In Concrete (m/hr)
By Hand
Chase depth -->
Ne 25 mm wide
25-50 mm wide
50-75 mm wide
75-100 mm wide
Machine
Chase depth -->
Ne 25 mm wide
25-50 mm wide
50-75 mm wide
75-100 mm wide
Cutting Chases In Brickwork
In Brickwork (m/hr)
By Hand
Chase depth -->
Ne 25 mm wide
25-50 mm wide
50-75 mm wide
75-100 mm wide
0-25mm
Machine
Ne 25 mm wide
25-50 mm wide
50-75 mm wide
75-100 mm wide
5.88
5.00
4.17
3.70
25-37mm 37-50mm
4.00
3.03
3.33
2.50
2.86
2.13
2.44
1.81
4.17
3.45
2.86
2.50
25-37mm 37-50mm
2.78
2.08
2.27
1.69
1.92
1.45
1.67
1.23
0-25mm
0-25mm
Machine
Ne 25 mm wide
25-50 mm wide
50-75 mm wide
75-100 mm wide
Cutting Chases In Heavyweight Blockwork
In Heavyweight Blockwork (m/hr)
By Hand
Chase depth -->
Ne 25 mm wide
25-50 mm wide
50-75 mm wide
75-100 mm wide
3.03
2.50
2.13
1.82
25-37mm 37-50mm
2.04
1.54
1.67
1.25
1.41
1.05
1.22
0.92
11.10
6.67
6.67
5.00
0-25mm
3.85
3.23
2.70
2.33
7.69
6.25
5.26
4.55
5.56
4.55
4.55
3.33
4.17
3.33
3.33
2.50
25-37mm 37-50mm
2.63
1.96
2.17
1.64
1.82
1.36
1.56
1.18
5.00
4.17
3.57
3.13
3.85
3.13
2.70
2.33
0-25mm
7.69
6.25
5.26
4.55
25-37mm 37-50mm
5.00
3.85
4.17
3.13
3.45
2.63
3.03
2.27
14.20
11.10
10.00
9.09
25-37mm 37-50mm
10.00
7.69
7.69
5.88
7.14
5.26
6.25
4.76
0-25mm
Concrete
Brickwork
Lightweight Blockwork Hand
Heavyweight Blockwork Hand
Small
Large
7.14
3.57
12.50
5.56
6.67
4.17
12.50
6.25
20.0 -25.0 10.0 -14.3
7.69- 12.5 3.85 -5.88
Item
Cross Section
Footing formwork
Activity
To Foundations
To Ground Beams
Formwork
Task / Description
Pilecaps, < 0.7m2
Pilecaps, 0.7-2.5m2
Pilecaps, 2.5-3.0m2
Pilecaps, > 3.0m2
Ground Beams, < 0.7m2
Ground Beams, 0.7-1.5m2
Typical rate for number of formwork uses before shutter remake. NOTE: This varies significantly depen
Walls = 20 uses
Slab Soffits = 10 - 15 uses
Beam & Column Boxes = 30 uses
Raft formwork
Activity
Activity
Ramp formwork
Ramp - Deshuttering & Stacking Appropriately at Same Location
Shades Formwork
Activity
Shades Formwork
Weather Shade, Chajjas, Corbels - Deshuttering & Stacking Appropriately at Same Location
Staircase formwork
Activity
Activity
Walls (Any Thickness), Including Buttresses - Shuttering & Providing Support - Up to 3.5m Height
Walls
Columns
Sides and Soffits of Beams
Soffits of Slabs
Vertical Bolt Holes
Horizontal Bolt Holes
Vertical Shutter Joints
Horizontal Shutter Joints
Rub Down Precast Concrete
Scabble
Single head brush hammer
Three head brush hammer
Mixing Concrete
Mixing By Hand
A typical rate of 0.32 m3/hr of concrete.Compulsory Paddle MixerGenerally with one or two 3.5m 3dru
seconds (m3/Hr).
Mix Time -->
Single drum plant
Double drum plant
Task / Description
Concrete Weight, 1m3
Readymix Lorry, Length
Readymix Lorry, Width
Readymix Lorry, Height
Readymix Lorry, Length
Readymix Lorry, Turning Circle
Readymix Lorry, Allowable Access Ramp Gradient
Mixing Concrete, By Hand
Mixing Concrete, Single Drum Paddle Mixer
Mixing Concrete, Double Drum Paddle Mixer
Mixing Concrete, Single Drum Plant Pan Mixer
Mixing Concrete, Dry Mix Plant
CONCRETING
1 m3of concrete weights 2.4 tonnes Skip Capacities Dual Flow Skips
Skip Size
0.50 m3
0.75 m3
1.00 m3
Rollover Skips, Front discharge
Skip Size
0.50 m3
0.75 m3
Readymix Lorries
- Length
- Width
- Height
- Weight
- Turning Circle
0 - 3.5 m
Fix
3.5 - 5.0 m
Strike
0.70
0.81
0.93
1.16
1.23
Fix
1.23
1.39
1.54
1.85
2.17
0.58
0.68
0.78
0.96
1.03
0 - 3.5 m
Fix
0.96
1.11
1.27
1.56
1.64
Fix
0.91
1.05
1.20
1.49
1.39
0 - 3.5 m
0.78
0.93
1.06
1.47
1.54
Fix
Strike
1.23
1.39
1.54
2.08
2.33
0.74
0.88
1.02
1.39
1.47
0 - 3.5 m
Fix
1.18
1.32
1.47
2.00
2.33
3.5 - 5.0 m
Strike
0.91
1.09
1.27
1.67
1.82
2.00
2.44
2.70
3.5 - 5.0 m
Strike
Fix
1.47
1.64
1.82
Strike
0.87
1.04
1.20
Exc 0.2 m2
Fix
Strike
4.00
2.08
Strike
1.69
1.92
2.08
2.50
2.86
Fix
1.02
1.15
1.28
1.54
1.82
3.5 - 5.0 m
Strike
wise stated.
