21 212 22 General Arrangement Summary 46 per the tender requirement and the tender drawings instruction, we plan to carry cut the project as follows: Preperstive works In this phese, we will set up the site temporary facilities for construction including: office area laid dawn ares, stacking area, haul road scoess to the site, temporary fence, temporary car parking etc. Construction of the project Construction of the project will be canied out sfter earthwork and site services available. The 1289 villas are distributed onthe 18 fronds. The villas on each frond will be divided into 10 flow processes to construct. There will be different villas to be constucted st one process as a result of different villas on each frond. Clear of temporary works and construction plants According to the requirement of tender, all the temporary works and construction plants will be cesred afer the completion of the project in term of the specifications . Milestones For the contol of the whole construction period, some milestones shall be made for reference. We have fully taken all factors of the project into consideration in our time schedule. Our time schedule can meet the requirements of Employer. The key points of construction period are listed as follow: The Faim Jume ian-Garden Homes Method Statement 16 Trensh DT 8 7 Leveling instrument NAT26 3 18 Electrons Tacheometer LEICAT C302 1 12 Generstor 2 Resewed Generator 200KVA 2 a Water ani zes-200 16 22 | anemating CumentW eding Machine ExS-200-1 16 = Hy draulle Pipe Bender MB088 16 Grinding Cuser SQ402 32 Bench Drill ¢ 13 Ee Electreal Hammer Tee 32 on Manual Holst a 32 Fe Eleotiioal Prescue Pump SIMSYEUSIE 16 ” Manual Pressue Pump S-YE804 16 412 4134 41.32 Structure Works Site Survey General information This project is made of 1269 sets villes. Mostvillas are 2 layers snd parts are 3 layers. Entering sit= Before constructing, with the help of the survey engineer sent by the cient the map of plane control point, coordinate, location of paint, elevation and the survey position systems that are offered by the dient should be received. Te get comectly conditions of the contel point and survey position system, the plane control network should be checked, which is offered by the client. When checking, GPS and Electronic Tacheomete can be used, and rigorous adjustment must be adopted. The checked result should be report to the client and supervisor engineer. Eredion of the site control network Erection of the horizontal control network According to horizontal control point offered by the client, a whole horizontal control network in site should be erect. The erection of the horizental control network should be divided into the first class and the second class. Adopt GPS to erect the first class contol point every 300m and sdopt Electronic Tacheometer to erect the second dass pointevery 100m. The adjustment should berigorcus. Erection of the elevation control network According to elevation contral point offered by the client, 2 leveling points should be erect atright place in site. Annexed leveling should Page tt 414 221 142 41.4.3 41.4.4 4145 be adopted to achieve the elevation of the three contrel paints and the others in cther field. So the elevation of control points is coherent Transfer the height system of the contol points to working field te contral construction. The second horizontel control point can be sccordance with the elevation control paint. The error should be fit to the locate criterion. Construction survey Erection of the building horizontal control network According with the second step horizontal control network, erect construction axis control network of every building, and pairs of contal point must be the only form. The control point should be 500m or 1000m sway from axis. Erection of the building elevation control network According with the elevation control points, adopt snnexed leveling to eed building elevation points to control vertical construction. Foundstion construction survey Due to isolate foundation pitis not very deep, so lead the axisl control network that had been erected te foundation pit and check the relation between the axis. If the relation is comect, fine part line, eccavation line, column location line and control line can be lay out. Through @evation contol point on ground with leveling instrument, elevation of foundation pit and foundation constuction can be controlled. Construcion survey of structure on the ground when the construction height achieve to height =0.000, the axis should be lay out. Check it and lay cutthe axis to the column and above floor. Line out the height On every building, measure level line 1.0.0m from the first floor vertical Pop 2 The Faim Jumeian-Garaen Homes Method Statement 4146 42 421 422 4221 =} structure, mark three points on this line, draw ruler from these three points to form relative three points when constuction is on the top of the structure, collste the elevation point that had been transferred from the fist floor before leveling If the relation of the points transfered is comed, lead horizontal line 1.00m to outside of the structure according with elevation of the average point to contral construction of plane structure of every floor. Finishing snd equipment instsllstion survey Lead axis of siructure construction to outside construction and make mars, which will contol cutide installation. Every