1. PLTA = Hydro Power Plant (Pembangkit Listrik Tenaga Air)
2. PLTB = Wind Power Plant (Pembangkit Listrik Tenaga Bayu)
3. PLTD = Diesel Fuel Power Plant (Pembangkit Listrik Tenaga Diesel)
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

PLTG = Gas Power Plant (Pembangkit Listrik Tenaga Gas)


PLTGU = Gas & Steam Power Plant (Pembangkit Listrik Tenaga Gas & Uap)
PLTM = Mini Hydro Power Plant (Pembangkit Listrik Tenaga Mini Hidro)
PLTMH = Micro Hydro Power Plant (Pembangkit Listrik Tenaga Mikro Hidro)
PLTMG = Gas Engine Power Plant (Pembangkit Listrik Tenaga Mesin Gas)
PLTN = Nuclear Power Plant (Pembangkit Listrik Tenaga Nuklir)
PLTP = Geothermal Power Plant (Pembangkit Listrik Tenaga Panas Bumi)
PLTS = Solar Power Plant (Pembangkit Listrik Tenaga Surya)
PLTU = Steam Power Plant (Pembangkit Listrik Tenaga Uap)
PS = Pump Storage

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

Fast Track Program I


Status of power plant projects under the 10,000 MW Fast Track I Program as of November 2014
Power Plant
PLTU 2 Labuan
PLTU 1 Indramayu
PLTU 1 Suralaya Unit 8
PLTU 3 Lontar
PLTU 2 Pelabuhan Ratu
PLTU 1 Rembang
PLTU 2 Adipala
PLTU 1 Pacitan
PLTU 2 Paiton Unit 9
PLTU 3 Tanjung Awar Awar
PLTU Tarahan Baru
PLTU 1 Parit Baru
PLTU 1 Teluk Balikpapan
PLTU 1 Pulang Pisau
PLTU Asam-Asam
PLTU 2 Amurang
PLTU Anggrek
PLTU Tidore
PLTU 2 Jayapura
PLTU Meulaboh / Nagan Raya
PLTU 2 Pangkalan Susu
PLTU 1 Bengkalis
PLTU Tenayan
PLTU Tanjung Balai
PLTU Belitung
PLTU 3 Air Anyer
PLTU 2 Selat Panjang
PLTU 2 Pantai Kura Kura
PLTU Teluk Sirih
PLTU1 Timika
PLTU Ambon
PLTU Kendari
PLTU Barru
PLTU 2 Lombok
PLTU 1 Ende
PLTU 2 Kupang
PLTU 1 Bima
PLTU 1
PLTU 2

Location
Banten
West Java
Banten
Banten
West Java
Central Java
Central Java
East Java
East Java
East Java
Lampung
West Kalimantan
East Kalimantan
Central Kalimantan
South Kalimantan
North Sulawesi
Gorontalo
North Maluku
Papua
Aceh
North Sumatera
Riau
Riau
Riau Islands
Bangka Belitung
Bangka Belitung
Riau
West Kalimantan
West Sumatera
Papua
Maluku
Southeast Sulawesi
South Sulawesi
West Nusa Tenggara
East Nusa Tenggara
East Nusa Tenggara
West Nusa Tenggara
North Sulawesi
Central Kalimantan

Capacity (MW)
2 x 300
3 x 330
1 x 625
3 x 315
3 x 350
2 x 315
1 x 660
2 x 315
1 x 660
2 x 350
2 x 100
2 x 50
2 x 110
2 x 60
2 x 65
2 x 25
2 x 25
2x 7
2 x 100
2 x 110
2 x 220
2 x 10
2 x 110
2x 7
2 x 16.5
2 x 30
2x 7
2 x 27.5
2 x 112
2x 7
2 x 15
2 x 10
2 x 50
2 x 25
2x 7
2 x 16.5
2 x 10
2 x 25
2x 7

COD
2009-2010
2011
2011
2011-2012
2014
2011
2015
2013
2012
2014-2016
2014
2016
2015
2015
2013
2012
2016
2014
2014
2014
2015
Cancelled
2015
2013
2014-2015
2013-2015
Cancelled
2016
2013-2014
Cancelled
2015
2012-2014
2012-2013
2015
2015
2014-2015
2016
2016
Cancelled

Status
Completed
Completed
Completed
Completed
Completed
Completed
In Progress
Completed
Completed
Completed
Completed
In Progress
In Progress
In Progress
Completed
Completed
In Progress
In Progress
In Progress
Completed
Completed
Cancelled
In Progress
Completed
Completed
Completed
Cancelled
In Progress
Completed
Cancelled
In Progress
Completed
Completed
In Progress
In Progress
Completed
In Progress
In Progress
Cancelled

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

Fast Track Program II


Province
Aceh

Developer

Type

Power Plant Name

Capacity
(MW)

COD

83

2020

IPP

Hydro (PLTA)

Peusangan 4

IPP

Geothermal (PLTP)

Jaboi

2x5

2019

IPP

Geothermal (PLTP)

Seulawah Agam

110

2024

IPP

Geothermal (PLTP)

Gunung Endut

40

2021

IPP

Geothermal (PLTP)

Rawa Dano

110

2019

Bengkulu

PLN

Geothermal (PLTP)

Hululais

2 x 55

2018-2019

Jambi

PLN

Geothermal (PLTP)

Sungai Penuh

2 x 55

2024

West Java

PLN

Hydro (PLTA)

Upper Cisokan PS

4 x 260

2019

PLN

Hydro (PLTA)

Jatigede

2 x 55

2019

PLN

Steam (PLTU)

Indramayu

1,000

2019

PLN

Steam (PLTU)

Java-6

2 x 1,000

2023

IPP

Geothermal (PLTP)

Cibuni

10

2020

IPP

Geothermal (PLTP)

Cisolok-Cisukarame

50

2020

IPP

Geothermal (PLTP)

Gunung Ciremai

2 x 55

2022

IPP

Geothermal (PLTP)

Kamojang 5

30

2015

IPP

Geothermal (PLTP)

Karaha Bodas

30

2016

IPP

Geothermal (PLTP)

Karaha Bodas

2 x 55

2020

IPP

Geothermal (PLTP)

Patuha

3 x 55

2014 & 2019

IPP

Geothermal (PLTP)

Tampomas

45

2020

IPP

Geothermal (PLTP)

Tangkuban Perahu 1

2 x 55

2019-2020

IPP

Geothermal (PLTP)

Tangkuban Perahu 2

2 x 30

2020

IPP

Geothermal (PLTP)

Wayang Windu 3 - 4

2 x 110

2020

IPP

Steam (PLTU)

Java-1

1,000

2019

IPP

Steam (PLTU)

Java-3

2 x 660

2012-2022

IPP

Steam (PLTU)

Java-5

2 x 1,000

2012-2022

IPP

Geothermal (PLTP)

Baturaden

2 x 110

2021

IPP

Geothermal (PLTP)

Dieng

55

2019

IPP

Geothermal (PLTP)

Dieng

60

2021

IPP

Geothermal (PLTP)

Guci

55

2021

IPP

Geothermal (PLTP)

Umbul Telumoyo

55

2022

IPP

Geothermal (PLTP)

Ungaran

IPP

Steam (PLTU)

Java-4

IPP

Geothermal (PLTP)

Ijen

IPP

Geothermal (PLTP)

Iyang Argopuro

IPP

Geothermal (PLTP)

West Kalimantan

PLN

South Kalimantan
Central Kalimantan

Banten

Central Java

East Java

55

2021

2 x 1,000

2019-2020

2 x 55

2020

55

2021

Wilis/Ngebel

3 x 55

2020-2021

Steam (PLTU)

Parit Baru

2 x 50

2017-2018

IPP

Steam (PLTU)

South Kalimantan

2 x 100

2018-2019

PLN

Gas (PLTG)

Bangkanai

280

2016-2017

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

East Kalimantan

IPP

Steam (PLTU)

East Kalimantan

2 x 100

2018-2019

Lampung

IPP

Hydro (PLTA)

Semangka

2 x 28

2018

IPP

Geothermal (PLTP)

Danau Ranau

2 x 55

2022

IPP

Geothermal (PLTP)

Rajabasa

2 x 110

2023-2024

IPP

Geothermal (PLTP)

Suoh Sekincau

4 x 55

2020-2024

IPP

Geothermal (PLTP)

Ulubelu 3 and 4

2 x 55

2016-2017

IPP

Geothermal (PLTP)

Wai Ratai

55

2022

Maluku

PLN

Geothermal (PLTP)

Tulehu

2 x 10

2018-2019

North Maluku

IPP

Geothermal (PLTP)

Jailolo

4 x 10

2021-2023

IPP

Geothermal (PLTP)

Songa Wayaua

2020

PLN

Geothermal (PLTP)

Sembalun

2 x 10

2021

PLN

Steam (PLTU)

Lombok

2 x 50

2018-2019

IPP

Geothermal (PLTP)

Hu'u

2 x 10

2024

IPP

Geothermal (PLTP)

Atadei

2 x 2.5

2019

IPP

Geothermal (PLTP)

Mataloko

20

2019

IPP

Geothermal (PLTP)

Sokoria

30

2020-2023

IPP

Geothermal (PLTP)

Oka Ile Ange

10

2021

PLN

Steam (PLTU)

Punagaya

2 x 100

2017-2018

IPP

Hydro (PLTA)

Bonto Batu

110

2024

IPP

Hydro (PLTA)

Malea

2 x 45

2020

IPP

Geothermal (PLTP)

Bora Pulu

40

2022

IPP

Geothermal (PLTP)

Marana

2 x 10

2022

PLN

Geothermal (PLTP)

Kotamobagu

80

2024

IPP

Geothermal (PLTP)

Lahendong V and VI

2 x 20

2017-2018

PLN

Hydro (PLTA)

Masang 2

55

2020

IPP

Geothermal (PLTP)

Bonjol

60

2022

IPP

Geothermal (PLTP)

Muaralaboh

2 x 110

2017-2018

IPP

Geothermal (PLTP)

Lumut Balai

4 x 55

2017-2019

IPP

Geothermal (PLTP)

Rantau Dadap

2 x 110

2019-2020

PLN

Hydro (PLTA)

Asahan 3

2 x 87

2018

PLN

Steam (PLTU)

Pangkalan Susu 3 & 4

2 x 200

2016-2017

IPP

Hydro (PLTA)

Hasang

40

2018

IPP

Hydro (PLTA)

Wampu

3 x 15

2015

IPP

Geothermal (PLTP)

Sarulla 1

3 x 110

2017-2018

IPP

Geothermal (PLTP)

Sarulla 2

2 x 55

2022

IPP

Geothermal (PLTP)

Simbolon Samosir

2 x 55

2022

IPP

Geothermal (PLTP)

Sipholon Ria-ria

20

2022

IPP

Geothermal (PLTP)

Sorik Marapi

240

2020-2021

West Nusa
Tenggara

East Nusa Tenggara

South Sulawesi

Southeast Sulawesi
North Sulawesi
West Sumatera

South Sumatera
North Sumatera

Total

17,458

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

Electricity Development Program 2015 2019


An additional is 35 GW of generation capacity is required for the next 5 years, excluding the 6.6 GW
already in construction.
Table 3 Power Plant Requirement by Developer
PLN
Total Capacity
Year Total Location
(MW)
2015
26
2,658
2016
40
2,348
2017
43
4,830
2018
30
3,777
2019
17
4,414
Total

156

18,027

IPP
Year
2015
2016
2017
2018
2019
Tota
l

Total Location
13
13
39
33
37

Total Capacity
(MW)
1,471
1,357
1,720
5,461
14,905

135

24,914

Table 4 Additional Power Plant Requirement by Project Status


Developer
2015
2016
2017
2018
Construction
PLN
2,308
784
339
562
IPP
1,471
971
286
41
Sub-Total
3,779
1,755
625
603
Committed
PLN
454
2,090
575
IPP
3
78
563
5,048
Sub-Total
3
532
2,653
5,623
Planned
PLN
1,610
2,251
2,640
IPP
315
861
372
Sub-Total
1,925
3,112
3,011
Total
3,782
4,212
6,389
9,237