Ne 0.2 m2
Fix
Strike
12.50
12.50
1.39
1.56
1.72
Strike
2.63
1.39
8.33
8.33
Column Height--->
2 - 3 m
Fix
Strike
0.00 - 0.05 m2
0.05 - 0.10 m2
0.10 - 0.20 m2
0.20 - 0.40 m2
exc 0.40 m2
1.35
1.69
1.82
2.04
2.33
Task - UOM
3 - 4 m
Fix
2.70
3.45
4.00
4.55
5.26
1.5
Mandays/10Sqm
Sqm
0.8 Mandays/10Sqm
Sqm
0.9
0.48 Mandays/10Sqm Mandays/10Sqm
Shutter size
0.75 m2
Fix
3.85
0.75 - 1.50 m2
1.82
4.55
1.50 - 2.25 m
2.00
5.00
2.25 - 3.00 m
2.22
5.56
2.50
7.14
0.75 m2
1.72
4.55
0.75 - 1.50 m
1.82
4.55
1.50 - 3.00 m
2.50
6.25
3.00 - 5.00 m2
2.63
6.67
1.50 m
1.82
4.55
2.63
6.67
3.00 - 5.00 m2
2.70
7.14
1.50 - 3.00 m
Slow
0.9
1.6
2.0
2.3
1.1
1.7
Material (M)
MS Wall Form
Panel - 1250 x
500:
16Nos/10Sqm
Strike
1.64
exc 3.00 m2
1.67
1.82
2.33
2.44
2.50
Ave
1.6
2.0
2.3
2.5
1.7
1.8
Fast Units
2.0 m2/hr
2.3 m2/hr
2.5 m2/hr
3.1 m2/hr
1.8 m2/hr
2.5 m2/hr
1.8
2.5
0.6
0.9
1.0
1.2
1.5
1.4
5.3
0.9
1.0
1.2
1.0
1.9
2.3
3.2
3.8
1.0
3.2
1.2
1.3
1.8
2.0
7.9
6.9
8.5
3.5
5.2
-
0.7
0.8
0.4
0.7
-
-
1.1
-
2.1
1.9
-
-
-
2.8
1.2
0.9
2.5
2.6
0.8
1.0
1.1
1.3
1.6
1.5
7.1
1.8
2.2
2.5
1.4
2.3
2.8
4.5
4.8
1.5
4.1
2.8
1.6
2.1
2.3
9.5
7.5
10.2
4.5
6.5
2.5
0.8
0.9
0.6
0.8
2.5
2.3
1.4
300.0
3.2
3.0
15.6
43.5
29.3
3.5
1.5
1.1
2.6
3.5
1.2
1.1
1.3
1.5
1.8
1.7
10.0
1.9
2.5
2.9
2.0
3.3
3.5
4.0
5.4
1.8
5.4
3.2
1.8
2.4
2.5
10.3
8.3
12.0
6.0
7.5
3.5
1.0
1.2
-
-
2.8
2.6
1.8
500.0
3.8
3.5
17.5
47.5
31.2
4.2
1.9
1.4
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
no/hr
no/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
hrs/no
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
mm/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
7.6
3.1
4.5
3.1
8.2
3.9
6.2
3.7
9.1
4.5
7.1
4.5
no/hr
no/hr
no/hr
no/hr
ficantly depending on care taken with shutters and programme time available etc.
Task - UOM
Sqm
1.41
0.71 Mandays/10Sqm Mandays/10Sqm
Sqm
0.84
0.42 Mandays/10Sqm Mandays/10Sqm
TASKS
Task - UOM
Material (M)
MS Wall Form
Panel - 1250 x
500:
16Nos/10Sqm
Sqm
0.44
0.22 Mandays/Sqm Mandays/Sqm
Sqm
0.13 Mandays/Sqm
0.26 Mandays/Sqm
Task - UOM
Sqm
0.12 Mandays/Sqm
Material (M)
MS Floor Form
Panel - 750 x
600 0.14 Mandays/Sqm 2.2Nos/Sqm
0.07 Mandays/Sqm
Task - UOM
0.08 Mandays/Sqm
Sqm
0.23 Mandays/Sqm
MS Floor Form
Panel - 750 x
600 0.46 Mandays/Sqm 2.2Nos/Sqm
Sqm
0.14 Mandays/Sqm
0.28 Mandays/Sqm
Task - UOM
Sqm
MS Wall Form
Panel - 1250 x
2.22
2.64
500 - 32
Mandays/10Sqm(Inclu Mandays/10Sqm(In Nos/10Sqm(Inclu
ding Both Sides)
cluding Both Sides) ding Both Sides)
Sqm
1.32
1.76
Mandays/10Sqm(Inclu Mandays/10Sqm(In
ding Both Sides)
cluding Both Sides)
ed finish.
With Mechanical
By Hand
Sander
2
2
5.56 m /hr
8.62 m /hr
2.80 m2/hr
6.99 m2/hr
2.80 m2/hr
6.99 m2/hr
4.21 m2/hr
7.58 m2/hr
16.67
14.49
28.57
25.00
16.95
no/hr
no/hr
m/hr
m/hr
m2/hr
Material (M)
Material (M)
0 - 4 mm
30.74 hrs/m2
0 - 8 mm
59.14 hrs/m2
0 - 4 mm
37.14 hrs/m2
0 - 8 mm
71.12 hrs/m2
80 secs
210
420
158
315
Slow
-
-
-
-
-
-
-
-
158.0
315.0
-
-
Ave
2.4
8.3
2.5
3.7
24.4
16.4
17.0
0.3
180.0
370.0
120.0
90.0
Laiden Weight
1,261 kg
1,850 kg
2,585 kg
Laiden Weight
1,361 kg
2,057 kg
8.23 m
2.43 m
3.66 m
Fast Units
- Tonnes
- m
- m
- m
- Tonnes
- m
20.0 degrees
- m3/hr
210.0 m3/hr
420.0 m3/hr
- m3/hr
- m3/hr
24.38 tonnes
16.36 m
m
Strike
3.57
3.85
4.55
5
5.88
Material (M)
Props - 2m to
3m Long: 2
Nos/Rm
Shuttering Oil:
4Ltr/10Sqm
Material (M)
Props - 2m to
3m Long: 2
Nos/Rm
Shuttering Oil:
4Ltr/10Sqm
Material (M)
MS Floor Form
Panel - 750 x
600 13.3Nos/10Sqm
MS Floor Form
Panel - 1250 x
500:
6.4Nos/10Sqm
Material (M)
Material (M)
Adjustable
Props - 2.02m to
3.75 m:
Shuttering Oil:
2Nos/Sqm
0.3Ltr/Sqm
Adjustable Props
- 2.02m to 3.75
m: 2Nos/Sqm
and Shuttering
Oil: 5Ltr/10Sqm
Material (M)
Adjustable
Props - 2.02m to
3.75 m:
Shuttering Oil:
2Nos/Sqm
5Ltr/10Sqm
Material (M)
Props - 2m to
3m Long:
Shuttering Oil:
4Nos/Rm(Includi 5Ltr/10Sqm(On
ng Both Sides) One Side)
13.89
17.24
20.83
90.91
45.45
90.91
11.76
25.00
29.41
37.04
166.67
83.33
142.86
20.83
Concrete Pumping
Large Concrete Pours, lorry pump.
