General Arrangement
Summary
46 per the tender requirement and the tender drawings instruction,
we plan to carry cut the project as follows:
Preperstive works
In this phese, we will set up the site temporary facilities for
construction including: office area laid dawn ares, stacking area, haul
road scoess to the site, temporary fence, temporary car parking etc.
Construction of the project
Construction of the project will be canied out sfter earthwork and site
services available.
The 1289 villas are distributed onthe 18 fronds. The villas on each
frond will be divided into 10 flow processes to construct. There will be
different villas to be constucted st one process as a result of different
villas on each frond.
Clear of temporary works and construction plants
According to the requirement of tender, all the temporary works and
construction plants will be cesred afer the completion of the project
in term of the specifications .
Milestones
For the contol of the whole construction period, some milestones
shall be made for reference. We have fully taken all factors of the
project into consideration in our time schedule. Our time schedule can
meet the requirements of Employer.
The key points of construction period are listed as follow:The Faim Jume ian-Garden Homes Method Statement
16 Trensh DT 8
7 Leveling instrument NAT26 3
18 Electrons Tacheometer LEICAT C302 1
12 Generstor
2 Resewed Generator 200KVA 2
a Water ani zes-200 16
22 | anemating CumentW eding Machine ExS-200-1 16
= Hy draulle Pipe Bender MB088 16
Grinding Cuser SQ402 32
Bench Drill ¢ 13
Ee Electreal Hammer Tee 32
on Manual Holst a 32
Fe Eleotiioal Prescue Pump SIMSYEUSIE 16
” Manual Pressue Pump S-YE804 16412
4134
41.32
Structure Works
Site Survey
General information
This project is made of 1269 sets villes. Mostvillas are 2 layers snd
parts are 3 layers.
Entering sit=
Before constructing, with the help of the survey engineer sent by the
cient the map of plane control point, coordinate, location of paint,
elevation and the survey position systems that are offered by the
dient should be received.
Te get comectly conditions of the contel point and survey position
system, the plane control network should be checked, which is
offered by the client. When checking, GPS and Electronic
Tacheomete can be used, and rigorous adjustment must be adopted.
The checked result should be report to the client and supervisor
engineer.
Eredion of the site control network
Erection of the horizontal control network
According to horizontal control point offered by the client, a whole
horizontal control network in site should be erect. The erection of the
horizental control network should be divided into the first class and
the second class. Adopt GPS to erect the first class contol point
every 300m and sdopt Electronic Tacheometer to erect the second
dass pointevery 100m. The adjustment should berigorcus.
Erection of the elevation control network
According to elevation contral point offered by the client, 2 leveling
points should be erect atright place in site. Annexed leveling should
Page tt414
221
142
41.4.3
41.4.4
4145
be adopted to achieve the elevation of the three contrel paints and the
others in cther field. So the elevation of control points is coherent
Transfer the height system of the contol points to working field te
contral construction. The second horizontel control point can be
sccordance with the elevation control paint. The error should be fit to
the locate criterion.
Construction survey
Erection of the building horizontal control network
According with the second step horizontal control network, erect
construction axis control network of every building, and pairs of
contal point must be the only form. The control point should be
500m or 1000m sway from axis.
Erection of the building elevation control network
According with the elevation control points, adopt snnexed leveling to
eed building elevation points to control vertical construction.
Foundstion construction survey
Due to isolate foundation pitis not very deep, so lead the axisl control
network that had been erected te foundation pit and check the relation
between the axis. If the relation is comect, fine part line, eccavation
line, column location line and control line can be lay out. Through
@evation contol point on ground with leveling instrument, elevation of
foundation pit and foundation constuction can be controlled.
Construcion survey of structure on the ground
when the construction height achieve to height =0.000, the axis
should be lay out. Check it and lay cutthe axis to the column and
above floor.
Line out the height
On every building, measure level line 1.0.0m from the first floor vertical
Pop 2The Faim Jumeian-Garaen Homes Method Statement
4146
42
421
422
4221
=}
structure, mark three points on this line, draw ruler from these three
points to form relative three points when constuction is on the top of
the structure, collste the elevation point that had been transferred
from the fist floor before leveling If the relation of the points
transfered is comed, lead horizontal line 1.00m to outside of the
structure according with elevation of the average point to contral
construction of plane structure of every floor.
Finishing snd equipment instsllstion survey
Lead axis of siructure construction to outside construction and make
mars, which will contol cutide installation. Every room of
construction should be made —+1 line on ground, each wall and ceiling,
which will control inside installation.
Surveyors
Because this project is huge, the survey workload is big and the time
limit for a project is short, professional survey engineers and
comparstive surveyors will be needed.
Formwork
Selection of formwork system
According to the character of this project constuction, steel form is
used in columns and wood form is used in beams and boards.
