Professional Documents
Culture Documents
VOLMEN DE LA CISTERNA
N DE RECAMARAS:
ALTURA DE LA
CONSTRUCCIN:
DOTACION:
TIEMPO DE SUMINISTRO:
INTERVALO DE SUMINISTRO:
V
3
9
200 l/has/da
12 horas
7 das
1 l/s
Qmd=
No . de personas x Dotacion
=
86 400 s
8 personas(200
Qmd=
86 400 s
l
)
dia
=0.0185l/ s
l
QMD =0.0185 1.40=0.0259 l/ s
s
Qtoma=
Qtoma=
Q4
V
(0.0001 X 10 05)(4)
=0.0000356 m3 /s
m
1
( )
=3.56=
1
2
La tubera de cobre
1m3
( 1000lts
)
= 17.6 m3
V= Axh
A=
V 17.6 M 3
=
=11.73 M 2
h
1.5 M
b= 11.73=3.429 m
b= 3.42 M
a= 3.42M
h= 2.4 M
2.4M
3.42M
3.42 M
CALCULO DE LA BOMBA
Hp=
(Qb x xCDT )
(76 X )
Donde
Qb=Gasto a bombear en
lts
s
(0.016
Hp=
lts
s
lts 1 kg
x
x 11.04 m)
s
(76 X 0.7)
Hp= 0.007939 HP