Professional Documents
Culture Documents
HYDRO DECK
Combining the very best in engineering
design, mooring analysis and high-end
fabrication, AG&P ALE Ventures Pty
Ltd delivers an innovative solution to
the offshore market to solve major
logistical challenges and remove
supply chain bottlenecks.
The first of its kind, the Hydro Deck has been designed
and built through the joint venture between AG&P, a
leader in integrated industrial process outsourcing and
ALE, one of the worlds leading engineering and heavy
lift companies.
The Hydro Deck is a transition pontoon that works in
conjunction with modular offloading facilities (MOF) for
on-shoring modules and infrastructure. Its innovative
design enables load-in operations for combined loads of
up to 17,000 metric tonnes, regardless of tidal conditions
or port facilities.
ON BOARD SYSTEMS:
2.1 Ballast System
2.2 Air Ballast System
2.3 Ballast Stripping System
2.4 Hydraulic Valve System
2.5 Cooling Water System
2.6 Fuel Oil System
2.7 Lubricating & Hydraulic Oil Systems
2.8 Bilge Systems
2.9 Deaeration System
2.10 Fresh Water System
2.11 Sewage System
2.12 Hydraulic Mooring system
2.13 Hydraulic Ro-Ro Ramp system
2.13 Ventilation & Air Conditioning System
ELECTRICAL SYSTEMS:
3.1 Power Generation
3.2 Main Switchboard, Control & Power Distribution
3.3 Main & Emergency Lighting System
3.4 AMS Control, Alarm & Monitoring System
3.5 Impressed Current Protection System
3.6 Navigation Aids System
3.7 Communications System
3.8 CCTV System
SAFETY SYSTEMS:
5.1 Fire Hydrant System
5.2 CO2 Fire Extinguishing System
5.3 Quick-Closing Valve System, Ventilation
Dampers & Emergency Stops
5.4 Fire Detection System
5.5 Fire Integrity Plan
HYDRO DECK
SAFETY ADVANTAGES
FIXED RAMP SYSTEM ON EACH END The ramp system has been designed
for the maximum axle loads of the
strongest SPMTs on the market to
provide the safest possible ramp
solution. Their hydraulic capability
eliminates crane and/or forklift
work, which are often the cause of
an incident during a ro-ro operation.
This feature also limits the exposure
of the field personnel to the elements
by eliminating tasks.
Technical Specifications
Type of vessel
Build
2013
Class notation
FLAG
Singapore
Ro-ro ramps
Principal dimensions
140/40/12m
1.7/2.7m
Draft maximum
11.1m
Light weight
8500t
32000t
20t/m2
Ballast system
Mooring system
:2/60t winches
:mooring cylinders
AG&P ALE Ventures offer the Hydro Deck and its team of specialists as part of
the full service solution available to clients worldwide.
Contact details:
Derek Thomas
derek.thomas@agp.ph
www.agp.ph
James Dunn
j.dunn@ale-heavylift.com
www.ale-heavylift.com
Key
1 - Fuel Oil Day Tank
2 - Exhaust Silencer
3 - Main Generator
4 - Harbour Service Generator
5 - Air Ballast Compressor
6 - Starter Board Ballast Air
Compressor (Aft)
7 - Hydraulic Oil Tank
8 - Plate Cooler
9 - Sea Water Pumps
10 - Fresh Water Tank
11 - Fuel Oil Overflow Tank
12 - Fuel Oil Bunker Tank
13 - Sea Chest
14 - Sea Strainer
15 - Sludge Tank
16 - Ballast Pump
17 - 400V Ballast and Starter
Switchboard (Aft)
18 - Bilge Holding Tank
19 - Solenoid Box for Values
20 - Hydraulic Power Unit for Valves
21 - Sewage Tank
22 - Start Battery Cabinet
23 - Hydraulic Power Unit Mooring
24 - General 24V Supply Cabinet
25 - Control Room Switchboard
26 - Fuel Oil Transfer Pumps
27 - Hydrophore
28 - Bilge Pump
29 - Sewage Pump
30 - Fire Pump
Key
1 - Fuel Oil Day Tank
2 - Exhaust Silencer
3 - Main Generator
4 - Air Ballast Compressor
5 - Starter Board Ballast Air
Compressor (Forward)
6 - Plate Cooler
7 - Sea Water Pump
8 - Hydraulic Power Unit for Vales
9 - Solenoid Box for Valves
10 - Ballast Pump
11 - 400V Ballast and Starter
Switchboard (Forward)
12 - Sea Strainer
13 - Sea Chest
14 - Sludge Tank
15 - Bilge Holding Tank
16 - Start Battery Cabinet
17 - Hydraulic Power Unit Mooring
18 - General 24V Supply Cabinet
19 - Control Room Switchboard
20 - Bilge Pump and Oily Bilge Pump
21 - Fire Pump
22 - 400V/230V Transformer
23 - Fresh Water Cooling Pumps