Simple Rule Of Thumb, concretors 0.5 - 1.0 hrs/m3 of concrete,
depending on access, pour size and concrete availability.
Base Slabs etc, 1,200m3 equalling 25 - 35m3/hr per pump, with 3 No
pumps and 12 men for 2 shifts of 12 hrs.
Place Concrete
Barrowing Concrete (m3/hr).
Receive concrete from mixer/lorry direct to barrow, wheel to placing position, tip and return.
Distance
Extra over to place direct, for dump and shovel in from side, a typical rate of 0.26 hrs/m 3.Direct From R
(m3/hr).
Type
Mass Fill
50mm Blinding
Ground Beams ne 0.1 m2 SA
Ground Beams ex 0.1 m2 SA
Pile Caps ne 0.1 m2 SA
Pile Caps ex 0.1 m2 SA
Duct Walls
Stub Columns
Ground Slab ne 155 mm
Ground Slab 150-300 mm
Ground Slab 300-500 mm
Drains, Bed & Cover
By Lorry Mounted Concrete Pump (m3/hr).
Solid Slabs
Coffered Slabs
Columns
Wall
Independent Beams
Stairs and Landings
By Dumper, From Ready Mix Lorry To Position (m3/hr).
Dumper Capacity -->
0 - 20 m
20 - 50 m
50 - 100 m
100 - 250 m
250 - 500 m
500 - 750 m
750 - 1,000 m
By Tower/Mobile Crane (m3/hr).
Pile Caps
Mass Fill Pours
Slabs
Walls
Columns
Concrete Placement
Task / Description
Placing concrete, lorry based pump
Hollorib Decking, concrete topping
Hollorib Decking, concrete topping, incl PowerFloat
Placing Concrete, By Wheelbarrow over 1-10m
Placing Concrete, By Wheelbarrow over 10-20m
Placing Concrete, By Wheelbarrow over 20-50m
Placing Direct From Readymix Lorry, Mass Fill
Placing Direct From Readymix Lorry, 50mm Blinding
Placing Direct From Readymix Lorry, Ground Beams
Placing Direct From Readymix Lorry, Pile Caps
Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing
0 - 10 m
10 - 20 m
20 - 50 m
2.32
1.81
1.08
0 - 10 m
10 - 20 m
20 - 50 m
0.99
0.87
0.66
Ready Mix
Tip Direct
3.12
1.27
1.52
1.69
1.16
2.56
0.78
0.43
2.13
2.33
2.56
0.91
Thickness -->
Via Dumper
Via Dumper
Tip Direct
Thrown In
2.56
1.49
1.06
0.82
1.30
1.00
1.49
1.16
1.06
0.79
2.13
7.69
0.71
0.52
0.39
0.29
1.82
1.22
1.96
1.27
2.13
1.35
0.85
0.73
13.5 m3/hr
ne 100 mm
100 - 150 mm
150 - 200 mm
200 - 300 mm
300 - 500 mm
2.17
2.44
2.63
2.86
3.23
1.64
1.59
1.82
1.61
1.89
2.56
1.54
1.27
0.5 - 0.10 m2
exc 0.10 m2
ne 150 mm
150 - 225 mm
exc 225 mm
0.6 m3
18 m3/hr
0.8 m3
2.63
2.94
3.23
3.45
3.85
1.82
1.59
1.82
1.89
2.33
3.23
1.54
1.89
1.2 m3
1.5 m3
2.3 m3
10.41
9.09
7.29
5.78
3.65
2.16
-
14.08
12.36
10.41
7.87
4.95
2.92
-
SA ne 2 m
SA 2-5 m3
ne 10 m3
10-25 m3
exc 25 m3
ne 100 mm
100-150 mm
150-200 mm
200-300 mm
Exc 300 mm
2
ne 150 mm
SA 0-0.05 m
SA 0.05-0.1 m
SA ex 0.1 m
ne 100 mm
100-150 mm
150-300 mm
exc 300 mm
SA ne 0.05 m2
SA 0.05-0.1 m2
SA ex 0.1 m2
Slow
30.0
85.0
40.0
2.1
1.5
0.8
2.8
-
1.5
1.0
18.82
16.39
13.88
10.00
8.33
4.27
-
25.00
22.22
18.86
13.51
8.95
5.43
3.97
0.4 m Skip
0.6 m Skip
0.8 m Skip
1.19
1.39
1.61
1.75
2.04
2.33
3.70
4.17
4.76
4.00
4.55
0.84
4.35
5.00
5.86
0.90
1.09
1.21
1.09
1.31
1.47
1.26
1.53
1.69
1.26
1.53
1.69
1.38
1.66
1.85
0.95
1.09
1.21
0.90
1.09
1.25
0.64
0.64
###
0.88
1.00
1.10
0.52
0.58
0.69
0.58
0.65
0.78
0.76
0.85
1.02
0.64
0.76
0.88
0.76
0.92
1.05
0.95
1.11
1.28
1.10
1.28
1.47
0.43
0.45
0.48
0.48
0.50
0.54
0.51
0.53
0.57
Ave
40.0
100.0
50.0
2.3
1.8
1.1
3.1
1.3
-
1.5
Fast
50.0
120.0
70.0
2.5
2.1
1.5
3.3
1.6
1.7
2.3
Units
m3/hr
m2/hr
m2/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
33.33
29.41
25.00
18.18
12.35
7.87
5.78
-
-
2.1
-
1.2
4.0
0.9
1.2
0.9
0.6
0.8
0.5
0.6
0.6
0.4
0.8
0.4
2.3
0.9
1.4
4.5
1.3
1.5
1.1
0.7
1.0
0.6
0.8
1.1
0.5
1.1
0.6
2.6
1.0
1.6
5.5
1.7
1.8
1.2
0.9
1.1
0.8
1.0
1.5
0.6
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/h
Post Tensioning
Concrete - Post Tensioning Sequence:
Concrete poured 1st Bay.