The fam mateiab snd requirements must conform to the
specification.
Formwork construction
Foundation formwork
The installstion procedures sre ss follows:
Leveling — [Setting oul — [brush the release agent] — [Erecting thd
[formwork fom the middle sectioh — [Erecting the horizontal rib and
Hisgonal brace — [Setting up the shoring shef — [Checking and
PopThe Paim Jume ian-Garaen Homes Method Statement
re-adjusting
6b) The formwork of foundation chooses small steel form to assemble.
The sketch of formwork see below:
sisi sata
A] cS
ag a
4222 Column formwork
8) The installstion procedures sre as follows:
relin: {setting out | column form advanced assembly |—[brusH
kelease sgentl—lcolumn reinforcement installation |—ffor.m_focing —
[adjust form vertica litt-Set up brace and shorind—|check and rectify
6) This column formwork chooses the tunsble steel form, rectangular
column from 600mm te 850mm will use one form type, the long side
af form can change from least 600mm to lagest 850mm The
rectangular column from 1000mm to 1250mm will use one form type.
136° and 90° column formwork are abo similar. The sketch see
below:
Page tdrectangular coluan form section
135° colum form pian
The circle column formwork chooses steel form. Please see below:
42232 Horizontal Formwork
3) Installation Procedure422
4231
[Messuring the elevation of beam and sla
4 — [Setting the shoring
hell — Erecting the vertical and horizontsl rid —- [Erecting the
bottom form of beans — Binding the steel bar of bean] — [Erecting
fhe side form of beam —erecting slab forn} —[brush the release
lsgent —binding the steel ber of slah—(Embedding the tubes snd
[pertd — [Checking and Adjusting.
Weed form is used for the bottom form and the side form of beam and
alo used for the form of the slab. The wood form is 18mm thick.
Timber is used for the main rib with the spacing of 900mm-1200mm.
and used for the secondary rib with the spacing of 200mm. For the
side form of the beam, timber is used for the horizontal, vertical rib
and diagonal brace. See support system drawing.
Support System of Beam snd Slab
In this project, bowel coupler scaffold is employed for the shoring
system of beam and slab. For applying in the different height of
column and slab, the sdjustable support is set on the bottom of
scaffold and —UBhaped supporting head is set on the top of the
scaffold. For the details, plessesee below:The Paim Jumefan-Garaen Homes Method Stfement
4232
4233
4234
424
4244
4244
4245
The spacing of vertical support bar under the besm is 900900mm.
Under the slab, its spacing is 12001200mm.
Except for the quantity of turnover utility of scaffold, half-story quantity
of scaffold is used for curing support. The scaffold for curing support
might be removed after the conarete stength reaches the full strength,
while other scaffold could be removed afte reaching the half of the
strength for the slab and 75% for the beam.
Timber 100100 is used for the longitudins|and transverse rips of the
beam. Timber 1002100 is used for the longitudinal rib of the slab and
fimber 50x100 is used for the transverse rib of the slab with the
spacing of 200mm.
Removal of formwork
The general principle of removal is: Firstly stripping the formwork be
seded Iste and soon striping the formwork be erected firstly
When stripping the horizontal formwork, curing support is essential for
meeting the requirement without random removal.
After striking the formwork, some stains or residus should be
removed immedistely and brushed the release agent.
The forms and shoring materials should be stacked according te the
proposed location and sequence.
Stripping the form strictly according to the requirements of the rules,
no sllowance for stripping the form in advance for shortening the work
time and econemizing the materials is available.
‘Quality control of for mevork
All items built in shall be installed insuch a manne: that they cannot
be disturbed during construction.
Generally, pipes, conduits or fixing shall not be in contact with the
reinforcement.
Where holding down bolts or similar assemblies are to be cast into
concrete, they shall be accurately fixed in position prior to the start of
Paget?The Paim Jumeion-Garden Homes Method Sttement
4254
425.6
43
4.34
4344
4.31.2
4313
432
43.21
43.22
4.33
43.341
4332
4333
work and they shall be maintained in position during concreting
‘operations.
Before any concrete is placed all formwork must be approved for
position.
Formwork shall be thoroughly clesned after esch use and may
damaged or distorted formwork shall not be re-used.
All formwork shall be removed without shock or vibration that might
damage the concrete.
Reinforcement work
Materials
Materisls of steel reinforcing bars shall meet the specificstion’s
requirements.
Mild steel! bars shall be of plain round bars with minimumyield stress
of 250N/men.
High yield steel bars shall have e minimum yield stress of 460N/mn?
(hot rolled) complying with BS 4449.
Welded wire fabric shall conform to BS 4483.