2019

Total
200
55
255

4,193
2,824
7,017

2,539
5,737
8,276

5,658
11,429
17,087

1,675
9,113
10,788
19,319

8,175
10,661
18,836
42,940

GOI measures to accelerate 35 GW power plant developments:


1. Simplify and expedite approval of subsidiary loan agreements (SLA) and foreign commercial
loans (PKLN)
2. Approve direct loan from international development bank to PLN with government guarantee
3. Continue multi-years electricity project through state budget
4. Plan additional capital to PLN to add investment capacity
5. Approve additional gas and LNG allocation to PLN
6. Give dispensation for forestry permits
7. Authorize Perhutani to buy forest land on behalf of users
8. Automatic issue of jetty permit once location permit is issued by local government
9. Simplify electricity permits
10. Form land acquisition team especially for 35 GW program

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION
Total National Power Plant Projects
(Includes power plants for interconnected system, including projects under FTP I and FTP II)
2015
PLN
PLTU (Steam)
PLTP (Geothermal)
PLTGU (Steam & Gas)
PLTG (Gas)
PLTD (Diesel)
PLTM (Mini Hydro)
PLTA (Hydro)
PS (Pump Storage)
Other Power Plants
Sub-Total
IPP
PLTU (Steam)
PLTP (Geothermal)
PLTGU (Steam & Gas)
PLTG (Gas)
PLTD (Diesel)
PLTM (Mini Hydro)
PLTA (Hydro)
PS (Pump Storage)
Other Power Plants
Sub-Total
Unallocated
PLTU (Steam)
PLTP (Geothermal)
PLTGU (Steam & Gas)
PLTG (Gas)
PLTD (Diesel)
PLTM (Mini Hydro)
PLTA (Hydro)
PS (Pump Storage)
Other Power Plants
Sub-Total
Total
PLTU (Steam)
PLTP (Geothermal)
PLTGU (Steam & Gas)
PLTG (Gas)
PLTD (Diesel)
PLTM (Mini Hydro)
PLTA (Hydro)
PS (Pump Storage)
Other Power Plants
Total

2016

2017

2018

2019

2020

2021

1,883
400
5
20
3
2,311

650
450
1,784
1
2,885

299
2,930
1,430
11
4,670

1,114
10
2,300
240
24
88
3,776

2,735
70
650
15
284
1,040
4,794

550
55
73
9
138
825

1,400
30
45
8
1,482

849
85
300
20
29
45
1,328

193
240
775
80
10
364
47
1,709

2,954
310
1,760
234
127
77
5,462

13,762
415
100
116
73
60
14,526

3,283
30
400
50
20
11
3,793

1,499
85
750
1,804
30
45
4,213

492
240
3,705
1,510
10
375
47
6,379

4,068
320
4,060
474
151
165
9,238

16,497
485
650
100
130
357
1,040
60
19,319

2022
-

2023

2024

Total

65
293
1
379

363
363

520
520

210
650
860

7,231
365
6,330
3,992
65
2,356
1,040
4
21,382

2,450
1,092
143
225
3,909

1,200
635
41
328
2,204

200
420
1,025
1,645

500
460
333
1,293

530
748
693
1,971

24,038
4,435
2,835
475
10
824
2,844
68
35,528

125
58
159
342

1,460
5
188
83
1,736

1,835
10
165
149
450
2,609

3,775
30
79
450
4,334

3,625
125
753
4,503

10,820
15
566
1,222
900
13,523

3,125
1,147
131
152
522
5,076

2,660
660
294
703
1
4,318

2,035
430
165
1,537
450
4,617

4,275
460
30
931
450
6,146

4,155
958
125
2,095
7,333

42,089
4,815
9,165
5,033
10
889
6,421
1,940
72
70,433

20
-

The above table shows the following:


-

Additional power plant capacity for the next 10 years (2015-2024) for the whole of Indonesia is
70.4 GW or 7 GW on average per year
Coal steam power plant (PLTU) will contribute 42.1 GW or 59.8%, while gas steam power plant
(PLTGU) will contribute 13% or 9.1 GW and 5 GW for gas power plant (PLTG). Renewable Energy
based power plant will be dominated by geothermal power plants (PLTP) and hydro (PLTA),
contributing 4.8 GW and 9.3 GW of total capacity.

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

Power Plant Project List by Province


ACEH
Aceh has abundant energy sources: 589 MW of geothermal, 1,482 MW of hydro, and 1.7 billion tons of
coal reserves. In 2015, Pertamina plans to build LNG FSRU in Arun and gas pipeline from Arun to Medan.
The gas distributed through this pipeline will be used to power gas power plants in Aceh and Medan.
In order to fulfill electricity demand until 2024, Aceh will need 1,952 MW of additional capacity.
Power Plant Development Project List in Aceh
No

Project
1 Arun (Peaker)
2 Sabang
3 Sinabang
4 Singkil
5 Bidin 1
6 Kerpap
7 Ketol A
8 Kr Isep
9 Lawe Gurah
10 Lawe Mamas
11 Lawe Sikap
12 Sabang
13 Sabulussalam
14 Sumbagut-2 Peaker
15 Tembolon
16 Lumut
17 Peusangan 1-2
18 Sinabang
19 Redelong
20 Jaboi (FTP 2)
21 Meulaboh (Nagan Raya) #3,4
22 Sumbagut-3 Peaker
23 Meurebo-2
24 Peusangan-4 (FTP 2)
25 Jambu Aye
26 Lawe Alas
27 Seulawah Agam (FTP 2)
28 Tampur-1
Total ACEH

PLTG/MG
PLTS
PLTS
PLTS
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTMG
PLTM
PLTGU/MGU
PLTM
PLTM
PLTA
PLTU
PLTA
PLTP
PLTU
PLTA
PLTA
PLTA
PLTA
PLTA
PLTA
PLTP
PLTA

Type
Gas/Gas Engine
Solar
Solar
Solar
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Gas Engine
Mini Hydro
Steam Gas/Steam Gas Engine
Mini Hydro
Mini Hydro
Hydro
Steam
Hydro
Geothermal
Steam
Hydro
Hydro
Hydro
Hydro
Hydro
Hydro
Geothermal
Hydro

Developers (Assumed) Capacity (MW)


PLN
200
IPP
1
IPP
2
IPP
1
IPP
7
IPP
2
IPP
10
IPP
10
IPP
5
IPP
7
IPP
7
PLN
4
IPP
7
PLN
250
IPP
3
IPP
10
PLN
88
IPP
2x7
IPP
18
IPP
2x5
PLN
2x200
IPP
250
IPP
59
IPP
83
Unallocated
160
Unallocated
151
IPP
2x55
Unallocated
428
1,952

COD
2015
2015
2015
2015
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2017
2018
2018
2018-2020
2019
2019-2020
2019-2020
2020
2020
2024
2024
2024
2024
2024

Summary of Electricity Development in Aceh (including transmission and substation development)


Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Growth/Total

Sales (GWh)
Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
2,117
2,407
416
94
330
692
268
2,291
2,602
450
160
544
107
2,475
2,807
484
312
350
408
506
2,668
3,022
521
105
60
1,286
471
2,873
3,251
560
245
120
228
415
3,092
3,495
601
264
60
180
541
3,325
3,757
645
60
40
50
3,576
4,040
693
83
120
179
3,846
4,340
744
60
336
82
4,138
4,665
799
849
60
756
1,548
7.70%
7.60%
7.50%
1,952
1,380
4,470
4,167

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

NORTH SUMATERA
North Sumatera has a large potential of hydro and geothermal energy source. It does not, however has
coal potential and a declining natural gas reserves. North Sumatera has 1,370 MW of geothermal and
385 MW of hydro potential.
Power Plant Development Project List in North Sumatera
No

Project
1 Pangkalan Susu #2 (FTP 1)
2 North Sumatera Scattered
3 Truck Mounted North Sumatera
4 Barge Mounted North Sumatera
5 Mobile Power Plant Nias
6 Nias (FTP 2)
7 Wampu (FTP 2)
8 North Sumatera Scattered
9 North Sumatera Scattered
10 Sarulla 1 (FTP 2)
11 Pangkalan Susu #4 (FTP 2)
12 Sumbagut 1 Peaker
13 North Sumatera 1
14 Asahan III (FTP 2)
15 Hasang (FTP 2)
16 Pangkalan Susu #3 (FTP 2)
17 Sumbagut 3 Peaker
18 Sumbagut 4 Peaker
19 Nias
20 Sorik Marapi (FTP 2)
21 Simonggo 2
22 Batang Toru (South Tapanuli)
23 Kumbih 3
24 Sibundong 4
25 Sipholon Ria Ria (FTP 2)
26 Simbolon Samosir (FTP 2)
27 Sumatera Pump Storage 1
28 North Sumatera 2
29 Sarulla 2 (FTP 2)
30 Sumatera Pump Storage 2
Total North Sumatera

PLTU
PLTMH
PLTG/MG
PLTG/MG
PLTG/MG
PLTU
PLTA
PLTMH
PLTMH
PLTP
PLTU
PLTGU/MGU
PLTU
PLTA
PLTA
PLTU
PLTGU/MGU
PLTGU/MGU
PLTMG
PLTP
PLTA
PLTA
PLTA
PLTA
PLTP
PLTP
PLTA
PLTU
PLTP
PLTA

Type
Steam
Micro Hydro
Gas/Gas Engine
Gas/Gas Engine
Gas/Gas Engine
Steam
Hydro
Micro Hydro
Micro Hydro
Geothermal
Steam
Steam Gas/Steam Gas Engine
Steam
Hydro
Hydro
Steam
Steam Gas/Steam Gas Engine
Steam Gas/Steam Gas Engine
Gas Engine
Geothermal
Hydro
Hydro
Hydro
Hydro
Geothermal
Geothermal
Hydro
Steam
Geothermal
Hydro

Developers (Assumed) Capacity (MW)


PLN
440
IPP
11
PLN
100
PLN
250
PLN
25
PLN
7
IPP
45
IPP
63
IPP
99
IPP
3x110
PLN
200
PLN
250
IPP
300
PLN
174
IPP
40
PLN
200
PLN
250
PLN
250
PLN
20
IPP
240
PLN
90
IPP
4x125
PLN
48
IPP
120
IPP
20
IPP
2x55
PLN
500
IPP
2x300
IPP
110
PLN
500
5,906

COD
2015
2015
2016
2016
2016
2016
2016
2017
2017
2017-2018
2018
2018
2018
2019
2019
2019
2019
2019
2020
2020-2021
2021
2022
2022
2022
2022
2023
2023
2023-2024
2024
2024

Summary of Electricity Development in North Sumatera (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Growth/Total

Sales (GWh)
Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
9,293
10,244
1,886
451
1,700
1,154
659
10,374
11,426
2,054
441
840
976
587
11,597
12,754
2,189
272
1,140
395
809
13,002
14,283
2,398
970
880
596
1,681
14,623
16,046
2,636
914
310
226
1,149
16,445
18,031
2,899
100
840
890
663
18,674
20,465
3,222
250
240
162
606
21,321
23,351
3,602
688
480
44
1,135
24,436
26,746
4,125
910
680
150
1,514
28,090
30,728
4,676
410
700
711
13.10%
13%
10.60%
5,406
7,810
4,593
9,514

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

RIAU
Riaus potential energy sources are natural gas, coal and hydro in various locations.
Power Plant Development Project List in Riau
No

Project
1 Riau (FTP 1 Amendment)
2 Riau Peaker
3 Riau
4 Riau Partnership
5 Selat Panjang
6 Bengkalis
7 Selat Panjang 1
8 Rengat
9 Tembilahan
Total RIAU

PLTU
PLTG/MG
PLTGU
PLTU
PLTS
PLTMG
PLTMG
PLTU
PLTU

Type
Steam
Gas/Gas Engine
Steam & Gas
Steam
Solar
Gas Engine
Gas Engine
Steam
Steam