After 48 hrs concrete is stressed to initial strength (15 kN takes 1 day).
5 days after initial stressing, concrete is stressed to final strength (30 kN takes 1 day).
Formwork may now be struck and adjacent bay poured.
Post Tensioning
Task / Description
Lag for Initial Stress Tensioning after 1st bay cast
Lag for Final Stress Tensioning after Initial Stress
Slow
-
-
Ave
48.0
120.0
Fast Units
- hrs
- hrs
Footing Reinforcement
Posted Mon, 2011-06-06 18:02 by PP Admin
Activity
Footing Reinforcement
Reinforcement
Posted Sat, 2009-02-07 16:05 by Technical Develop...
Staircase Reinforcement
Posted Mon, 2011-06-06 18:03 by PP Admin
Activity
Staircase Reinforcement
Walls Reinforcement
Posted Mon, 2011-06-06 18:03 by PP Admin
Activity
Walls Reinforcement
Task UOM
TASKS
LBarbender/Fitter
(Mandays)
L - Helper
(Mandays)
0.38
0.28 Mandays/0.1Mt Mandays/0.1Mt
0.2 Mandays/0.1Mt
0.28
Mandays/0.1Mt
0.32
0.29 Mandays/0.1Mt Mandays/0.1Mt
Slow
40.3
28.2
22.5
16.9
12.0
9.2
6.9
5.7
5.3
5.2
55.4
38.8
29.5
23.4
16.6
12.4
Ave
38.4
26.9
20.6
16.3
11.5
8.6
6.7
5.5
5.1
4.9
52.8
37.0
28.4
22.4
15.8
11.9
Fast Units
36.5 hrs/tonne
25.8 hrs/tonne
20.1 hrs/tonne
15.4 hrs/tonne
10.9 hrs/tonne
8.2 hrs/tonne
6.5 hrs/tonne
5.2 hrs/tonne
4.9 hrs/tonne
4.6 hrs/tonne
50.6 hrs/tonne
35.1 hrs/tonne
26.9 hrs/tonne
21.9 hrs/tonne
15.1 hrs/tonne
11.3 hrs/tonne
9.9
6.8
6.1
6.1
41.2
29.2
22.7
17.6
12.4
9.4
7.4
7.0
6.4
5.3
48.9
34.4
26.6
20.9
14.6
11.3
8.6
TASKS
9.2
6.6
5.9
5.9
40.8
28.6
22.0
17.3
12.2
9.2
7.2
6.8
6.1
5.1
48.0
33.6
25.8
20.4
14.4
10.8
8.4
Task UOM
8.7 hrs/tonne
6.2 hrs/tonne
5.6 hrs/tonne
5.6 hrs/tonne
39.1 hrs/tonne
27.4 hrs/tonne
21.2 hrs/tonne
16.9 hrs/tonne
11.8 hrs/tonne
8.7 hrs/tonne
7.0 hrs/tonne
6.4 hrs/tonne
5.9 hrs/tonne
4.8 hrs/tonne
45.5 hrs/tonne
31.9 hrs/tonne
24.3 hrs/tonne
19.5 hrs/tonne
13.8 hrs/tonne
10.5 hrs/tonne
8.2 hrs/tonne
LBarbender/Fitter
(Mandays)
L - Helper
(Mandays)
0.34
0.32 Mandays/0.1Mt Mandays/0.1Mt
Mt
0.2 Mandays/0.1Mt
Mt
0.32
0.29 Mandays/0.1Mt Mandays/0.1Mt
0.28
Mandays/0.1Mt
TASKS
Task UOM
LBarbender/Fitter
(Mandays)
L - Helper
(Mandays)
0.45
0.41 Mandays/0.1Mt Mandays/0.1Mt
0.28
Mandays/0.1Mt
Mt
0.2 Mandays/0.1Mt
Mt
0.43
0.39 Mandays/0.1Mt Mandays/0.1Mt
Mt
0.5
0.47 Mandays/0.1Mt Mandays/0.1Mt
Mt
0.57
0.55 Mandays/0.1Mt Mandays/0.1Mt
Bars Include
5%
Wastage
Binding
Wire:
5kg/0.1M
t
Cover
Blocks 10No/0.1
Mt
Bars Include
5%
Wastage
Bars Include
5%
Wastage
Bars Include
5%
Wastage
Binding
Wire:
5kg/0.1M
t
Cover
Blocks 10No/0.1
Mt
Bars Include
5%
Wastage
Bars Include
5%
Wastage
Bars Include
5%
Wastage
Binding
Wire:
5kg/0.1M
t
Cover
Blocks 10No/0.1
Mt
Bars Include
5%
Wastage
Bars Include
5%
Wastage
Bars Include
5%
Wastage
Bars Include
5%
Wastage
Breaking Out
Posted Sun, 2009-02-22 08:46 by PP Admin
Slabs - reinforced
Walls - unreinforced
Walls - reinforced
Beams - reinforced
Columns - reinforced
Foundations - unreinforced
Foundations - reinforced
Breaking Out Tarmac
Rates include for breaking out and removal of rubble (hrs/m3).
Pavings
Roadways
Breaking Out Brickwork
Rates include for breaking out and removal of rubble (hrs/m3).