(Couplers of reinforcement
Thirking of this project reality the bars of columns shall ue
electosisg welding couplers, cold-squeezed couplers for beams and
overlap couplers for slabs.
‘Connection of bars and steel plates shall be arcwelding.
‘Quality control of rebar works
All steel reinforcement used in the works shall be obtained from firms
holding 3 valid certificate of approval conforming te the specification.
Take the sample from the rebar ss required and then send to
laboratories for chemical composition snalysis snd physical
performance test. They can be used only when the tests are passed.
Rebar shall be shaped and fabricated in workshop and trans ported to
PageThe Paim Jumeian-Garaen Homes Method Statement
$2.34
4335
4.3.36
site for fixing, the formwork cart start until the rebar works approved
by Engineer.
Clean of reinforcement loose rust and scale, earth, and other
materisis, which reduce of destroy bond with concrete.
Storage of Rebar: different size of Peper shall be fabricated rebar and
stockpiled separstely with clearly markings. All rebar shall be
stockpiled on the wood or concrete support snd be covered. The
desrance will st least be 200mm sbove the ground surface and
supports will be enough to prevent deformation of Rebar.
Use plastic circle-clips to control thickness of concrete cover
(illustrated in the following picture): plastic circle-clips are classified
into two groups: Floor and column. The selection of plastic cirde-clips
in sccordance with varicus diameter of Reber, in this way the
thickness of the concrete cover can be controlled in certain tolerance.
4337
Positioning of column rebar: positioning stinup group is below.
Pop 944
444
442
4424
4422
4423
4424
4.43
44.24
44.22
(Concrete work
‘Concrete supply
This project shall we ready mix concrete. We shall choose the
qualified ready-mix producer nearby.
A. detiled technical requirement shall be sttached to the resdy-mic
concrete supply contract to make sure that the quality of the concrete
is in compliance with the specification.
Put forward mix ratio application and special technical requirements
ahead of schedule to the concrete producer.
The duplicate of delivery ticket shall be furnished from the resdy mie
concrete producer.
‘Concrete delivery
The concrete should be transported to site by the concrete mixer
tuck fromthe concrete mixing plant according tp the concrete casting
schedule.
No water shall be added to the concrete during transport of concrete
to the site or at the site
Any anti-segegstion'drying precautions shall b= adopted to ensure
the workability required during concrete pouring. The cong ete should
be transported from plant to site for pouring as soon as possible. If
any concrete segregation arises, remix or dis card the mixed materials
stall events.
‘Concrete shall be placed not later than 90 minutes from the time of
mixing, unless otherwise approved by the engineer.
Placing of concrete
The placing and compaction of concrete in its final position shall be
carried outss soon ss practicable sfter mixing.
‘Concrete shall not be placed in any part of the structure until the
Pop44.22
4434
4435
44.26
44.37
$4.28
444
44.44
4442
forms, supports and rebars are ss approval. Spaces of forms shall be
dean and free fom standing water.
‘Concrete shall be deposited in horizontal layers to 8 compacted depth
not exceeding 400 mm where internal vibrators are used.
if the shade tempersture is 40°C and rising, concreting will not be
permitted.
Face of concrete shall be left ecposed for not more than 20 minutes
before fresh concrete is deposited against it in order to avoid cold
joints.
When concrete is to be placed directly against the surface of the
sxcavstion, sllsoftened material snd debris shall be removed from
contact surface which shall be made diy clean and firm, and in the
case of reinforced concrete sections, protected with a layer of 10009
polythene sheeting. If the contact surfaces have become softened
due to delay in placing the concrete or to any other cause, they shall
again be excavsted te firm material and trimmed as directed
immedistely before concrete is placed.
‘Care shall be taken during placing of concrete to prevent earth or any
other deleterious matter being mixed with the concrete.
‘Concrete shall not be dropped into place from a height exceeding 2m.
When trunking or chutes are used they shall be kept clesn and used
insuch sway ss to avoid segregation. All chutes shall be kept clean
and free fom coating of hardened concrete by thoroughly flushing
with water after each run.
‘Compaction of concrete
The concrete shall be thoroughly compected by mechanical vibration
during the operation of placing to produce a dense homogeneous
mass.
There are sufficient vibrators in serviceable condition on site so that
spare equipment is available in the event of breskdawn.444.2 Under no circumstances is the reinforcement to be vibrated in order to
achieve compaction of the concrete. Immersion vibrators shall be
used.
4444 Concrete shall not be subjected to disturbance between 4 hours and
24 hours after placing accept with the agreement of the Engineer.
4445 There shall be no excess water on the top surface on completion of
44,
compaction. Pay sttention to the work with non-vibration or over
vibration.
§ Concrete curing and protection
Water curing shall be allowed and continuously spplied for s minimum
of 7 days. Polythene sheeting shall be used to cover the concrete
members under curing.
