Cutting Chases In Concrete

In Concrete (m/hr)
By Hand
Chase depth -->
Ne 25 mm wide
25-50 mm wide
50-75 mm wide
75-100 mm wide
Machine
Chase depth -->
Ne 25 mm wide
25-50 mm wide
50-75 mm wide
75-100 mm wide
Cutting Chases In Brickwork
In Brickwork (m/hr)
By Hand
Chase depth -->
Ne 25 mm wide
25-50 mm wide
50-75 mm wide
75-100 mm wide

0-25mm

Machine
Ne 25 mm wide
25-50 mm wide
50-75 mm wide
75-100 mm wide

5.88
5.00
4.17
3.70

25-37mm 37-50mm
4.00
3.03
3.33
2.50
2.86
2.13
2.44
1.81

4.17
3.45
2.86
2.50

25-37mm 37-50mm
2.78
2.08
2.27
1.69
1.92
1.45
1.67
1.23

0-25mm

0-25mm

Machine
Ne 25 mm wide
25-50 mm wide
50-75 mm wide
75-100 mm wide
Cutting Chases In Heavyweight Blockwork
In Heavyweight Blockwork (m/hr)
By Hand
Chase depth -->
Ne 25 mm wide
25-50 mm wide
50-75 mm wide
75-100 mm wide

3.03
2.50
2.13
1.82

25-37mm 37-50mm
2.04
1.54
1.67
1.25
1.41
1.05
1.22
0.92

11.10
6.67
6.67
5.00

0-25mm
3.85
3.23
2.70
2.33

7.69
6.25
5.26
4.55

5.56
4.55
4.55
3.33

4.17
3.33
3.33
2.50

25-37mm 37-50mm
2.63
1.96
2.17
1.64
1.82
1.36
1.56
1.18

5.00
4.17
3.57
3.13

3.85
3.13
2.70
2.33

Cutting Chases In Lightweight Blockwork


In Lightweight Blockwork (m/hr)
By Hand
Chase depth -->
Ne 25 mm wide
25-50 mm wide
50-75 mm wide
75-100 mm wide
Machine
Chase depth -->
Ne 25 mm wide
25-50 mm wide
50-75 mm wide
75-100 mm wide

0-25mm
7.69
6.25
5.26
4.55

25-37mm 37-50mm
5.00
3.85
4.17
3.13
3.45
2.63
3.03
2.27

14.20
11.10
10.00
9.09

25-37mm 37-50mm
10.00
7.69
7.69
5.88
7.14
5.26
6.25
4.76

0-25mm

Cutting Switch Boxes


Cutting Switch Boxes etc (No/hr)

Concrete
Brickwork
Lightweight Blockwork Hand
Heavyweight Blockwork Hand

Box Type -->


Hand
Machine
Hand
Machine
Hand Machine
Hand Machine

Small

Large

7.14
3.57
12.50
5.56
6.67
4.17
12.50
6.25
20.0 -25.0 10.0 -14.3
7.69- 12.5 3.85 -5.88

Beam Falsework Formwork


Rates include for making, fixing, cleaning and minor repair works etc, rates in m 2/hr.
Soffits - On runners and props, including erection of props etc.
Hight of Beam Soffit--->
Width
100 - 200 mm
200 - 300 mm
300 - 500 mm
500 - 750 mm
exc 750 mm
Soffits - On runners and props, on previously erected props etc.
Hight of Beam Soffit--->
Width
100 - 200 mm
200 - 300 mm
300 - 500 mm
500 - 750 mm
exc 750 mm
Sides - Strutted from soffit bearers etc.
Hight of Beam Soffit--->
Depth
100 - 200 mm
200 - 300 mm
300 - 500 mm
500 - 750 mm
exc 750 mm
Sides - Using clamps and struts etc.
Hight of Beam Soffit--->
Depth
100 - 200 mm
200 - 300 mm
300 - 500 mm
Columns Formwork
Rates include for fixing, cleaning and minor repair works etc, rates in m 2/hr unless otherwise stated.
Cross Sectional Area-->
Item
Kickers-Direct to slab (no/hr)
Kickers-Suspended (no/hr)
Square Sides-Timber Clamped and Propped

Item
Cross Section

Footing formwork
Activity

Footing - Shuttering & Providing Support


Footing - Deshuttering & insitu Stacking
Formwork & Falsework - Ground Foundation Formwork
Ground Foundation Formwork All formwork rates in m2/hr.
Item
To Pilecaps

To Foundations

To Ground Beams

Formwork
Task / Description
Pilecaps, < 0.7m2
Pilecaps, 0.7-2.5m2
Pilecaps, 2.5-3.0m2
Pilecaps, > 3.0m2
Ground Beams, < 0.7m2
Ground Beams, 0.7-1.5m2

Ground Beams, 1.5-3.0m2


Ground Beams, 3.0-5.0m2
Elevated Plain Slab Soffit
Beams, on erected falsework, width 100-200mm
Beams, on erected falsework, width 200-300mm
Beams, on erected falsework, width 300-500mm
Beams, on erected falsework, width 500-750mm
Beams, on erected falsework, width over 750mm
Walls, Construct Kickers
Walls, Fully Framed Formwork/Struts, 1.0-2.0m2
Walls, Fully Framed Formwork/Struts, 2.0-5.0m2
Walls, Fully Framed Formwork/Struts, over 5.0m2
Walls, StoriForm Shutters, 1.0-3.0m2
Walls, StoriForm Shutters, 3.0-5.0m2
Walls, StoriForm Shutters, 5.0-10.0m2
Walls, StoriForm Shutters, 10.0-15.0m2
Walls, StoriForm Shutters, over 15.0m2
Ground Slabs
Columns, Construct Kickers, direct to slab
Columns, Construct Kickers, suspended from soffit slab
Columns, Square Sides, Timber Clamp/Prop, csa < 0.1m2
Columns, Square Sides, Timber Clamp/Prop, csa 0.1-0.4m2
Columns, Square Sides, Timber Clamp/Prop, csa over 0.4m2
Columns, Square Sides, Steel Forms, 1.5 x 1.5 x 9.0m high
Columns, Square Sides, Steel Forms, 2.0 x 2.0 x 9.0m high
Columns, Square Sides, Steel Forms, 2.0 x 4.0 x 9.0m high
Columns, Round Sides, Sacrificial Plastic Mould, 3.0-4.0m dia
Columns, Round Sides, Steel Mould, 3.0-4.0m dia
Columns, Sloping Column Heads, extra over rate
Staircases, Stair Soffit, Sloping
Staircases, Stair Soffit, Flat Landing
Staircases, Wall Strings
Staircases, Open Strings
Staircases, Riser Boards fixed to strings
Staircases, Risers fixed to Strings
Waffle Flooring, 2.4m grid
Shaft Slip Forming
Table Form, Aluminum System, 400m2 bays
Table Form, H-Frame Steel Falsework, 400m2 bays
Tunnel Forms, Wall and Slab poured as one
Hollorib Decking, lay deck
Hollorib Decking, shear connecting studs
Stop Ends, no perforations
Stop Ends, minor perforations
Stop Ends, dense perforations

Box Outs, 0.01-0.05m2


Box Outs, over 0.05m2
Dummy Frames, under 3.0m2
Dummy Frames, over 3.0m2
Formwork Re-Use

Typical rate for number of formwork uses before shutter remake. NOTE: This varies significantly depen
Walls = 20 uses
Slab Soffits = 10 - 15 uses
Beam & Column Boxes = 30 uses
Raft formwork
Activity

Raft - Shuttering & Providing Support


Raft - Deshuttering & insitu Stacking
Ramp formwork

Activity

Ramp formwork
Ramp - Deshuttering & Stacking Appropriately at Same Location
Shades Formwork
Activity

Shades Formwork

Weather Shade, Chajjas, Corbels - Deshuttering & Stacking Appropriately at Same Location
Staircase formwork
Activity

Staircase (Excluding Spiral Staircase) - Shuttering & Providing Support


Staircase (Excluding Spiral Staircase) - Deshuttering & Stacking Appropriately at Same Location
Walls formwork

Activity

Walls (Any Thickness), Including Buttresses - Shuttering & Providing Support - Up to 3.5m Height

Walls - Deshuttering & insitu Stacking

Making Good Concrete


Rates including blowing out, preparations, clean and shutter joints and making a fair faced finish.