Developers (Assumed) Capacity (MW)


PLN
2x110
PLN
2x100
IPP
250
IPP
2x600
PLN
2
IPP
18
IPP
15
IPP
6
IPP
6
1,936

COD
2015
2017
2017-2018
2019
2015
2018
2018
2016
2015

Summary of Electricity Development in Riau (including transmission and substation development)


Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Growth/Total

Sales (GWh)
Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
3,826
4,255
717
220
480
1,026
521
4,296
4,771
803
380
458
154
4,827
5,351
900
290
240
770
494
5,426
6,007
1,008
160
120
70
228
6,102
6,746
1,131
1,200
60
499
1,817
6,866
7,583
1,269
400
560
308
7,728
8,530
1,381
72
8,702
9,605
1,492
360
94
9,803
10,812
1,677
480
60
115
11,048
12,151
1,882
360
154
141
12.50%
12%
11.30%
1,870
2,880
3,597
3,944

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

RIAU ISLANDS
ESDM estimates around 51.46 TCF of natural gas potential in Riau Islands, in addition to large oil and gas
reserves (222 TCF and 500 million barrels) in Block D-Alpha Natuna.
Power Plant Development Project List in Riau Islands (Excl. Batam)
No

Project
1 Bengkalis
2 Tanjung Batu
3 TB. Karimun
4 TB. Karimun #1 (FTP 1)
5 TB Karimun #2 (FTP 1)
6 Tanjung Batu 1
7 TB. Karimun Peaker 1
8 Natuna 2
9 Tanjung Pinang 2
10 Dabo Singkep
11 Tanjung Pinang 3
12 Natuna 3
13 Tanjung Batu 2
Total Riau Islands

PLTS
PLTS
PLTS
PLTU
PLTU
PLTMG
PLTG/MG
PLTG/MG
PLTMG
PLTMG
PLTMG
PLTG/MG
PLTMG

Type
Solar
Solar
Solar
Steam
Steam
Gas Engine
Gas/Gas Engine
Gas/Gas Engine
Gas Engine
Gas Engine
Gas Engine
Gas/Gas Engine
Gas Engine

Developers (Assumed) Capacity (MW)


PLN
2
IPP
1
IPP
3
PLN
7
PLN
7
PLN
15
IPP
40
IPP
25
IPP
30
IPP
2x16
PLN
2x50
IPP
25
PLN
15
301

COD
2015
2015
2015
2015
2015
2016
2017
2018
2018
2018, 2021
2020-2021
2021
2021

Summary of Electricity Development in Riau Islands (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Growth/Total

Sales (GWh)
Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
676
743
138
14
220
258
8.0
723
793
147
15
8.4
773
848
157
40
30
8.9
828
907
168
104
9.5
887
971
180
60
10.5
951
1,040
192
50
11.1
1,020
1,116
206
106
12.0
1,096
1,197
221
30
13.0
1,178
1,286
237
120
13.8
1,267
1,383
255
15.1
7.20%
4.5%
7.10%
329
430
288
110

10

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

BANGKA BELITUNG
Bangka and Belitung have limited potential energy sources for power generation and will need support
and supply from other areas, primarily from areas in Sumatera
Power Plant Development Project List in Bangka Belitung
No

Project
1 Air Anyer (FTP 1)
2 Bangka Peaker 1
3 Bangka 1
4 Bangka 2
5 Belitung 4
6 Belitung 5
7 New Belitung (FTP 1)
8 Belitung Peaker
9 MPP Bangka
Total Bangka Belitung

PLTU
PLTG/MG
PLTU
PLTU
PLTU
PLTMG
PLTU
PLTG/MG
PLTG/MG

Type
Steam
Gas/Gas Engine
Steam
Steam
Steam
Gas Engine
Steam
Gas/Gas Engine
Gas/Gas Engine

Developers (Assumed) Capacity (MW)


PLN
30
IPP
2x50
Unallocated
2x100
Unallocated
2x100
Unallocated
50
Unallocated
2x15
PLN
17
IPP
30
PLN
50
707

COD
2015
2018
2020-2021
2023-2024
2021
2023-2024
2015
2018
2016

Summary of Electricity Development in Bangka Belitung (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Growth/Total

Sales (GWh)
Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
867
984
177
47
150
120
151.4
967
1,097
197
50
210
470
104.7
1,079
1,224
219
90
144.2
1,206
1,366
244
130
240
118.8
1,349
1,527
272
120
20.3
1,511
1,709
304
100
60
160.8
1,693
1,915
339
150
60
238.7
1,900
2,147
379
180
29.5
2,133
2,409
425
115
60
174.9
2,396
2,706
476
115
120
181.7
12.00%
11.9%
11.60%
707
1,200
680
1,325

11

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

WEST SUMATERA
Potential energy sources for power generation in West Sumatera are coal, geothermal and hydro. ESDM
estimates around 908 MW of geothermal potential in this area.
Power Plant Development Project List in West Sumatera
No

Project
1 Bonjol (FTP 2)
2 Masang 2 (FTP 2)
3 Masang 3
4 Muara Laboh (FTP 2)
5 Sumatera Pump Storage
Total West Sumatera

PLTP
PLTA
PLTA
PLTP
PLTA

Type
Geothermal
Hydro
Hydro
Geothermal
Hydro

Developers (Assumed) Capacity (MW)


IPP
60
PLN
55
Unallocated
89
IPP
220
PLN
500
924

COD
2022
2021
2022
2018-2024
2024

Note: PLN is also working on 34 mini-hydro projects in West Sumatera with local government and
private sector. Most of the projects are in PPA status, some are already in construction.
Summary of Electricity Development in West Sumatera (including transmission and substation
development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Growth/Total

Sales (GWh)
Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
3,361
3,695
581
1,010
516
208
3,724
4,091
641
390
610
210
3,969
4,356
681
210
140
81
4,269
4,682
730
70
60
82
225
4,567
5,005
778
25
56
4,884
5,350
830
4
60
5,186
5,679
878
55
120
145
5,519
6,041
932
149
60
140
338
5,825
6,374
981
160
68
6,157
6,734
1,033
650
60
240
1,373
7.00%
6.9%
6.60%
924
2,070
1,757
2,764

12

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

JAMBI
Based on information from the Jambi provincial government, the region has energy potential from coal,
gas and hydro, including about 779 million tons of coal reserves.
Power Plant Development Project List in Jambi
No

Project
1 Truck Mounted Tanjung Jabung Timur
2 Batanghari
3 Jambi Peaker
4 Jambi
5 Merangin
6 Sungai Penuh (FTP 2)
Total Jambi

PLTG/MG
PLTGU
PLTG/MG
PLTU
PLTA
PLTP

Type
Gas/Gas Engine
Steam & Gas
Gas/Gas Engine
Steam
Hydro
Geothermal

Developers (Assumed) Capacity (MW)


PLN
100
PLN
30
PLN
100
IPP
2x600
IPP
2x175
PLN
2x55
1,890

COD
2016
2017
2017
2019
2021-2022
2024

Summary of Electricity Development in Jambi (including transmission and substation development)


Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Growth/Total

Sales (GWh)
Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
1,666
1,836
328
1,800
648
229.0
1,859
2,047
365
100
120
1
90.6
2,081
2,288
407
130
500
274.6
2,329
2,559
454
330
159
98.5
2,605
2,858
506
1,200
240
1,670.8
2,899
3,178
561
30
70
34.0
3,220
3,528
621
175
60
298.3
3,571
4,007
686
175
60
296.4
3,955
4,436
758
120
34.8
4,375
4,904
835
110
60
84
211.6
11.30%
11.5%
11.00%
1,890
2,580
1,702
3,239

13

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

SOUTH SUMATERA
South Sumateras potential energy sources are as follows:

Energy Source
Oil
Natural Gas
Coal
Coal Bed Methane
Geothermal
Gambut
Hydro
Solar
Biomass
Biogas

Potential
757.6 MMSTB
24179.5 BSCF
47.1 billion tons
183.00 TCF
1,911 MW
64,200 Ha
9,385,728 kW
53.85 x 10 MW
16,034.24 GWh
235.01 KWh

Production
2793307000 BBL
434.104.64000 MMBTU
9.276.361 tons
not yet utilized
not yet utilized
not yet utilized
partial utilization
utilized
partial utilization
not yet utilized

Power Plant Development Project List in South Sumatera


No

Project
1 Banyuasin
2 Danau Ranau (FTP 2)
3 Keban Agung
4 Lumut Balai (FTP 2)
5 Rantau Dadap (FTP 2)
6 Sumbagsel 1
7 Sumsel 1
8 Sumsel 5
9 Sumsel 6
10 Sumsel 7
11 Sumsel 8
12 Sumsel 9
13 Sumsel 10
Total South Sumatera

PLTU
PLTP
PLTU
PLTP
PLTP
PLTU
PLTU
PLTU
PLTU
PLTU
PLTU
PLTU
PLTU

Type
Steam
Geothermal
Steam
Geothermal
Geothermal
Steam
Steam
Steam
Steam
Steam
Steam
Steam
Steam

Developers (Assumed) Capacity (MW)


IPP
115
IPP
110
IPP
2x112.5
IPP
4x55
IPP
2x110
IPP
2x150
IPP
2x300
IPP
2x150
IPP
2x300
IPP
2x150
IPP
2x600
IPP
2x600
IPP
600
3,105

COD
2024
2023
2015
2017-2019-2024
2019-2020
2018-2019
2020-2021
2015-2016
2019-2020
2018
2019
2020-2021
2020

Summary of Electricity Development in South Sumatera (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Growth/Total

Sales (GWh)
Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
4,618
5,123
878
375
2,510
767
918
5,129
5,684
967
150
460
372
383
5,714
6,324
1,067
55
590
216
228
6,382
7,055
1,182
450
450
162
791
7,144
7,889
1,312
615
740
1,365
8,005
8,834
1,459
710
420
1,154
8,988
9,913
1,583
300
60
504
10,113
11,147
1,708
120
142
11,405
12,564
1,912
110
540
90
561
12,895
14,198
2,147
340
490
769
12.40%
12.0%
10.60%
3,105
5,640
2,347
6,815

14

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

BENGKULU
ESDM estimates 500 MW of geothermal and 400 MW of hydro potential for power generation in
Bengkulu province, as well as around 120 million tons of coal reserves.
Power Plant Development Project List in Bengkulu
No

Project
1 Air Putih
2 Bengkulu
3 Hululais (FTP 2)
4 Ketahun 1
5 Muko Muko
6 Scattered West Sumatera
7 Scattered South Sumatera
Total Bengkulu

PLTA
PLTU
PLTP
PLTA
PLTU
PLTMH
PLTMH

Type
Hydro
Steam
Geothermal
Hydro
Steam
Micro Hydro
Micro Hydro

Developers (Assumed) Capacity (MW)


IPP
21
PLN
200
PLN
2x55
PLN
84
IPP
2x7
IPP
31
IPP
13
473

COD
2018
2019
2019-2020
2022
2017
2017
2016

Summary of Electricity Development in Bengkulu (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Growth/Total

Sales (GWh)
Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
791
881
175
160
75
878
976
193
13
120
90
120
978
1,086
213
45
60
179
1,093
1,212
236
21
120
340
179
1,222
1,354
262
255
150
860
512
1,368
1,514
291
55
30
163
1,532
1,695
324
170
81
1,718
1,899
360
84
60
205
1,929
2,132
401
150
80
2,168
2,395
448
73
11.40%
11.1%
10.30%
473
800
1,510
1,667

15

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

LAMPUNG
Lampungs energy source potential for power generation is mainly geothermal and hydro, but there is
also potential in biomass and coal reserves.
Power Plant Development Project List in Lampung
No

Project
1 Lampung Peaker
2 Rajabasa (FTP 2)
3 Semangka (FTP 2)
4 Suoh Sekincau (FTP 2)
5 MPP Lampung
6 Ulubelu #3,4 (FTP 2)
7 Wai Ratai (FTP 2)
Total Lampung