Walls/columns
Foundation
Breaking Diaphragm Wall
Breaking Openings using coring machine 0.2m3/hour
Breaking out to expose couplers using hand held braker1.75m2/day ot 2.5m run/day (0.7m slab)
Task / Description
Concrete
Concrete
Concrete
Concrete
Concrete
Cutting Holes
Posted Sat, 2009-02-28 07:31 by PP Admin
Common Brickwork
Posted Mon, 2009-07-13 06:29 by PP Admin
Cutting Back
Posted Sun, 2009-03-01 17:58 by PP Admin
Depth
Ne 50 mm
50 - 100 mm
100 - 200 mm
200 - 300 mm
Ne 50 mm
50 - 100 mm
100 - 200 mm
200 - 300 mm
all walls
all walls
all sizes
all sizes
all sizes
all sizes
Hand
Depth
Ne 50 mm
50-100 mm
100-150 mm
upto 150 mm
Hand
Depth
Ne 100 mm
exc 100 mm
all sizes
Hand
Machine
2.35
3.15
3.75
4.12
4.71
5.52
5.88
6.12
4.71
5.52
7.5
9.2
3.6
5.4
1.96
2.46
3.94
5.55
3.92
4.32
4.71
9.09
3.04
3.92
5.89
7.3
3
4.8
Machine
1.96
2.08
2.17
Machine
2.4
2.75
2.75
Slow
3.2
5.5
5.2
9.1
4.7
1.56
1.64
1.75
3.57
Ave
-
4.1
-
6.2
3.9
1.38
1.57
1.57
Fast Units
1.9 hrs/m3
3.7 hrs/m3
3.9 hrs/m3
4.7 hrs/m3
3.1 hrs/m3
5.6
3.6
5.4
7.5
9.2
1.9
2.1
2.1
-
2.4
2.7
0-75
4.7
3.3
5.1
6.5
8.2
1.7
-
-
3.6
1.8
2.1
75-125
2.94
2.22
1.67
1.28
3.9 hrs/m3
3.0 hrs/m3
4.8 hrs/m3
5.6 hrs/m3
7.3 hrs/m3
1.5 hrs/m3
1.6 hrs/m3
1.7 hrs/m3
- hrs/m3
1.3 hrs/m3
1.5 hrs/m3
125-250
250-375
1.75 -
1.32 -
1.05 -
0.83 -
250-375
1.85
1.39
1.11
0.88
375-500
-
0-75
-
-
75-125
-
-
125-250
0-75
-
-
-
-
75-125
125-250
250-375 375-500
7.69
5.26
4
5.88
4
2.94
5
3.33
2.5
4.17
2.78
2.08
0-75
75-125
125-250
250-375 375-500
5.56
3.85 4.55
3.23 3.85 2.70
3.23
2.27
5.88
4
2.5
1.67
16.6
12.5
10
8.33
11.1
9.09
7.69
6.67
8.33
7.14
5.88
4.76
375-500
5
4.55
3.45
3.03
2.17
1.92
1.45
1.28
0.35m
0.5m
0.32
0.39
0.44
0.49
0.68
0.83
0.35m
-
0.6m
0.79m
0.94m
0.63
0.93
1.38
0.81
1.22
1.83
0.94
1.45
1.92
1.07
1.65
2.1
1.54
2.16
2.55
1.78
2.36
3.37
0.6m
0.79m
0.94m
0.9
1.32
1.93
1.11
1.65
2.39
1.25
1.93
2.49
1.59
2.38
2.73
2.13
2.97
3.45
2.79
3.72
4.38
0.44
0.56
0.64
0.72
1.02
1.32
0.5m
0.63
0.76
0.85
1.05
1.41
2.07
15.2
11.5
6.67
Slow
0.6
1.5
1.8
1.9
2.5
4.2
9.2
10.1
11.5
-
-
-
-
-
Ave
-
-
-
-
-
-
-
-
-
15.2
11.5
6.7
0.2
2.5
Fast Units
0.3 hrs/no
0.4 hrs/no
0.8 hrs/no
0.8 hrs/no
1.1 hrs/no
2.3 hrs/no
8.2 hrs/no
9.5 hrs/no
10.2 hrs/no
- m/hr
- m/hr
- m/hr
- m3/hr
- m/day
1.1m
2.2m
1.74 8.10
2.16 8.58
2.34 9.00
2.5 9.50
2.55
10.01
4.2
10.52
1.1m
2.2m
2.25 9.72
2.81
10.29
3.04
10.85
3.25
11.4
4.3
12.01
5.43
12.62
Ground Excavation
Posted Sat, 2009-02-07 07:26 by Technical Develop...
Gravel
Clay/Chalk
V.Difficult
Bucket
0.3m3
0.4m3
0.5m3
0.3m3
0.4m3
0.5m3
0.3m3
0.4m3
0.5m3
0.3m3
0.4m3
0.5m3
Slow
6.7
3.2
3.3
3.3
8.2
7.1
6.5
6.3
12.2
10.2
9.7
6.1
Trench Excavations
Posted Sun, 2009-03-01 18:05 by PP Admin
Trench Excavation...
Task / Description
Hydraulic Excavator, 0.3m3 bucket, Sand/Soil
Hydraulic Excavator, 0.3m3 bucket, Gravel Beds
Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.3m3 bucket, Hard Ground
Hydraulic Excavator, 0.4m3 bucket, Sand/Soil
Hydraulic Excavator, 0.4m3 bucket, Gravel Beds
Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk
Slow
5.6
4.8
4.8
9.7
20.5
18.2
18.2
Hydraulic
Hydraulic
Hydraulic
Hydraulic
Hydraulic
Excavator,
Excavator,
Excavator,
Excavator,
Excavator,
0.4m3
0.5m3
0.5m3
0.5m3
0.5m3
bucket,
bucket,
bucket,
bucket,
bucket,
Hard Ground
Sand/Soil
Gravel Beds
Clay/Chalk
Hard Ground
17.0
26.0
26.3
26.3
22.7
3.3
3.0
2.7
6.6
6.2
5.8
Bulk Works
8.7
28.5
50
7.1
25.9
40
7.1
25
40
6.1
22.2
28.6
Basements
Small &
Deep
7.1 8.4>
25
10
28.6
13.3
6.1
4.5
22.2
8.7
28.6
11.1
6.1
4.1
22.2
8.3
28.6
10.5
5.4
4.1
20
7.7
20
6.7
Trenches
8
15.4
20
6.9
14.3
18.1
6.5
13.3
16.7
5.9
11.8
11.8
Ave
8.4
4.5
4.1
4.1
10.0
8.7
8.3
7.7
13.3
11.1
10.5
6.7
Fast Units
9.9 m3/hr
5.0 m3/hr
5.2 m3/hr
5.2 m3/hr
11.7 m3/hr
10.2 m3/hr
9.4 m3/hr
9.1 m3/hr
15.4 m3/hr
12.9 m3/hr
12.1 m3/hr
7.7 m3/hr
Ave
7.1
6.1
6.1
5.4
25.0
22.2
22.2
Fast Units
8.2 m3/hr
7.3 m3/hr
7.1 m3/hr
6.4 m3/hr
29.2 m3/hr
26.0 m3/hr
26.0 m3/hr
20.0
28.6
28.6
28.6
25.0
23.4 m3/hr
33.1 m3/hr
33.2 m3/hr
33.2 m3/hr
28.8 m3/hr
4.5
6.8 m2/hr
4.2
6.5 m2/hr
4.0
6.0 m2/hr
7.1
8.8 m2/hr
6.7
9.2 m2/hr
6.2
10.5 m2/hr
Deep Compaction
Posted Fri, 2009-02-06 05:37 by Technical Develop...