The most important time for curing is the first 12 hours after placing. It
is of ecreme importance to prevent loss of moisture during this
period.
446 Concrete test cubes number
Frequency of testing for fresh and harden concrete shall be as
follows:
Minimum
Test
cx | C40 and above
Temperature As directed by the! Esch load
engineer
‘Concrete slump | Every 250m" | Esch load
Visual examination of|As directed by the) Each load
Sggregste (after weshing) | engineer
Conoete density and |@cubes per100nr = | @ cubes per 50nr
mpressive strength
ae ee Min. once per day Min. once per day
‘Concrete unit weight Twice per day Every 0m"
Min. twice per day
PopConcrete bleeding NA As directed by the
engineer
Water permeability NA 3 cubes per 100n7 or a5
directed by the engineer
Rapid chloride penetration | NA 3 cubes per 250m? or as
directed by the engineer
$0; and CL contents As directed by the) Every 25007 or as
engineer directed by the engineer
447
Esch grade of concrete shall be sampled on every day that it is
placed, even if the amount of concrete placed is less than that
indicated in the above table.
cubes shall be made for density and compressive stength testing. 4
qubes shall be made for water permeability testing. @ cubes shall be
made for ACP testing.
For compressive strength and density, test 3 cubes st 7 days and 3 at
28 days.
For water permesbility, test 3 cubes st 28 days and 2 at 56 days.
For rapid chloride penetration, test 3 cubes at 28 days and Jat 56
days.
Keep records of sllspecdmens taken and tests.
‘Concrete joint restment
Expansion joint shall be constructed at the locations, of the material
and to the dimensions shown on the drawings.
Avoid a cold joint.
The surface of concrete previously placed shall be thoroughly
deaned of dirt, scum, lsitance or other soft material with stiff wire
brushes, ifrequired, shall be roughed with a steel tool.
The surface of concrete joint shall be washed with cdesn water. The448
45
4.54
4.5.1.1
joint shall be kept wet for st least for four hours prior to concreting.
‘Concreting during hot season shall take the following precautions:
Shading and spraying water on the aggregate to reduce its
tempersture;
‘Cooling the mixing water before using:
Screen the mixing plant. and transport vehicles from wind, rsin and
sun.
Gect wind bresks and sunshades at concrete placing location.
Place concrete at night. Adequate srtificial lighting system shall be
‘Opersted snd spproved by the engineer.
Soray water on reinforced bars and formwork for cooling before
concrete placing
Timely cover and maintain after concrete placing and incesse
fequency of water spraying.
At no time will concreting be permitted if the shade tempersture is
400 and rising.
ifice is used, tae inte account all ice when computing water’cement
ratio and ensure that ice is melted before the concrete leaves the
mibcer.
‘Scaffold
Based on the characteristics of this project and the time overlapping
of stucture, decoration and E/M works, use the two rows
bawelb-coupler scaffold, which are sid out along all the external wall.
Requirement of Setting the Scaffold
Dimension forscaffold
The longitudinal spacing of the vertical bar is 1.5mand is tanverse
Poe451.2
4514
4515
4.5.1.8
spacing is 1.2m. The distances between the intemal vertical bar and
the surface of wall are 200mm. The distance between the bottom bar
and the ground surface is 200mm, three handrails are required for the
working story and its interval is 500mm.
Interval of the points connecting to the wall
The vertical spacing is no more than @m, the longitudinal specing is
no more than @m, snd the free height of the upper section of the
scaffold is also no more than 6m.
Diagonal Bridging
The diagonal bridging should be erected st the same time with
scaffolding and its diagonal bar, which is 6m wide on the horizontal
plane of projection, has a 45-degree angle with the surface level. The
diagonal bar must have a joint to the whole scaffald.
Sequence of Assembling the components
Footing of the vertical bar — Vertical bar —- Transverse bar —
Diagonal bar — Locking the connector - Erecting the scaffold
board — Upper vertical bar — Pin connection for the vertical bar —
Transverse bar.
Scaffold Board, Protecting Board snd handrails
The scaffold bosrds should meet the requirement of two story's
constuction and its thictness is 50mm. At the edge of the scaffold,
the height of handrai is no less than 1.1m and the height of
ederior-protected board is 200~250mm. For the handrail, he net
free height is no more than 0.5mm.
Safety Netting
At the outside of the scaffold, the safety netting should be required.
For the entrance of slope way and corridor, the level safety netting is
alo required453
4531
4533
45.26
454
$544
4543
Slope Way
The slope road should haves soft slope for facilitating the workers
and the tans portation of materials .
Internal Scaffolds for Decoration, E/M and Some Mobile Scaffold
For cocpersting with the E’/M end decoration works of some
contractors, some internal scaffolds and mobile scaffolds sre required.