PLTG/MG
PLTP
PLTA
PLTP
PLTG/MG
PLTP
PLTP

Type
Gas/Gas Engine
Geothermal
Hydro
Geothermal
Gas/Gas Engine
Geothermal
Geothermal

Developers (Assumed) Capacity (MW)


PLN
200
IPP
2x110
IPP
56
IPP
220
PLN
100
IPP
2x55
IPP
55
961

COD
2017
2023-2024
2018
2020-2024
2016
2016-2017
2022

Summary of Electricity Development in Lampung (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Growth/Total

Sales (GWh)
Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
3,982
4,437
817
480
377.5
97.9
4,429
4,931
901
155
286
426
348.7
4,930
5,481
994
255
420
364
376.4
5,490
6,096
1,097
56
240
485
272.8
6,112
6,781
1,200
330
730
293.1
6,796
7,533
1,293
62
120
108
179.5
7,546
8,359
1,393
180
40
43.9
8,367
9,263
1,500
55
240
140
183.5
9,266
10,253
1,648
110
300
286.4
10,250
11,336
1,810
268
30
621.1
13.30%
12.8%
9.00%
961
2,626
2,671
2,703

16

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

DKI JAKARTA
Jakarta does not have primary energy source potential and will need gas supply from other areas for the
two major planned power plants (Muara Karang and Java 2/Tanjung Priok).
Power Plant Development Project List in DKI Jakarta
No

Project
1 Muara Karang
2 Java 2
3 Java 12
4 Java 12
Total Jakarta

PLTGU
PLTGU
PLTU
PLTU

Type
Steam & Gas
Steam & Gas
Steam
Steam

Developers (Assumed) Capacity (MW)


PLN
500.0
PLN
800.0
IPP
1,000.0
IPP
1,000.0
3,300.0

COD (Status)
2017 (procurement)
2018 (planned)
2022 (planned)
2023 (planned)

Summary of Electricity Development in DKI Jakarta (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
30,870
33,046
4,923
3,101
319
797
33,254
35,577
5,298
1,054
108
515
35,404
37,857
5,634
500
3,980
418
1,468
37,681
40,270
5,990
800
4,060
226
1,728
40,127
42,862
6,372
780
40
240
42,332
45,183
6,715
860
30
173
45,022
48,039
7,135
1,000
1,320
90
1,689
48,242
51,447
7,637
1,000
1,060
42
1,753
51,868
55,285
8,201
860
30
224
55,504
59,128
8,767
680
10
211
420,304
448,694
66,672
3,300
17,755
1,313
8,798

17

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

BANTEN
Banten has around 613 MWe of geothermal potential and 18.80 million tons of coal reserve for power
generation.
Power Plant Development Project List in Banten
No

Project
1 Situmulya
2 Banten
3 Java-Bali 3 Peaker
4 Lontar Expansion
5 Bulakan
6 Cidano
7 Java 9
8 Cikidang
9 Cisisemut
10 Cisungsang 2
11 Karang Ropong (Cibareno 1)
12 Java 7
13 Java 7
14 Java 5 (FTP 2)
15 Java 5 (FTP 2)
16 Cibareno
17 Cisiih Leutik
18 Nagajaya
19 Rawa Dano (FTP 2)
20 Endut (FTP 2)
Total Banten

PLTM
PLTU
PLTGU/MG
PLTU
PLTM
PLTM
PLTU
PLTM
PLTM
PLTM
PLTM
PLTU
PLTU
PLTU
PLTU
PLTM
PLTM
PLTM
PLTP
PLTP

Type
Mini Hydro
Steam
Steam Gas/Steam Gas Engine
Steam
Mini Hydro
Mini Hydro
Steam
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Steam
Steam
Steam
Steam
Mini Hydro
Mini Hydro
Mini Hydro
Geothermal
Geothermal

Developers (Assumed) Capacity (MW)


COD (Status)
IPP
3.0 2015 (in Construction)
IPP
625.0 2016 (in Cosntruction)
IPP
500.0
2017 (Planned)
PLN
315.0 2018 (Procurement)
IPP
10.0 2018 (Procurement)
IPP
2.0 2018 (Procurement)
IPP
600.0 2018 (Procurement)
IPP
2.0 2019 (Procurement)
IPP
2.0 2019 (Procurement)
IPP
3.0 2019 (Procurement)
IPP
5.0 2019 (Procurement)
IPP
1,000.0 2019 (Procurement)
IPP
1,000.0 2019 (Procurement)
IPP
1,000.0 2019 (Procurement)
IPP
1,000.0 2019 (Procurement)
IPP
3.0
2020 (Planned)
IPP
4.0
2020 (Planned)
IPP
6.0
2020 (Planned)
IPP
110.0
2020 (Planned)
IPP
40.0
2020 (Planned)
6,230.0

Summary of Electricity Development in Banten (including transmission and substation development)


Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
26,795
28,498
4,151
3
2,020
362
298
29,565
31,388
4,578
625
1,114
216
1,042
32,571
34,493
5,028
500
1,900
395
740
35,149
37,137
5,412
927
960
150
1,526
37,964
40,043
5,830
1,012
360
664
2,146
41,236
43,448
6,313
1,123
420
159
1,857
45,568
47,997
6,966
1,000
220
1,513
50,493
53,165
7,712
1,040
500
35
1,782
56,006
58,970
8,552
380
10
138
62,159
65,434
9,490
260
40
128
417,506
440,573
64,032
6,230
8,134
2,031
11,170

18

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

WEST JAVA
West Java has various potential energy sources for power generation: 2,137.5 MW of hydro, 4.24 TCF of
natural gas, 5,839 MWe of geothermal, and 0.8 TCF of coal bed methane.
Power Plant Development Project List in West Java
No

Project
1 Cirompang
2 Cilaki
3 Cisanggiri
4 Kamojang 5 (FTP 2)
5 Cianten 2
6 Cianten 1
7 Pakenjeng Bawah
8 Cijampang 1
9 Karaha Bodas (FTP 2)
10 Java-Bali 4 Peaker
11 Muara Tawar Add-On 2,3,4
12 Rajamandala
13 Cibalapulang
14 Cilaki 1B
15 Cimandiri
16 Cikopo 2
17 Cicatih
18 Kalapa Nunggal
19 Pusaka 1
20 Java Bali 1 Peaker
21 Java Bali 4 Peaker
22 Cibalapulang 2
23 Cibalapulang 3
24 Cilaki 1A
25 Pakenjeng Atas
26 Ciasem
27 Java 1
28 Java 1
29 Jatigede (FTP 2)
30 Jatigede (FTP 2)
31 Indramayu 4 (FTP 2)
32 Upper Cisokan Pump Storage (FTP 2)
33 Upper Cisokan Pump Storage (FTP 2)
34 Upper Cisokan Pump Storage (FTP 2)
35 Upper Cisokan Pump Storage (FTP 2)
36 Cikaniki 1
37 Cikaniki 2
38 Cikaengan
39 Pusaka 3
40 Cikandang
41 Caringin
42 Ciarinem
43 Cianten 1B
44 Cikaengan 2
45 Patuha (FTP 2)
46 Patuha (FTP 2)
47 Tangkuban Perahu 1 (FTP 2)
48 Java 1 (FTP 2)
49 Cianten 3
50 Cikawung Bawah
51 Cikawung Atas
52 Cibuni
53 Wayang Windu 3 (FTP 2)
54 Cibuni (FTP 2)
55 Tangkuban Perahu 2 (FTP 2)

PLTM
PLTM
PLTM
PLTP
PLTM
PLTM
PLTM
PLTM
PLTP
PLTGU/MG
PLTGU
PLTA
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTGU/MG
PLTGU/MG
PLTM
PLTM
PLTM
PLTM
PLTM
PLTGU
PLTGU
PLTA
PLTA
PLTU
PS
PS
PS
PS
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTP
PLTP
PLTP
PLTU
PLTM
PLTM
PLTM
PLTM
PLTP
PLTP
PLTP

Type
Mini Hydro
Mini Hydro
Mini Hydro
Geothermal
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Geothermal
Steam Gas/Steam Gas Engine
Steam Gas
Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Steam Gas/Steam Gas Engine
Steam Gas/Steam Gas Engine
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Steam Gas
Steam Gas
Hydro
Hydro
Steam
Pump Storage
Pump Storage
Pump Storage
Pump Storage
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Geothermal
Geothermal
Geothermal
Steam
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Geothermal
Geothermal
Geothermal

Developers (Assumed) Capacity (MW)


COD (Status)
IPP
8.0 2015 (in Construction)
IPP
7.0 2015 (in Construction)
IPP
3.0
2015 (Funding)
IPP
30.0 2015 (in Construction)
IPP
5.0 2016 (in Construction)
IPP
2.0 2016 (in Construction)
IPP
6.0
2016 (Funding)
IPP
1.0 2016 (Procurement)
IPP
30.0
2016 (Planned)
IPP
300.0
2017 (Planned)
PLN
650.0 2017 (in Construction)
IPP
47.0 2017 (in Construction)
IPP
9.0
2017 (Funding)
IPP
10.0
2017 (Funding)
IPP
3.0
2017 (Funding)
IPP
6.0
2017 (Funding)
IPP
6.0
2017 (Funding)
IPP
3.0
2017 (Funding)
IPP
9.0
2017 (Funding)
PLN
400.0
2017 (Planned)
IPP
150.0
2017 (Planned)
IPP
7.0
2018 (Funding)
IPP
6.0
2018 (Funding)
IPP
3.0 2018 (Procurement)
IPP
4.0 2018 (Procurement)
IPP
3.0 2018 (Procurement)
IPP
800.0 2018 (Procurement)
IPP
800.0 2018 (Procurement)
PLN
55.0 2019 (Procurement)
PLN
55.0 2019 (Procurement)
PLN
1,000.0
2019 (Planned)
PLN
260.0 2019 (in Construction)
PLN
260.0 2019 (in Construction)
PLN
260.0 2019 (in Construction)
PLN
260.0 2019 (in Construction)
IPP
3.0 2019 (Procurement)
IPP
3.0 2019 (Procurement)
IPP
3.0 2019 (Procurement)
IPP
3.0 2019 (Procurement)
IPP
6.0 2019 (Procurement)
IPP
4.0 2019 (Procurement)
IPP
3.0 2019 (Procurement)
IPP
6.0 2019 (Procurement)
IPP
7.0 2019 (Procurement)
IPP
55.0 2019 (in Construction)
IPP
55.0
2019 (Planned)
IPP
55.0
2019 (Planned)
IPP
1,000.0 2019 (Procurement)
IPP
6.0
2020 (Planned)
IPP
3.0
2020 (Planned)
IPP
5.0
2020 (Planned)
IPP
3.0
2020 (Planned)
IPP
110.0
2020 (Planned)
IPP
10.0
2020 (Planned)
IPP
30.0
2020 (Planned)

19

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION
56 Karaha Bodas (FTP 2)
57 Karaha Bodas (FTP 2)
58 Tangkuban Perahu 2 (FTP 2)
59 Wayang Windu 4 (FTP 2)
60 Cisolok-Cisukarame (FTP 2)
61 Tangkuban Perahu 1 (FTP 2)
62 Tampomas (FTP 2)
63 Java 3 (FTP 2)
64 Java 11
65 Ciremai Mountain (FTP 2)
66 Ciremai Mountain (FTP 2)
67 Java 3 (FTP 2)
68 Java 6 (FTP 2)
69 Java 6 (FTP 2)
70 Indramayu 5
Total West Java

PLTP
PLTP
PLTP
PLTP
PLTP
PLTP
PLTP
PLTU
PLTU
PLTP
PLTP
PLTU
PLTU
PLTU
PLTU

Geothermal
Geothermal
Geothermal
Geothermal
Geothermal
Geothermal
Geothermal
Steam
Steam
Steam
Geothermal
Steam
Steam
Steam
Steam