room of construction should be made —+1 line on ground, each wall and ceiling, which will control inside installation. Surveyors Because this project is huge, the survey workload is big and the time limit for a project is short, professional survey engineers and comparstive surveyors will be needed. Formwork Selection of formwork system According to the character of this project constuction, steel form is used in columns and wood form is used in beams and boards. The fam mateiab snd requirements must conform to the specification. Formwork construction Foundation formwork The installstion procedures sre ss follows: Leveling — [Setting oul — [brush the release agent] — [Erecting thd [formwork fom the middle sectioh — [Erecting the horizontal rib and Hisgonal brace — [Setting up the shoring shef — [Checking and Pop The Paim Jume ian-Garaen Homes Method Statement re-adjusting 6b) The formwork of foundation chooses small steel form to assemble. The sketch of formwork see below: sisi sata A] cS ag a 4222 Column formwork 8) The installstion procedures sre as follows: relin: {setting out | column form advanced assembly |—[brusH kelease sgentl—lcolumn reinforcement installation |—ffor.m_focing — [adjust form vertica litt-Set up brace and shorind—|check and rectify 6) This column formwork chooses the tunsble steel form, rectangular column from 600mm te 850mm will use one form type, the long side af form can change from least 600mm to lagest 850mm The rectangular column from 1000mm to 1250mm will use one form type. 136° and 90° column formwork are abo similar. The sketch see below: Page td rectangular coluan form section 135° colum form pian The circle column formwork chooses steel form. Please see below: 42232 Horizontal Formwork 3) Installation Procedure 422 4231 [Messuring the elevation of beam and sla 4 — [Setting the shoring hell — Erecting the vertical and horizontsl rid —- [Erecting the bottom form of beans — Binding the steel bar of bean] — [Erecting fhe side form of beam —erecting slab forn} —[brush the release lsgent —binding the steel ber of slah—(Embedding the tubes snd [pertd — [Checking and Adjusting. Weed form is used for the bottom form and the side form of beam and alo used for the form of the slab. The wood form is 18mm thick. Timber is used for the main rib with the spacing of 900mm-1200mm. and used for the secondary rib with the spacing of 200mm. For the side form of the beam, timber is used for the horizontal, vertical rib and diagonal brace. See support system drawing. Support System of Beam snd Slab In this project, bowel coupler scaffold is employed for the shoring system of beam and slab. For applying in the different height of column and slab, the sdjustable support is set on the bottom of scaffold and —UBhaped supporting head is set on the top of the scaffold. For the details, plessesee below: The Paim Jumefan-Garaen Homes Method Stfement 4232 4233 4234 424 4244 4244 4245 The spacing of vertical support bar under the besm is 900900mm. Under the slab, its spacing is 12001200mm. Except for the quantity of turnover utility of scaffold, half-story quantity of scaffold is used for curing support. The scaffold for curing support might be removed after the conarete stength reaches the full strength, while other scaffold could be removed afte reaching the half of the strength for the slab and 75% for the beam. Timber 100100 is used for the longitudins|and transverse rips of the beam. Timber 1002100 is used for the longitudinal rib of the slab and fimber 50x100 is used for the transverse rib of the slab with the spacing of 200mm. Removal of formwork The general principle of removal is: Firstly stripping the formwork be seded Iste and soon striping the formwork be erected firstly When stripping the horizontal formwork, curing support is essential for meeting the requirement without random removal. After striking the formwork, some stains or residus should be removed immedistely and brushed the release agent. The forms and shoring materials should be stacked according te the proposed location and sequence. Stripping the form strictly according to the requirements of the rules, no sllowance for stripping the form in advance for shortening the work time and econemizing the materials is available. ‘Quality control of for mevork All items built in shall be installed insuch a manne: that they cannot be disturbed during construction. Generally, pipes, conduits or fixing shall not be in contact with the reinforcement. Where holding down bolts or similar assemblies are to be cast into concrete, they shall be accurately fixed in position prior to the start of Paget? The Paim Jumeion-Garden Homes Method Sttement 4254 425.6 43 4.34 4344 4.31.2 4313 432 43.21 43.22 4.33 43.341 4332 4333 work and they shall be maintained in position during concreting ‘operations. Before any concrete is placed all formwork must be approved for position. Formwork shall be thoroughly clesned after esch use and may damaged or distorted formwork shall not be re-used. All formwork shall be removed without shock or vibration that might damage the concrete. Reinforcement work Materials Materisls of steel reinforcing bars shall meet the specificstion’s requirements. Mild steel! bars shall be of plain round bars with minimumyield stress of 250N/men. High yield steel bars shall have e minimum yield stress of 460N/mn? (hot rolled) complying