UPGRADATION OF

TO

ROAD Km. 0/0 - 0/0

1 Name of District

2 Name of Block

3 Name of the Work

4 Name of the scheme

5 Amount of Administrative Sanction

lakhs

6 Amount of Estimate now prepared

lakhs

7 Whether detailed specifications enclosed

8 Total Length of road

9 Existing Surface of road

10

Provision made in this estimate

Clearing the Scrub jungles

Earthwork excavation

Scarification

Collecton & Supply of US/Well


Gravel/Earthern shoulder)

providing and laying GSB Gr-III

Providing & Laying WBM grade II

Providing & Laying WBM grade III

Providing & Laying Prime coat

Providing & Laying tack coat

Providing & Laying Premix carpet with seal


coat

C.D works

Retaining wall /side drains

CC pavement

Road Furniture

Others (if Any)

L.S.Provisions like LWF & DPR

TOTAL ESTIMATE AMOUNT

Upgradation of
from km 0/0 to 0/0

to

road

PMGSY Phase VIII (Package No:

Yes
Km

AMOUNT (In Lakhs)

corenentwork
/ T No:

Estimate Amount As Per OMMAS

PAVEMENT DESIGN

Km

Traffic
Category

CBR
Value

0.0%

Pavement
Existing crust
thick
thickness
required
(in mm)
(in mm)
0

Proposed Pavement Thickness


(in mm)

Balance
thickness required
(in mm)

GSB "III"

Total
Thickness
WBM WBM Grade
proposed
Grade II
III
0

ROAD GEOMETRICS
PROPOSED CD DETAILS

S.No

Ch. (m)

Span

S.No

Type

Km

Carriage Roadway Shoulder


way width width in ( Earthern/
"m"
in "m"
Gravel)

0/0-1/0

Gravel

1/0-2/0

Earthern

0
0
0

ROAD PROTECTIVE WORKS:


Protective works proposed in
this road as tabulated below.
Km

Chainage

Side

EXECUTIVE ENGINEER (RD)


DRDA
THENI DISTRICT

CC PAVEMENT:

Length

Km

chainage

Length in
(m)

ASST EXECUTIVE ENGINEER (RD)

BLOCK ENGINEER

ROADS&BRIDGES

PANCHAYAT UNION

Note:

1. This checklist should be enclosed and submitted along with DPR for T.S
2.Estimate should not exceed A.S.amount.
3.To avoid working estimate at later date please
ensure that no changes are permitted in pavement design
except in exceptional circumstances like location change of CD & Protective works, in rare instances.
4.Maintenance estimate for individual road above 10 lakhs to be submitted for T.S and maintenance
estimate less than 10 lakhs to be technically sanctioned by Executive Engineer before tender process.
5.The district consolidated covering letter along with estimates to be submitted for reference and records.

1.cement rate

4560/MT ( Rs 228/bag)

2.Steel,bitumen ,Emulsion ,RCC hume pipe ,approved district rate signed by EE to be


adopted for all works and EE signed copy for all materials to be
enclosed without fail .

Lead:
1. Lead in KM for U.S gravel to be mentioned in lead statement along with cement,metal & sand
and signed by concerned Block Engineer even if average or local lead is adopted