Ground Compaction
Task / Description
Deep Vibroflot, 3m centres
Vibro-Roller, Sand
Vibro-Roller, Soil
Vibro-Roller, Clay
Vibro-Roller, Hardcore
Vibro-Roller, Ash
Slow
330.0
28.5
-
-
-
-
Ave
380.0
31.2
58.8
55.6
38.4
57.8
Ne 100m
0.85
0.77
0.81
0.71
100-200mm
1.02
0.92
0.97
0.84
Fast Units
465.0 m3/hr
45.2 m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
200-300mm
1.28
1.16
1.2
1.06
exc 300m
1.69
1.56
1.61
1.41
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
0.8m3
0.8m3
0.8m3
0.8m3
0.8m3
0.8m3
0.8m3
0.8m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3
0.6m3
0.6m3
0.6m3
0.6m3
0.6m3
0.6m3
0.6m3
0.6m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
Task / Description
Sand/Soil, pushed 5-50m to stockpile
Sand/Soil, pushed 50-120m to stockpile
Gravel, pushed 5-50m to stockpile
Gravel, pushed 50-120m to stockpile
Clay/Chalk, pushed 5-50m to stockpile
Clay/Chalk, pushed 50-120m to stockpile
Boulder Clay, pushed 5-50m to stockpile
Boulder Clay, pushed 50-120m to stockpile
Sand/Soil, pushed 5-50m to stockpile
Sand/Soil, pushed 50-120m to stockpile
Gravel, pushed 5-50m to stockpile
Gravel, pushed 50-120m to stockpile
Clay/Chalk, pushed 5-50m to stockpile
Clay/Chalk, pushed 50-120m to stockpile
Boulder Clay, pushed 5-50m to stockpile
Boulder Clay, pushed 50-120m to stockpile
50-200m2, Sand/Soil
over 200m2, Sand/Soil
50-200m2, Gravel
over 200m2, Gravel
50-200m2, Hardcore
over 200m2, Hardcore
50-200m2, Boulder Clay
over 200m2, Boulder Clay
50-200m2, Sand/Soil
over 200m2, Sand/Soil
50-200m2, Gravel
over 200m2, Gravel
50-200m2, Hardcore
over 200m2, Hardcore
50-200m2, Boulder Clay
over 200m2, Boulder Clay
Slow
13.9
7.6
14.2
7.6
12.7
6.9
11.6
6.3
23.8
16.7
25.0
17.2
21.7
15.1
19.6
13.7
18.6
24.4
18.9
24.2
15.8
19.2
17.2
22.2
43.5
55.5
43.8
55.5
37.1
47.6
43.8
55.6
Ave
20.4
9.5
20.4
10.2
18.4
8.9
16.9
8.2
28.5
18.5
32.0
19.3
27.5
16.9
24.5
15.9
28.5
37.2
28.6
37.2
23.5
29.6
26.4
33.8
48.0
61.1
48.3
61.1
40.3
51.6
45.7
59.1
Fast Units
25.0 m3/hr
12.6 m3/hr
25.6 m3/hr
12.8 m3/hr
23.2 m3/hr
11.6 m3/hr
21.3 m3/hr
10.4 m3/hr
35.7 m3/hr
20.4 m3/hr
37.0 m3/hr
21.2 m3/hr
33.3 m3/hr
18.8 m3/hr
30.3 m3/hr
17.5 m3/hr
38.5 m3/hr
50.0 m3/hr
38.4 m3/hr
50.0 m3/hr
31.2 m3/hr
40.0 m3/hr
35.7 m3/hr
45.4 m3/hr
52.6 m3/hr
66.7 m3/hr
52.9 m3/hr
66.7 m3/hr
43.5 m3/hr
55.6 m3/hr
47.6 m3/hr
62.5 m3/hr
Fencing Works
Posted Fri, 2011-07-15 05:46 by PP Admin
Fencing Works
Task / Description
Site Hoarding, timber posts, plywood nailed to horizontal rails
Post Erection, Timber / Metal, dig, erect, fix
Post Erection, Concrete, dig, erect, fix
Fence Erection, Chainlink, posts at 1.5m
Fence Erection, Chainlink, posts at 2.0m
Fence Erection, Chainlink, posts at 3.0m
Fence Erection, Chestnut Pailings, posts at 1.5m
Fence Erection, Chestnut Pailings, posts at 2.0m
Fence Erection, Chestnut Pailings, posts at 3.0m
Fence Erection, Barbed Wire, posts at 1.5m
Fence Erection, Barbed Wire, posts at 2.0m
Fence Erection, Barbed Wire, posts at 3.0m
Gate Erection, Chainlink on frame
Slow
Ave
1.0
3.3
3.2
-
-
-
-
-
-
-
-
-
-
1.2
4.5
4.0
4.2
4.4
5.5
23.8
33.3
41.6
71.4
100.0
125.0
4.1
Fast Units
-
m/hr
no/hr
no/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
no/hr
Mosaic Tiles
Standard tiles of 0.045 x 0.045 m.