There are adjustable support and rotating gear for adjusting the
height and moving of the scaffold.
The Using of the Scaffold
The construction load {including workers, materisls and tool) per
square on the work story is no more than 3KM/nt.
The weight of single construction spparstus should be less than 1KN.
The whole weight of the mortar and container should be less than
4.5KN. The weight of single parts should be less than 2. SKN.
The materia used should be stacked firmly and trimly and have no
affection te the workers on the work story.
No allowance for stripping the component parts of the whole scaffold
é available.
When itis necessary to go up or down the scaffold, workers should go
through the protected corridor with safety netting.
During the works, everyone should have the consciousness of
protecting himself and others.
The Removing of the Scaffold
The removing works should be implemented strictly according to the
proposed procedure.
The point connecting to the wall could be removed only after all the
top component parts have been removed thoroughly.
During the removing works, all the loosen bers should be moved
immediately in case of supporting snd depending by mistake.
Pop4.6
464
4623
463
46.3.1
46.32
4824
Membrane Waterproof
Waterproof materials:
4mm thick SBS, protection beard 3mmthick, polethylene sheet 1000
gauge and soon.
Product handling
Celiver material in manufactures unopened contsiners identified
with name, brand, type, grade, class and other qualifying information.
Deliver buk materia with | certification fom the manufacturer
stating the name, type snd grade of each product used. Furnish
certificate accompanying each {or furnish manufacture’s blanket
certificate) for each buk product used in the work.
Store materisl inssfe sreas well sway from open flames, sparks or
excessive hest. Store material st temperstures not ecceeding 220.
‘Quality Assurance
The membrane waterproofing work shall be preformed by a firm
having 15 years experience in the installstion of materials specified
herein on project comparable te this project. The firm shall have the
spproval of the membrane materials manufacture. Submit proof of
experience and specification and instellations upon engineer request.
The applicator shall provide evidence of successful completion of
work of similar scope to that shown and specified for this project using
similar membrane waterproofing systems .
Prior 2 commencement of work, the subcontractor shallsubmit sn on
ite quality control plan s work schedule.
Conform to the manufadurer's instructions and the manufacturers
substrate preparation specification.
Roof waterproofing system shall be tested by ponding water. Where
this test cannot be done, care must be taken during execution to
prevent any damage to the membrane.
eT463.6
4637
464
465
4662
3)
The waterproofing work and the related protection will be undertaken
with the same subcontractor.
Pre-installstion Conference: A pre-installstion conference shall be
held prior to operation commencement to establish procedures to
maintain optimum working conditions and te coordinate this work with
related and sdjacent works.
‘Construdion condition: proceed with membrane waterproofing and
associated work only when westher conditions will permit unrestricted
usé of materials and adequate quality control of work being installed,
in compliance with requirements and with recommendations of
primary materia manufactures.
‘Construction process:
[Substrate clesning — priming the substrate prime] — [laying the
Eaditions! layed — [tordhing and laying the SBS membrane —
ftorch-spplied with staggered joints — brotection layet
Execution
Conditions ofsurfaces
Examine the substrates, adjcining constuction snd the conditions
under which the work is to be installed. Do not proceed with the work
until uns.stisfactory conditions have been corrected.
Not apply membrane to damp surface. All concrete surfaces shall be
thoroughly dry following rain.
The surface shall be smooth and clean of waxy or oily substances,
dust, dirt, and the like.
Preparstion
‘Clean substrate of debris and deleterious material thatshall impair
the membrane. Patch cracks, voids and honeycombs to provide a
smooth, structurally sound surface. Cut off high spots and grind
smocth. Apply surfsce conditioners in sccordsnce with membrane
Popby}
manufacturer's instructions.
Do not proceed with membrane waterproofing until all drains, piping,
conduit, vents, ducts and other projections through the substrate have
been instslled. Holes, honeycombs snd cavities shall be pointed o
filled and finished flush in accordance with manufacturer's directions
utilizing materials recommended by the manufacturer of the
waterproofing membrane.
Trest externa! and interns! corners of substrate ss shown and in
Sccordance with manufacturer's recommendations .
Membr ane waterproof installation
Install and complet the system to assure thet no water leskage
through the system occurs. At the start of the installation and
periodically ss work progresses provide the services of the
manufacturer's t=chnicsl representative at the job site as often as
deemed necessary by the manufacturer to advise on sil phase of this
Before applying the membrane, prime with approved primer.
Install the system in accordance with the manufacturer's inst uction.
Fully torched SBS membrane te lay with minimum 100mmlaps all
round snd stagger end laps.
Lay staggered joints, torch-spplied.
Ensure that 300mm length of horizontal membrane shall be turned
up.