Walls
Columns
Sides and Soffits of Beams
Soffits of Slabs
Vertical Bolt Holes
Horizontal Bolt Holes
Vertical Shutter Joints
Horizontal Shutter Joints
Rub Down Precast Concrete

Scabble
Single head brush hammer
Three head brush hammer

Mixing Concrete
Mixing By Hand
A typical rate of 0.32 m3/hr of concrete.Compulsory Paddle MixerGenerally with one or two 3.5m 3dru
seconds (m3/Hr).
Mix Time -->
Single drum plant
Double drum plant
Task / Description
Concrete Weight, 1m3
Readymix Lorry, Length
Readymix Lorry, Width
Readymix Lorry, Height
Readymix Lorry, Length
Readymix Lorry, Turning Circle
Readymix Lorry, Allowable Access Ramp Gradient
Mixing Concrete, By Hand
Mixing Concrete, Single Drum Paddle Mixer
Mixing Concrete, Double Drum Paddle Mixer
Mixing Concrete, Single Drum Plant Pan Mixer
Mixing Concrete, Dry Mix Plant

CONCRETING
1 m3of concrete weights 2.4 tonnes Skip Capacities Dual Flow Skips

Skip Size
0.50 m3
0.75 m3
1.00 m3
Rollover Skips, Front discharge
Skip Size
0.50 m3
0.75 m3
Readymix Lorries
- Length
- Width
- Height

- Weight
- Turning Circle

0 - 3.5 m
Fix

3.5 - 5.0 m
Strike

0.70
0.81
0.93
1.16
1.23

Fix
1.23
1.39
1.54
1.85
2.17

0.58
0.68
0.78
0.96
1.03

0 - 3.5 m
Fix
0.96
1.11
1.27
1.56
1.64

Fix
0.91
1.05
1.20
1.49
1.39

0 - 3.5 m
0.78
0.93
1.06
1.47
1.54

Fix

Strike

1.23
1.39
1.54
2.08
2.33

0.74
0.88
1.02
1.39
1.47

0 - 3.5 m
Fix

1.18
1.32
1.47
2.00
2.33

3.5 - 5.0 m
Strike

0.91
1.09
1.27

1.67
1.82
2.00
2.44
2.70

3.5 - 5.0 m
Strike

Fix
1.47
1.64
1.82

Strike
0.87
1.04
1.20

Exc 0.2 m2
Fix

Strike
4.00
2.08

Strike

1.69
1.92
2.08
2.50
2.86

Fix

1.02
1.15
1.28
1.54
1.82

3.5 - 5.0 m
Strike

wise stated.
Ne 0.2 m2
Fix

Strike

12.50
12.50

1.39
1.56
1.72

Strike
2.63
1.39

8.33
8.33

Column Height--->

2 - 3 m
Fix

Strike

0.00 - 0.05 m2
0.05 - 0.10 m2
0.10 - 0.20 m2
0.20 - 0.40 m2
exc 0.40 m2

1.35
1.69
1.82
2.04
2.33

Labor (L) Carpenter


(Mandays)

Task - UOM

3 - 4 m
Fix
2.70
3.45
4.00
4.55
5.26

Labor (L) Helper


(Mandays)

1.5
Mandays/10Sqm

Sqm

0.8 Mandays/10Sqm

Sqm

0.9
0.48 Mandays/10Sqm Mandays/10Sqm

Shutter size
0.75 m2

Fix

3.85

0.75 - 1.50 m2

1.82

4.55

1.50 - 2.25 m

2.00

5.00

2.25 - 3.00 m

2.22

5.56

2.50

7.14

0.75 m2

1.72

4.55

0.75 - 1.50 m

1.82

4.55

1.50 - 3.00 m

2.50

6.25

3.00 - 5.00 m2

2.63

6.67

1.50 m

1.82

4.55

2.63

6.67

3.00 - 5.00 m2

2.70

7.14

1.50 - 3.00 m

Slow
0.9
1.6
2.0
2.3
1.1
1.7

Material (M)
MS Wall Form
Panel - 1250 x
500:
16Nos/10Sqm

Strike
1.64

exc 3.00 m2

1.67
1.82
2.33
2.44
2.50

Ave
1.6
2.0
2.3
2.5
1.7
1.8

Fast Units
2.0 m2/hr
2.3 m2/hr
2.5 m2/hr
3.1 m2/hr
1.8 m2/hr
2.5 m2/hr

1.8
2.5
0.6
0.9
1.0
1.2
1.5
1.4
5.3
0.9
1.0
1.2
1.0
1.9
2.3
3.2
3.8
1.0
3.2
1.2
1.3
1.8
2.0
7.9
6.9
8.5
3.5
5.2
-
0.7
0.8
0.4
0.7
-
-
1.1
-
2.1
1.9
-
-
-
2.8
1.2
0.9

2.5
2.6
0.8
1.0
1.1
1.3
1.6
1.5
7.1
1.8
2.2
2.5
1.4
2.3
2.8
4.5
4.8
1.5
4.1
2.8
1.6
2.1
2.3
9.5
7.5
10.2
4.5
6.5
2.5
0.8
0.9
0.6
0.8
2.5
2.3
1.4
300.0
3.2
3.0
15.6
43.5
29.3
3.5
1.5
1.1

2.6
3.5
1.2
1.1
1.3
1.5
1.8
1.7
10.0
1.9
2.5
2.9
2.0
3.3
3.5
4.0
5.4
1.8
5.4
3.2
1.8
2.4
2.5
10.3
8.3
12.0
6.0
7.5
3.5
1.0
1.2
-
-
2.8
2.6
1.8
500.0
3.8
3.5
17.5
47.5
31.2
4.2
1.9
1.4

m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
no/hr
no/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
hrs/no
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
mm/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr

7.6
3.1
4.5
3.1

8.2
3.9
6.2
3.7

9.1
4.5
7.1
4.5

no/hr
no/hr
no/hr
no/hr

ficantly depending on care taken with shutters and programme time available etc.

Labor (L) Carpenter


(Mandays)

Task - UOM

Labor (L) Helper


(Mandays)

Sqm

1.41
0.71 Mandays/10Sqm Mandays/10Sqm

Sqm

0.84
0.42 Mandays/10Sqm Mandays/10Sqm

TASKS

Task - UOM

Labor (L) Carpenter


(Mandays)

Material (M)
MS Wall Form
Panel - 1250 x
500:
16Nos/10Sqm

Labor (L) Helper


(Mandays)

Ramp - Shuttering &


Providing Support

Sqm

0.44
0.22 Mandays/Sqm Mandays/Sqm

Sqm

0.13 Mandays/Sqm

0.26 Mandays/Sqm

Task - UOM

Sqm

Labor (L) Carpenter


(Mandays)

0.12 Mandays/Sqm

Labor (L) Helper


(Mandays)

Material (M)

MS Floor Form
Panel - 750 x
600 0.14 Mandays/Sqm 2.2Nos/Sqm

0.07 Mandays/Sqm

Task - UOM

0.08 Mandays/Sqm

Labor (L) Carpenter


(Mandays)

Labor (L) Helper


(Mandays)