Site Clearance
Initial Works
Clearing Site of Bushes, shrubs, roots
Lifting turf to be sorted and stacked
Cutting Down Trees & Roots
Small Trees / Shrubs
600 mm - 900 mm Girth
900 mm - 1,200 mm Girth
1,200 - 1,500 mm Girth
Cutting Down Hedges & Roots
Hawthorn
25.00 m2/hr
2.95 m2/hr
14
18
22
26
hrs/each
hrs/each
hrs/each
hrs/each
1.0 m high
1.5 m high
2.0 m high
0.9 m/hr
0.8 m/hr
0.6 m/hr
Site Clearance
Task / Description
Shrubs and Bushes, dig up and removal
Turf, lifting and removal
Trees, small sizes and shrubs
Trees and Shrubs, 500mm - 900mm girth
Trees and Shrubs, 900mm - 1200mm girth
Trees and Shrubs, 1200mm - 1500mm girth
Hedges and Roots, 0.5-1.0m high
Hedges and Roots, 1.0-1.5m high
Hedges and Roots, 1.5-2.0m high
Slow
-
-
-
-
-
-
-
-
-
Ave
25.0
2.9
14.0
18.0
22.0
26.0
0.9
0.8
0.6
Fast Units
38.0 m2/hr
- m2/hr
- m2/hr
- hrs/no
- hrs/no
- hrs/no
- m/hr
- m/hr
- m/hr
Road Basecourse
Posted Thu, 2011-07-14 12:09 by PP Admin
Rural environment:
Spread & Compact Production = 50m3/hr
Trimming Production = 350m2/hr
Road Markings
Road Surfaces
Posted Sun, 2009-02-08 11:52 by Technical Develop...
Concrete
Concrete
Concrete
Concrete
Road
Road
Road
Road
surfacing,
surfacing,
surfacing,
surfacing,
Task / Description
Kerbs or Side Haunches
150mm thick
200mm thick
300mm thick
Slow
2.7
2.3
1.5
1.1
1.7
1.6
-
-
-
0.9
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Ave
-
-
-
-
-
-
0.3
0.2
2.5
1.3
1.0
10.5
2.5
6.2
4.5
5.0
5.5
3.5
7.7
5.8
6.2
7.1
6.6
5.8
8.3
Fast Units
4.2 m2/hr
2.7 m2/hr
2.3 m2/hr
1.5 m2/hr
2.8 m2/hr
1.9 m2/hr
- m2/hr
- m2/hr
- m2/hr
1.9 m2/hr
1.2 m2/hr
- m2/hr
- m2/hr
- m/hr
- m/hr
- m/hr
- m/hr
- m/hr
- m/hr
- m/hr
- m/hr
- m/hr
- no/hr
- no/hr
- no/hr
Slow
-
-
-
-
Ave
0.4
12.5
7.7
6.7
Fast Units
- m3/hr
- m2/hr
- m2/hr
- m2/hr
Rule of Thumb
Posted Thu, 2011-07-14 13:43 by PP Admin
Rule of Thumb
Task / Description
Site Investigation Pre Drilling
Ground Excavation, Hydraulic Backhoe
Bored Piling, 25-70m deep
Formwork Fixing
Reinforcement Fixing
Concrete Placement
Scaffold Erection, Steel Falsework
Blockwork Laying
Plastering and Rendering
Blockwork Laying
Stonework Cladding
Window Glazing
Granolithic Flooring
Floor Screeding
Floor Screeding
Ceramic Wall Tiling
Slow
5.0
-
10.0
-
-
-
-
-
-
7.0
-
-
-
-
-
-
Ave
4.0
50.0
8.0
12.0
0.7
16.0
140.0
7.0
12.0
12.0
5.1
1.5
4.5
4.5
60.0
1.5
Fast Units
3.0 days/no
- m3/day
6.0 days/no
- m2/day
- Tonnes/day
- m3/day
- m3/day
- m2/day
- m2/day
17.5 m2/day
- m2/day
- m2/hr
- m2/hr
- m2/hr
- m2/day
- m2/hr
Lift Installation
Posted Sat, 2009-03-07 13:45 by PP Admin
Lift Installation
Sequence of Work
A standard installation sequence for a "conventional hydraulic lift with 2 - 3 storeys and doors etc.
Handover of lift shaft structure and associated lift machine room.
Deliver all materials to site, 2 weeks.
Hoisting of machine roof equipment, setting out and plumbing, pit channel, car brackets and guide rails, 10 days.
Hoist in hydraulic arm, piping, lift shaft trunking and conduits etc and wiring of lift shaft, 9 days.
Positioning of motor control room equipment, machine room trunking and conduits and machine room wiring etc, 13 day
Install sill angles and architraves etc, landing grouting done by others and landing doors, 9 days.
Partially dismantle lift shaft scaffolding and install pit equipment, 5 days.
Install car frame and platform, car wall panels and ceiling, car door operators and wiring of lift car, 14 days.
Architectural finishing stop work period, to install external glazing (if any) complete landing finishes and lift shaft final BS
detectors etc, 12 days.
Lift machine room PowerOn required.
Initial tuning and adjustments, 7 days.
Final tuning and adjustments, 7 days.
Submission of Form 5 to EMSD.
Interface testing with other contractors, carried out at later state (coordinated with others), duration of 6 days.
Final test and commissioning with client and handover, 2 days.
Procurement
Lifts are long lead items - from 12 weeks for a standard lift and considerably longer (1 to 1.5 years) for specially designe
installations
Installation Periods
Therefore, the overall duration of the installation, including delivery, architectural finishes, by others,
submission etc...
Rule Of Thumb
Upto 8 storeys=12 - 16 weeks
Upto 15 storeys=16 - 24 weeks
More Accurately
2 to 3 storey installation = 3 wks/level
4 storeys and above =2 wks/level
Test & Commissioning
Rule of thumb, allow 2 weeks plus 1 day per lift per storey.