with BS 4449. Welded wire fabric shall conform to BS 4483. (Couplers of reinforcement Thirking of this project reality the bars of columns shall ue electosisg welding couplers, cold-squeezed couplers for beams and overlap couplers for slabs. ‘Connection of bars and steel plates shall be arcwelding. ‘Quality control of rebar works All steel reinforcement used in the works shall be obtained from firms holding 3 valid certificate of approval conforming te the specification. Take the sample from the rebar ss required and then send to laboratories for chemical composition snalysis snd physical performance test. They can be used only when the tests are passed. Rebar shall be shaped and fabricated in workshop and trans ported to Page The Paim Jumeian-Garaen Homes Method Statement $2.34 4335 4.3.36 site for fixing, the formwork cart start until the rebar works approved by Engineer. Clean of reinforcement loose rust and scale, earth, and other materisis, which reduce of destroy bond with concrete. Storage of Rebar: different size of Peper shall be fabricated rebar and stockpiled separstely with clearly markings. All rebar shall be stockpiled on the wood or concrete support snd be covered. The desrance will st least be 200mm sbove the ground surface and supports will be enough to prevent deformation of Rebar. Use plastic circle-clips to control thickness of concrete cover (illustrated in the following picture): plastic circle-clips are classified into two groups: Floor and column. The selection of plastic cirde-clips in sccordance with varicus diameter of Reber, in this way the thickness of the concrete cover can be controlled in certain tolerance. 4337 Positioning of column rebar: positioning stinup group is below. Pop 9 44 444 442 4424 4422 4423 4424 4.43 44.24 44.22 (Concrete work ‘Concrete supply This project shall we ready mix concrete. We shall choose the qualified ready-mix producer nearby. A. detiled technical requirement shall be sttached to the resdy-mic concrete supply contract to make sure that the quality of the concrete is in compliance with the specification. Put forward mix ratio application and special technical requirements ahead of schedule to the concrete producer. The duplicate of delivery ticket shall be furnished from the resdy mie concrete producer. ‘Concrete delivery The concrete should be transported to site by the concrete mixer tuck fromthe concrete mixing plant according tp the concrete casting schedule. No water shall be added to the concrete during transport of concrete to the site or at the site Any anti-segegstion'drying precautions shall b= adopted to ensure the workability required during concrete pouring. The cong ete should be transported from plant to site for pouring as soon as possible. If any concrete segregation arises, remix or dis card the mixed materials stall events. ‘Concrete shall be placed not later than 90 minutes from the time of mixing, unless otherwise approved by the engineer. Placing of concrete The placing and compaction of concrete in its final position shall be carried outss soon ss practicable sfter mixing. ‘Concrete shall not be placed in any part of the structure until the Pop 44.22 4434 4435 44.26 44.37 $4.28 444 44.44 4442 forms, supports and rebars are ss approval. Spaces of forms shall be dean and free fom standing water. ‘Concrete shall be deposited in horizontal layers to 8 compacted depth not exceeding 400 mm where internal vibrators are used. if the shade tempersture is 40°C and rising, concreting will not be permitted. Face of concrete shall be left ecposed for not more than 20 minutes before fresh concrete is deposited against it in order to avoid cold joints. When concrete is to be placed directly against the surface of the sxcavstion, sllsoftened material snd debris shall be removed from contact surface which shall be made diy clean and firm, and in the case of reinforced concrete sections, protected with a layer of 10009 polythene sheeting. If the contact surfaces have become softened due to delay in placing the concrete or to any other cause, they shall again be excavsted te firm material and trimmed as directed immedistely before concrete is placed. ‘Care shall be taken during placing of concrete to prevent earth or any other deleterious matter being mixed with the concrete. ‘Concrete shall not be dropped into place from a height exceeding 2m. When trunking or chutes are used they shall be kept clesn and used insuch sway ss to avoid segregation. All chutes shall be kept clean and free fom coating of hardened concrete by thoroughly flushing with water after each run. ‘Compaction of concrete The concrete shall be thoroughly compected by mechanical vibration during the operation of placing to produce a dense homogeneous mass. There are sufficient vibrators in serviceable condition on site so that spare equipment is available in the event of breskdawn. 444.2 Under no circumstances is the reinforcement to be vibrated in order to achieve compaction of the concrete. Immersion vibrators shall be used. 4444 Concrete shall not be subjected to disturbance between 4 hours and 24 hours after placing accept with the agreement of the Engineer. 