Sqm

0.23 Mandays/Sqm

MS Floor Form
Panel - 750 x
600 0.46 Mandays/Sqm 2.2Nos/Sqm

Sqm

0.14 Mandays/Sqm

0.28 Mandays/Sqm

Task - UOM

Labor (L) Carpenter


(Mandays)

Labor (L) Helper


(Mandays)

Sqm

MS Wall Form
Panel - 1250 x
2.22
2.64
500 - 32
Mandays/10Sqm(Inclu Mandays/10Sqm(In Nos/10Sqm(Inclu
ding Both Sides)
cluding Both Sides) ding Both Sides)

Sqm

1.32
1.76
Mandays/10Sqm(Inclu Mandays/10Sqm(In
ding Both Sides)
cluding Both Sides)

ed finish.
With Mechanical
By Hand
Sander
2
2
5.56 m /hr
8.62 m /hr
2.80 m2/hr

6.99 m2/hr

2.80 m2/hr

6.99 m2/hr

4.21 m2/hr

7.58 m2/hr

16.67
14.49
28.57
25.00
16.95

no/hr
no/hr
m/hr
m/hr
m2/hr

Material (M)

Material (M)

0 - 4 mm

30.74 hrs/m2

0 - 8 mm

59.14 hrs/m2

0 - 4 mm

37.14 hrs/m2

0 - 8 mm

71.12 hrs/m2

two 3.5m 3drums, giving a cycle time of 60 to 80


60 secs

80 secs
210
420

158
315

Slow
-
-
-
-
-
-
-
-
158.0
315.0
-
-

Ave
2.4
8.3
2.5
3.7
24.4
16.4
17.0
0.3
180.0
370.0
120.0
90.0

Qty Per Lift


0.44 m3
0.68 m3
0.94 m3

Laiden Weight
1,261 kg
1,850 kg
2,585 kg

Qty Per Lift


0.44 m3
0.68 m3

Laiden Weight
1,361 kg
2,057 kg

8.23 m
2.43 m
3.66 m

Fast Units
- Tonnes
- m
- m
- m
- Tonnes
- m
20.0 degrees
- m3/hr
210.0 m3/hr
420.0 m3/hr
- m3/hr
- m3/hr

24.38 tonnes
16.36 m

m
Strike
3.57
3.85
4.55
5
5.88

Material (M)

Props - 2m to
3m Long: 2
Nos/Rm

Shuttering Oil:
4Ltr/10Sqm

Material (M)

Props - 2m to
3m Long: 2
Nos/Rm

Shuttering Oil:
4Ltr/10Sqm

Material (M)

MS Floor Form
Panel - 750 x
600 13.3Nos/10Sqm

MS Floor Form
Panel - 1250 x
500:
6.4Nos/10Sqm

Material (M)

Material (M)

Adjustable
Props - 2.02m to
3.75 m:
Shuttering Oil:
2Nos/Sqm
0.3Ltr/Sqm

Adjustable Props
- 2.02m to 3.75
m: 2Nos/Sqm
and Shuttering
Oil: 5Ltr/10Sqm

Material (M)
Adjustable
Props - 2.02m to
3.75 m:
Shuttering Oil:
2Nos/Sqm
5Ltr/10Sqm

Material (M)

Props - 2m to
3m Long:
Shuttering Oil:
4Nos/Rm(Includi 5Ltr/10Sqm(On
ng Both Sides) One Side)

Concrete Finishes (m2/hr).


Area Finished -->
Steel Float by Hand
Wood Float by Hand
Power Float
Light Brush on Trowel
Brush on Trowel Margin
Sprayed using hand pump
Wire Brush, expose agg

0-40 m2 40-200 m2 exc 200 m2


9.26
11.76
13.89
55.56
27.78
55.56
6.99

13.89
17.24
20.83
90.91
45.45
90.91
11.76

25.00
29.41
37.04
166.67
83.33
142.86
20.83

Concrete Pumping
Large Concrete Pours, lorry pump.
Simple Rule Of Thumb, concretors 0.5 - 1.0 hrs/m3 of concrete,
depending on access, pour size and concrete availability.
Base Slabs etc, 1,200m3 equalling 25 - 35m3/hr per pump, with 3 No
pumps and 12 men for 2 shifts of 12 hrs.

Place Concrete
Barrowing Concrete (m3/hr).
Receive concrete from mixer/lorry direct to barrow, wheel to placing position, tip and return.
Distance

As above but including load concrete from deck/tray.


Distance

Extra over to place direct, for dump and shovel in from side, a typical rate of 0.26 hrs/m 3.Direct From R
(m3/hr).
Type
Mass Fill
50mm Blinding
Ground Beams ne 0.1 m2 SA
Ground Beams ex 0.1 m2 SA
Pile Caps ne 0.1 m2 SA
Pile Caps ex 0.1 m2 SA
Duct Walls
Stub Columns
Ground Slab ne 155 mm
Ground Slab 150-300 mm
Ground Slab 300-500 mm
Drains, Bed & Cover
By Lorry Mounted Concrete Pump (m3/hr).

Solid Slabs

Coffered Slabs
Columns
Wall

Independent Beams
Stairs and Landings
By Dumper, From Ready Mix Lorry To Position (m3/hr).
Dumper Capacity -->

0 - 20 m
20 - 50 m
50 - 100 m
100 - 250 m
250 - 500 m
500 - 750 m
750 - 1,000 m
By Tower/Mobile Crane (m3/hr).
Pile Caps
Mass Fill Pours

Slabs

Trough & Coffered Slabs


Structural Topping ne 100 mm
Stairs & Landings
Blinding
Beams

Walls

Columns

Concrete Placement
Task / Description
Placing concrete, lorry based pump
Hollorib Decking, concrete topping
Hollorib Decking, concrete topping, incl PowerFloat
Placing Concrete, By Wheelbarrow over 1-10m
Placing Concrete, By Wheelbarrow over 10-20m
Placing Concrete, By Wheelbarrow over 20-50m
Placing Direct From Readymix Lorry, Mass Fill
Placing Direct From Readymix Lorry, 50mm Blinding
Placing Direct From Readymix Lorry, Ground Beams
Placing Direct From Readymix Lorry, Pile Caps

Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing
Placing

Direct From Readymix Lorry, Duct Walls


Direct From Readymix Lorry, Stub Columns
Direct From Readymix Lorry, Ground Slab
Direct From Readymix Lorry,Drains Bed and Cover
From Tower Crane, Pile Caps
From Tower Crane, Mass Fill
From Tower Crane, Slabs under 150mm thick
From Tower Crane, Slabs over 150mm thick
From Tower Crane, Trough/Coffered Slabs
From Tower Crane, Stairs and Landings
From Tower Crane, Blinding
From Tower Crane, Beams under 150mm thick
From Tower Crane, Beams over 150mm thick
From Tower Crane, Walls
From Tower Crane, Columns

0 - 10 m
10 - 20 m
20 - 50 m

2.32
1.81
1.08

0 - 10 m
10 - 20 m
20 - 50 m

0.99
0.87
0.66

Ready Mix
Tip Direct
3.12
1.27
1.52
1.69
1.16
2.56
0.78
0.43
2.13
2.33
2.56
0.91
Thickness -->

