12.

1 METRADO DE CARGAS
TECHO 04(AZOTEA)
CARGAS MUERTAS
DESCRIPCION
V101(70X35)
V102(50X25)
COL (60X35)
DESCRIPCION
LOSA ALIG 20 cm
ACABADO
TABIQUERIA

PERALTE
0.7
0.5
0.6

BASE
0.35
0.25
0.35

LONG
16.2
10.65
2.5

P.E
2.4
2.4
2.4

LARGO
18.6
18.6
18.6

ANCHO
12.05
12.05
12.05

P(E-020)
0.3
0.1
0.15

LARGO
18.6

ANCHO
12.05

P(E-020)
0.1

E-030
0.25

PERALTE
0.7
0.5
0.6

BASE
0.35
0.25
0.35

LONG
16.2
10.65
2.5

P.E
2.4
2.4
2.4

LARGO
18.6
18.6
18.6

ANCHO
12.05
12.05
12.05

P(E-020)
0.3
0.1
0.15

LARGO
18.6

ANCHO
12.05

P(E-020)
0.2

CARGAS DE USO
DESCRIPCION
CARGA EN AZOTEA

TECHO 03(DEPARTAMENTOS)
CARGAS MUERTAS
DESCRIPCION
V101(70X35)
V102(50X25)
COL (60X35)
DESCRIPCION
LOSA ALIG 20 cm
ACABADO
TABIQUERIA

CARGAS DE USO
DESCRIPCION
CARGA EN AZOTEA

E-030
0.25

TECHO 02(DEPARTAMENTOS)
CARGAS MUERTAS
DESCRIPCION
V101(70X35)
V102(50X25)
COL (60X35)
DESCRIPCION
LOSA ALIG 20 cm
ACABADO
TABIQUERIA

PERALTE
0.7
0.5
0.6

BASE
0.35
0.25
0.35

LONG
16.2
10.65
2.5

P.E
2.4
2.4
2.4

LARGO
18.6
18.6
18.6

ANCHO
12.05
12.05
12.05

P(E-020)
0.3
0.1
0.15

LARGO
18.6

ANCHO
12.05

P(E-020)
0.2

E-030
0.25

PERALTE
0.7
0.5
0.6

BASE
0.35
0.25
0.35

LONG
16.2
10.65
2.5

P.E
2.4
2.4
2.4

LARGO
18.6
18.6
18.6

ANCHO
12.05
12.05
12.05

P(E-020)
0.35
0.1
0.15

LARGO
18.6

ANCHO
12.05

P(E-020)
0.25

CARGAS DE USO
DESCRIPCION
CARGA EN AZOTEA

TECHO 01(OFICINAS)
CARGAS MUERTAS
DESCRIPCION
V101(70X35)
V102(50X25)
COL (60X35)
DESCRIPCION
LOSA ALIG 25 cm
ACABADO
TABIQUERIA

CARGAS DE USO
DESCRIPCION
CARGA EN AZOTEA

E-030
0.25

RESUMEN
PISOS

PESO(TN)

PTP4
PTP3
PTP2
PTP1

166.29765
205.5204
205.5204
219.528525

P= 796.867
Cb=ZUCS/R
Z=
U=
C=
S=
R=
Cb=

0.4
1
2.5
1.2
8
0.15

Fi=(pihi)/(pihi)*v

V= Cb*P= 119.530

PISOS

PESO(TN)

PTP4
PTP3
PTP2
PTP1

166.29765
205.5204
205.5204
219.528525
pi*hi

altura
11
8.5
6
3.5

Pi*hi
1829.27415
1746.9234
1233.1224
768.3498375

Fi
39.2015361403
37.4367509646
26.4259418573
16.4658172878

5577.6697875

119.53004625

DATOS

:
qa=1.8 kg/cm2
SISTEMA APORTICADO
CHICLAYO
CONCRETO 210 KG/CM2

SUELO INTERMEDIO

1.-DISTRIBUCION DE CARGAS.PISOS

DESCRIPCION

1 PISO
2PISO
3PISO
4PISO

N TECHO

COCHERA
OFICINAS
DEPARTAMENTOS
DEPARTAMENTOS
AZOTEA

TECHO
TECHO
TECHO
TECHO

1
2
3
4

CARGA DE USO
(TN/M3)