IPP
IPP
IPP
IPP
IPP
IPP
IPP
Unallocated
Unallocated
IPP
IPP
Unallocated
Unallocated
Unallocated
Unallocated

55.0 2020 (in Construction)


55.0 2020 (in Construction)
30.0
2020 (Planned)
110.0
2020 (Planned)
50.0
2020 (Planned)
55.0
2020 (Planned)
45.0
2020 (Planned)
660.0 2021 (Procurement)
600.0
2022 (Planned)
55.0
2022 (Planned)
55.0
2022 (Planned)
660.0 2022 (Procurement)
1,000.0
2023 (Planned)
1,000.0
2023 (Planned)
1,000.0
2024 (Planned)
12,257.0

Summary of Electricity Development in West Java (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
46,339
49,240
6,810
48
2,884
490
842
49,289
52,369
7,241
344
6,238
1,435
1,378
52,802
56,095
7,754
1,293
4,220
1,106
1,957
56,717
60,248
8,326
1,622
3,850
342
1,974
60,532
64,293
8,883
3,353
5,320
593
5,534
64,739
68,755
9,497
567
460
259
1,649
69,400
73,692
10,177
1,260
300
80
2,066
73,959
78,527
10,842
770
860
298
1,533
78,888
83,737
11,558
2,000
540
32
3,083
84,119
89,264
12,318
1,000
600
20
1,679
636,784
676,220
93,406
12,257
25,272
4,655
21,695

20

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

CENTRAL JAVA
Central Java has 360 MW of hydro and 1,981 MWe of geothermal potential for power generation.
Pertagas plans to build LNG FSRU in Tambaklorok to supply gas to PLNs power plants in Central and East
Java.
Power Plant Development Project List in Central Java
No

Project
1 Adipala
2 Cilacap Expansion
3 Karimunjawa
4 Kunci Putih
5 Logawa Sunyalaungu
6 Logawa Baseh
7 Banjaran Kebon Manis
8 Logawa Babakan
9 Logawa Baseh Karangpelem
10 Palumbungan
11 Gelang
12 Bendosari
13 Pugeran
14 Adipasir 2
15 Ambal
16 Pagarpelah
17 Gunung Wugul
18 Timbangreja
19 Java 8
20 Adipasir 1
21 Banyumlayu
22 Serayu
23 Dieng (FTP 2)
24 Central Java (PPP)
25 Central Java (PPP)
26 Java 4 (FTP 2)
27 Java 4 (FTP 2)
28 Java 10
29 Karimunjawa
30 Preng 1
31 Preng 2
32 Tulis
33 Harjosari
34 Lambur
35 Prukut Sambirata
36 Dadapayam
37 Binangun
38 Jimat
39 Damar
40 Pageruyung
41 Karimunjawa
42 Dieng (FTP 2)
43 Ungaran (FTP 2)
44 Baturaden (FTP 2)
45 Guci (FTP 2)
46 Umbul Telomoyo (FTP 2)
47 Matenggeng PS
48 Matenggeng PS
49 Baturaden (FTP 2)
50 Matenggeng PS
51 Matenggeng PS
52 Java 13
53 Java 13
TOTAL

PLTU
PLTU
PLTMG
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTU
PLTM
PLTM
PLTM
PLTP
PLTU
PLTU
PLTU
PLTU
PLTU
PLTMG
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTS
PLTP
PLTP
PLTP
PLTP
PLTP
PS
PS
PLTP
PS
PS
PLTU
PLTU

Type
Steam
Steam
Gas Engine
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Steam
Mini Hydro
Mini Hydro
Mini Hydro
Geothermal
Steam
Steam
Steam
Steam
Steam
Gas Engine
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Solar
Geothermal
Geothermal
Geothermal
Geothermal
Geothermal
Pump Storage
Pump Storage
Geothermal
Pump Storage
Pump Storage
Steam
Steam

Developers (Assumed) Capacity (MW)


PLN
660.0
IPP
614.0
PLN
4.0
IPP
1.0
IPP
1.5
IPP
3.0
IPP
2.2
IPP
1.3
IPP
1.9
IPP
1.6
IPP
0.3
IPP
4.0
IPP
6.0
IPP
0.3
IPP
2.1
IPP
3.2
IPP
3.0
IPP
0.4
IPP
1,000.0
IPP
0.3
IPP
0.5
IPP
8.6
IPP
55.0
IPP
950.0
IPP
950.0
IPP
1,000.0
IPP
1,000.0
PLN
660.0
PLN
1.0
IPP
1.8
IPP
4.5
IPP
9.0
IPP
9.9
IPP
8.0
IPP
1.5
IPP
3.0
IPP
3.8
IPP
0.5
IPP
2.1
IPP
4.4
PLN
1.0
IPP
55.0
IPP
55.0
IPP
110.0
IPP
55.0
IPP
55.0
Unallocated
225.0
Unallocated
225.0
IPP
110.0
Unallocated
225.0
Unallocated
225.0
Unallocated
1,000.0
Unallocated
1,000.0
10,324.7

COD (Status)
2015 (Construction)
2015 (Construction)
2016 (Procurement)
2016 (Construction)
2016 (Construction)
2017 (Funding)
2017 (Funding)
2017 (Funding)
2017 (Funding)
2017 (Funding)
2018 (Procurement)
2018 (Procurement)
2018 (Procurement)
2018 (Procurement)
2018 (Procurement)
2018 (Procurement)
2018 (Procurement)
2018 (Procurement)
2018 (Procurement)
2019 (Procurement)
2019 (Procurement)
2019 (Procurement)
2019 (Planned)
2019 (Funding)
2019 (Funding)
2019 (Planned)
2019 (Planned)
2019 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2021 (Planned)
2021 (Planned)
2021 (Planned)
2021 (Planned)
2021 (Planned)
2021 (Planned)
2021 (Planned)
2021 (Planned)
2021 (Planned)
2021 (Planned)
2021 (Planned)
2021 (Planned)
2021 (Planned)

21

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION
Summary of Electricity Development in Central Java (including transmission and substation
development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
20,653
21,857
3,369
1,274
3,100
547
1,984
22,151
23,438
3,544
6
1,037
694
333
23,820
25,199
3,739
10
3,220
152
264
25,642
27,120
3,949
1,019
1,600
70
1,615
27,609
29,194
4,172
2,674
220
90
3,994
29,662
31,359
4,400
1,999
620
379
3,233
31,854
33,669
4,639
276
360
140
784
34,194
36,134
4,890
505
360
32
580
36,690
38,764
5,153
560
480
714
39,355
41,571
5,430
2,000
450
20
2,924
291,630
308,305
43,285
10,323
11,447
2,124
16,425

22

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

YOGYAKARTA
Yogyakarta has around 10 MWe of geothermal potentials in Parangtritis, Gunung Kidul.
Only one power plant project is planned for Yogya: Wind power plant (PLTB) Samas with capacity of 50
MW developed by IPP for COD in 2019.

23

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

EAST JAVA
East Java has the following energy source potential for power generation: 5.73 TCF of natural gas,
1,031.94 MMSTB of oil, 0.08 million tons of coal, 2,162 MW of hydro and 1,274 MWe of geothermal.
PLN plans to receive gas supply from the Cepu field to power PLTGU Gresik (800 MW capacity).
Power Plant Development Project List in East Java
No

Project
1 Grati
2 Tanjung Awar Awar
3 Grati Add on Block 2
4 Grati
5 Lodoyo
6 Peaker Java-Bali 2
7 Java 3
8 Pacet
9 Balelo
10 Bawean
11 Jompo 1 (Upper Jompo)
12 Jompo 2 (Lower Jompo)
13 Kali Tengah (Sungai Tengah)
14 Ketajek
15 Zeelandia
16 Ijen (FTP 2)
17 Wilis / Ngebel (FTP 2)
18 Ijen (FTP 2)
19 Karangkates #4-5
20 Kesamben
21 Bawean
22 Wilis / Ngebel (FTP 2)
23 Iyang Argopuro (FTP 2)
24 Wilis / Ngebel (FTP 2)
25 Bawean
Total East Java

PLTGU
PLTU
PLTGU
PLTGU
PLTM
PLTGU/MG
PLTGU
PLTM
PLTM
PLTMG
PLTM
PLTM
PLTM
PLTM
PLTM
PLTP
PLTP
PLTP
PLTA
PLTA
PLTMG
PLTP
PLTP
PLTP
PLTMG

Type
Steam & Gas
Steam
Steam & Gas
Steam & Gas
Mini Hydro
Steam Gas/Steam Gas Engine
Steam & Gas
Mini Hydro
Mini Hydro
Gas Engine
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Geothermal
Geothermal
Geothermal
Hydro
Hydro
Gas Engine
Geothermal
Geothermal
Geothermal
Gas Engine

Developers (Assumed) Capacity (MW)


PLN
300.0
PLN
350.0
PLN
150.0
PLN
150.0
IPP
10.0
PLN
500.0
PLN
800.0
IPP
2.0
IPP
4.0
PLN
2.0
IPP
2.0
IPP
3.0
IPP
1.0
IPP
3.0
IPP
2.0
IPP
55.0
IPP
55.0
IPP
55.0
Unallocated
100.0
Unallocated
37.0
Unallocated
3.0
IPP
55.0
IPP
55.0
IPP
55.0
Unallocated
3.0
2,752.0

COD (Status)
2016 (Procurement)
2016 (Construction)
2016 (Planned)
2017 (Procurement)
2017 (Planned)
2017 (Planned)
2018 (Planned)
2019 (Procurement)
2019 (Procurement)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2021 (Planned)
2021 (Planned)
2021 (Planned)
2021 (Planned)

Summary of Electricity Development in East Java (including transmission and substation development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
33,442
35,487
5,471
3,644
236
377
36,104
38,310
5,854
800
2,054
775
1,194
39,327
41,695
6,318
660
2,700
481
985
42,704
45,242
6,797
800
2,110
294
1,189
46,544
49,273
7,341
6
1,100
110
268
50,633
53,580
7,913
319
930
180
922
54,714
57,880
8,483
168
690
60
576
59,014
62,403
9,078
580
170
63,553
67,181
9,699
630
183
68,355
72,234
10,351
780
187
494,390
523,285
77,305
2,753
15,218
2,136
6,051

24

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

BALI
Bali has 296 MWe of geothermal potential in Banyuwedang, Buleleng, Seririt Buleleng, Batukao
Tabanan, Penebel Tabanan and Buyan Bratan Buleleng.
Power Plant Development Project List in Bali
No

Project
1 Pesanggaran
2 Celukan Bawang
3 Pesanggaran
4 Pesanggaran
5 Pesanggaran
6 Celukan Bawang
7 Celukan Bawang
8 Muara
9 Telagawaja
10 Sambangan
11 Ayung
12 Tukad Daya
13 Sunduwati
14 Telagawaja Ayu
15 Bedugul
Total Bali

PLTMG
PLTU
PLTMG
PLTMG
PLTMG
PLTU
PLTU
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTM
PLTP

Type
Gas Engine
Steam
Gas Engine
Gas Engine
Gas Engine
Steam
Steam
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Geothermal

Developers (Assumed) Capacity (MW)


PLN
50.0
IPP
130.0
PLN
50.0
PLN
50.0
PLN
50.0
IPP
125.0
IPP
125.0
IPP
1.0
IPP
4.0
IPP
2.0
IPP
2.0
IPP
8.0
IPP
2.0
IPP
1.0
Unallocated
10.0
611.0

COD (Status)
2015 (Construction)
2015 (Construction)
2015 (Construction)
2015 (Construction)
2015 (Construction)
2015 (Construction)
2015 (Construction)
2017 (Funding)
2019 (Procurement)
2018 (Procurement)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2020 (Planned)
2022 (Planned)

Summary of Electricity Development in Bali (including transmission and substation development)


Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
4,721
4,981
856
580
360
146
865
5,158
5,439
934
60
295
118
5,591
5,892
1,011
1
210
114
191
6,068
6,390
1,096
2
1,060
205
189
6,589
6,934
1,189
4
120
57
7,218
7,594
1,302
14
60
10
79
7,842
8,247
1,413
36
8,515
8,952
1,534
10
30
4
63
9,243
9,714
1,663
300
20
55
10,030
10,537
1,804
36
70,975
74,680
12,802
611
2,200
794
1,689

25

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

WEST KALIMANTAN
West Kalimantan has energy source potential in hydro, biomass, coal and uranium. West Kalimantan has
the largest biomass potential, as well as 160.598.700 tons of coal.
Power Plant Development Project List in West Kalimantan
No

Project
1 Sintang
2 Ketapang
3 Mobile PP West Kalimantan
4 Parit Baru (FTP 1)
5 Pantai Kura Kura (FTP 1)
6 Parit Baru (FTP 2)
7 PLTM Scattered West Kalimantan
8 Nanga Pinoh
9 Ketapang
10 Ketapang CPO
11 Ketapang Biomass
12 West Kalimantan 1
13 West Kalimantan Peaker
14 West Kalimantan 2
15 West Kalimantan 3
Total West Kalimantan

PLTU
PLTU
PLTG/MG
PLTU
PLTU
PLTU
PLTM
PLTA
PLTU
PLTD
PLTU
PLTU
PLTG/MG/GU
PLTU
PLTU

Type
Steam
Steam
Gas/Gas Engine
Steam
Steam
Steam
Mini Hydro
Hydro
Steam
Diesel
Steam
Steam
Gas/Gas Engine/Steam Gas
Steam
Steam

Developers (Assumed) Capacity (MW)


PLN
3x7
PLN
2x10
PLN
100.0
PLN
2x50
PLN
2x27.5
PLN
2x50
PLN
15.2
IPP
98.0
IPP
2x6
IPP
10.0
IPP
10.0
IPP
2x100
IPP
100.0
IPP
2x200
Unallocated
2x200
1,642.0

COD
2015/16
2016
2016
2016
2016
2017/18
2018/19
2022
2015
2017
2017
2018
2019
2020/21
2023/24

Summary of Electricity Development in West Kalimantan (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
2,216
2,635
432
19
430
682
157
2,490
2,972
486
184
60
390
267
2,776
3,310
541
176
180
400
361
3,088
3,678
600
261
300
1,040
502
3,434
4,086
665
105
60
110
3,816
4,535
737
200
300
300
4,239
5,034
816
200
277
4,710
5,566
901
98
164
5,235
6,181
999
200
276
5,818
6,858
1,106
200
276
37,822
44,855
7,283
1,643
1,030
2,812
2,690

26

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

SOUTH KALIMANTAN
South Kalimantans primary energy source potential is among the largest in Indonesia. It has a large coal
reserves (around 1.8 billion tons) with around 12 million tons of production per year. Potential in rural
areas includes mini hydro and solar.
Power Plant Development Project List in South Kalimantan
No

Project
1 Kotabaru
2 Mobile PP Southeast Kalimantan
3 South Kalimantan Peaker 1
4 Southeast Kalimantan 2
5 Kusan
6 South Kalimantan (FTP 2)
7 South Kalimantan Peaker 2
Total South Kalimantan

PLTU
PLTG/MG
PLTG/MG/GU
PLTU
PLTA
PLTU
PLTG/MG/GU

Type
Steam
Gas/Gas Engine
Gas/Gas Engine/Steam Gas
Steam
Hydro
Steam
Gas/Gas Engine/Steam Gas

Developers (Assumed) Capacity (MW)


PLN
2x7
PLN
200.0
PLN
200.0
PLN
2x100
PLN
65.0
IPP
2x100
Unallocated
100.0
979.0

COD
2015
2016
2017
2019/20
2024
2018/19
2021

Summary of Electricity Development in South Kalimantan (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
2,377
2,861
464
14
30
246
114
2,606
3,114
506
200
510
30
221
2,831
3,356
548
200
120
474
283
3,064
3,753
591
100
90
60
202
3,316
4,031
637
200
20
333
3,583
4,326
686
100
210
203
3,868
4,645
738
100
90
126
4,132
4,940
787
52
4,413
5,251
841
55
4,714
5,582
898
65
138
176
34,904
41,859
6,696
979
1,070
948
1,765

27

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

CENTRAL KALIMANTAN
Central Kalimantan has large coal reserves, as well as natural gas and hydro potential.
Power Plant Development Project List in Central Kalimantan
No

Project
1 Pulang Pisau (FTP 1)
2 Bangkanai (FTP 2)
3 Kuala Pambuang
4 Bangkanai (FTP 2)
5 Sampit
6 Southeast Kalimantan 1
7 Southeast Kalimantan 3
Total Central Kalimantan

PLTU
PLTMG
PLTU
PLTG/MG
PLTU
PLTU
PLTU

Type
Steam
Gas Engine
Steam
Gas/Gas Engine
Steam
Steam
Steam

Developers (Assumed) Capacity (MW)


PLN
2x60
PLN
155.0
PLN
2x3
PLN
140.0
PLN
2x25
IPP
2x100
IPP
2x100
871.0

COD
2015
2016
2016
2017
2018
2019/20
2020/21

Summary of Electricity Development in Central Kalimantan (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
882
992
177
120
60
928
368
1,032
1,125
198
161
210
126
198
1,179
1,380
240
140
30
520
209
1,298
1,643
281
50
190
710
247
1,424
1,776
299
100
165
1,557
1,919
320
200
150
314
1,701
2,073
343
100
30
170
1,825
2,206
363
30
1,939
2,329
381
33
2,060
2,460
402
60
330
99
14,897
17,903
3,004
871
730
2,614
1,833

28

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

EAST KALIMANTAN
East Kalimantan has vast energy source potential: 25 billion tons of coal reserves (with 120 million tons
of production per year), 46 TSCF of natural gas (including 5.7 TSCF in the Mahakam Block), 985 MMSTB
of oil, 108 TSCF of coal bed methane, 980 MW of hydro, and 200 500 kW of mini hydro.
Power Plant Development Project List in East Kalimantan
No

Project
1 Tanjung Redep
2 Teluk Balikpapan (FTP 1)
3 Mobile PP East Kalimantan
4 East Kalimantan Peaker 2
5 Kelai
6 Lati (Expansion)
7 Tanah Grogot
8 East Kalimantan (MT)
9 Senipah (ST)
10 East Kalimantan (FTP 2)
11 East Kalimantan 4
12 East Kalimantan 3
13 East Kalimantan Peaker 3
14 East Kalimantan 5
Total East Kalimantan

PLTU
PLTU
PLTG/MG
PLTG/MG/GU
PLTA
PLTU
PLTU
PLTU
PLTGU
PLTU
PLTU
PLTU
PLTG/MG/GU
PLTU

Type
Steam
Steam
Gas/Gas Engine
Gas/Gas Engine/Steam Gas
Hydro
Steam
Steam
Steam
Steam & Gas
Steam
Steam
Steam
Gas/Gas Engine/Steam Gas
Steam

Developers (Assumed) Capacity (MW)


PLN
2x7
PLN
2x110
PLN
30.0
PLN
100.0
PLN
55.0
IPP
5.0
IPP
2x7
IPP
2x27.5
IPP
35.0
IPP
2x100
IPP
2x100
IPP
2x200
Unallocated
100.0
Unallocated
2x200
1,828.0

COD
2015
2015
2016
2017
2024
2015
2016
2017
2017
2018/19
2019/20
2022/23
2022
2023/24

Summary of Electricity Development in East Kalimantan (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
2,968
3,482
561
239
170
170
465
3,259
3,801
615
44
590
590
256
3,617
4,209
682
190
360
360
428
4,055
4,855
764
100
240
240
249
4,569
5,420
860
200
180
180
394
5,140
6,132
966
100
226
5,744
6,883
1,079
150
150
71
6,418
7,628
1,205
300
150
150
414
7,171
8,456
1,345
400
588
8,012
9,381
1,502
255
415
50,953
60,247
9,579
1,828
1,840
1,840
3,506

29

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

NORTH KALIMANTAN
North Kalimantans energy source potential includes 1,607.3 million tons of coal, 25 MSCF of natural gas
in South Sebuku, and another 18 mmscfd of natural gas in the Bangkudulis field. It also has a large-hydro
potential of around 6 GW and 2 MW of mini-hydro.
Power Plant Development Project List in North Kalimantan
No

Project
1 Tanjung Selor
2 Malinau
3 Tanjung Selor
4 Malinau
5 Nunukan 2
Total North Kalimantan

PLTU
PLTU
PLTMG
PLTMG
PLTMG

Type
Steam
Steam
Gas Engine
Gas Engine
Gas Engine

Developers (Assumed) Capacity (MW)


PLN
2x7
PLN
2x3
PLN
15.0
PLN
6.0
PLN
10.0
51.0

COD
2015
2016
2016
2017
2018

Summary of Electricity Development in North Kalimantan (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
165
208
30
14
34
182
226
33
21
31
199
235
36
6
30
416
84
218
255
39
10
14
237
277
43
50
10
259
300
47
5
282
326
51
4
308
353
56
5
336
383
61
5
366
416
66
5
2,552
2,979
462
51
80
416
197

30

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

NORTH SULAWESI
North Sulawesi has large renewable energy potential. Its geothermal potential is estimated at around
700 MW in Lahendong, Tompaso and Kotamobagu. Only 80 MW are currently being utilized.
Power Plant Development Project List in North Sulawesi
No

Project
1 Mobile PP North Sulawesi (Amurang)
2 Minahasa Peaker
3 Talaud
4 Tahuna
5 North Sulawesi 1
6 Scattered PLTM North Sulawesi
7 Sawangan
8 Kotamobagu (FTP 2)
9 Amurang
10 Scattered PLTM North Sulawesi
11 Lahendong V (FTP 2)
12 Scattered PLTM North Sulawesi
13 Lahendong VI (FTP 2)
14 Scattered PLTM North Sulawesi
15 Poigar 2
16 North Sulawesi 3
17 Tahuna
18 Sulbagut 2
19 Sulbagut Peaker
Total North Sulawesi

PLTG/MG
PLTG/MG/GU
PLTU
PLTMG
PLTU
PLTM
PLTA
PLTP
PLTU
PLTM
PLTP
PLTM
PLTA
PLTM
PLTA
PLTU
PLTMG
PLTU
PLTG/MG/GU

Type
Gas/Gas Engine
Gas/Gas Engine/Steam Gas
Steam
Gas Engine
Steam
Mini Hydro
Hydro
Geothermal
Steam
Mini Hydro
Geothermal
Mini Hydro
Hydro
Mini Hydro
Hydro
Steam
Gas Engine
Steam
Gas/Gas Engine/Steam Gas

Developers (Assumed) Capacity (MW)


PLN
100.0
PLN
150.0
PLN
2x3
PLN
10.0
PLN
2x25
PLN
0.5
PLN
2x6
PLN
80.0
LEASED
2x25
IPP
3.5
IPP
20.0
IPP
0.5
IPP
20.0
IPP
4.2
IPP
30.0
IPP
2x50
Unallocated
5.0
Unallocated
2x100
Unallocated
100.0
942.0

COD
2016
2017
2017
2018
2018
2018
2020
2024
2017
2017
2017
2018
2018
2019
2021
2019/20
2021
2022/23
2024

Summary of Electricity Development in North Sulawesi (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
1,436
1,699
266
60
110
49
1,590
1,870
294
100
320
175
148
1,760
2,114
316
230
10
221
1,948
2,349
345
81
140
18
204
2,154
2,579
381
54
120
44
136
2,382
2,832
422
62
30
237
172
2,634
3,251
446
35
60
85
2,913
3,559
495
100
60
370
236
3,221
3,901
549
100
166
3,562
4,282
605
180
60
56
222
23,600
28,436
4,119
942
850
1,020
1,639

31

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

CENTRAL SULAWESI
Central Sulawesi has large potential in hydro and natural gas as energy sources for power generation. It
has also around 380 MWe of geothermal potential, but this is still speculative.
Power Plant Development Project List in Central Sulawesi
No