At construction joint, control joint snd orsck over 1.5mm apply
minimum 200mm wide strip of water proof membrane in the longest
lengths possible to minimize joint. Apply continuous layer of
waterproofing membrane over top to obtain a double thickness. This
shall be in addition to the double layer application throughout
Around protusions apply waterproofing membrane at least 120mm in
all directions and seal all terminations with jointsealer.4.6.7 Protection
467.1 The horizontal surface shall be protected by a layer of cementsand
soreed and be cast over slayer of 1000 gauge polythene sheet
4.6.7.2 The vertical surfaces of substructure shall be protected by protection
beard, spot bonded te the membrane against backfill.
Pape51
52
521
522
533
Finishing works
Summary
The finishing works of this project mainly includes masonry work,
gypsunvplaster board suspended ceiling, PVC laminated drop panel,
paint finish, ceramictile, floor tiles etc
General working sequence
‘Check and acceptance of structure works —- masonry works —
ecerior finishing — interior plaster — ceiling (with the cooperation
by MBE work}
The sequence of the masonry and plaster works is from the bettom to
the top, fom the ecternal to the interior.
After scoeptance checking of the last process by special quality
ins pector, the next can be executed.
Inthe same floor, the sequence shall be from toilet, room and then the
comida, while inside of the room being from the ceiling, wall and then
to the floor,
Masonry work
The block to be used shall be selected in acoordsnce with the design
requirement and regulation, which shall be clean and not polluted.
The mortar shall be mixed on site.
The block shall be cleaned before bricking and the surface shall abo
be checked to ensure to meet the requirement.
Lay cut walb in advance for accurste spacing of surface bond
patterns with uniform joint widths and to sccurstely locate openings,
movement type joints, retums and offsets. Avoid use of
less-than-half-size units st corners, jambs and wherever poss ible st
other locations.om
re)
in
54
5.41
542
544
The masonry work shall be started fromthe turning corner or fromthe
fixed point, and the external and internal block wall shall be executed
st same time, stagger joints in every course. Align joints plumb over
esch other inevery other course. Lay all joints 10mm thick.
The masonry shall be smooth in the transverse direction and straight
in the vertical direction. The block surface shall be clean, and the
mortar shall be tight and full of the joint.
The opening, tench, piping and embedded part shall be positioned or
executed while performing the block work. The tench cannot be
chiselled in the finis hed wall.
Reinforce joints every third course with two @mm dismeter greased
smooth reds. Locate reds 20mm in from faces of masonry unit
centered on joint running parallel to wall.
Plaster
Ad first the cross line shall be made on the floor as the reference line
of plasterwork. And then based on such reference line the level
controlling point shall be made in order to get the straight and smocth
wall surface.
All surfaces to be plastered shall be desn snd free from dust, oil,
grease, loose or projecting mortar, and all traces of salt are to be
thoroughly sprayed with water.
At the location where different material block interface, the wire mesh
netless than 200mm wide shall be freed to avoid the plaster crack
due to the future shrinking.
Provide 150mm * 450mm long strip of diamond mesh reinforcing
diagonally st comers of opening exceeding 0.18nt.
The block shall be watered to get the wet surface before plastering.
Form vertical and horizontal quide screeds 25mm wide. The spacing
shall not exceed 1500mm
i
i547
5)
55
541
553
inn
in in
ink
‘Quality requirement
The type snd quality of the material shall comply with the design
requirement and the standard specification of the material.
The different layer of the plaster shall be coherence very well to avoid
the hollow situstion. The cracking and peeling are definitely rejected.
The plaster surface shall be smooth snd clesning, racking bond shall
be levelling, corner line shall be straight.
The plaster tolerance shall comply with the related and scceptance
code.
Painting
Substrate should be in accordance with the specification. Relstive
humidity shall be below 8594 and provide adequate continuous
ventilation.
Concrete, block work, plaster surfaces, which sre to be painted, shall
be washed down prior to painting. Remove dust, grease, rust, scale
and extraneous matter, tool and machine marks and insect from all
surfaces. The surfaces shall be allowed to dry cut completely before
application of paint.
No exterior or interior of exposed painting shall be carried out under
advese weather condifions such as rain, creme humidity, dust
storms, and if tempersture is higher than 260. ete
Painting should be carried out with roller or brushes.
Permit paint to dry before applying succeeding coats, touch up
suction spots and sand between cost with sandpaper. Remove dust
of sanding.
Edge, corners, welds shall receive special attention te ensure that
they receive sn adequate thiccness of paint.
All items not require to be painted shall first be fitted and then
removed before any psinting preparation commences. The fitting
Pe5.58
559
5.6
5.6.1
562
5.621
522
5623
5a24
525
shall be re-ficed in position when sll painting is completed and dry for
24 hours minimum.