Via Dumper
Via Dumper
Tip Direct
Thrown In
2.56
1.49
1.06
0.82
1.30
1.00
1.49
1.16
1.06
0.79
2.13
7.69
0.71
0.52
0.39
0.29
1.82
1.22
1.96
1.27
2.13
1.35
0.85
0.73
13.5 m3/hr

ne 100 mm
100 - 150 mm
150 - 200 mm
200 - 300 mm
300 - 500 mm

2.17
2.44
2.63
2.86
3.23
1.64
1.59
1.82
1.61
1.89
2.56
1.54
1.27

0.5 - 0.10 m2
exc 0.10 m2
ne 150 mm
150 - 225 mm
exc 225 mm

0.6 m3

18 m3/hr

0.8 m3

2.63
2.94
3.23
3.45
3.85
1.82
1.59
1.82
1.89
2.33
3.23
1.54
1.89
1.2 m3

1.5 m3

2.3 m3

10.41
9.09
7.29
5.78
3.65
2.16
-

14.08
12.36
10.41
7.87
4.95
2.92
-

SA ne 2 m
SA 2-5 m3
ne 10 m3
10-25 m3
exc 25 m3
ne 100 mm
100-150 mm
150-200 mm
200-300 mm
Exc 300 mm
2

ne 150 mm
SA 0-0.05 m
SA 0.05-0.1 m
SA ex 0.1 m
ne 100 mm
100-150 mm
150-300 mm
exc 300 mm
SA ne 0.05 m2
SA 0.05-0.1 m2
SA ex 0.1 m2
Slow
30.0
85.0
40.0
2.1
1.5
0.8
2.8
-
1.5
1.0

18.82
16.39
13.88
10.00
8.33
4.27
-

25.00
22.22
18.86
13.51
8.95
5.43
3.97

0.4 m Skip
0.6 m Skip
0.8 m Skip
1.19
1.39
1.61
1.75
2.04
2.33
3.70
4.17
4.76
4.00
4.55
0.84
4.35
5.00
5.86
0.90
1.09
1.21
1.09
1.31
1.47
1.26
1.53
1.69
1.26
1.53
1.69
1.38
1.66
1.85
0.95
1.09
1.21
0.90
1.09
1.25
0.64
0.64
###
0.88
1.00
1.10
0.52
0.58
0.69
0.58
0.65
0.78
0.76
0.85
1.02
0.64
0.76
0.88
0.76
0.92
1.05
0.95
1.11
1.28
1.10
1.28
1.47
0.43
0.45
0.48
0.48
0.50
0.54
0.51
0.53
0.57
Ave
40.0
100.0
50.0
2.3
1.8
1.1
3.1
1.3
-
1.5

Fast
50.0
120.0
70.0
2.5
2.1
1.5
3.3
1.6
1.7
2.3

Units
m3/hr
m2/hr
m2/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr

33.33
29.41
25.00
18.18
12.35
7.87
5.78

-
-
2.1
-
1.2
4.0
0.9
1.2
0.9
0.6
0.8
0.5
0.6
0.6
0.4

0.8
0.4
2.3
0.9
1.4
4.5
1.3
1.5
1.1
0.7
1.0
0.6
0.8
1.1
0.5

1.1
0.6
2.6
1.0
1.6
5.5
1.7
1.8
1.2
0.9
1.1
0.8
1.0
1.5
0.6

m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/hr
m3/h

Post Tensioning
Concrete - Post Tensioning Sequence:
Concrete poured 1st Bay.
After 48 hrs concrete is stressed to initial strength (15 kN takes 1 day).
5 days after initial stressing, concrete is stressed to final strength (30 kN takes 1 day).
Formwork may now be struck and adjacent bay poured.

Post Tensioning
Task / Description
Lag for Initial Stress Tensioning after 1st bay cast
Lag for Final Stress Tensioning after Initial Stress

Slow
-
-

Ave
48.0
120.0

Fast Units
- hrs
- hrs

Footing Reinforcement
Posted Mon, 2011-06-06 18:02 by PP Admin

Activity

Footing Reinforcement

Reinforcement
Posted Sat, 2009-02-07 16:05 by Technical Develop...

Mesh reinforcement - to slabs = 10.5 m2/hr


Mesh reinformcement - to beams/columns = 2.5 m2/hr
Reinforcement
Task / Description
Slabs/Foundations, steelfixing, 6mm
Slabs/Foundations, steelfixing, 8mm
Slabs/Foundations, steelfixing, 10mm
Slabs/Foundations, steelfixing, 12mm
Slabs/Foundations, steelfixing, 16mm
Slabs/Foundations, steelfixing, 20mm
Slabs/Foundations, steelfixing, 25mm
Slabs/Foundations, steelfixing, 32mm
Slabs/Foundations, steelfixing, 40mm
Slabs/Foundations, steelfixing, 50mm
Beams/Columns, steelfixing, 6mm
Beams/Columns, steelfixing, 8mm
Beams/Columns, steelfixing, 10mm
Beams/Columns, steelfixing, 12mm
Beams/Columns, steelfixing, 16mm
Beams/Columns, steelfixing, 20mm

Beams/Columns, steelfixing, 25mm


Beams/Columns, steelfixing, 32mm
Beams/Columns, steelfixing, 40mm
Beams/Columns, steelfixing, 50mm
Walls, steelfixing, 6mm
Walls, steelfixing, 8mm
Walls, steelfixing, 10mm
Walls, steelfixing, 12mm
Walls, steelfixing, 16mm
Walls, steelfixing, 20mm
Walls, steelfixing, 25mm
Walls, steelfixing, 32mm
Walls, steelfixing, 40mm
Walls, steelfixing, 50mm
Staircases, steelfixing, 6mm
Staircases, steelfixing, 8mm
Staircases, steelfixing, 10mm
Staircases, steelfixing, 12mm
Staircases, steelfixing, 16mm
Staircases, steelfixing, 20mm
Staircases, steelfixing, 25mm

Staircase Reinforcement
Posted Mon, 2011-06-06 18:03 by PP Admin

Activity

Staircase Reinforcement

Walls Reinforcement
Posted Mon, 2011-06-06 18:03 by PP Admin

Activity

Walls Reinforcement

Task UOM

TASKS

LBarbender/Fitter
(Mandays)

L - Helper
(Mandays)

Foot Rein - Placing in Position &


Binding - Using TMT Bars, Mild Steel,
Tor Steel
Mt

0.38
0.28 Mandays/0.1Mt Mandays/0.1Mt

Foot Rein - Straightening, Cutting


(With Machine Cutting), bending Using TMT Bars, Mild Steel, Tor Steel Mt

0.2 Mandays/0.1Mt

0.28
Mandays/0.1Mt

Foot Rein - Straightening, Cutting


(With Manual Cutting), bending Using TMT Bars, Mild Steel, Tor Steel Mt

0.32
0.29 Mandays/0.1Mt Mandays/0.1Mt

Slow
40.3
28.2
22.5
16.9
12.0
9.2
6.9
5.7
5.3
5.2
55.4
38.8
29.5
23.4
16.6
12.4

Ave
38.4
26.9
20.6
16.3
11.5
8.6
6.7
5.5
5.1
4.9
52.8
37.0
28.4
22.4
15.8
11.9

Fast Units
36.5 hrs/tonne
25.8 hrs/tonne
20.1 hrs/tonne
15.4 hrs/tonne
10.9 hrs/tonne
8.2 hrs/tonne
6.5 hrs/tonne
5.2 hrs/tonne
4.9 hrs/tonne
4.6 hrs/tonne
50.6 hrs/tonne
35.1 hrs/tonne
26.9 hrs/tonne
21.9 hrs/tonne
15.1 hrs/tonne
11.3 hrs/tonne

9.9
6.8
6.1
6.1
41.2
29.2
22.7
17.6
12.4
9.4
7.4
7.0
6.4
5.3
48.9
34.4
26.6
20.9
14.6
11.3
8.6

TASKS

9.2
6.6
5.9
5.9
40.8
28.6
22.0
17.3
12.2
9.2
7.2
6.8
6.1
5.1
48.0
33.6
25.8
20.4
14.4
10.8
8.4

Task UOM

8.7 hrs/tonne
6.2 hrs/tonne
5.6 hrs/tonne
5.6 hrs/tonne
39.1 hrs/tonne
27.4 hrs/tonne
21.2 hrs/tonne
16.9 hrs/tonne
11.8 hrs/tonne
8.7 hrs/tonne
7.0 hrs/tonne
6.4 hrs/tonne
5.9 hrs/tonne
4.8 hrs/tonne
45.5 hrs/tonne
31.9 hrs/tonne
24.3 hrs/tonne
19.5 hrs/tonne
13.8 hrs/tonne
10.5 hrs/tonne
8.2 hrs/tonne

LBarbender/Fitter
(Mandays)

L - Helper
(Mandays)

Staircase Rein - Placing in Position &


Binding - Using TMT Bars, Mild Steel,
Tor Steel
Mt

0.34
0.32 Mandays/0.1Mt Mandays/0.1Mt

Staircase Rein - Straightening,


Cutting (With Machine Cutting),
bending - Using TMT Bars, Mild
Steel, Tor Steel.

