66900 m2
3.0 Determine the amount of impervious and pervious areas draining to the OSD storage system.
3.1 Post-redevelopment:
Impervious area:
Building Footprint, carparks &
roads
=
Turf and landscape
66900 m2
26500 m2
3.2 Pre-development:
The site before development was a park lawn surfaced with tress and grass (impervious area of
Impervious area =
0 m2
Pervious area =
66900 m2
4.0 Determine times of concentration, tc and tcs.
Site-based Method - To determine times of concentration, an analysis of the site catchment
drainage system will need to be undertaken. For this case, it is assumed that:
tcs =
tc =
20 minutes
30 minutes
5.0 Calculate the pre and post-development flows for the area draining to the OSD storage.
The minor drainage system that the OSD storage will discharge into has been designed for 5 year
ARI capacity. The rainfall intensity is estimated using Equation 13.2 (MASMA) (tc > 30 minutes)
and Table 13.A1 for tc:
ln(RIt) = a + b ln(t) + c (ln(t))2 + d (ln(t))3
From Table 13.A1: (For 5 year ARI)
a=
6.1694
b = -0.2513
ln(5I30) =
I30 =
c=
-0.0382
d=
0.0021
4.955
181.2 mm/hr
Using the Rational Method, the pre and post-development flows are calculated as follows:
Development
Status
Pre-development
I (mm/hr)
181.2
Impervious Area
C
A (m2)
0.8
0
Pervious Area
C
A (m2)
0.3
66900
CA
20070
Qd (l/s)
1010.19 Qp
Post-redevelopment
181.2
0.8
66900
0.3
26500
61470
3093.99 Qa
Equations 19.1a
b = 4 Qa Qp
Equations 19.1b
Equations 19.1
So
a=
12690.2
b=
1E+007
PSD =
1076.5 l/s
td (min)
5
10
15
20
30
35
40
45
50
55
60
I(mm/hr)
297
255.4
212.6
181.2
141.9
132.6
125
118.5
118.5
118.5
125
td
(mins)
5
10
15
20
30
35
40
Qd
(l/s)
5071.275
4360.955
3630.145
3093.990
2422.943
2264.145
2134.375
Impervious Area
C
A (m2)
0.8
66900
0.8
66900
0.8
66900
0.8
66900
0.8
66900
0.8
66900
0.8
66900
0.8
66900
0.8
66900
0.8
66900
0.8
66900
Pervious Area
C
A (m2)
0.3
26500
0.3
26500
0.3
26500
0.3
26500
0.3
26500
0.3
26500
0.3
26500
0.3
26500
0.3
26500
0.3
26500
0.3
26500
PSD
1076.5
1076.5
1076.5
1076.5
1076.5
1076.5
1076.5
850.156
835.207
813.722
791.505
749.843
736.371
723.873
48.901
56.866
68.314
80.152
102.351
109.530
116.189
SSR
(m3)
1251.67
2081.33
2473.30
2666.80
2827.35
2978.31
3106.35
CA
61470
61470
61470
61470
61470
61470
61470
61470
61470
61470
61470
Qd (l/s)
5071.275
4360.955
3630.145
3093.990
2422.943
2264.145
2134.375
2023.388
2023.388
2023.388
2134.375
45
50
55
60
2023.388
2023.388
2023.388
2134.375
1076.5
1076.5
1076.5
1076.5
711.912
711.912
711.912
723.873
122.562
122.562
122.562
116.189
3210.07
3566.74
3923.41
4659.53
2473.30 m3
Where
2g.
PSD
Ys + S.L - Ye
KL
and
p.
Dp =
KL = Kt + Ke + Kf + Ko
Using the downstream end of the outlet pipe as the height datum, Ys =
Ye =
The outlet pipe slope, S =
1.8 m
1.2 m
25 m
0.75
0.55
- Equation 19.8
- Equation 19.9
0.253 D-4/3
0.5
4.05 + 0.101D-4/3
KL
5.310
4.909
4.784
4.804
Area, Ap Estimated D
(mm)
(m2)
0.6577
915.1
0.6324
897.3
0.6243
891.5
0.6256
892.4
A pipe diameter of
450 mm is adopted.
>
exceed 600mm and side slope steeper than 1(V):4(H), due consideration should be given to safety
aspects, such as the need for fencing, both when the storage is full or empty.
The minimum designed floor slope is 2% graded toward the DCP.
The adopted dimension of the storage volume are:
55 m (L) x
50 m (W) x
1 m (Dave) =
2750 m3 >
2473.30
20 minutes, 50year ARI rainfall intensity for the site is estimated using Equation 13.3:
I20 =
50
203.6 mm/hr
Using the Rational Method, the amjor system flow is calculated as follows:
I (mm/hr)
203.6
Impervious Area
C
A (m2)
0.9
66900
Pervious Area
C
A (m2)
0.5
26500
Q = CBCW B H1.5
B=
19.55 m
CA
73460
Q (l/s)
4154.57
1.7