REHABILITACION Y MEJORAMIENTO DE PISTAS DE LA AV. ISABEL LA CATOLICA, TRAMO: PASEO DE LA REPUBLICA - AV. PROLONGACION HUANUCO
Cliente
Lugar
Item
Descripcin
Und.
Metrado
Rendim. Cuadrilla
Duracion
(dias)
GLB
1.00
1.00
1.00
01.02.00
m2
25.00
10.00
1.00
1.0
3.0
01.03.00
TRAZO Y REPLANTEO
m2
41,056.27
250.00
9.00
18.0
01.04.00
MANTENIMIENTO DE TRANSITO-SEALIZACION
GLB
1.00
1.00
1.00
1.0
01.05.00
und
1.00
1.00
1.00
1.0
7,364.98
400.00
2.00
9.0
02.02.00
m2
9,808.00
400.00
2.00
12.0
02.03.00
m2
8,883.39
200.00
3.00
15.0
02.04.00
819.21
100.00
1.00
8.0
m3
2,400.00
1.00
100.00
24.0
03.02.00
ELIMINACION DE DESMONTE
m3
3,900.00
380.00
1.00
10.0
03.03.00
m2
4,189.67
100.00
4.00
10.0
m2
5,261.47
200.00
2.00
13.0
04.02.00
m2
3,633.68
120.00
3.00
10.0
04.03.00
m2
3,633.68
200.00
2.00
9.0
04.04.00
m2
735.14
2,000.00
0.50
1.0
04.05.00
m2
9,808.00
1,000.00
3.00
3.0
04.06.00
m2
9,808.00
250.00
3.00
13.0
m2
1,900.00
200.00
2.00
5.0
05.02.00
m2
1,900.00
120.00
3.00
5.0
05.03.00
M3
230.00
20.00
3.00
4.0
05.04.00
819.21
100.00
1.00
8.0
05.05.00
289.00
160.00
1.00
2.0
m2
26,013.00
1,000.00
3.00
9.0
RIEGO DE LIGA
QUINCENA 01
QUINCENA O2
QUINCENA 03
QUINCENA 04
QUINCENA 05
QUINCENA 06
QUINCENA 07
QUINCENA 08
CRONOGRAMA DE OBRAS
REHABILITACION Y MEJORAMIENTO DE PISTAS DE LA AV. ISABEL LA CATOLICA, TRAMO: PASEO DE LA REPUBLICA - AV. PROLONGACION HUANUCO
Cliente
Lugar
Item
Descripcin
Und.
Metrado
Rendim. Cuadrilla
Duracion
(dias)
06.02.00
COLOCACION DE GEOTEXTIL
m2
16,000.00
800.00
3.00
7.0
06.03.00
m2
26,013.00
400.00
3.00
22.0
540.20
20.00
3.00
9.0
1.00
1.00
1.00
1.0
07.02.00
07.03.00
m2
148.50
20.00
1.00
7.0
07.04.00
COLOCACION DE ARBOLES
und
100.00
1.00
8.00
13.0
m3
GLB
08.00.00 SEALIZACION
08.01.00 SEALIZACION HORIZONTAL
08.01.01
m2
806.00
140.00
1.00
6.0
08.01.02
m2
840.00
170.00
1.00
5.0
und
31.00
80.00
0.50
1.0
08.02.02
und
7.00
20.00
0.50
1.0
08.02.03
und
14.00
20.00
1.00
1.0
09.00.00 SEMAFORIZACION
09.01.00
09.01.01
und
8.00
1.00
1.00
8.0
09.01.02
und
6.00
1.00
3.00
2.0
09.01.03
und
18.00
1.00
3.00
6.0
09.01.04
und
4.00
1.00
1.00
4.0
09.02.00
09.02.01
und
15.00
5.00
5.0
09.02.02
und
5.00
2.00
2.0
09.02.03
und
9.00
2.00
2.0
09.02.04
und
14.00
5.00
5.0
09.02.05
und
18.00
5.00
5.0
09.02.06
und
14.00
5.00
5.0
10.0
09.03.00
09.03.01
OBRAS PRELIMINARES
GLB
1.00
10.00
09.03.02
und
4.00
5.00
5.0
09.03.03
und
28.00
15.00
15.0
09.03.04
CABLES DE CONTROL
und
1.00
5.00
5.0
QUINCENA 01
QUINCENA O2
QUINCENA 03
QUINCENA 04
QUINCENA 05
QUINCENA 06
QUINCENA 07
QUINCENA 08
VALORIZACION DE LA OBRA
REHABILITACION Y MEJORAMIENTO DE PISTAS DE LA AV. ISABEL LA CATOLICA, TRAMO: PASEO DE LA REPUBLICA - AV. PROLONGACION HUANUCO
Cliente
Lugar
Item
7/7/2009
Descripcin
Und.
Metrado
Parcial S/.
