PROJECT: Dar al Hijra Project, Madinah
Revision /
Issue.:
Date :
Activity
Aspect
Vehicular
movement,
machinery and
equipment used
on site
Machinery and
vehicular noise
Impact
Pages
FORM-HSE-02
(PS)
01 / 15/12/10
2-Mar-15
1-1
Controls: Checks,
Tests, Permits,
Authorization.
Mitigation Action
significant
Oil Spillage from the Oil Leaching into the ground polluting
equipment
the soil and ground water
Excavation
Maintenance of the
Vehilce and
Equipment
Stock Piles
Back Filling
Waste
Management
significant
Only approved material will be used for backfilling. While
transporting the materials the trucks will be properly covered.
The waste at site will be properly segregated and disposed as
per local standards.
Assessor By
Er. Rehan S. Barey
HSE Manager