Project
1 Ampana
2 Buleleng
3 Palu 3
4 Tawaeli (Expansion)
5 Scattered PLTM Central Sulawesi
6 Luwuk
7 Scattered PLTM Central Sulawesi
8 Scattered PLTM Central Sulawesi
9 Scattered PLTM Central Sulawesi
10 Marana (FTP 2)
11 Bora Pulu (FTP 2)
12 Tolitoli
13 Poso 1
Total Central Sulawesi

PLTU
PLTM
PLTU
PLTU
PLTM
PLTMG
PLTM
PLTM
PLTM
PLTP
PLTP
PLTU
PLTA

Type
Steam
Mini Hydro
Steam
Steam
Mini Hydro
Gas Engine
Mini Hydro
Mini Hydro
Mini Hydro
Geothermal
Geothermal
Steam
Hydro

Developers (Assumed) Capacity (MW)


PLN
2x3
PLN
1.2
PLN
2x50
IPP
2x15
IPP
9.6
IPP
40.0
IPP
15.1
IPP
10.8
IPP
14.0
IPP
20.0
IPP
40.0
Unallocated
2x25
Unallocated
120.0
457.0

COD
2016
2016
2018
2016
2017
2017
2018
2019
2020
2022
2022
2020/21
2021/22

Summary of Electricity Development in Central Sulawesi (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
957
1,081
208
90
38
1,050
1,229
218
37
200
104
125
1,188
1,382
246
50
260
1,324
331
1,345
1,613
268
115
170
310
281
1,520
1,805
302
11
60
10
62
1,711
2,016
340
39
180
66
133
1,904
2,229
378
85
30
165
2,104
2,454
416
120
430
341
2,308
2,677
454
23
2,526
2,918
494
90
110
52
16,613
19,404
3,324
457
990
2,444
1,551

32

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

GORONTALO
Power Plant Development Project List in Gorontalo
No

Project
1 Gorontalo (FTP 1)
2 Gorontalo Peaker
3 Gorontalo Energy
4 Taludaa
5 Iya
6 Sulbagut 3
7 Sulbagut 1
Total Gorontalo

PLTU
PLTG/MG
PLTU
PLTM
PLTM
PLTU
PLTU

Type
Steam
Gas/Gas Engine
Steam
Mini Hydro
Mini Hydro
Steam
Steam

Developers (Assumed) Capacity (MW)


PLN
2x25
PLN
100.0
IPP
2x7
IPP
3.0
IPP
2.0
IPP
2x50
IPP
2x50
369.0

COD
2016/17
2018
2017
2017
2017
2019/20
2019/20

Summary of Electricity Development in Gorontalo (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
419
506
84
70
30
17
476
569
95
25
30
20
59
545
645
107
44
60
180
130
623
728
122
100
60
86
710
823
138
100
30
166
808
930
156
100
30
165
908
1,040
174
12
1,020
1,162
193
30
70
24
1,149
1,303
215
9
1,292
1,459
239
30
12
7,950
9,165
1,523
369
340
300
680

33

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

SOUTH SULAWESI
South Sulawesi has around 1,996 MW of hydro and mini hydro potential and 470 BSCF of natural gas
reserves.
Power Plant Development Project List in South Sulawesi
No

Project
1 Mobile PP South Sulawesi (Tallo Lama)
2 Mobile PP South Sulawesi (Tello)
3 Selayar
4 South Sulawesi Barru 2
5 Bakaru 2
6 Makassar Peaker
7 Punagaya (FTP 2)
8 Peaker South Sulawesi
9 South Sulawesi 2
10 Poko
11 Scattered PLTM South Sulawesi
12 Wajo
13 Scattered PLTM South Sulawesi
14 Scattered PLTM South Sulawesi
15 Scattered PLTM South Sulawesi
16 Scattered PLTM South Sulawesi
17 Malea (FTP 2)
18 Bonto Batu (FTP 2)
19 Jeneponto 2
20 Salu Uro
21 Kalaena 1
22 Paleleng
23 Buttu Batu
24 Seko 1
25 Selayar
Total South Sulawesi

PLTG/MG
PLTG/MG
PLTMG
PLTU
PLTA
PLTGU
PLTU
PLTGU
PLTU
PLTA
PLTM
PLTMG
PLTM
PLTM
PLTM
PLTM
PLTA
PLTA
PLTU
PLTA
PLTA
PLTA
PLTA
PLTA
PLTMG

Type
Gas/Gas Engine
Gas/Gas Engine
Gas Engine
Steam
Hydro
Steam & Gas
Steam
Steam & Gas
Steam
Hydro
Mini Hydro
Gas Engine
Mini Hydro
Mini Hydro
Mini Hydro
Mini Hydro
Hydro
Hydro
Steam
Hydro
Hydro
Hydro
Hydro
Hydro
Gas Engine

Developers (Assumed) Capacity (MW)


PLN
100.0
PLN
50.0
PLN
10.0
PLN
100.0
PLN
2x63
PLN
450.0
PLN
2x100
PLN
450.0
PLN
2x200
PLN
2x117
IPP
10.5
IPP
20.0
IPP
26.5
IPP
23.0
IPP
10.0
IPP
25.0
IPP
2x45
IPP
110.0
IPP
2x125
IPP
2x47.5
IPP
2x26.5
IPP
2x20
IPP
200.0
IPP
480.0
Unallocated
10.0
3,564.0

COD
2016
2016
2017
2018
2020
2017/18
2017/18
2018/19
2019/20
2021
2015
2016
2017
2018
2019
2020
2020
2024
2018/19
2020/21
2021/22
2021/22
2022/23
2023/24
2024

Summary of Electricity Development in South Sulawesi (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
5,351
6,066
1,038
11
180
116
6,737
7,569
1,244
170
930
886
422
7,794
8,812
1,427
437
210
22
615
9,585
10,917
1,737
798
210
115
1,087
10,395
11,918
1,882
485
350
713
11,283
13,030
2,042
489
1,240
70
941
12,221
14,071
2,211
212
120
620
386
13,176
15,124
2,383
264
240
140
339
14,229
16,284
2,573
260
462
15,391
17,703
2,782
440
266
857
106,162
121,494
19,319
3,566
3,480
2,119
5,938

34

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

SOUTHEAST SULAWESI
Power Plant Development Project List in Southeast Sulawesi
No

Project
1 Kendari (Expansion)
2 Scattered PLTM Southeast Sulawesi
3 Bau Bau
4 Mobile PP Southeast Sulawesi (Kendari)
5 Mobile PP Southeast Sulawesi (Wangi Wangi)
6 Mobile PP Southeast Sulawesi (Bombana)
7 Mobile PP Southeast Sulawesi (North Kolaka)
8 Wangi Wangi
9 Bau Bau
10 Scattered PLTM Southeast Sulawesi
11 Bau Bau
12 Kendari 3
13 Lasolo
14 Watunohu
15 Konawe
16 Bau Bau 2
Total Southeast Sulawesi

PLTU
PLTM
PLTMG
PLTG/MG
PLTMG
PLTMG
PLTMG
PLTU
PLTU
PLTM
PLTU
PLTU
PLTA
PLTA
PLTA
PLTU

Type
Steam
Mini Hydro
Gas Engine
Gas/Gas Engine
Gas Engine
Gas Engine
Gas Engine
Steam
Steam
Mini Hydro
Steam
Steam
Hydro
Hydro
Hydro
Steam

Developers (Assumed) Capacity (MW)


PLN
1x10
PLN
4.8
PLN
30.0
PLN
50.0
PLN
5.0
PLN
10.0
PLN
5.0
PLN
2x3
PLN
2x25
PLN
5.0
IPP
2x7
IPP
2x50
IPP
2x72.5
Unallocated
15.0
Unallocated
2x25
Unallocated
2x25
550.0

COD
2015
2015
2016
2016
2016
2016
2016
2017
2019
2019/20
2015
2019
2023/24
2023
2023
2023/24

Summary of Electricity Development in Southeast Sulawesi (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
773
910
160
29
60
80
934
1,081
195
100
150
522
187
1,127
1,295
246
6
180
37
1,329
1,540
284
120
454
239
1,451
1,745
294
151
103
1,580
1,886
318
4
23
1,680
2,000
334
60
14
1,797
2,132
354
90
16
1,920
2,267
375
163
160
289
2,051
2,410
397
98
180
395
385
14,642
17,266
2,957
551
840
1,531
1,373

35

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

WEST SULAWESI
Power Plant Development Project List in West Sulawesi
No

Project
1 Mamuju
2 Tabulahan
3 Masupu
4 Karama (Unsolicited)
Total West Sulawesi

PLTU
PLTA
PLTA
PLTA

Type
Steam
Hydro
Hydro
Hydro

Developers (Assumed) Capacity (MW)


IPP
2x25
IPP
2x10
IPP
2x17.5
IPP
190.0
345.0

COD
2017
2020/21
2020/21
2024

Summary of Electricity Development in West Sulawesi (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
260
289
58
30
90
24
291
322
66
60
68
18
324
393
73
50
60
404
169
360
428
81
30
9
399
471
90
6
440
516
99
28
200
40
75
485
565
109
28
60
260
356
533
617
120
180
585
674
132
5
641
735
145
190
660
455
4,318
5,010
973
296
440
1,522
1,297

36

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

MALUKU
Energy sources available for power generation in Maluku are limited to hydro sources in Seram and Buru
Islands, and geothermal sources in Ambon and Haruku Islands. Geothermal sources will be used to
power PLTP Tulehu 2x10 MW.
Power Plant Development Project List in Maluku
No

Project
1 Mobile PP Ambon
2 Waai (FTP 1)
3 Langgur
4 Namlea
5 Saumlaki
6 Dobo
7 Seram Peaker
8 Ambon Peaker
9 Nua (Masohi)
10 Tulehu (FTP 2)
11 Scattered PLTM Maluku
12 Sapalewa
13 Wai Tina
14 Langgur
15 Ambon Peaker 2
16 Dobo
17 Seram Peaker
18 Namlea
19 Saumlaki
20 Ambon
21 Wai Tala
Total Maluku

PLTMG
PLTU
PLTMG
PLTMG
PLTMG
PLTMG
PLTMG
PLTMG
PLTM
PLTP
PLTM
PLTM
PLTM
PLTMG
PLTMG
PLTMG
PLTMG
PLTMG
PLTMG
PLTU
PLTA

Type
Gas Engine
Steam
Gas Engine
Gas Engine
Gas Engine
Gas Engine
Gas Engine
Gas Engine
Mini Hydro
Geothermal
Mini Hydro
Mini Hydro
Mini Hydro
Gas Engine
Gas Engine
Gas Engine
Gas Engine
Gas Engine
Gas Engine
Steam
Hydro

Developers (Assumed) Capacity (MW)


PLN
70.0
PLN
2x15
PLN
20.0
PLN
10.0
PLN
10.0
PLN
10.0
PLN
20.0
PLN
30.0
PLN
2x4.4
PLN
2x10
PLN
10.0
IPP
2x4
IPP
2x6
Unallocated
10
Unallocated
20
Unallocated
5.0
Unallocated
5.0
Unallocated
10.0
Unallocated
5.0
Unallocated
2x25
Unallocated
2x13.5
391.0

COD
2016
2017
2017
2017
2017
2017
2018
2018
2018/19
2018/19
2019/20
2018
2018/19
2020
2021
2021
2022
2023
2023
2023/24
2023/24

Summary of Electricity Development in Maluku (including transmission and substation development)


Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
601
660
130
60
60
24
667
756
138
70
20
6
67
739
858
151
80
150
197
154
815
956
164
78
20
170
137
898
1,049
179
25
61
986
1,170
192
15
60
210
70
1,081
1,275
209
25
31
1,182
1,385
227
5
15
1,290
1,503
245
54
30
90
1,405
1,628
265
39
76
9,664
11,240
1,900
391
310
673
725