Duracion
(dias)
QUINCENA 01
QUINCENA O2
QUINCENA 03
QUINCENA 04
QUINCENA 05
01.01.00
01.02.00
01.03.00
TRAZO Y REPLANTEO
01.04.00
MANTENIMIENTO DE TRANSITO-SEALIZACION
01.05.00
und
GLB
1.00
2,800.00
1.0
50%
m2
60.00
4,280.40
6.0
100%
m2
41,056.27
73,490.72
18.0
100%
GLB
1.00
150,503.40
1.0
1.00
1,105.64
1.0
100%
QUINCENA 08
100%
50%
25%
25%
25%
261,898.08
7,364.98
65,842.92
9.0
02.02.00
m2
9,808.00
122,992.32
12.0
100%
02.03.00
m2
8,883.39
62,183.73
15.0
100%
02.04.00
819.21
10,879.11
8.0
100%
100%
181,509.99
m3
2,400.00
59,976.00
24.0
03.02.00
ELIMINACION DE DESMONTE
m3
3,900.00
75,699.00
10.0
100%
03.03.00
m2
4,189.67
45,834.99
10.0
100%
444,840.11
04.01.00
m2
5,261.47
32,147.58
13.0
100%
04.02.00
m2
3,633.68
55,086.59
10.0
100%
04.03.00
m2
3,633.68
62,135.93
9.0
100%
04.04.00
m2
735.14
1,426.17
1.0
100%
04.05.00
m2
9,808.00
30,404.80
3.0
100%
04.06.00
m2
9,808.00
263,639.04
13.0
100%
122,422.82
05.01.00
m2
1,900.00
11,609.00
2.0
05.02.00
m2
1,900.00
28,348.00
3.0
05.03.00
M3
230.00
64,027.40
0.0
100%
05.04.00
819.21
17,236.18
8.0
100%
05.05.00
289.00
1,202.24
2.0
100%
m2
26,013.00
100%
9.0
100%
100%
680,041.62
QUINCENA 07
232,180.16
06.01.00
QUINCENA 06
50,465.22
25%
VALORIZACION DE LA OBRA
REHABILITACION Y MEJORAMIENTO DE PISTAS DE LA AV. ISABEL LA CATOLICA, TRAMO: PASEO DE LA REPUBLICA - AV. PROLONGACION HUANUCO
Cliente
Lugar
Item
7/7/2009
Descripcin
Und.
Metrado
Parcial S/.
Duracion
(dias)
QUINCENA 01
QUINCENA O2
QUINCENA 03
QUINCENA 04
06.02.00
COLOCACION DE GEOTEXTIL
m2
16,000.00
36,480.00
7.0
100%
06.03.00
m2
26,013.00
593,096.40
22.0
50%
m3
540.20
205,416.45
9.0
100%
GLB
1.00
100,000.00
1.0
100%
QUINCENA 05
QUINCENA 06
QUINCENA 07
50%
321,889.27
07.02.00
07.03.00
m2
148.50
4,472.82
7.0
07.04.00
COLOCACION DE ARBOLES
und
100.00
12,000.00
13.0
100%
100%
45,887.71
08.00.00 SEALIZACION
08.01.00 SEALIZACION HORIZONTAL
23,856.80
08.01.01
m2
806.00
11,928.80
6.0
100%
08.01.02
m2
840.00
11,928.00
5.0
100%
22,030.91
08.02.01
und
31.00
13,218.40
1.0
100%
08.02.02
und
7.00
2,932.51
1.0
100%
08.02.03
und
14.00
5,880.00
1.0
100%
442,520.00
09.00.00 SEMAFORIZACION
09.01.00
QUINCENA 08
09.01.01
und
8.00
76000.00
8.0
09.01.02
und
6.00
54000.00
2.0
09.01.03
und
18.00
45000.00
6.0
09.01.04
und
4.00
10800.00
4.0
100%
100%
50%
50%
100%
09.02.00
und
09.02.01
und
15.00
36750.00
5.0
100%
09.02.02
und
5.00
16000.00
2.0
100%
09.02.03
und
9.00
21870.00
2.0
100%
09.02.04
und
14.00
15400.00
5.0
100%
09.02.05
und
18.00
35100.00
5.0
100%
09.02.06
und
14.00
26600.00
5.0
100%
09.03.00
09.03.01
OBRAS PRELIMINARES
GLB
1.00
30000.00
10.0
100%
09.03.02
und
4.00
43200.00
5.0
100%
09.03.03
und
28.00
16800.00
15.0
100%
09.03.04
CABLES DE CONTROL
und
1.00
15000.00
5.0
100%
MES 01
MES 02
MES 03
MES 04
COSTO DIRECTO
2,733,189.76
451,385.69
1,046,117.70
806,752.81
GASTOS GENERALES(8.15418%)
222,869.22
36,806.80
85,302.32
65,784.08
428,933.56
34,976.02
SUBTOTAL
2,956,058.98
488,192.49
1,131,420.02
872,536.89
463,909.58
IMPUESTO (16.6997%)
493,655.05
81,527.02
188,944.54
145,711.65
77,471.83
VALORIZACION DE LA OBRA
REHABILITACION Y MEJORAMIENTO DE PISTAS DE LA AV. ISABEL LA CATOLICA, TRAMO: PASEO DE LA REPUBLICA - AV. PROLONGACION HUANUCO
Cliente
Lugar
Item
7/7/2009
Descripcin
Und.
TOTAL PRESUPUESTO
Metrado
Parcial S/.
3,449,714.03
Duracion
(dias)
QUINCENA 01
QUINCENA O2
569,719.52
QUINCENA 03
QUINCENA 04
1,320,364.56
QUINCENA 05
QUINCENA 06
1,018,248.54
QUINCENA 07
QUINCENA 08
541,381.41