Professional Documents
Culture Documents
Catchment Area
Total Catchment Area for Plot 1 & Plot 2
=
=
=
38500 + 47750
86250 m2
8.625 ha
Sample
No
HA1
A
B
A
B
A
B
A
B
A
B
A
B
HA2
HA3
HA4
HA5
HA6
Depth
(m)
0.5
1.0
0.5
1.0
0.5
1.0
0.5
1.0
0.5
1.0
0.5
1.0
Moisture
Content
%
22
26
20
14
23
26
24
23
26
30
38
38
Silt
%
30.3
27.2
29.7
21.7
30.3
36.9
27.7
32.2
26.2
22.8
65.8
65.6
Clay
%
10.8
10.3
4.8
1.7
6.4
13.2
7.4
4.2
11.5
19.6
18.0
20.4
Organic
Matter
%
0.1
0.1
0.1
0.1
0.1
0.1
Depth
% Silt &
% Sand
% Organic
Soil Structure
Permeability
No
(m)
Very Fine
(0.06-2.0
Matter
Classification
Classification
Sand
mm)
HA1
HA2
HA3
HA4
HA5
HA6
K Factor
Average
K Factor
0.5
41.7
43.1
0.1
0.12
1.0
37.5
27.1
0.1
0.05
0.5
34.5
53.1
0.1
0.09
1.0
23.4
56.0
0.1
0.08
0.5
36.7
54.3
0.1
0.11
1.0
50.1
38.8
0.1
0.20
0.5
35.1
50.8
0.1
0.09
1.0
36.4
52.9
0.1
0.10
0.5
37.7
49.1
0.1
0.10
1.0
42.4
38.5
0.1
0.10
0.5
83.8
16.0
0.1
0.44
1.0
86.0
13.9
0.1
0.45
0.09
0.09
0.16
0.10
0.10
0.45
LS Factor
Calculation of LS Factor using equation as follow
where
S
m
=
=
=
10.0
0.50
60.0
0.0084
%
for
m
5<S<12%
CP Factor
Assuming the condition at site is bareland (newly cleared area)
CP Factor =
1.00
Storm Event
The design storm event for Plot 1 & Plot 2 (3 month ARI)
38500
m2
=
=
=
=
=
47750
500
16.2
104.8
0.74
m2
m
min
mm/hr
Volume
Peakflow
LS
Catchment
(m3)
(m3/s)
Factor
Factor
CP Factor
Sediment
Yield
(m )
(tones)
38500
806.153
0.8294
0.09
0.0084
1.00
2.58776
47750
999.8392
1.0286
0.09
0.0084
1.00
3.29351
5.881
tonnes
per storm
event
where
2 .5 P 2
R1 =100 Rainfall
Erosivity
Factor
(0.073
P 0.73
) (MJ.mm/ha.hr.yr)
R1
P=
R2
( EI 30 )
170 .2
E 9.2 8P 8 8 3 8
.1 5
where
E=
P=
I30 =
No
Station Name
Station No
Source
9001
TNB
9002
9003
TNB
TNB
2
3
Average
Annual
E Factor
Rainfall (mm)
2332.3
I30
(mm/hr)
71.3
R
Factor
(i)
795.323
R
Factor
(ii)
5364.51
71.3
71.3
759.125
679.229
4953.59
4046.62
Sediment
Sediment
Yield (i)
Yield (ii)
(tones)
(tones)
2226.6
1993.3
R Factor
R
Factor
Catchment
(i)
(ii)
KFactor
LS Factor
CP Factor
(m2)
38500
744.56
4788.24
0.09
0.0084
1.00
0.563
3.620
47750
744.56
4788.24
0.09
0.0084
1.00
0.563
3.620
Total Sediment Yield for Plot 1 & Plot 2 using equation Bols (1978) =
1.126
tonnes/ha.yr
Total Sediment Yield for Plot 1 & Plot 2 using equation FRIM (1999) =
7.240
tonnes/ha.yr
APPENDIX B
SOIL ERODIBILITY ANALYSIS (DENG SENG, 2004)