Hydropower Projects of
Khyber Pakhtunkhwa
1.
The Project
Nila-da-Khatta is the left tributary of Kunhar River and situated at a distance of 25 km
from village Paras and 30 km upstream of Balakot town which is accessible directly
from Kaghan road. It has a design discharge of 1.37 cumecs with a gross head of
220m and an installed capacity of 2.47 MW. The project involves a Concrete Weir,
Sand trap, Headrace Tunnel, Surge shaft, Penstock, Powerhouse, Tailrace Canal and
Housing Area.
Accessibility
The project power house site is easily accessible from Balakot-Kaghan road whereas,
the weir intake site is accessible through existing Jeep able track.
Location
Name of River
Nila Da Katha
Design Discharge
1.37
m3 / s
Gross Head
220
Design Capacity
2.47
MW
12.04
GWh/ a
Nil
(ROR)
3.25
Km
Estimated Cost
4.28
M. US$
Cost per kW
1733
US$/ kW
Reservoir
Status of Project
2.
The Project
Bhimbal Khatta is right tributary of Kunhar River about 8 km downstream of Naran town.
The proposed intake is located a distance of about 3-4 km in the Bhimbal valley from
main road. The proposed power house will be located on the right bank of Kunhar
River. Natural slope in the valley varies between 30 to 70 degrees. It has a design
discharge of 4.23 cumecs with a gross head of 223 m and an installed capacity of 7.86
MW. Gradient of the river bed is about 10%. The mountains are covered with thick
vegetation. The project involves a Concrete Weir, Sand trap, Headrace Tunnel, Surge
shaft, Penstock, Powerhouse, Tailrace Canal and Housing Area.
Accessibility
Access is possible by main Balakot-Kaghan road. However Bridge will be required to
cross the Kunhar River and about 0.5 km road to be constructed to reach power house
site. For weir intake about 3 km road and a bridge to cross Bhimbal Nullah need to be
constructed.
Location
Bhimbal Kaghan
Name of River
Bhimbal Katha
Design Discharge
4.23
m3 / s
Gross Head
223
Design Capacity
7.86
MW
38.88
GWh/ a
Nil
(ROR)
2.37
Km
Estimated Cost
21.72
M. US$
Cost per kW
2763
US$/ kW
Reservoir
Status of Project
3.
The Project
The Saiful Maluk Katha is left tributary of Kunhar River. The Saiful Maluk originates
form the most famous Saiful Maluk Lake. Saiful Maluk Katha is located at village Naran
approximately 85 km north of Balakot town. The mountains are covered with thick
vegetation. The site is remaining covered with snow during winter. The project has a
design discharge of 1.93 cumecs with a gross head of 457 m and an installed capacity
of 7.43 MW. The project involves a Concrete Weir, Sand trap, Headrace Tunnel, Surge
shaft, Penstock, Powerhouse, Tailrace Canal and Housing Area.
Accessibility
Weir intake site is accessible by jeep able road from Naran. About 0.5 km road from
existing jeep able road need to be constructed to reach power house site.
Location
Name of River
Design Discharge
1.93
m3 / s
Gross Head
457
Design Capacity
7.43
MW
35.63
GWh/ a
Reservoir
Nil
(ROR)
3.6
Km
Estimated Cost
27.26
M. US$
Cost per kW
3669
US$/ kW
Status of Project
4.
The Project
The project is located near village Balkani and Damori.
Weir is proposed
Name of River
Design Discharge
Gross Head
Balkani Khwar
5.20
m3 / s
122.51
Design Capacity
5.17
MW
14.03
GWh/ a
Nil
(ROR)
2.70
Km
Estimated Cost
6.25
M. US$
Cost per kW
1209
US$/ kW
Reservoir
Status of Project
5.
The Project
The project is located at Mankial, a village at the mouth of Chowkel khwar to Swat
River. At Mankial, a timber bridge strengthened by steel wire ropes crosses Swat River
and connects the village to main road. The project has a design discharge of 7.30
cumecs with a gross head of 195 m and an installed capacity of 12 MW. The project
involves a Concrete Weir, Sand trap, Headrace Tunnel, Surge Shaft, Penstock,
Powerhouse, Tailrace Canal and Housing Area.
Accessbility
Both intake and power house are accessible by Jeepable road.
Location
Chokel Swat
Name of River
Chokel Khwar
Design Discharge
7.30
m3 / s
Gross Head
195
Design Capacity
12
MW
47.64
GWh/ a
Nil
(ROR)
2.06
Km
Estimated Cost
19.01
M. US$
Cost per kW
1584
US$/ kW
Status of Project
6.
The Project
Kedam Khwar is the right tributary of Swat River. Kedam is a village 7 km north of
Behrain town. The long and narrow valley reaches an elevation of 4500 m. The intake
weir is located near village Pul Bela. The project has a gross head of 660 m and with
minimum discharge of 3.13 cumecs and having a power potential of 17.14 MW. The
project involves a Concrete Weir, Sand trap, Headrace Tunnel, Surge Shaft, Penstock,
Powerhouse, Tailrace Canal and Housing Area.
Accessibility
Intake is not accessible and therefore new road of about 4 km need to be constructed.