4445 There shall be no excess water on the top surface on completion of 44, compaction. Pay sttention to the work with non-vibration or over vibration. § Concrete curing and protection Water curing shall be allowed and continuously spplied for s minimum of 7 days. Polythene sheeting shall be used to cover the concrete members under curing. The most important time for curing is the first 12 hours after placing. It is of ecreme importance to prevent loss of moisture during this period. 446 Concrete test cubes number Frequency of testing for fresh and harden concrete shall be as follows: Minimum Test cx | C40 and above Temperature As directed by the! Esch load engineer ‘Concrete slump | Every 250m" | Esch load Visual examination of|As directed by the) Each load Sggregste (after weshing) | engineer Conoete density and |@cubes per100nr = | @ cubes per 50nr mpressive strength ae ee Min. once per day Min. once per day ‘Concrete unit weight Twice per day Every 0m" Min. twice per day Pop Concrete bleeding NA As directed by the engineer Water permeability NA 3 cubes per 100n7 or a5 directed by the engineer Rapid chloride penetration | NA 3 cubes per 250m? or as directed by the engineer $0; and CL contents As directed by the) Every 25007 or as engineer directed by the engineer 447 Esch grade of concrete shall be sampled on every day that it is placed, even if the amount of concrete placed is less than that indicated in the above table. cubes shall be made for density and compressive stength testing. 4 qubes shall be made for water permeability testing. @ cubes shall be made for ACP testing. For compressive strength and density, test 3 cubes st 7 days and 3 at 28 days. For water permesbility, test 3 cubes st 28 days and 2 at 56 days. For rapid chloride penetration, test 3 cubes at 28 days and Jat 56 days. Keep records of sllspecdmens taken and tests. ‘Concrete joint restment Expansion joint shall be constructed at the locations, of the material and to the dimensions shown on the drawings. Avoid a cold joint. The surface of concrete previously placed shall be thoroughly deaned of dirt, scum, lsitance or other soft material with stiff wire brushes, ifrequired, shall be roughed with a steel tool. The surface of concrete joint shall be washed with cdesn water. The 448 45 4.54 4.5.1.1 joint shall be kept wet for st least for four hours prior to concreting. ‘Concreting during hot season shall take the following precautions: Shading and spraying water on the aggregate to reduce its tempersture; ‘Cooling the mixing water before using: Screen the mixing plant. and transport vehicles from wind, rsin and sun. Gect wind bresks and sunshades at concrete placing location. Place concrete at night. Adequate srtificial lighting system shall be ‘Opersted snd spproved by the engineer. Soray water on reinforced bars and formwork for cooling before concrete placing Timely cover and maintain after concrete placing and incesse fequency of water spraying. At no time will concreting be permitted if the shade tempersture is 400 and rising. ifice is used, tae inte account all ice when computing water’cement ratio and ensure that ice is melted before the concrete leaves the mibcer. ‘Scaffold Based on the characteristics of this project and the time overlapping of stucture, decoration and E/M works, use the two rows bawelb-coupler scaffold, which are sid out along all the external wall. Requirement of Setting the Scaffold Dimension forscaffold The longitudinal spacing of the vertical bar is 1.5mand is tanverse Poe 451.2 4514 4515 4.5.1.8 spacing is 1.2m. The distances between the intemal vertical bar and the surface of wall are 200mm. The distance between the bottom bar and the ground surface is 200mm, three handrails are required for the working story and its interval is 500mm. Interval of the points connecting to the wall The vertical spacing is no more than @m, the longitudinal specing is no more than @m, snd the free height of the upper section of the scaffold is also no more than 6m. Diagonal Bridging The diagonal bridging should be erected st the same time with scaffolding and its diagonal bar, which is 6m wide on the horizontal plane of projection, has a 45-degree angle with the surface level. The diagonal bar must have a joint to the whole scaffald. Sequence of Assembling the components Footing of the vertical bar — Vertical bar —- Transverse bar — Diagonal bar — Locking the connector - Erecting the scaffold board — Upper vertical bar — Pin connection for the vertical bar — Transverse bar. Scaffold Board, Protecting Board snd handrails The scaffold bosrds should meet the requirement of two story's constuction and its thictness is 50mm. At the edge of the scaffold, the height of handrai is no less than 1.1m and the height of ederior-protected board is 200~250mm. For the handrail, he net free height is no more than 0.5mm. Safety Netting At the outside of the scaffold, the safety netting should be required. For the entrance of slope way and corridor, the level safety netting is alo required 453 4531 4533 45.26 454 $544 4543 Slope Way The slope road should haves soft slope for facilitating the workers and the tans portation of materials . Internal Scaffolds for Decoration, E/M and Some Mobile Scaffold For cocpersting with the E’/M end decoration works of some contractors, some internal scaffolds and mobile scaffolds sre required. There are adjustable support and rotating gear for adjusting the height and moving of the scaffold. The Using of the Scaffold The construction load {including workers, materisls and tool) per square on the work