Professional Documents
Culture Documents
Copyright notice
Adaptive Processes
Adaptive Processes
Nobel.
Adaptive Processes
Adaptive Processes
Adaptive Processes
TABLE OF CONTENTS
WHAT AND WHY OF CPRE......................................................9
1. Introduction to requirements engineering............................. 12
2. Understand System Context.................. Error! Bookmark not defined.
3. Elicitation................................ Error! Bookmark not defined.
4. Documenting requirements................... Error! Bookmark not defined.
5. Documenting requirements in natural languages....... Error! Bookmark not
defined.
6. Model based requirements documentation..... Error! Bookmark not defined.
7. Requirements validation.................... Error! Bookmark not defined.
8. Managing requirements...................... Error! Bookmark not defined.
9. Requirements tools......................... Error! Bookmark not defined.
10. ANSWER KEYS......................................................... 18
Introduction to requirements engineering ........................ 18
Understand System Context ............. Error! Bookmark not defined.
Elicitation ........................... Error! Bookmark not defined.
Documenting Requirements .............. Error! Bookmark not defined.
Documenting requirements in natural languages .. Error! Bookmark not
defined.
Model based requirements documentation Error! Bookmark not defined.
Requirements Validation ............... Error! Bookmark not defined.
Managing Requirements ................. Error! Bookmark not defined.
Requirements tools .................... Error! Bookmark not defined.
Adaptive Processes
Getting certified
or not will
determine if your
prospective
employer will
call you for an
interview or not.
Adaptive Processes
Introduction
What and Why of CPRE
CPRE stands for Certified Professional in Requirements
Engineering, a certification provided by International
requirements Engineering Board (IREB), Germany
(www.IREB.org). This is the most widely acknowledged
certification for requirements engineers. There are more
than 20000 requirements engineering professionals certified
in CPRE Foundation Level examination world-wide.
Better salary.
Adaptive Processes
What is IREB?
International requirements Engineering Board (IREB) was
founded in Germany in to support the requirements
engineering community by:
Adaptive Processes
Preparation
One can prepare for the exam
By attending a CPRE training with a training provider.
The training should take at least three days and be
conducted by a training provider recognized by IREB.
Additionally to
the
Certification examination
The exam takes 75 minutes. In this time, one has to answer
45 multiple choice questions. The questions are of
differing difficulty and therefore assigned differing
amounts of points. The exam is closed-book, i.e. no
materials are allowed to be used. To pass the exam, one
must achieve at least than 60% of the total score possible.
The exam is conducted by a
10
Examination results
Exam results are checked by the certification body. Results
are dispatched to the personal address stated on the
application. If one has passed the exam, one will receive
the certificate together with the results. If one takes the
exam online, one gets the results right after the
examination. The certificate is delivered via post. The
certificates achieved via online exam are dispatched within
the same period of time the results of conventional exams
are sent.
Adaptive Processes
11
1.
To
a.
b.
c.
d.
To
a.
b.
c.
d.
Statements
Application should be able to support 100 concurrent
users.
Application development shall follow agile
development approach.
System shall be able to capture necessary
information about project risks.
Adaptive Processes
12
Statements
System shall be able to capture necessary
information about project risks.
1st release of the application must be completed
within 3 months.
Application should process any report within 15
minutes.
Application development shall follow agile
development approach.
Qualities
Empathy
Analytic thinking
Public speaking
Conflict resolution
Adaptive Processes
13
10
Adaptive Processes
14
12
13
14
Adaptive Processes
15
15
16
17
18
Adaptive Processes
16
20
Adaptive Processes
17
2. ANSWER KEYS
1.Introduction to requirements engineering
1
FALSE
Statements
Application should be
This is non-functional
concurrent users.
application behavior.
Application development
This is non-functional
as it does not indicate
application behavior.
Explanation
capture necessary
capture, hence
functional.
risks.
TRUE
it can be assigned to a
application, hence
functional.
5
True / False
Adaptive Processes
Statements
Be with the Best! |
Explanation
18
capture necessary
capture, hence
functional.
risks.
TRUE
Example of business
constraint.
completed within 3
months.
FALSE
FALSE
Application should
Non-functional
requirement - related to
15 minutes.
performance.
Application development
Non-functional
requirement - related to
development approach.
method of project
management.
6
True / False
Statements
Explanation
TRUE
Empathy
TRUE
Analytic thinking
FALSE
Public speaking
TRUE
Conflict resolution
Adaptive Processes
19
15
Definition.
16
Definition.
17
Adaptive Processes
20
Adaptive Processes
21