Lift Installation
Task / Description
Hydraulic Lift, Install 2 to 3 storeys
Hydraulic Lift, Install 4 storeys and above
Hydraulic Lift, Testing allow 2 wks plus
Slow
-
-
-
Ave
3.0
2.0
1.0
Fast Units
- wks/floor
- wks/floor
- day/floor
-
75.0
12.0
65.0
- wks
52.0 wks
Floor Finishes
Posted Fri, 2011-07-15 05:43 by PP Admin
Floor Finishes
Task / Description
Granolithic Flooring
Terrazzo Flooring, in-situ
Terrazzo Flooring, pre-cast
Mosaic Tiling, 0.045x0.045m
Clay, quarry Tiles, small areas, much cutting
Clay, quarry Tiles, large areas, little cutting
Raised Floor System
Linolium/Thermo-Plastic Flooring
Thermo-Plastic Floor Tiles
Wood Block Flooring, lay blocks
Wood Block Flooring, sand and polish
Carpeting, Underlay & Gripper
Carpeting, Adhesive Fixing
Carpeting, Fully Fitted
Hardboard Sheeting Coverings, small areas
Hardboard Sheeting Coverings, large areas
Floor Sheeting Coverings, Lay Lino
Painting
Task / Description
Prepare Walls
Prepare Doors
Prepare Door Frames
Burn Off / Heat Strip Paintwork
Internal Timber, 1 coat primer before fixing, generally
Internal Timber, 1 coat primer before fixing, timber lengths
Internal Timber, knot, 1 primer, stop, 1 undercoat, 1 gloss
Internal Timber, touchup primer, 1 undercoat, 1 coat gloss
Internal Timber, polyurethane varnish, 2 coats
Internal Timber, polyurethane varnish, 3 coats
Internal Timber, linseed oil to hardwood, 2 coats
External Timber, windows and frames
External Timber, knot, 1 primer, 2 undercoats, 1 coat gloss,
External Timber, touchup primer, 2 undercoats, 1 coat gloss,
External Timber, 2 coats wood preservative
External Timber, 3 coats polyurethane varnish
Internal Walls, 2 coats emulsion to plaster
Internal Walls, 2 coats emulsion to brick/blockwork
Internal Walls, 1 mist, 2 coats emulsion to plaster
Internal Walls, 1 mist, 2 coats emulsion to brick/blockwork
Internal Walls, 1 primer, 1 undercoat, 1 gloss to plaster
Internal Walls, undercoat to door frame
Internal Walls, gloss to door frame
Internal Walls, undercoat to door
Internal Walls, gloss to door
External Walls, 2 coats sandtex to render/concrete
External Walls, 2 coats sandtex to brick/blockwork
External Walls, 1 sealer, 2 emulsion to render/concrete
External Walls, 1 sealer, 2 emulsion to brick/blockwork
Floors, epoxy paint
Ceilings, emulsion paint, 2 coats
Ceilings, emulsion paint, 3 coats
Ceilings, textured paint
Ceilings, artex finish
Internal Steelwork, 1 primer, 1 undercoat, 1 gloss
External Steelwork, 1 primer, 2 undercoats, 1 gloss
Guttering Steelwork, 1 coat primer, 2 undercoats, 1 gloss
Ceilings
Emulsion paint
- 2 coat 6.05 m2/hr
- 3 coats 5.02 m2/hr
Textured paint 4.20 m2/hr
Artex 4.10 m2/hr
Externally
Posted Mon, 2009-07-13 09:23 by Oliver Melling
Internally
Posted Mon, 2009-07-13 09:22 by Oliver Melling
Internally
Posted Mon, 2009-07-13 09:05 by Oliver Melling
Externally
Posted Mon, 2009-07-13 09:13 by Oliver Melling
Slow
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1.3
0.9
-
Ave
14.2
12.5
25.0
1.1
6.7
20.0
1.7
3.1
3.3
2.2
3.6
2.4
1.5
2.0
4.0
2.0
8.0
6.0
6.0
4.5
2.3
20.0
16.5
7.1
6.2
2.5
2.0
2.0
1.7
2.9
6.1
5.0
4.2
4.1
2.4
1.7
2.5
Fast Units
- m2/hr
- m2/hr
- m/hr
- m2/hr
- m2/hr
- m/hr
2.1 m2/hr
3.8 m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m/hr
- m/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m/hr
Soft Landscaping
Posted Sun, 2009-02-08 11:57 by Technical Develop...
Soil
Spread topsoil, prepare for turf/seeding = 2.5 m2/hr Spread fertilizer and rake in = 25.0
m2/hr
Planting
Hedges or Shrubs, ne 750 mm high = 4.0 no/hr Hedges or Shrubs, exc 750 m high = 1.5
no/hr Saplings, ne 3.0 m high = 1.7 hrs/no
Turfing
Typical rate including minor preparations = 135 m2/day
Landscaping
Task / Description
Top Soil, spread, level and prepare for turf or seeding
Top Soil, rake in fertilizer for seeding
Planting, Shrubs and Hedges, under 750mm high
Planting, Shrubs and Hedges, over 750mm high
Planting, Saplings, under 3.0m high
Turfing, including for minor preparations
Slow
-
-
-
-
-
-
Ave
2.5
25.0
4.0
1.5
1.7
16.8
Fast Units
- m2/hr
- m2/hr
- no/hr
- no/hr
- no/hr
- m2/hr
Stone Cladding
Posted Sat, 2009-02-07 16:28 by Technical Develop...
External Stone Walls Various stone finishes are available...
Polished / Tooled= Highly reflective finish. The full colour and grain of the stone becomes visible
good weather and chemical protection.
Honed= Very smooth finish without reflections to show the full colour of the stone.
Flamed= Produced by applying a high-temperature flame to the surface ofthe stone. This flame f
textured finish.
Sequence of operations...
Each wall stone is individually numberd to correspond to theshop drawings. The setting out line is es
installed in accordance with the initial setting out line. Prior to drilling a cover meter is employed to c
Each stone is individually supported and restrained.
Typical wall panel size 0.75 m2/stone.
Stones 0.5 m2 and under = 14 no/day
Stones 0.75 m2 and under = 12 no/day
Stones 0.75 - 1.00 m2 = 10 no/day
Flat Stone walls - Simple = 9.0 m2/day
Flat Stone walls - Average = 5.1 m2/day
Flat Stone Walls - V. Complex = 1.8 m2/day
Curved Wall cladding = 8.0 m2/day
Edge Beams/Window edges = 2.3 m2/day
Stone soffits = 4.0 m2/day
A cladding team consists of 1 fixer and 1 mate.
Task / Description
Fix 0.5m2 Stones to Metal Support Frame
Fix 0.5-0.75m2 Stones to Metal Support Frame
Fix 0.75-1.0m2 Stones to Metal Support Frame
Fix Complex Stonework to Metal Support Frame
Fix Curved Stone Cladding
Fix Stone Edge Beams/Window Reveals
Fix Stone Soffits
Stone Floors
Granite Wall Panels, First Fix
Granite Wall Panels, Second Fix
Slow
5.6
7.2
6.9
-
6.9
-
-
6.9
-
-
Ave
7.0
9.0
8.7
1.8
8.0
2.3
4.0
10.4
1.3
1.1
Fast Units
7.8 m2/day
10.1 m2/day
9.7 m2/day
- m2/day
9.2 m2/day
3.2 m2/day
- m2/day
12.2 m2/day
- m2/hr
- m2/hr