Mt

0.2 Mandays/0.1Mt

Staircase Rein- Straightening,


Cutting (With Manual Cutting),
bending - Using TMT Bars, Mild
Steel, Tor Steel.

Mt

0.32
0.29 Mandays/0.1Mt Mandays/0.1Mt

0.28
Mandays/0.1Mt

TASKS

Task UOM

Walls Rein - Placing in Position &


Binding - Using TMT Bars, Mild Steel,
Tor Steel
Mt
Walls Rein - Straightening, Cutting
(With Machine Cutting), bending Using TMT Bars, Mild Steel, Tor
Steel.
Walls Rein - Straightening, Cutting
(With Manual Cutting), bending Using TMT Bars, Mild Steel, Tor
Steel.

Walls Rein - Stirrups Cutting and


Bending

Walls Rein - Stirrups Teing

LBarbender/Fitter
(Mandays)

L - Helper
(Mandays)

0.45
0.41 Mandays/0.1Mt Mandays/0.1Mt

0.28
Mandays/0.1Mt

Mt

0.2 Mandays/0.1Mt

Mt

0.43
0.39 Mandays/0.1Mt Mandays/0.1Mt

Mt

0.5
0.47 Mandays/0.1Mt Mandays/0.1Mt

Mt

0.57
0.55 Mandays/0.1Mt Mandays/0.1Mt

Bars Include
5%
Wastage

Binding
Wire:
5kg/0.1M
t

Cover
Blocks 10No/0.1
Mt

Bars Include
5%
Wastage
Bars Include
5%
Wastage

Bars Include
5%
Wastage

Binding
Wire:
5kg/0.1M
t

Cover
Blocks 10No/0.1
Mt

Bars Include
5%
Wastage
Bars Include
5%
Wastage

Bars Include
5%
Wastage

Binding
Wire:
5kg/0.1M
t

Cover
Blocks 10No/0.1
Mt

Bars Include
5%
Wastage
Bars Include
5%
Wastage
Bars Include
5%
Wastage
Bars Include
5%
Wastage

Breaking Out
Posted Sun, 2009-02-22 08:46 by PP Admin

Concrete And Remove (hrs/m3)


Slabs - unreinforced

Slabs - reinforced

Walls - unreinforced
Walls - reinforced
Beams - reinforced
Columns - reinforced
Foundations - unreinforced
Foundations - reinforced
Breaking Out Tarmac
Rates include for breaking out and removal of rubble (hrs/m3).
Pavings

Roadways
Breaking Out Brickwork
Rates include for breaking out and removal of rubble (hrs/m3).
Walls/columns
Foundation
Breaking Diaphragm Wall
Breaking Openings using coring machine 0.2m3/hour
Breaking out to expose couplers using hand held braker1.75m2/day ot 2.5m run/day (0.7m slab)
Task / Description
Concrete
Concrete
Concrete
Concrete
Concrete

Slabs, unreinforced 50-150mm


Slabs, unreinforced 150-300mm
Slabs, reinforced 50-150mm
Slabs, reinforced 150-300mm
Walls, unreinforced

Concrete Walls, reinforced


Concrete Foundations, unreinforced
Concrete Foundations, reinforced
Concrete Beams
Concrete Columns
Tarmac paving 20-50mm thick
Tarmac paving 50-100mm thick
Tarmac paving 100-150mm thick
Tarmac roadway 150mm thick
Brickwork, walls and columns
Brickwork, foundations

Cutting Holes
Posted Sat, 2009-02-28 07:31 by PP Admin

Cutting Holes in concrete by Hand (no/hr


Hole depth (mm) -->
Ne 50 cm2
50-100 cm2
100-150 cm2
250-500 cm2
Cutting Holesin concrete by Machine (no/hr)
Hole depth (mm) -->
Ne 50 cm2
50-100 cm2
100-150 cm2
150-250 cm2
250-500 cm2

Common Brickwork
Posted Mon, 2009-07-13 06:29 by PP Admin

Common Brickwork, by Machine (no/hr)


Hole depth (mm) -->
Ne 100 cm2
100-250 cm2
250-500 cm2
500-100 cm2
Common Brickwork, by Hand (no/hr)

Hole depth (mm) -->


Ne 100 cm2
100-250 cm2
250-500 cm2
500-100 cm2

Cutting Back
Posted Sun, 2009-03-01 17:58 by PP Admin

Cutting Back Concrete


Cutting Piles For Pile Caps, Using Breaker & Air Tools
Providing A Rough Finish(hrs/pile)
Pile Diameter-->
0 - 100mm high
100-200mm high
200-300mm high
300-500mm high
500-750mm high
750-1000mm high
Providing A Neat Finish(hrs/pile)
Pile Diameter-->
0 - 100 mm high
100-200 mm high
200-300 mm high
300-500 mm high
500-750 mm high
750-1000mm high
Cut Concrete Slabs
Using Trolley Type Clipper Saw (m/hr)
Ne 25 mm deep
25-50 mm deep
50-75 mm deep
Cutting Back
Task / Description
Concrete Pile Caps, 50-300mm deep and 0.6m dia
Concrete Pile Caps, 300-750mm deep and 0.6m dia
Concrete Pile Caps, > 750mm deep and 0.6m dia
Concrete Pile Caps, 50-300mm deep and 1.1m dia
Concrete Pile Caps, 300-750mm deep and 1.1m dia
Concrete Pile Caps, > 750mm deep and 1.1m dia
Concrete Pile Caps, 50-300mm deep and 2.5m dia
Concrete Pile Caps, 300-750mm deep and 2.5m dia
Concrete Pile Caps, > 750mm deep and 2.5m dia
Concrete, Cutting Slabs, 5-25m deep
Concrete, Cutting Slabs, 25-50m deep
Concrete, Cutting Slabs, 50-75m deep
Concrete, Cutting Holes, coring machine
Concrete, Cutting Back to expose couplers 0.7m slab

Depth
Ne 50 mm
50 - 100 mm
100 - 200 mm
200 - 300 mm
Ne 50 mm
50 - 100 mm
100 - 200 mm
200 - 300 mm
all walls
all walls
all sizes
all sizes
all sizes
all sizes

Hand

Depth
Ne 50 mm
50-100 mm
100-150 mm
upto 150 mm

Hand

Depth
Ne 100 mm
exc 100 mm
all sizes

Hand

Machine
2.35
3.15
3.75
4.12
4.71
5.52
5.88
6.12
4.71
5.52
7.5
9.2
3.6
5.4

1.96
2.46
3.94
5.55
3.92
4.32
4.71
9.09
3.04
3.92
5.89
7.3
3
4.8

Machine
1.96
2.08
2.17

Machine
2.4
2.75
2.75

Slow
3.2
5.5
5.2
9.1
4.7

1.56
1.64
1.75
3.57

Ave
-
4.1
-
6.2
3.9

1.38
1.57
1.57

Fast Units
1.9 hrs/m3
3.7 hrs/m3
3.9 hrs/m3
4.7 hrs/m3
3.1 hrs/m3

5.6
3.6
5.4
7.5
9.2
1.9
2.1
2.1
-
2.4
2.7

0-75

4.7
3.3
5.1
6.5
8.2
1.7
-
-
3.6
1.8
2.1

75-125
2.94
2.22
1.67
1.28

3.9 hrs/m3
3.0 hrs/m3
4.8 hrs/m3
5.6 hrs/m3
7.3 hrs/m3
1.5 hrs/m3
1.6 hrs/m3
1.7 hrs/m3
- hrs/m3
1.3 hrs/m3
1.5 hrs/m3

