
$10.40
2.000000
$20.80
FOF1670
YEE FO FO 10CM
PZA
$93.48
0.600000
$56.09
COB1320
PZA
$93.38
0.800000
$74.70
FOF1030
PZA
$79.54
0.200000
$15.91
CM
CM
BRONCE 5CM
FOF1660
YEE FO FO 5CM
PZA
$57.91
0.200000
$11.58
SOL0080A
KG
$75.00
0.100000
$7.50
COB0160
PZA
$19.49
0.400000
$7.80
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
Importe
COB0480
PZA
$1.84
0.400000
$0.74
COB0520
PZA
$14.15
0.200000
$2.83
COB2760
$81.00
0.600000
$48.60
COB2750
$57.09
0.800000
$45.67
COB2730
$25.93
0.400000
$10.37
COB2720
$16.21
0.800000
$12.97
COB1130
PZA
$2.12
0.200000
$0.42
19MM
COM0030
GASOLINA
LT
$5.35
2.000000
$10.70
COM0050
GRASA COMUN
KG
$16.38
0.800000
$13.10
SEL0020
SELLADOR ROSCAS TF
KG
$14.87
0.100000
$1.49
SOL0080A
KG
$75.00
0.800000
$60.00
COB1150
PZA
$3.45
0.400000
$1.38
32MM
COB1280
PZA
$6.39
0.200000
$1.28
COB1300
PZA
$42.90
0.200000
$8.58
COB1980
TEE REDUCCION
JGO
$38.63
0.200000
$7.73
PZA
$38.63
0.200000
$7.73
PZA
$64.10
0.200000
$12.82
PZA
$64.10
0.200000
$12.82
COBRE-COBRE-COBRE
32X19X32MM
COB2030
TEE REDUCCION
COBRE-COBRE-COBRE
32X32X25MM
COB2090
TEE REDUCCION
COBRE-COBRE-COBRE
38X32X32MM
COB2120
TEE REDUCCION
COBRE-COBRE-COBRE
38X38X19MM
SUBTOTAL:
MATERIALES
$3,673.87
MANO DE OBRA
CMOCIV20
CUADRILLA MO CIV 20
JOR
CIVOFCA
JOR
$692.44
0.042553
$29.47
CIVOF1A
JOR
$508.61
0.425532
$216.43
CIVAYOP
JOR
$303.37
0.531915
$161.37
Importe:
$407.27
Rendimiento:
SUBTOTAL:
1.330080
MANO DE OBRA
$306.20
$306.20
EQUIPO Y HERRAMIENTA
%MO16004
HERRAMIENTA
(%)mo
$306.20
0.020000
$6.12
%MO14824
CONSUMIBLES
(%)mo
$306.20
0.020000
$6.12
SUBTOTAL:
EQUIPO Y HERRAMIENTA
Costo Directo:
DIRECTOR PROYECTOS PEMEX ING. ASCENCION MEDINA NIEVES
$12.24
28-Jul-2004
Pagina:
Dependencia:
PEMEX REFINACION
Contrato No.
PR-OP-L-022/04P
Obra:
Fecha:
2004/07/28
### de
Duracin:
###
Lugar:
MINATITLAN, VERACRUZ
Concepto
Unidad
Costo
Cantidad
25.5%
SUBTOTAL
FINANCIAMIENTO
$5,010.35
1.1283%
SUBTOTAL
UTILIDAD
Importe
$56.53
$5,066.88
6.3%
$319.21
PRECIO UNITARIO
$5,386.09
OTROS CARGOS
$26.08
PRECIO DE VENTA
$5,412.17