All materials shall be used strict in sccordance with the
manufacturer's printed instructions and paints of different brands shall
net be mixed or used in the same coating system. Ne dilution of
painting material shall be slloved except strictly as detailed by the
manufacturers and ss approved by the engineer.
Painting work shall be shaded from direct sun light to avoid blistering
and wrinkling. Where possible, painting of exterior surfaces shall
follow the sun se that itis carried out in shadow.
Suspended ceilings
General working sequence
surface cleaning —setiing the control line—ficing hanger rod—
installing primary frame— installing secondary frame— checking after
M&E system installation and testing—adjusting—instslling gypsum
board—finished products protection
‘Construction methods
Surface cleaning is necessary before installation.
Setting the suspended ceiling horizontal line. the line for frame and
hanger rod point The line should be clear and sccurste.
Hanger rod should be installed vertically If there is obstacle on the
hanger pot point, we can install two essistant hanger reds on each
side of the obstacle, and then set angle steel on the two rods laterally.
Last we can install the hanger rod on the angle ste!
Installing the primary frame on the hanger rod with screw, according
to the cross line of the room, the primary frame should be amended to
ensure that it is horizontal
Installing the secondary frame on the primary fame in vertical
direction. The connection stWe should be in scoordance with the5a26
5a27
5a28
5629
af
57.4
S72
aS
574
57.5
57.6
SAT.
57.8
579
5.7.10
5.11
57.12
products.
The side fame should be fixed around the wall according io the
$us pending ceiling line using self-tapping screw.
The frame should be checked after MAE system installation and
water test.
The fame system should be reexamined after the side frame
instsllation. The amendment sequence is side frame—secondary
fame—primary frame
The type of gyps um board is decided by design. The workers who
install the gypsum board should wear white glove.
Ceramics
Lay cut tile work acoording to the most current British Standards.
Wall and floor slab-on which tile 6 to be applied shall be thoroughly
deaned of extraneous matter, dust and efflorescence.
Examine surfaces to which tile is to be installed.
The tiles used in this project shall be carefully selected and well
matched so that it has the same colour and texture and the size and
the thictness will be the same.
Selected tiles are immersed in water before using.
Level the substrates.
Lay out the tiles.
Joint for tile installation shall be uniformly maximum 2mm wide.
Neatly cut tile around fitments, ficture, scoess panels drains and the
like. Prohibited splitting of tiles except where no alternative is possible.
No allow less than 1/2 size to occur.
All internal sngles shall be square, snd external angles shall be
bullnose. Bullnoses shall form integral part of a full sized tile.
Wall tiles shall extend to 150mm sbove finished ceiling.
Allow to grout after setting 48 hours.57.13
5.8
5.8.1.1
58.1.3
5.8.1.4
58.15
58.1.6
5.8.1.7
5.8.1.8
6.2.1.9
The finished tile work shall be cleaned Remove and replace all
damaged tiles.
Roofing tile
Provide roofing tile where indicated on drawings, a5 specified herein,
and es needed for s complete and proper installation.
Examine the areas and conditions which the tile work will be
performed, comect any conditions detrimental to timely and proper
completion of the work. Do not proceed until unsatisfactory conditions
have been comected.
The base plate should be installed on the pedestal when structural
construction period.
Install the chsnnel frame for the roof tiles on the base plate by welding
and check the plumb and level
—ZI purlin be fixed on thehannel, and the sheet installed on purlin.
‘Chalk horizontal and vertical lines on sheet to assure proper spacing
for sppesrance and water tightness according to the tile size.
Install the roof tile in accordance to manufacturer's
recommendations and code requirements.
Cracked of broken tiles should not be installed or allowed to remain
on the roof.
Install ventilation tiles one per Snt ofroof area.
6.8.1.10 Cut the last course of tiles of each slope ss high as possible. Allow
the roof te settle before bedding the roof. Lay mortar bedding on both
sides of the cut and place ridge or hip tile in position.
§.8.1.11 Install glass tiles four per each roof faces or plane to allow daylight in
sticspace.
§.8.1.12 Verify that the tile courses and runs sre following straight and tue
lines.
5.8.1.13Verify thet the colour blend is smooth with no sbrupt changes
Popsoperent.
6.8.1.14 Meke any necessary comections before proceeding with further
installation.
59 (Other finishing work
Cther finishing works should proceed strictly in accordance to the
manufacturer's instuctions.61.1
B12
e121
61.22
613
e134
MEP Works
Domestic water. Rainwater, Drainage and Fire fighting system
Summary
This chapter concems sbout Cold & hot water, Rainwater pipe
Installation, Fire esctinguisher. Equipment and sanitary fixtures for this
project is provided by client. The buildings are residential vills,
therefore, higher requirements for construction technique and
cooperation sre put forward to the contractor
The installstion, material and sll components for domestic water,
rainwater and drsinsge shall conform in all respect with the
regulstions of the relevant local Authorities and to the satisfaction of
the Engineer.