125-250

250-375
1.75 -
1.32 -
1.05 -
0.83 -
250-375

1.85
1.39
1.11
0.88

375-500
-

0-75
-
-

75-125
-
-

125-250

0-75
-
-
-
-

75-125

125-250

250-375 375-500
7.69
5.26
4
5.88
4
2.94
5
3.33
2.5
4.17
2.78
2.08

0-75

75-125

125-250

250-375 375-500
5.56
3.85 4.55
3.23 3.85 2.70
3.23
2.27

5.88
4
2.5
1.67

16.6
12.5
10
8.33

11.1
9.09
7.69
6.67

8.33
7.14
5.88
4.76

375-500
5
4.55
3.45
3.03
2.17
1.92
1.45
1.28

0.35m

0.5m
0.32
0.39
0.44
0.49
0.68
0.83

0.35m
-

0.6m

0.79m
0.94m
0.63
0.93
1.38
0.81
1.22
1.83
0.94
1.45
1.92
1.07
1.65
2.1
1.54
2.16
2.55
1.78
2.36
3.37

0.6m

0.79m
0.94m
0.9
1.32
1.93
1.11
1.65
2.39
1.25
1.93
2.49
1.59
2.38
2.73
2.13
2.97
3.45
2.79
3.72
4.38

0.44
0.56
0.64
0.72
1.02
1.32
0.5m
0.63
0.76
0.85
1.05
1.41
2.07

15.2
11.5
6.67
Slow
0.6
1.5
1.8
1.9
2.5
4.2
9.2
10.1
11.5
-
-
-
-
-

Ave
-
-
-
-
-
-
-
-
-
15.2
11.5
6.7
0.2
2.5

Fast Units
0.3 hrs/no
0.4 hrs/no
0.8 hrs/no
0.8 hrs/no
1.1 hrs/no
2.3 hrs/no
8.2 hrs/no
9.5 hrs/no
10.2 hrs/no
- m/hr
- m/hr
- m/hr
- m3/hr
- m/day

1.1m

2.2m
1.74 8.10
2.16 8.58
2.34 9.00
2.5 9.50
2.55
10.01
4.2
10.52

1.1m

2.2m
2.25 9.72
2.81
10.29
3.04
10.85
3.25
11.4
4.3
12.01
5.43
12.62

Ground Excavation
Posted Sat, 2009-02-07 07:26 by Technical Develop...

Ground Excavation Rates (m3/hr):


Ground Type
Sand/Soil

Gravel

Clay/Chalk

V.Difficult

Small or Deep Excavations


Task / Description
Hydraulic Excavator, 0.3m3 bucket, Sand/Soil
Hydraulic Excavator, 0.3m3 bucket, Gravel Beds
Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.3m3 bucket, Hard Ground
Hydraulic Excavator, 0.4m3 bucket, Sand/Soil
Hydraulic Excavator, 0.4m3 bucket, Gravel Beds
Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.4m3 bucket, Hard Ground
Hydraulic Excavator, 0.5m3 bucket, Sand/Soil
Hydraulic Excavator, 0.5m3 bucket, Gravel Beds
Hydraulic Excavator, 0.5m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.5m3 bucket, Hard Ground

Bucket
0.3m3
0.4m3
0.5m3
0.3m3
0.4m3
0.5m3
0.3m3
0.4m3
0.5m3
0.3m3
0.4m3
0.5m3
Slow
6.7
3.2
3.3
3.3
8.2
7.1
6.5
6.3
12.2
10.2
9.7
6.1

Trench Excavations
Posted Sun, 2009-03-01 18:05 by PP Admin

Trench Excavation...
Task / Description
Hydraulic Excavator, 0.3m3 bucket, Sand/Soil
Hydraulic Excavator, 0.3m3 bucket, Gravel Beds
Hydraulic Excavator, 0.3m3 bucket, Clay/Chalk
Hydraulic Excavator, 0.3m3 bucket, Hard Ground
Hydraulic Excavator, 0.4m3 bucket, Sand/Soil
Hydraulic Excavator, 0.4m3 bucket, Gravel Beds
Hydraulic Excavator, 0.4m3 bucket, Clay/Chalk

Slow
5.6
4.8
4.8
9.7
20.5
18.2
18.2

Hydraulic
Hydraulic
Hydraulic
Hydraulic
Hydraulic

Excavator,
Excavator,
Excavator,
Excavator,
Excavator,

0.4m3
0.5m3
0.5m3
0.5m3
0.5m3

bucket,
bucket,
bucket,
bucket,
bucket,

Hard Ground
Sand/Soil
Gravel Beds
Clay/Chalk
Hard Ground

17.0
26.0
26.3
26.3
22.7

Excavate and Board Trench, 0.5-1.5m deep, < 2.0m wide

3.3

Excavate and Board Trench, 1.5-3.0m deep, < 2.0m wide

3.0

Excavate and Board Trench, 3.0-4.5m deep, < 2.0m wide

2.7

Excavate and Board Trench, 0.5-1.5m deep, > 2.0m wide

6.6

Excavate and Board Trench, 1.5-3.0m deep, > 2.0m wide

6.2

Excavate and Board Trench, 3.0-4.5m deep, > 2.0m wide

5.8

Bulk Works
8.7
28.5
50
7.1
25.9
40
7.1
25
40
6.1
22.2
28.6

Basements

Small &
Deep
7.1 8.4>
25
10
28.6
13.3
6.1
4.5
22.2
8.7
28.6
11.1
6.1
4.1
22.2
8.3
28.6
10.5
5.4
4.1
20
7.7
20
6.7

Trenches

8
15.4
20
6.9
14.3
18.1
6.5
13.3
16.7
5.9
11.8
11.8

Ave
8.4
4.5
4.1
4.1
10.0
8.7
8.3
7.7
13.3
11.1
10.5
6.7

Fast Units
9.9 m3/hr
5.0 m3/hr
5.2 m3/hr
5.2 m3/hr
11.7 m3/hr
10.2 m3/hr
9.4 m3/hr
9.1 m3/hr
15.4 m3/hr
12.9 m3/hr
12.1 m3/hr
7.7 m3/hr

Ave
7.1
6.1
6.1
5.4
25.0
22.2
22.2

Fast Units
8.2 m3/hr
7.3 m3/hr
7.1 m3/hr
6.4 m3/hr
29.2 m3/hr
26.0 m3/hr
26.0 m3/hr

20.0
28.6
28.6
28.6
25.0

23.4 m3/hr
33.1 m3/hr
33.2 m3/hr
33.2 m3/hr
28.8 m3/hr

4.5

6.8 m2/hr

4.2

6.5 m2/hr

4.0

6.0 m2/hr

7.1

8.8 m2/hr

6.7

9.2 m2/hr

6.2

10.5 m2/hr

Compact & Consolidate


Posted Fri, 2009-02-06 05:41 by Technical Develop...

Compact & Consolidate using Vibratory Roller or compactor.


Sand 31.25 m2/hr
Soil 58.82 m2/hr
Clay 55.56 m2/hr
Hardcore 38.46 m2/hr
Ash 57.85 m2/hr

Deep Compaction
Posted Fri, 2009-02-06 05:37 by Technical Develop...