Location
Name of River
Kedam Khwar
Design Discharge
3.13
m3 / s
Gross Head
660
Design Capacity
17.14
MW
67.4
GWh/ a
Nil
(ROR)
2.45
Km
Estimated Cost
20.02
M. US$
Cost per kW
1168
US$/ kW
Reservoir
Status of Project
7.
The Project
The Gande gar scheme is located on Ushiri River, a tributary Dir valley. The Ushiri
River joins Panjkora River at village Darora. The scheme is identified on the Gande Gar
irrigation water channel starting from village Almas at a distance of about 14 km from
main Timergara-Dir road. Gande Gar irrigation scheme is irrigation an area of about
3000 acres of land. The valley is green covered with vegetation and tree, and at the
higher elevation natural forest covers the mountains.
Ushiri Valley is densely populated and has a highly developed infrastructure concerning
housing traffic, irrigation, and agriculture. The project has a gross head of 175 m and
with design discharge of 2.25 cumecs and having a power potential of 3.21 MW. The
project involves a Concrete Weir, Sand trap, Remodelling of existing canal & allied
structures, Forebay, Spillway, Penstock, Powerhouse, Tailrace Canal and Housing Area.
Accessibility
Both intake and power house site are accessible by metalled road.
Location
Name of River
Usheri Khwar
Design Discharge
2.25
m3 / s
Gross Head
175
Design Capacity
3.21
MW
21.24
GWh/ a
Reservoir
Nil
(ROR)
14
Km
Estimated Cost
5.1
M. US$
1588
US$/ kW
Cost per kW
Status of Project
8.
The Project
The Ayun scheme is proposed to be developed on Ayun Gol (River) in District Chitral
near village Ayun about 35 km short of Chitral town. The Ayun Gol is the right tributary
of Chitral River. The project has a gross head of 270 m and with design discharge of 7
cumecs and having a power potential of 15.71 MW. The project involves a Concrete
Weir, Sand trap, Headrace Tunnel, Surge Shaft, Penstock, Powerhouse, Tailrace Canal
and Housing Area.
Accessibility
Both intake and power house site are accessible by metalled road.
Location
Name of River
Design Discharge
Ayun Gol
7
m3 / s
270
Design Capacity
15.17
MW
83.06
GWh/ a
Reservoir
Nil
(ROR)
5.4
Km
Estimated Cost
30.2
M. US$
Cost per kW
1991
US$/ kW
Gross Head
Status of Project
9.
The Project
The Barum Gol is the right tributary of Mastuj River. The valley is 26 km long and joins
the Mastuj River at an elevation of 1800. The steepest part of the river is near the lower
end of the valley. The project has a gross head of 507 m and with design discharge of 6
cumecs and having a power potential of 24.93 MW. The project involves a Concrete
Weir, Sand trap, Headrace Tunnel, Surge Shaft, Penstock, Powerhouse, Tailrace Canal
and Housing Area.
Accessibility
The intake is accessible by jeep able road up to Barum village. From Barum Village,
access road needs to be constructed up to 300 m length to arrive at the intake site.
Similarly, for power house site, access road needs to be constructed from existing
vehicular bridge on Mastuj River. The proposed length of road will be about 1 Km.
Location
Name of River
Ayun Gol
Design Discharge
6.0
m3 / s
Gross Head
507
Design Capacity
24.93
MW
137.7
GWh/ a
Reservoir
Nil
(ROR)
4.4
Km
Estimated Cost
39.25
M. US$
Cost per kW
1574
US$/ kW
Status of Project
Location
Name of River
Mastuj River
Design Discharge
38.0
m3 / s
Gross Head
60.0
Design Capacity
18.21
MW
108.40
GWh/ a
Nil
(ROR)
5.75
Km
Estimated Cost
17.63
M. US$
968
US$/ kW
Reservoir
Cost per kW
Status of Project
Location
Name of River
Design Discharge
Panjkora
88
M 3/s
193.6
Design Capacity
150
MW
680
GW h/a
7.803
Km
Total Estimated
370.6
Million US$
Cost per kW
2470.8
US $ / kW
Net Head
10.33
US Cent
Unit Cost
8.61
US Cent
70.31
Million US $
EIRR
16.8%
FIRR
14.7%
Status of Project
Location
Name of River
Luthkho
Design Discharge
65
M 3/s
Gross Head
247
Design Capacity
132
MW
3 Nos, Pelton
585
GWh
Reservoir
RoR
NIL
7.59
km
Pressure Shaft
212
Tailrace
30
Estimated
322.33
Million US $
Cost Per kW
2442
US $ / kW
Location
Name of River
Turkho
Design Discharge
28
m 3/s
Gross Head
615
Design Capacity
144
MW
3 Nos, Pelton
611.83
Gw h/a
Reservoir
(RoR)
NIL
8.5
km
Pressure Shaft
573
Tailrace Tunnel
480
Estimated Cost
339.05
Million US $
Cost Per kW
2354.60
US $ / kW
Salient Features of
Provincial Power
Policy 2006
PHYDO will provide one window facility and technical help to the private
period.
Concession period will be 50 years.
Lease could be transferred to another buyer of the project with prior approval
the lease period. For solicited sites, the power potential determined in the
feasibility report will be considered for estimated the total lease money payable
per annum to PHYDO. However, for the raw sites the annual payable lease
amount will be adjusted later-on in accordance with the firm capacity in terms of
available power potential of the site determine in the feasibility report duly