story is no more than 3KM/nt. The weight of single construction spparstus should be less than 1KN. The whole weight of the mortar and container should be less than 4.5KN. The weight of single parts should be less than 2. SKN. The materia used should be stacked firmly and trimly and have no affection te the workers on the work story. No allowance for stripping the component parts of the whole scaffold é available. When itis necessary to go up or down the scaffold, workers should go through the protected corridor with safety netting. During the works, everyone should have the consciousness of protecting himself and others. The Removing of the Scaffold The removing works should be implemented strictly according to the proposed procedure. The point connecting to the wall could be removed only after all the top component parts have been removed thoroughly. During the removing works, all the loosen bers should be moved immediately in case of supporting snd depending by mistake. Pop 4.6 464 4623 463 46.3.1 46.32 4824 Membrane Waterproof Waterproof materials: 4mm thick SBS, protection beard 3mmthick, polethylene sheet 1000 gauge and soon. Product handling Celiver material in manufactures unopened contsiners identified with name, brand, type, grade, class and other qualifying information. Deliver buk materia with | certification fom the manufacturer stating the name, type snd grade of each product used. Furnish certificate accompanying each {or furnish manufacture’s blanket certificate) for each buk product used in the work. Store materisl inssfe sreas well sway from open flames, sparks or excessive hest. Store material st temperstures not ecceeding 220. ‘Quality Assurance The membrane waterproofing work shall be preformed by a firm having 15 years experience in the installstion of materials specified herein on project comparable te this project. The firm shall have the spproval of the membrane materials manufacture. Submit proof of experience and specification and instellations upon engineer request. The applicator shall provide evidence of successful completion of work of similar scope to that shown and specified for this project using similar membrane waterproofing systems . Prior 2 commencement of work, the subcontractor shallsubmit sn on ite quality control plan s work schedule. Conform to the manufadurer's instructions and the manufacturers substrate preparation specification. Roof waterproofing system shall be tested by ponding water. Where this test cannot be done, care must be taken during execution to prevent any damage to the membrane. eT 463.6 4637 464 465 4662 3) The waterproofing work and the related protection will be undertaken with the same subcontractor. Pre-installstion Conference: A pre-installstion conference shall be held prior to operation commencement to establish procedures to maintain optimum working conditions and te coordinate this work with related and sdjacent works. ‘Construdion condition: proceed with membrane waterproofing and associated work only when westher conditions will permit unrestricted usé of materials and adequate quality control of work being installed, in compliance with requirements and with recommendations of primary materia manufactures. ‘Construction process: [Substrate clesning — priming the substrate prime] — [laying the Eaditions! layed — [tordhing and laying the SBS membrane — ftorch-spplied with staggered joints — brotection layet Execution Conditions ofsurfaces Examine the substrates, adjcining constuction snd the conditions under which the work is to be installed. Do not proceed with the work until uns.stisfactory conditions have been corrected. Not apply membrane to damp surface. All concrete surfaces shall be thoroughly dry following rain. The surface shall be smooth and clean of waxy or oily substances, dust, dirt, and the like. Preparstion ‘Clean substrate of debris and deleterious material thatshall impair the membrane. Patch cracks, voids and honeycombs to provide a smooth, structurally sound surface. Cut off high spots and grind smocth. Apply surfsce conditioners in sccordsnce with membrane Pop by} manufacturer's instructions. Do not proceed with membrane waterproofing until all drains, piping, conduit, vents, ducts and other projections through the substrate have been instslled. Holes, honeycombs snd cavities shall be pointed o filled and finished flush in accordance with manufacturer's directions utilizing materials recommended by the manufacturer of the waterproofing membrane. Trest externa! and interns! corners of substrate ss shown and in Sccordance with manufacturer's recommendations . Membr ane waterproof installation Install and complet the system to assure thet no water leskage through the system occurs. At the start of the installation and periodically ss work progresses provide the services of the manufacturer's t=chnicsl representative at the job site as often as deemed necessary by the manufacturer to advise on sil phase of this Before applying the membrane, prime with approved primer. Install the system in accordance with the manufacturer's inst uction. Fully torched SBS membrane te lay with minimum 100mmlaps all round snd stagger end laps. Lay staggered joints, torch-spplied. Ensure that 300mm length of horizontal membrane shall be turned up. At construction joint, control joint snd orsck over 1.5mm apply minimum 200mm wide strip of water proof membrane in the longest lengths possible to minimize joint. Apply continuous layer of waterproofing membrane over top to obtain a double thickness. This shall be in addition to the double layer application throughout Around protusions apply waterproofing membrane at least 120mm in all directions and seal all terminations with jointsealer. 