You are on page 1of 3

Geological Model Checklist Form

PT Arutmin Indonesia

GEOLOGICAL MODEL CHECKLIST FORM

Project
Date
Revision

Project Name

Date of Revision
Number-Month-Year

Prepared by
Supervisor
Superintendent

No.

JOB STEP

1.

Validate database
Lithological database update from sie
logs
Seam correlation according database
statistic
Assay data according core hole
Dirty band/parting in seams (CD/MS)
Define topo model
Using topo model from aerial/origin
Check all data has valid Z value by
viewing in front view
Define relevant sheet and grid spec
respect to pit shell and adjacent
geological data
Define specific name for surface
(topo_orig)

2.

Check/
Applied
(Yes/No)

Modeler Name

REMARKS

Geological Model Checklist Form


PT Arutmin Indonesia

3.

4.
5.

Define schema
Appropriate name of schema
Table & grid names
Model options (all, floor+roof, etc)
Parting check against lithological
database if there any CD or MS
Weighting is 100 for interval & 5 for
burden
Appropriate interpolator
Search radius is 2000 m
Split separation is 0.10 m
Lithology codes if parting is modeled
check against lithological database
if any CD or MS
Check elements/compounds against
lithological database
Conformable sequence applied
appropriate interval/surface
Check trend surface
Check limits if any (intrusion, old
workings, washedout, etc)
Check faults if any against mapping
report and latest definition
Define display definitions
Applied site standard display
definition for intervals & surfaces
Load drill hole data
Load drill hole into dholes.dgn in
separate layers according its type
(quality hole, outcrop, etc)
Separate holes with problem in
another layer
Validate drill hole data
Run & check drillhole statistic if any
gross errors
Contour drillhole of major seam (SL3,
SM2, etc) with no smoothing to give
real pictures
Run report value to check topo model
againts drillhole collars
Build model
Run table and read the table model
file, see feedback on data errors &
inconsistencies (mostly in red fonts)
Grid model

6.

7.

Geological Model Checklist Form


PT Arutmin Indonesia

8.

9.

10.

Validate model
Verify thickness of drillhole data and
compare with model data
Create cross section and long
section 100m or 125m spacing,
check the continuation, correlation,
thickness and fault separations
Create contours of mineable seams
floors & thicknesses
Check any anomalies
Graphical output
Create graphical output in separate
design files for several types of
output (cnt_structure, cnt_quality,
sect_line, sect_2d, etc)
Create sections (cross & long) for
every mineable seams in 100 m
spacing
Create contour of mineable seam
floors & thicknesses
Quality
Prepare raw quality data and check
the database using statistic on excel
Define quality model parameters
interpolator must be inverse
Define quality definitions
Define quality defaults from statistic
Ensure key quality (RD) filled in with
appropriate value from statistic
Load data to Stratmodel check the
report ensure the coal or interval
should be 0
Composite quality against drillholes
Check graphical quality Contour of
RD value for mineable seams, and
check if any bull-eyes/anomalies

Modeler,

Checked by,

You might also like