0.25
0.2
0.2
0.1

2.- PREDIMENSIONAMIENTO.DESCRIPCION
V101(70X35)
V102(50X25)
COL(60X35)
LOSA ALIG. 20CM
LOSA ALIG. 25CM

PREALTE
P = (7/10) = 0.7 m
P = (5/10) = 0.5 m
Pc = (0.7*80%) = 0.56m
E = (4.6/25) = 0.184 m
E = (4.6/25) = 0.184 m

BASE
B = (0.7/2) = 0.35 m
B=0.5/2=0.25
Bc=0.35
E=0.2
E=0.25 (aumenta el espesor

T-4; T-3; T-2


por la carga de uso) T-1

COLUMNA
Area Columna Central=P/(0.45

fc)

P =K x At x Np
K
1000

Area Columna excentrica

At(m2)
22.55

=P/(0.35 fc)

Np
4

0.45
0.45

fc (kg/cm2)
210

P =K x At x Np
K
1000

At(m2)
14.35

Np
4

0.35
0.35

fc (kg/cm2)
210

3.- CALCULO DEL PERIODO FUNDAMENTAL.T=H/Ct

T=11/35

0.314

4.- CALCULO DE COEFICIENTE DE AMPLIACION SISMICA.-

2.5
=2.5 (Tp )/(T
)

4.78
=2.5 (0.6 )/0.314

Ya que el valor es 4.78 no cumple con la condicion, lo que se tomaria el valor de 2.5
5.-CALCULO DEL FACTOR DE ZONA.Z=0.4

NORMA E-030, CHICLAYO SE ENCUENTRA EN LA ZONA 3

6.-CALCULO DEL FACTOR DE USO .U=1

NORMA E-030 POR SER UNA EDIFICACION COMUN

7.-CALCULO DEL FACTOR DE SUELO .S=1.2

NORMA E-030 POR SER UN SUELO INTERMEDIO DEACUERDO A SU


CAPACIDAD PORTANTE DE 1.8 KG/CM2

8.-CALCULO DEL COEFICIENTE DE REDUCCION.Rx=Ry=8

NORMA E-030 POR SER UN SISTEME ESTRUCTURAL TIPO PORTICO

9.-CALCULO DEL COEFICIENTE BASAL.-

Cbx=Cby=ZUCS/R

Cbx=Cby=((0.4)(1)(2.5)(1.2))/8

10.-CALCULAR LA CORTANTE BASAL.-

Vx;y =Cb x P

Vx;y =0.15 x 796.87

11.-COMPROBAR.-

0.125C/R

0.1252.5/8

0.3125

12.-PESO SISMICO DE LA ESTRUCTURA POR PISO.-

P =100% CM+X% CV
USO
COMUN, TECHOS Y
AZOTEAS

X%

NORMA E-030 CAP 4

25

PISOS
PESO(TN)
PTP4
166.29765
PTP3
205.5204
PTP2
205.5204
PTP1
219.528525
796.866975
P=
13.- CALCULO DE LAS FUEZAS SISMICAS POR ALTURA.-

Fi=(pihi)/(pihi)*v
PISOS
PTP4
PTP3
PTP2
PTP1

Fi
39.2015361403
37.4367509646
26.4259418573
16.4658172878
119.53004625

14.-CALCULO DE LA MASA EXCENTRICA.Ex=5%(18)=0.9 m


Ey =5%(11.7)=0.585 m

6,435

X
9.9 m

Y
6.435 m

6,435

9,9

15.-DEFINICION DE CARGAS
N
1
2
3
4
5
6
7
8
9

CARGAS
P. DE LA ESTRUCTURA
ACABADOS
TABIQUERIA
P. LOSA 20 CM
P. LOSA 25 CM
C. U AZOTEA
C. U ENTREPISOS
C. SISMO EN X
C. SISMO EN Y

TYPE
DEAD
DEAD
DEAD
DEAD
DEAD
LIVE
LIVE
SEISMIC
SEISMIC

FACTOR
1
0
0
0
0
0
0
0
0

16.-DEFINIR MASAS
P. DE LA ESTRUCTURA
ACABADOS
TABIQUERIA
P. LOSA 20 CM
P. LOSA 25 CM
C. U AZOTEA
C. U ENTREPISOS
C. SISMO EN X
C. SISMO EN Y