4.6.7 Protection 467.1 The horizontal surface shall be protected by a layer of cementsand soreed and be cast over slayer of 1000 gauge polythene sheet 4.6.7.2 The vertical surfaces of substructure shall be protected by protection beard, spot bonded te the membrane against backfill. Pape 51 52 521 522 533 Finishing works Summary The finishing works of this project mainly includes masonry work, gypsunvplaster board suspended ceiling, PVC laminated drop panel, paint finish, ceramictile, floor tiles etc General working sequence ‘Check and acceptance of structure works —- masonry works — ecerior finishing — interior plaster — ceiling (with the cooperation by MBE work} The sequence of the masonry and plaster works is from the bettom to the top, fom the ecternal to the interior. After scoeptance checking of the last process by special quality ins pector, the next can be executed. Inthe same floor, the sequence shall be from toilet, room and then the comida, while inside of the room being from the ceiling, wall and then to the floor, Masonry work The block to be used shall be selected in acoordsnce with the design requirement and regulation, which shall be clean and not polluted. The mortar shall be mixed on site. The block shall be cleaned before bricking and the surface shall abo be checked to ensure to meet the requirement. Lay cut walb in advance for accurste spacing of surface bond patterns with uniform joint widths and to sccurstely locate openings, movement type joints, retums and offsets. Avoid use of less-than-half-size units st corners, jambs and wherever poss ible st other locations. om re) in 54 5.41 542 544 The masonry work shall be started fromthe turning corner or fromthe fixed point, and the external and internal block wall shall be executed st same time, stagger joints in every course. Align joints plumb over esch other inevery other course. Lay all joints 10mm thick. The masonry shall be smooth in the transverse direction and straight in the vertical direction. The block surface shall be clean, and the mortar shall be tight and full of the joint. The opening, tench, piping and embedded part shall be positioned or executed while performing the block work. The tench cannot be chiselled in the finis hed wall. Reinforce joints every third course with two @mm dismeter greased smooth reds. Locate reds 20mm in from faces of masonry unit centered on joint running parallel to wall. Plaster Ad first the cross line shall be made on the floor as the reference line of plasterwork. And then based on such reference line the level controlling point shall be made in order to get the straight and smocth wall surface. All surfaces to be plastered shall be desn snd free from dust, oil, grease, loose or projecting mortar, and all traces of salt are to be thoroughly sprayed with water. At the location where different material block interface, the wire mesh netless than 200mm wide shall be freed to avoid the plaster crack due to the future shrinking. Provide 150mm * 450mm long strip of diamond mesh reinforcing diagonally st comers of opening exceeding 0.18nt. The block shall be watered to get the wet surface before plastering. Form vertical and horizontal quide screeds 25mm wide. The spacing shall not exceed 1500mm i i 547 5) 55 541 553 inn in in ink ‘Quality requirement The type snd quality of the material shall comply with the design requirement and the standard specification of the material. The different layer of the plaster shall be coherence very well to avoid the hollow situstion. The cracking and peeling are definitely rejected. The plaster surface shall be smooth snd clesning, racking bond shall be levelling, corner line shall be straight. The plaster tolerance shall comply with the related and scceptance code. Painting Substrate should be in accordance with the specification. Relstive humidity shall be below 8594 and provide adequate continuous ventilation. Concrete, block work, plaster surfaces, which sre to be painted, shall be washed down prior to painting. Remove dust, grease, rust, scale and extraneous matter, tool and machine marks and insect from all surfaces. The surfaces shall be allowed to dry cut completely before application of paint. No exterior or interior of exposed painting shall be carried out under advese weather condifions such as rain, creme humidity, dust storms, and if tempersture is higher than 260. ete Painting should be carried out with roller or brushes. Permit paint to dry before applying succeeding coats, touch up suction spots and sand between cost with sandpaper. Remove dust of sanding. Edge, corners, welds shall receive special attention te ensure that they receive sn adequate thiccness of paint. All items not require to be painted shall first be fitted and then removed before any psinting preparation commences. The fitting Pe 5.58 559 5.6 5.6.1 562 5.621 522 5623 5a24 525 shall be re-ficed in position when sll painting is completed and dry for 24 hours minimum. All materials shall be used strict in sccordance with the manufacturer's