37

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

NORTH MALUKU
Halmahera Island has geothermal potential of around 40 MW, which will be a source of energy for PLTP
Jailolo. Telaga Ranu and Hamiding Mountain are estimated to have geothermal potential of 85 MWe
and 265 MWe.
Power Plant Development Project List in North Maluku
No

Project
1 North Maluku/Tidore (FTP 1)
2 Mobile PP Temate
3 Mobile PP Sofifi
4 Mobile PP Tobelo
5 Sofifi
6 Malifut Peaker
7 Songa Wayaua
8 Jailolo (FTP 2)
9 Jailolo 2
10 Tobelo
11 Temate
12 Tidore
Total North Maluku

PLTU
PLTMG
PLTMG
PLTMG
PLTU
PLTMG
PLTP
PLTP
PLTP
PLTMG
PLTMG
PLTMG

Type
Steam
Gas Engine
Gas Engine
Gas Engine
Steam
Gas Engine
Geothermal
Geothermal
Geothermal
Gas Engine
Gas Engine
Gas Engine

Developers (Assumed) Capacity (MW)


PLN
2x7
PLN
30
PLN
10
PLN
10
PLN
2x3
PLN
5
IPP
2x2.5
IPP
20
IPP
20
Unallocated
10
Unallocated
30
Unallocated
20
180

COD
2015
2016
2016
2016
2017
2017
2020
2021
2022/23
2020
2020
2021

Summary of Electricity Development in North Maluku (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
340
396
71
14
35
374
445
78
50
46
414
489
86
11
22
458
543
95
6
508
609
105
120
220
49
561
679
115
45
156
74
620
743
126
40
78
685
816
139
10
35
757
893
152
10
34
836
979
168
7
5,553
6,592
1,135
180
120
376
386

38

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

PAPUA
Papua has around 11,000 MW of hydro potential for power generation.
Power Plant Development Project List in Papua
No

Project
1 Jayapura (FTP 1)
2 Orya (Genyem)
3 Timika
4 Mobile PP Jayapura
5 Scattered PLTM Papua
6 Timika
7 Timika
8 Merauke
9 Serui
10 Nabire
11 Biak
12 Scattered PLTM Papua
13 Jayapura Peaker
14 Baliem
15 Baliem
16 Biak
17 Nabire-Kalibobo
18 Walesi Blok II
19 Merauke
20 Jayapura - Skouw
21 Serui
22 Orya 2
23 Merauke
24 Jayapura 2
Total Papua

PLTU
PLTA
PLTU
PLTMG
PLTM
PLTU
PLTMG
PLTMG
PLTMG
PLTMG
PLTMG
PLTM
PLTMG
PLTA
PLTA
PLTU
PLTU
PLTM
PLT Biomass
PLTU
PLTMG
PLTA
PLTMG
PLTU

Type
Steam
Hydro
Steam
Gas Engine
Mini Hydro
Steam
Gas Engine
Gas Engine
Gas Engine
Gas Engine
Gas Engine
Mini Hydro
Gas Engine
Hydro
Hydro
Steam
Steam
Mini Hydro
Biomass
Steam
Gas Engine
Hydro
Gas Engine
Steam

Developers (Assumed) Capacity (MW)


PLN
2x10
PLN
2x10
PLN
2x7
PLN
50
PLN
3.9
PLN
2x7
PLN
10
PLN
20
PLN
10
PLN
20
PLN
15
PLN
5.2
PLN
40
PLN
20
PLN
30
IPP
2x7
IPP
2x7
IPP
6x1
IPP
10
IPP
2x15
Unallocated
5
Unallocated
10
Unallocated
10
Unallocated
2x25
441

COD
2015
2015
2016
2016
2017
2017
2017
2017
2017
2017
2017
2018
2018
2023
2024
2018
2018
2018
2018
2019
2019
2020
2021
2021

Summary of Electricity Development in Papua (including transmission and substation development)


Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
941
1,087
171
40
40
244
94
1,011
1,175
183
64
60
88
1,104
1,283
200
78
150
121
1,202
1,400
217
94
150
1,307
1,524
236
40
120
84
1,417
1,643
255
5
31
1,533
1,811
276
20
120
48
1,655
1,944
297
25
66
1,782
2,082
319
45
80
582
110
1,917
2,227
343
30
66
13,869
16,176
2,497
441
510
886
858

39

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

WEST PAPUA
West Papua has 151 million tons of coal potential, 24 TSCF of natural gas, and 121 MMSTB of oil.
Power Plant Development Project List in West Papua
No

Project
1 Mobile PP Manokwari
2 Kombemur
3 Fak Fak
4 Waigo
5 Bintuni
6 Ransiki
7 Warsamson
8 Klalin
9 Andai
10 Manokwari 2
11 Fak Fak
Total West Papua

PLTMG
PLTM
PLTMG
PLTM
PLTMG
PLTM
PLTA
PLTU
PLTU
PLTMG
PLTMG

Type
Gas Engine
Mini Hydro
Gas Engine
Mini Hydro
Gas Engine
Mini Hydro
Hydro
Steam
Steam
Gas Engine
Gas Engine

Developers (Assumed) Capacity (MW)


PLN
20
PLN
2x3.3
PLN
10
PLN
1
PLN
10
PLN
2.4
PLN
3x15.5
IPP
2x15
IPP
2x7
Unallocated
20
Unallocated
5
166

COD
2016
2017
2017
2018
2018
2018
2021/22
2018
2018
2021
2021

Summary of Electricity Development in West Papua (including transmission and substation


development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
399
444
76
43
439
487
84
20
33
486
538
92
17
90
60
39
539
595
102
57
113
598
661
113
10
662
735
125
60
40
13
734
817
138
56
77
812
902
152
16
34
899
995
168
95
996
1,098
186
11
6,564
7,272
1,236
166
150
100
468

40

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

WEST NUSA TENGGARA


Power Plant Development Project List in West Nusa Tenggara
No

Project
1 Bima (FTP 1)
2 Lombok (FTP 1)
3 West Sumbawa
4 Mobile PP Lombok (Ampenan)
5 Lombok Peaker
6 Sumbawa
7 Bima
8 Lombok (FTP 2)
9 Lombok 2
10 Sembalun (FTP 2)
11 Lombok
12 Segara 1
13 East Lombok
14 Scattered PLTM West Nusa Tenggara
15 Brang Beh 1
16 Brang Beh 2
17 Lombok Peaker 2
18 Bima 2
19 Sumbawa 2
20 Lombok 3
21 Hu'u (FTP 2)
Total West Nusa Tenggara

PLTU
PLTU
PLTU
PLTG/MG
PLTGU
PLTMG
PLTMG
PLTU
PLTU
PLTP
Leased PLTU
PLTM
PLTU
PLTM
PLTA
PLTA
PLTG/MG/GU
PLTU
PLTU
PLTU
PLTU

Type
Steam
Steam
Steam
Gas/Gas Engine
Steam Gas
Gas Engine
Gas Engine
Steam
Steam
Geothermal
Steam
Mini Hydro
Steam
Mini Hydro
Hydro
Hydro
Gas/Gas Engine/Steam Gas
Steam
Steam
Steam
Steam

Developers (Assumed) Capacity (MW)


PLN
2x10
PLN
2x25
PLN
2x7
PLN
50
PLN
150
PLN
50
PLN
50
PLN
2x50
PLN
100
PLN
20
Leased
50
IPP
1.5
IPP
2x25
IPP
18.7
Unallocated
12
Unallocated
6
Unallocated
60
Unallocated
2x25
Unallocated
2x25
Unallocated
2x50
Unallocated
2x10
1022

COD
2015
2015/16
2015/16
2016
2017
2017
2017
2018/19
2019/20
2021
2018
2015
2017
2018/19
2020
2021
2022
2021/22
2023/24
2023/24
2024

Summary of Electricity Development in West Nusa Tenggara (including transmission and substation
development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
1,438
1,685
277
54
180
262
168
1,594
1,877
307
82
310
11
162
1,759
2,021
339
300
200
454
424
1,939
2,298
373
104
60
230
155
2,132
2,504
410
115
80
219
2,340
2,831
450
62
110
106
144
2,565
3,079
494
51
30
109
2,803
3,351
539
85
60
30
116
3,046
3,610
586
75
140
3,307
3,889
636
95
168
22,923
27,145
4,411
1,023
1,000
1,123
1,805

41

UNOFFICIAL TRANSLATION
NOT FOR CITATION OR ATTRIBUTION

EAST NUSA TENGGARA


East Nusa Tenggara has various renewable energy sources: Timor-Kupang Island has 2.02 MW of wind;
Flores has geothermal potential of 115 MW and 23.22 MW of hydro; Sumba Island has 12.40 MW
potential for mini hydro, biomass and wind; Alor Island has 20 MW of geothermal potential; and
Lembata Island has 5 MW of geothermal potential.
Power Plant Development Project List in East Nusa Tenggara
No

Project
1 Scattered PLTM East Nusa Tenggara
2 Mobile PP Kupang
3 Mobile PP Flores
4 Rote Ndao
5 Alor
6 Maumere
7 Kupang Peaker
8 Atambua
9 Alor
10 Waingapu
11 Ulumbu 5
12 Ende (FTP 1)
13 Kupang (FTP 1)
14 Timor 1
15 Scattered PLTM East Nusa Tenggara
16 Kupang
17 Scattered PLTM East Nusa Tenggara
18 Mataloko (FTP 2)
19 Atadei (FTP 2)
20 Sokoria (FTP 2)
21 Oka Ile Ange (FTP 2)
22 Sokoria (FTP 2)
23 Sokoria (FTP 2)
24 Sokoria (FTP 2)
25 Wae Rancang I - Manggarai
26 Wae Rancang II - Manggarai
27 Ulumbu 6
28 Timor 2
Total East Nusa Tenggara

PLTM
PLTMG
PLTMG
PLTU
PLTU
PLTMG
PLTMG
PLTU
PLTMG
PLTMG
PLTP
PLTU
PLTU
PLTU
PLTM
PLTU
PLTM
PLTP
PLTP
PLTP
PLTP
PLTP
PLTP
PLTP
PLTA
PLTA
PLTP
PLTU

Type
Mini Hydro
Gas Engine
Gas Engine
Steam
Steam
Gas Engine
Gas Engine
Steam
Gas Engine
Gas Engine
Geothermal
Steam
Steam
Steam
Mini Hydro
Steam
Mini Hydro
Geothermal
Geothermal
Geothermal
Geothermal
Geothermal
Geothermal
Geothermal
Hydro
Hydro
Geothermal
Steam

Developers (Assumed) Capacity (MW)


PLN
0.4
PLN
30
PLN
20
PLN
2x3
PLN
2x3
PLN
40
PLN
40
PLN
4x6
PLN
10
PLN
10
PLN
2x2.5
PLN
1x7
PLN
1x16.5
PLN
2x25
IPP
0.4
IPP
30
IPP
2.6
IPP
20
IPP
2x2.5
IPP
2x2.5
IPP
10
IPP
5
IPP
10
IPP
10
Unallocated
10
Unallocated
6.5
Unallocated
2x2.5
Unallocated
2x25
434

COD
2015
2016
2016
2017
2017
2017
2017
2018
2018
2018
2019
2015
2015
2018/19
2015
2016
2017
2019
2019
2020
2021
2021
2022
2023
2020
2021
2021
2022/23

Summary of Electricity Development in East Nusa Tenggara (including transmission and substation
development)
Year
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Total

Sales (GWh) Production (GWh) Peak Load (MW) Power Plant (MW) Substation (MVA) Transmission (KMs) Investment ($ million)
803
922
179
24
160
1,080
233
876
1,018
195
80
130
134
954
1,105
212
95
60
134
165
1,039
1,209
231
69
180
20
144
1,131
1,323
251
55
80
30
133
1,229
1,432
273
15
90
286
108
1,335
1,550
296
27
30
89
1,448
1,694
321
35
20
103
1,572
1,825
349
35
103
1,705
1,968
378
31
12,092
14,046
2,685
435
750
1,550
1,243

42