Professional Documents
Culture Documents
VMRFs
Cancer Hospital and Research centre,
Naya Raipur
CONTENTS
Better
Community
LEED
LEED brief / Structure
Requirements
Credit System
Better
LEED Approach / Methodology
LEED certification Process
LEED Methodology
Contractors Guidelines
Sustainability Beyond LEED
Building Shading design
Landscape
passive design solutions
LEED Responsibilities
Responsibility chart for LEED credits
Way Forward
Queries
Economy
Better
Environment
Building
Conceptualization
Energy
Design
Development
Healthy,
comfortable,
Durable, Energy
Efficiency,
Environmentally
Responsible
Water
Construction
Indoor Air
Quality
Commissioning
Sites
Materials
Credit Title
Points
available
Sustainable Sites
26
SSP1
SSC1
Site Selection
Mandatory
1
SSC2
SSC3
Brownfield Redevelopment
SSC8
1
3
2
Credit Title
Points
available
Water Efficiency
10
Mandatory
Credit Title
Points
available
35
Mandatory
Mandatory
Mandatory
19
LEED NC Materials
Credit
No.
Credit Title
Points
available
Mandatory
4
2
2
2
2
1
1
Points
available
EQP1
EQP2
EQC1
EQC2
EQC3.1
Mandatory
Mandatory
1
1
1
EQC4.1
EQC4.2
EQC4.3
EQC4.4
1
1
1
1
EQC5
EQC6.1
EQC6.2
EQC7.1
EQC7.2
EQC8.1
EQC8.2
1
1
1
1
1
1
1
Point Distribution
IAQ
15
ID
Water
6
Precertification Documentation
Material 13
17
Energy
13
Submission to IGBC
Site
60-79
80 onwards
Award of certification
1
2
4
3
5
5
Tyre washing facility shall be provided at the entry and exit of the construction entry to arrest the erosion of
soil due to truck movement. This is during the construction period. Alternatively, stone / gratings can be
provided at vehicular entrance/exit way to the site to ensure that the tyres are clean.
Vehicular movement shall be restricted to stabilized paths in site.
Top-soil testing shall be carried out to verify that the site-soil is not fertile.
Temporary storm water drains/ channels shall be proposed at the periphery of the site in accordance with the
natural gradient through the construction period and the channels shall empty into a sedimentation tank to
arrest the sediments.
Photographic documentation of the erosion sedimentation measures implemented at site shall be maintained
by the contractor.
Recycling process
Waste Management:
400 Km
Fevicol SH
35 gms/liter
80 gms/liter
Dow
Corning
Structural
sealant
3 gms/liter
983
Glazing
61 gms/liter
Jivanjor
0.00099
gms/liter
Bal Endura
No Voc
Scheduling
Conduct activities with high pollution potential during off hours
to allow time for new materials to air out.
Allow adequate time for flush-out and IAQ test procedures prior
to occupancy