printed instructions and paints of different brands shall net be mixed or used in the same coating system. Ne dilution of painting material shall be slloved except strictly as detailed by the manufacturers and ss approved by the engineer. Painting work shall be shaded from direct sun light to avoid blistering and wrinkling. Where possible, painting of exterior surfaces shall follow the sun se that itis carried out in shadow. Suspended ceilings General working sequence surface cleaning —setiing the control line—ficing hanger rod— installing primary frame— installing secondary frame— checking after M&E system installation and testing—adjusting—instslling gypsum board—finished products protection ‘Construction methods Surface cleaning is necessary before installation. Setting the suspended ceiling horizontal line. the line for frame and hanger rod point The line should be clear and sccurste. Hanger rod should be installed vertically If there is obstacle on the hanger pot point, we can install two essistant hanger reds on each side of the obstacle, and then set angle steel on the two rods laterally. Last we can install the hanger rod on the angle ste! Installing the primary frame on the hanger rod with screw, according to the cross line of the room, the primary frame should be amended to ensure that it is horizontal Installing the secondary frame on the primary fame in vertical direction. The connection stWe should be in scoordance with the 5a26 5a27 5a28 5629 af 57.4 S72 aS 574 57.5 57.6 SAT. 57.8 579 5.7.10 5.11 57.12 products. The side fame should be fixed around the wall according io the $us pending ceiling line using self-tapping screw. The frame should be checked after MAE system installation and water test. The fame system should be reexamined after the side frame instsllation. The amendment sequence is side frame—secondary fame—primary frame The type of gyps um board is decided by design. The workers who install the gypsum board should wear white glove. Ceramics Lay cut tile work acoording to the most current British Standards. Wall and floor slab-on which tile 6 to be applied shall be thoroughly deaned of extraneous matter, dust and efflorescence. Examine surfaces to which tile is to be installed. The tiles used in this project shall be carefully selected and well matched so that it has the same colour and texture and the size and the thictness will be the same. Selected tiles are immersed in water before using. Level the substrates. Lay out the tiles. Joint for tile installation shall be uniformly maximum 2mm wide. Neatly cut tile around fitments, ficture, scoess panels drains and the like. Prohibited splitting of tiles except where no alternative is possible. No allow less than 1/2 size to occur. All internal sngles shall be square, snd external angles shall be bullnose. Bullnoses shall form integral part of a full sized tile. Wall tiles shall extend to 150mm sbove finished ceiling. Allow to grout after setting 48 hours. 57.13 5.8 5.8.1.1 58.1.3 5.8.1.4 58.15 58.1.6 5.8.1.7 5.8.1.8 6.2.1.9 The finished tile work shall be cleaned Remove and replace all damaged tiles. Roofing tile Provide roofing tile where indicated on drawings, a5 specified herein, and es needed for s complete and proper installation. Examine the areas and conditions which the tile work will be performed, comect any conditions detrimental to timely and proper completion of the work. Do not proceed until unsatisfactory conditions have been comected. The base plate should be installed on the pedestal when structural construction period. Install the chsnnel frame for the roof tiles on the base plate by welding and check the plumb and level —ZI purlin be fixed on thehannel, and the sheet installed on purlin. ‘Chalk horizontal and vertical lines on sheet to assure proper spacing for sppesrance and water tightness according to the tile size. Install the roof tile in accordance to manufacturer's recommendations and code requirements. Cracked of broken tiles should not be installed or allowed to remain on the roof. Install ventilation tiles one per Snt ofroof area. 6.8.1.10 Cut the last course of tiles of each slope ss high as possible. Allow the roof te settle before bedding the roof. Lay mortar bedding on both sides of the cut and place ridge or hip tile in position. §.8.1.11 Install glass tiles four per each roof faces or plane to allow daylight in sticspace. §.8.1.12 Verify that the tile courses and runs sre following straight and tue lines. 5.8.1.13Verify thet the colour blend is smooth with no sbrupt changes Pop soperent. 6.8.1.14 Meke any necessary comections before proceeding with further installation. 59 (Other finishing work Cther finishing works should proceed strictly in accordance to the manufacturer's instuctions. 