‘Construction organization and main procedure
In accordance with the construction quantity and distributing, we will
arrange a special sub-contractor to complete the fire protection work.
And snother special team will be responsible for other installation
tasks, including the installation of sanitary focures, drainage rainwater
works. Every team should be divided inte several groups in
accordance with the system characteristic and distribution.
The main installation procedure is:
Installation preparstion + checking te materisl ~ reserving and
embedding co-opersting civil works, rechecking relevant size —
installation of supporters and hungers — Installation of pipes and
fixtures + water testing snd desning ~anticomosion and insulation
mark ing system testing and adjusting —completing check
Installation preperation
Purchasing equipment and material. The ordering lists of main
apThe Paim Jumeimn-Garaen Homes Method Statement
61.32
61.33
814
1.41
6142
material will be sent to appropriate suppliers according to BOO. The
dete that the material should reach the site and should be in
accordance with the cons fuction schedule and margin time will be
tock into account
Further design
Masterful stuff will be organized andressonsble designing schedule
will be put cut All the drawings shall be issued to the Engineer to get
Spproving.
Preperation of construction machines and toob. Make a grestdesl of
ore-fabrications during civil construction.
Main construction method and technical requirements
Materia! contirmation
Stict inspection should be made on all materials entering the site.
Firstly, to check ifthere sre commodity inspection certificate, quality
certificate and manual, then check the outside of the material. The
material can be delivered into the storage only efter the specification,
type, outer quality meet the requirement in the drawing snd be
identical with the content of manual. .
Recheck on the reserved/embedded
Construdion people should check the coordinate, elevation,
specification, etc. of reserved blackouts snd embedded parts after
entering the site Reportthe discrepancies from Installation Drawing
to dient and designers in written and timely, in order to make the
design revision in advance snd avoid the re-done of civil work
During civil constuction, the steel sleeves and pipe to be embedded
in the wall and floor slabshould be prefabricated. Keep in touch with
Gvilengineers and keep watch on the progress of civil construction on
site. Confirmthe scourste position and then embed those part timely.
Po B61.43
Fipe selection and connection method. 8899
Name of pipe Nisterial connection
Water supply pipe} PE. UPVC] Refer te manufacture’s technical documents
Sewerage pipe UPVC Refer to manufacture's technical documents
Rain water pipe UPVC Refer to manufactures technical documents
814.4
Hot water pipe PEX Refer to manufacture's technical documents
All internal sbove ground soil pipe work shall be UPVC pipe. All pipe
work connection shall bering seal joints allowing an expsnsion gap
where necessary
AIL UPVC pipe joints shall be fusion welded either by electro sleeve
coupling or butt weld.
The pipe of gravity rainwater systemshall be UPVC. All pipe work
connection shall bering seal joints.
Fipe installation
The procedure of pipe installation: from underground to above ground,
from over hesd to floor, from inside to outside, from large pipe to small
pipe, from main to branch. During installation, carefully re-check and
gssure the accuracy of the elevation and coordinate of pipe.
meanwhile, ensure the straightness and the slope of pipe so as to
achieve an aestheticeffed.
Valve installation: check if the type and specification of valve 65
identical to the drawing; if the direction of check valve and stop valve
in sccordsnce with the flow of medium as designed; with the valve
position identical to the drawing, the vale handle should be
convenient to be opersted; the valve should be closed during
installstion
PopB15
61.51
61.52
6.1.53
Ssnitary foctures installation. The sanitary fitting should be installed
before the lest plastering and decoration of civil trade Before
instsllation, inspect the reserved blockeuts, check if the installstion
position and relevant size are sppropriste, The permitted deviation for
the installation height and position of sanitary fittings should be within
the tolerance of the specification.
After installation of sanitary fitting, the product should be well
protected.
Flushing. Testing and Operstion of installation
General
The contactor shall ensure to the satisfaction of the Project Manager
thst the installation complies with all requirements including the
following Clauses.
Cleaning and flushing
The Contractor shall clean the entire instellation including all sanitary
fitments and pipe work, etc. after installation and keep themin a new
condition.
All pipes shall be flushed through with water if necessary to ensure
dearance of debris.
‘Clesning and flushing shall be caried out in sections as the
instsllstion becomes completed.
Hydraulic Testing of Pipe work
The Contactor shall cary out hydraulic test on the complete
plumbing systems and the drainage system to show that it is
functioning satisfactorily within the requirements of this specification
and local regulations .
The Contractor shall provide suitable test pumps and arrange for a
Page at