1
1
1
1
1
0.25
0.25
6
6

ACABADOS
TABIQUERIA
P. LOSA 20 CM
P. LOSA 25 CM
C.U. AZOTEA
C.U. ENTREPISOS
C.U. ENTREPISOS

100
150
300
350
100
200
200

17.-CARGAS
T4,3,2,1
T3,2,1
T4,3,2
T1
T4
T3
T2

kg/m2
kg/m3
kg/m4
kg/m5
kg/m6
kg/m7
kg/m8

C.U. ENTREPISOS

T1

250

kg/m9

15.-ANALISIS DE DESPLAZAMIENTO EN X
Cambie la dimension de las columnas en el eje x de 0.65m a 0.55m

PISOS
PTP4
PTP3
PTP2
PTP1

DESP. X

D. REAL

32.4368 3.2989
29.1379 5.7602
23.3777 8.1606
15.2171 15.2171

H. DE PISO
2500
2500
2500
3500

SAP200
0.001
0.002
0.003
0.004

16.-ANALISIS DE DESPLAZAMIENTO EN Y
y en el eje Y le aadi una placa de 10 cm en el eje B-B entre 2-3

PISOS
PTP4
PTP3
PTP2
PTP1

DESP. X

D. REAL

84.6777 8.3586
76.3191 14.6002
61.7189 20.8548
40.8641 40.8641

H. DE PISO
2500
2500
2500
3500

SAP200
0.003
0.006
0.008
0.012

CANTIDAD
4
4
16

P.P
38.1024
12.78
20.16

CANTIDAD
1
1
0

P.P
67.239
22.413
0

PMP4=

160.6944

CANTIDAD
1

P.P
5.60325

CVP4=

5.60325

PTP4=

166.29765

CANTIDAD
4
4
16

P.P
38.1024
12.78
20.16

CANTIDAD
1
1
1

P.P
67.239
22.413
33.6195

PMP3=

194.3139

CANTIDAD
1

P.P
11.2065

CVP3=

11.2065

PTP3=

205.5204

CANTIDAD
4
4
16

P.P
38.1024
12.78
20.16

CANTIDAD
1
1
1

P.P
67.239
22.413
33.6195

PMP2=

194.3139

CANTIDAD
1

P.P
11.2065

CVP2=

11.2065

PTP2=

205.5204

CANTIDAD
4
4
16

P.P
38.1024
12.78
20.16

CANTIDAD
1
1
1

P.P
78.4455
22.413
33.6195

PMP1=

205.5204

CANTIDAD
1

P.P
14.008125

pihi)*v

CVP1=

14.008125

PTP1=

219.52853

ALTURA (M)
0
3.5
6
8.5
11

T-4; T-3; T-2


rga de uso) T-1

Acc (cm2)
954.497354497

Acc (cm2)
780.952380952

5)(1.2))/8
0.15

119.530

AUTO L.LOAD

U.COEFCNT
U.COEFCNT

ETABS
0.001
0.002
0.003
0.004

ETABS
0.003
0.006
0.008
0.010

ACONDICIONAM
IENTO EN EL
ETABS 0.007

0.002
0.003
0.004
0.005

ACONDICIONAM
IENTO EN EL
ETABS 0.007

0.003
0.005
0.006
0.006

Cb=ZUCS/R

Fi=(pihi)/(pihi)*v

Area Columna Central=P/(0.45

fc)

P =K x At x Np

Area Columna excentrica


P =K x At x Np

=P/(0.35 fc)

T=H/Ct
T=11/35

(Tp )/(T
)
=2.5 (0.6
)/0.314

Cbx=Cby=ZUCS/R
Cbx=Cby=((0.4)(1)(2.5)(1.2))/8

Vx;y =0.15
=Cb x x
P 966.5

0.125C/R
0.1252.5/8

0.125C/R
0.1252.5/8

P =100% CM+X% CV

Fi=(pihi)/(pihi)*v

7,15

Ex=5%(18)=0.9 m
Ey =5%(13)=0.65 m

9,9

9,9
7,15