61.1 B12 e121 61.22 613 e134 MEP Works Domestic water. Rainwater, Drainage and Fire fighting system Summary This chapter concems sbout Cold & hot water, Rainwater pipe Installation, Fire esctinguisher. Equipment and sanitary fixtures for this project is provided by client. The buildings are residential vills, therefore, higher requirements for construction technique and cooperation sre put forward to the contractor The installstion, material and sll components for domestic water, rainwater and drsinsge shall conform in all respect with the regulstions of the relevant local Authorities and to the satisfaction of the Engineer. ‘Construction organization and main procedure In accordance with the construction quantity and distributing, we will arrange a special sub-contractor to complete the fire protection work. And snother special team will be responsible for other installation tasks, including the installation of sanitary focures, drainage rainwater works. Every team should be divided inte several groups in accordance with the system characteristic and distribution. The main installation procedure is: Installation preparstion + checking te materisl ~ reserving and embedding co-opersting civil works, rechecking relevant size — installation of supporters and hungers — Installation of pipes and fixtures + water testing snd desning ~anticomosion and insulation mark ing system testing and adjusting —completing check Installation preperation Purchasing equipment and material. The ordering lists of main ap The Paim Jumeimn-Garaen Homes Method Statement 61.32 61.33 814 1.41 6142 material will be sent to appropriate suppliers according to BOO. The dete that the material should reach the site and should be in accordance with the cons fuction schedule and margin time will be tock into account Further design Masterful stuff will be organized andressonsble designing schedule will be put cut All the drawings shall be issued to the Engineer to get Spproving. Preperation of construction machines and toob. Make a grestdesl of ore-fabrications during civil construction. Main construction method and technical requirements Materia! contirmation Stict inspection should be made on all materials entering the site. Firstly, to check ifthere sre commodity inspection certificate, quality certificate and manual, then check the outside of the material. The material can be delivered into the storage only efter the specification, type, outer quality meet the requirement in the drawing snd be identical with the content of manual. . Recheck on the reserved/embedded Construdion people should check the coordinate, elevation, specification, etc. of reserved blackouts snd embedded parts after entering the site Reportthe discrepancies from Installation Drawing to dient and designers in written and timely, in order to make the design revision in advance snd avoid the re-done of civil work During civil constuction, the steel sleeves and pipe to be embedded in the wall and floor slabshould be prefabricated. Keep in touch with Gvilengineers and keep watch on the progress of civil construction on site. Confirmthe scourste position and then embed those part timely. Po B 61.43 Fipe selection and connection method. 8899 Name of pipe Nisterial connection Water supply pipe} PE. UPVC] Refer te manufacture’s technical documents Sewerage pipe UPVC Refer to manufacture's technical documents Rain water pipe UPVC Refer to manufactures technical documents 814.4 Hot water pipe PEX Refer to manufacture's technical documents All internal sbove ground soil pipe work shall be UPVC pipe. All pipe work connection shall bering seal joints allowing an expsnsion gap where necessary AIL UPVC pipe joints shall be fusion welded either by electro sleeve coupling or butt weld. The pipe of gravity rainwater systemshall be UPVC. All pipe work connection shall bering seal joints. Fipe installation The procedure of pipe installation: from underground to above ground, from over hesd to floor, from inside to outside, from large pipe to small pipe, from main to branch. During installation, carefully re-check and gssure the accuracy of the elevation and coordinate of pipe. meanwhile, ensure the straightness and the slope of pipe so as to achieve an aestheticeffed. Valve installation: check if the type and specification of valve 65 identical to the drawing; if the direction of check valve and stop valve in sccordsnce with the flow of medium as designed; with the valve position identical to the drawing, the vale handle should be convenient to be opersted; the valve should be closed during installstion Pop B15 61.51 61.52 6.1.53 Ssnitary foctures installation. The sanitary fitting should be installed before the lest plastering and decoration of civil trade Before instsllation, inspect the reserved blockeuts, check if the installstion position and relevant size are sppropriste, The permitted deviation for the installation height and position of sanitary fittings should be within the tolerance of the specification. After installation of sanitary fitting, the product should be well protected. Flushing. Testing and Operstion of installation General The contactor shall ensure to the satisfaction of the Project Manager thst the installation complies with all requirements including the following Clauses. Cleaning and flushing The Contractor shall clean the entire instellation including all sanitary fitments and pipe work, etc. after installation and keep themin a new condition. All pipes shall be flushed through with water if necessary to ensure dearance of debris. ‘Clesning and flushing shall be caried out in sections as the instsllstion becomes completed. Hydraulic Testing of Pipe work The Contactor shall cary out hydraulic test on the complete plumbing systems and the drainage system to show that it is functioning satisfactorily within the requirements of this specification and local regulations . The Contractor shall provide suitable test pumps and arrange for a Page at

You might also like