Essentially required in order to reduce expected ground settlement and to protect


underground utilities / structures etc.
Deep compaction by 350 mm dia Vibroflot, 3 m centres in sand.
Working on 12 hour basis, a vibroflot will achieve an output of 3-4,000 m3/shift (5,000 m3/day has been
achieved in an extended shift).

Ground Compaction
Task / Description
Deep Vibroflot, 3m centres
Vibro-Roller, Sand
Vibro-Roller, Soil
Vibro-Roller, Clay
Vibro-Roller, Hardcore
Vibro-Roller, Ash

Hand Fill & Compact


Posted Fri, 2009-02-06 06:07 by Technical Develop...

Loose from side of excavation, including compaction (m3/hr)...


Material
Loose Sand/Soil
Clay/Heavy Chalk
Hoging
Hardcode

Slow
330.0
28.5
-
-
-
-

Ave
380.0
31.2
58.8
55.6
38.4
57.8

Ne 100m
0.85
0.77
0.81
0.71

100-200mm
1.02
0.92
0.97
0.84

Fast Units
465.0 m3/hr
45.2 m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr

200-300mm
1.28
1.16
1.2
1.06

exc 300m
1.69
1.56
1.61
1.41

Spread & Leveling


Posted Sun, 2009-03-01 18:01 by PP Admin

Spread and Level


Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler
Crawler

Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,
Shovel,

0.8m3
0.8m3
0.8m3
0.8m3
0.8m3
0.8m3
0.8m3
0.8m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3
0.6m3
0.6m3
0.6m3
0.6m3
0.6m3
0.6m3
0.6m3
0.6m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3
1.2m3

bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,
bucket,

Task / Description
Sand/Soil, pushed 5-50m to stockpile
Sand/Soil, pushed 50-120m to stockpile
Gravel, pushed 5-50m to stockpile
Gravel, pushed 50-120m to stockpile
Clay/Chalk, pushed 5-50m to stockpile
Clay/Chalk, pushed 50-120m to stockpile
Boulder Clay, pushed 5-50m to stockpile
Boulder Clay, pushed 50-120m to stockpile
Sand/Soil, pushed 5-50m to stockpile
Sand/Soil, pushed 50-120m to stockpile
Gravel, pushed 5-50m to stockpile
Gravel, pushed 50-120m to stockpile
Clay/Chalk, pushed 5-50m to stockpile
Clay/Chalk, pushed 50-120m to stockpile
Boulder Clay, pushed 5-50m to stockpile
Boulder Clay, pushed 50-120m to stockpile
50-200m2, Sand/Soil
over 200m2, Sand/Soil
50-200m2, Gravel
over 200m2, Gravel
50-200m2, Hardcore
over 200m2, Hardcore
50-200m2, Boulder Clay
over 200m2, Boulder Clay
50-200m2, Sand/Soil
over 200m2, Sand/Soil
50-200m2, Gravel
over 200m2, Gravel
50-200m2, Hardcore
over 200m2, Hardcore
50-200m2, Boulder Clay
over 200m2, Boulder Clay

Slow
13.9
7.6
14.2
7.6
12.7
6.9
11.6
6.3
23.8
16.7
25.0
17.2
21.7
15.1
19.6
13.7
18.6
24.4
18.9
24.2
15.8
19.2
17.2
22.2
43.5
55.5
43.8
55.5
37.1
47.6
43.8
55.6

Ave
20.4
9.5
20.4
10.2
18.4
8.9
16.9
8.2
28.5
18.5
32.0
19.3
27.5
16.9
24.5
15.9
28.5
37.2
28.6
37.2
23.5
29.6
26.4
33.8
48.0
61.1
48.3
61.1
40.3
51.6
45.7
59.1

Fast Units
25.0 m3/hr
12.6 m3/hr
25.6 m3/hr
12.8 m3/hr
23.2 m3/hr
11.6 m3/hr
21.3 m3/hr
10.4 m3/hr
35.7 m3/hr
20.4 m3/hr
37.0 m3/hr
21.2 m3/hr
33.3 m3/hr
18.8 m3/hr
30.3 m3/hr
17.5 m3/hr
38.5 m3/hr
50.0 m3/hr
38.4 m3/hr
50.0 m3/hr
31.2 m3/hr
40.0 m3/hr
35.7 m3/hr
45.4 m3/hr
52.6 m3/hr
66.7 m3/hr
52.9 m3/hr
66.7 m3/hr
43.5 m3/hr
55.6 m3/hr
47.6 m3/hr
62.5 m3/hr

Fencing Works
Posted Fri, 2011-07-15 05:46 by PP Admin

Fencing Works
Task / Description
Site Hoarding, timber posts, plywood nailed to horizontal rails
Post Erection, Timber / Metal, dig, erect, fix
Post Erection, Concrete, dig, erect, fix
Fence Erection, Chainlink, posts at 1.5m
Fence Erection, Chainlink, posts at 2.0m
Fence Erection, Chainlink, posts at 3.0m
Fence Erection, Chestnut Pailings, posts at 1.5m
Fence Erection, Chestnut Pailings, posts at 2.0m
Fence Erection, Chestnut Pailings, posts at 3.0m
Fence Erection, Barbed Wire, posts at 1.5m
Fence Erection, Barbed Wire, posts at 2.0m
Fence Erection, Barbed Wire, posts at 3.0m
Gate Erection, Chainlink on frame

Slow

Ave

1.0
3.3
3.2
-
-
-
-
-
-
-
-
-
-

1.2
4.5
4.0
4.2
4.4
5.5
23.8
33.3
41.6
71.4
100.0
125.0
4.1

Fast Units
-

m/hr
no/hr
no/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
no/hr

Mosaic Tiles
Standard tiles of 0.045 x 0.045 m.

A typical rate of 1.55 m2/hr

Site Clearance
Initial Works
Clearing Site of Bushes, shrubs, roots
Lifting turf to be sorted and stacked
Cutting Down Trees & Roots
Small Trees / Shrubs
600 mm - 900 mm Girth
900 mm - 1,200 mm Girth
1,200 - 1,500 mm Girth
Cutting Down Hedges & Roots
Hawthorn

25.00 m2/hr
2.95 m2/hr

14
18
22
26

hrs/each
hrs/each
hrs/each
hrs/each

1.0 m high
1.5 m high
2.0 m high

0.9 m/hr
0.8 m/hr
0.6 m/hr

Site Clearance
Task / Description
Shrubs and Bushes, dig up and removal
Turf, lifting and removal
Trees, small sizes and shrubs
Trees and Shrubs, 500mm - 900mm girth
Trees and Shrubs, 900mm - 1200mm girth
Trees and Shrubs, 1200mm - 1500mm girth
Hedges and Roots, 0.5-1.0m high
Hedges and Roots, 1.0-1.5m high
Hedges and Roots, 1.5-2.0m high

Slow
-
-
-
-
-
-
-
-
-

Ave
25.0
2.9
14.0
18.0
22.0
26.0
0.9
0.8
0.6

Fast Units
38.0 m2/hr
- m2/hr
- m2/hr
- hrs/no
- hrs/no
- hrs/no
- m/hr
- m/hr
- m/hr

