PIPA EXISTING 16"

0+02

0+000

RE

(Cold Bend)
DRAWING_NORTH

TRUE_NORTH

10

11

DESC

EASTING

NORTHING

BEND

IP.01
IP.02
IP.03
IP.04
IP.05
IP.06
IP.07

621938.315
621939.799
621938.389
621936.089
621936.259
621955.049
621959.511

9343497.761
9343498.441
9343500.769
9343503.068
9343514.796
9343567.997
9343591.179

ELBOW
ELBOW
ELBOW
ELBOW
HRB
HLB
HLB

DEGREE

16" NEW PIPELINE

0+260

0+240

0+250

0+220

0+200

0+140

0+160

Jl.Pulau Ampel
0+120

0+080

SPLIT TEE WITH STOPPLE PLUG


(SEE NOTE 4)

IP.07

0+180

IP.06

0+100

START POINT
HOT TAPPING
SPLIT TEE 18'' x 18'' x 16''
(SEE NOTE 4)

12

REFERENCES

REROUTE JALUR PIPA 16" AREA CILEGON


JALUR BUKIT BANTEN JAVA PERSADA BOJONEGARA
CILEGON

MATCHLINE DWG SHEET 5


V13-C007-3672-EPL-DG-003

OWNERSHIP

2
LOCATION :
UNIT :
AREA :

BANGUNAN/RUMAH

MANHOLE TELEPON

AS PIPA

BOX VALVE GAS

JALAN ASPAL

MANHOLE AIR BERSIH

JALAN TANAH

MANHOLE AIR LIMBAH

JALAN GANG

GANG

VENT 2"
TLP

TIANG REKLAME

RE

SUNGAI

SAWAH

SALURAN

BRONJONG

TIANG LISTRIK

PAGAR

TIANG TELEPON

PENGAMAN JALAN

KONTUR

HYDRANT

POHON

POLYGON BENCHMARK

TIANG LAMPU

POLYGON

KABEL LISTRIK DI BAWAH TANAH

TITIK KOORDINAT BM
TITIK KOORDINAT TEST PIT (TP),
SONDIR(S),HANDBORING (HB)
BORING
MANHOLE

TANDA/TITIK PIPA GAS


CATODIC
RAMBU JALAN

LONGITUDINAL PROFILE
HORIZONTAL SCALE = 1:1000
VERTICAL SCALE = 1:200

MC

MAIN ROAD CROSSING

GL

RC

RIVER CROSSING

T.O.P

KP

KILOMETER POINT

GROUND

GROUND LEVEL
TOP OF PIPE
KABEL TELEPON
PIPA GAS LAIN

JALUR PIPA BARU


IP

PIPA AIR
FIBER OPTIK

OB
SB
VB

GROUND

OVER BEND
SAG BEND
VERTICAL BEND

INTERSECTION POINT

HLB

HORIZONTAL LEFT BENDING

HRB

HORIZONTAL RIGH BENDING

NEW PIPELINE 16"

E
NOTES

DATUM ELV -4.00 meter

26/08/16

RE ISSUED FOR APPROVED

RPT

ADH

AHN

12/08/16

RE ISSUED FOR APPROVED

RPT

ADH

AHN

28/07/16

RE ISSUED FOR APPROVED

RPT

ADH

AHN

GROUND ELEVATION (m)

TOP OF PIPE (T.O.P)


CHAINAGE (KP)
METER (m)
LAND USE / TYPE

14/06/16

RE ISSUED FOR APPROVED

YAN

SHN

AKN

28/04/16

ISSUED FOR APPROVED

YAN

FI

AKN

28/03/16

RE ISSUED FOR REVIEW

IG

PAW

AKN

18/03/16

RE ISSUED FOR REVIEW

IG

PAW

DRAWN

CHKD

HARD ROCK

PIPE SIZE / WALL THICKNESS / MATERIAL


MAX.DESIGN PRESS./TEMP./HT FACTOR
DESIGN CODE / DESIGN FACTOR

4 (DESIGN FACTOR = 0.4)

CROSSING No.

CONSTRUCTION METHODE

REV.

OPEN CUT

FIELD JOINT COATING


PIPE PROTECTION

HSS
3 LPE COATED

BENDING DEGREE

NATURAL BEND

BENDING PROFILE

NATURAL BEND
IMPRESSED CURRENT

CATHODIC PROTECTION (TEST POINT)

1 TEST POINT

DATE

DESCRIPTION

AKN
APPVD. APPVD.
PGN

KBS

PT PERUSAHAAN GAS NEGARA (Persero) Tbk.


PMO INFRASTRUCTURE

PATOK GAS (EVERY 100M)

KONSORSIUM BYUCKSAN ENGINEERING CO. LTD -

MARKER POST (EVERY500M)

-2

-2

-2

2.351

-10

0.598

2.261

0
-20

-10

-2

2
-20

PENGEMBANGAN JARINGAN DISTRIBUSI WILAYAH


JAWA BAGIAN BARAT DAN SUMATERA BAGIAN SELATAN 3

1.555

0.941

-10

5.829

PROJECT TITLE :

7.384

1.663

HORIZONTAL SCALE 1:500


VERTICAL SCALE 1:50

PT SEPULUH SUMBER ANUGERAH

0+220

0+060
1.744

0+020

CROSS SECTION

TITLE :

PIPELINE ALIGNMENT SHEET


REROUTE JALUR PIPA 16" AREA CILEGON
JALUR BUKIT BANTEN JAVA PERSADA BOJONEGARA
KP 0+000 - 0+260

SCALE
NONE

JOB. NO. :

SHT. NO.

DRAWING NO.

REV.

4 OF 5

V13-C007-3672-EPL-DG-003