Professional Documents
Culture Documents
0+02
0+000
RE
(Cold Bend)
DRAWING_NORTH
TRUE_NORTH
10
11
DESC
EASTING
NORTHING
BEND
IP.01
IP.02
IP.03
IP.04
IP.05
IP.06
IP.07
621938.315
621939.799
621938.389
621936.089
621936.259
621955.049
621959.511
9343497.761
9343498.441
9343500.769
9343503.068
9343514.796
9343567.997
9343591.179
ELBOW
ELBOW
ELBOW
ELBOW
HRB
HLB
HLB
DEGREE
0+260
0+240
0+250
0+220
0+200
0+140
0+160
Jl.Pulau Ampel
0+120
0+080
IP.07
0+180
IP.06
0+100
START POINT
HOT TAPPING
SPLIT TEE 18'' x 18'' x 16''
(SEE NOTE 4)
12
REFERENCES
OWNERSHIP
2
LOCATION :
UNIT :
AREA :
BANGUNAN/RUMAH
MANHOLE TELEPON
AS PIPA
JALAN ASPAL
JALAN TANAH
JALAN GANG
GANG
VENT 2"
TLP
TIANG REKLAME
RE
SUNGAI
SAWAH
SALURAN
BRONJONG
TIANG LISTRIK
PAGAR
TIANG TELEPON
PENGAMAN JALAN
KONTUR
HYDRANT
POHON
POLYGON BENCHMARK
TIANG LAMPU
POLYGON
TITIK KOORDINAT BM
TITIK KOORDINAT TEST PIT (TP),
SONDIR(S),HANDBORING (HB)
BORING
MANHOLE
LONGITUDINAL PROFILE
HORIZONTAL SCALE = 1:1000
VERTICAL SCALE = 1:200
MC
GL
RC
RIVER CROSSING
T.O.P
KP
KILOMETER POINT
GROUND
GROUND LEVEL
TOP OF PIPE
KABEL TELEPON
PIPA GAS LAIN
PIPA AIR
FIBER OPTIK
OB
SB
VB
GROUND
OVER BEND
SAG BEND
VERTICAL BEND
INTERSECTION POINT
HLB
HRB
E
NOTES
26/08/16
RPT
ADH
AHN
12/08/16
RPT
ADH
AHN
28/07/16
RPT
ADH
AHN
14/06/16
YAN
SHN
AKN
28/04/16
YAN
FI
AKN
28/03/16
IG
PAW
AKN
18/03/16
IG
PAW
DRAWN
CHKD
HARD ROCK
CROSSING No.
CONSTRUCTION METHODE
REV.
OPEN CUT
HSS
3 LPE COATED
BENDING DEGREE
NATURAL BEND
BENDING PROFILE
NATURAL BEND
IMPRESSED CURRENT
1 TEST POINT
DATE
DESCRIPTION
AKN
APPVD. APPVD.
PGN
KBS
-2
-2
-2
2.351
-10
0.598
2.261
0
-20
-10
-2
2
-20
1.555
0.941
-10
5.829
PROJECT TITLE :
7.384
1.663
0+220
0+060
1.744
0+020
CROSS SECTION
TITLE :
SCALE
NONE
JOB. NO. :
SHT. NO.
DRAWING NO.
REV.
4 OF 5
V13-C007-3672-EPL-DG-003
A3
10
11
12