Kerbs & Paving


Posted Fri, 2011-07-15 05:35 by PP Admin

Kerbs & Paving


Task / Description
Concrete Slabs, laid on bedding, to slight falls
Concrete Slabs, laid on bedding, to steep falls
Concrete Slabs, laid in mortar, to slight falls
Concrete Slabs, laid in mortar, to steep falls
Concrete Slabs, laid on sand, to slight falls
Concrete Slabs, laid on sand, to steep falls
Cobble Stones, laid in mortar, no patterns
Cobble Stones, laid in mortar, with patterns
Artificial Stone, laid on sand, with patterns
Brick Paviors, in mortar, straight joints
Brick Paviors, in mortar, herringbone pattern
Gravel Paths, including preparation of sub-base
Concrete Paths, 100mm thick, including preparation of sub-base
Concrete Kerbs or Channels, laid straight
Concrete Kerbs or Channels, laid to 5m radius
Concrete Kerbs or Channels, laid to 10m radius
Concrete Kerbs or Channels, laid to 20m radius
Stone/Granite Kerbs or Channels, laid straight
Concrete Edging, laid straight
Concrete Edging, laid to 5m radius
Concrete Edging, laid to 10m radius
Concrete Edging, laid to 20m radius
Cutting and Fitting Ends, Concrete Kerbs
Cutting and Fitting Ends, Channels
Cutting and Fitting Ends, Concrete Edging

Road Basecourse
Posted Thu, 2011-07-14 12:09 by PP Admin

A good rule of thumb for the construction of road basecourse


Urban environment:
Spread & Compact Production = 30m3/hr
Trimming Production = 250m2/hr

Rural environment:
Spread & Compact Production = 50m3/hr
Trimming Production = 350m2/hr

Road Markings

Posted Sun, 2009-02-08 11:50 by Technical Develop...

Road and Car Park Markings


75 mm road lines = 20.5 m/hr
Road writing = 3.5 hrs/word or symbol

Road Surfaces
Posted Sun, 2009-02-08 11:52 by Technical Develop...

Barber Greene 8798 machine laying 100 mm in two coats (m2/hr)...


Tarmacadam = 160.0
Asphalt = 145.0

Manual laying 100 mm in two coats (m2/hr)...


Tarmacadam = 7.7
Asphalt = 5.0
Average laying of Asphalt wearing Course=40 Ton/hr so one crew can do 400 ton of asphalt /day

Concrete Road surfacing


Posted Tue, 2010-11-02 20:45 by PP Admin

Concrete
Concrete
Concrete
Concrete

Road
Road
Road
Road

surfacing,
surfacing,
surfacing,
surfacing,

Task / Description
Kerbs or Side Haunches
150mm thick
200mm thick
300mm thick

Slow
2.7
2.3
1.5
1.1
1.7
1.6
-
-
-
0.9
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

Ave
-
-
-
-
-
-
0.3
0.2
2.5
1.3
1.0
10.5
2.5
6.2
4.5
5.0
5.5
3.5
7.7
5.8
6.2
7.1
6.6
5.8
8.3

Fast Units
4.2 m2/hr
2.7 m2/hr
2.3 m2/hr
1.5 m2/hr
2.8 m2/hr
1.9 m2/hr
- m2/hr
- m2/hr
- m2/hr
1.9 m2/hr
1.2 m2/hr
- m2/hr
- m2/hr
- m/hr
- m/hr
- m/hr
- m/hr
- m/hr
- m/hr
- m/hr
- m/hr
- m/hr
- no/hr
- no/hr
- no/hr

Slow
-
-
-
-

Ave
0.4
12.5
7.7
6.7

Fast Units
- m3/hr
- m2/hr
- m2/hr
- m2/hr

Rule of Thumb
Posted Thu, 2011-07-14 13:43 by PP Admin

Rule of Thumb
Task / Description
Site Investigation Pre Drilling
Ground Excavation, Hydraulic Backhoe
Bored Piling, 25-70m deep
Formwork Fixing
Reinforcement Fixing
Concrete Placement
Scaffold Erection, Steel Falsework
Blockwork Laying
Plastering and Rendering
Blockwork Laying
Stonework Cladding
Window Glazing
Granolithic Flooring
Floor Screeding
Floor Screeding
Ceramic Wall Tiling

Slow
5.0
-
10.0
-
-
-
-
-
-
7.0
-
-
-
-
-
-

Ave
4.0
50.0
8.0
12.0
0.7
16.0
140.0
7.0
12.0
12.0
5.1
1.5
4.5
4.5
60.0
1.5

Fast Units
3.0 days/no
- m3/day
6.0 days/no
- m2/day
- Tonnes/day
- m3/day
- m3/day
- m2/day
- m2/day
17.5 m2/day
- m2/day
- m2/hr
- m2/hr
- m2/hr
- m2/day
- m2/hr

Lift Installation
Posted Sat, 2009-03-07 13:45 by PP Admin

Lift Installation
Sequence of Work
A standard installation sequence for a "conventional hydraulic lift with 2 - 3 storeys and doors etc.
Handover of lift shaft structure and associated lift machine room.
Deliver all materials to site, 2 weeks.
Hoisting of machine roof equipment, setting out and plumbing, pit channel, car brackets and guide rails, 10 days.
Hoist in hydraulic arm, piping, lift shaft trunking and conduits etc and wiring of lift shaft, 9 days.

Positioning of motor control room equipment, machine room trunking and conduits and machine room wiring etc, 13 day
Install sill angles and architraves etc, landing grouting done by others and landing doors, 9 days.
Partially dismantle lift shaft scaffolding and install pit equipment, 5 days.

Install car frame and platform, car wall panels and ceiling, car door operators and wiring of lift car, 14 days.
Architectural finishing stop work period, to install external glazing (if any) complete landing finishes and lift shaft final BS
detectors etc, 12 days.
Lift machine room PowerOn required.
Initial tuning and adjustments, 7 days.
Final tuning and adjustments, 7 days.
Submission of Form 5 to EMSD.
Interface testing with other contractors, carried out at later state (coordinated with others), duration of 6 days.
Final test and commissioning with client and handover, 2 days.

Procurement

Lifts are long lead items - from 12 weeks for a standard lift and considerably longer (1 to 1.5 years) for specially designe
installations

Installation Periods
Therefore, the overall duration of the installation, including delivery, architectural finishes, by others,
submission etc...
Rule Of Thumb
Upto 8 storeys=12 - 16 weeks
Upto 15 storeys=16 - 24 weeks
More Accurately
2 to 3 storey installation = 3 wks/level
4 storeys and above =2 wks/level
Test & Commissioning
Rule of thumb, allow 2 weeks plus 1 day per lift per storey.
Lift Installation
Task / Description
Hydraulic Lift, Install 2 to 3 storeys
Hydraulic Lift, Install 4 storeys and above
Hydraulic Lift, Testing allow 2 wks plus

Standard Lift, Manufacture, test and deliver


Non-Standard Lift, Manufacture, test and deliver

Lift Erection Schedule


Posted Sat, 2009-04-04 12:05 by PP Admin

Please find below the sequence or erection of a Lift..:


1. Site Survey of Lift Shaft
2. Installation of Rails
3. Installation of Door Frames
4. Installation of Outside Doors, Indicators and push buttons
5. Assembly of Cabin
6. Installation of Motor
7. Main Cable Installation, Connection to BMS if applicable.
8. Testing
9. Complete Installation of Interior Finishes
10. Balancing and Commissioning
These are the basic steps, other requirements will apply per specifications.

Slow
-
-
-

Ave
3.0
2.0
1.0

Fast Units
- wks/floor
- wks/floor
- day/floor

-
75.0

12.0
65.0

- wks
52.0 wks

Floor Finishes
Posted Fri, 2011-07-15 05:43 by PP Admin

Floor Finishes
Task / Description
Granolithic Flooring
Terrazzo Flooring, in-situ
Terrazzo Flooring, pre-cast
Mosaic Tiling, 0.045x0.045m
Clay, quarry Tiles, small areas, much cutting
Clay, quarry Tiles, large areas, little cutting
Raised Floor System
Linolium/Thermo-Plastic Flooring
Thermo-Plastic Floor Tiles
Wood Block Flooring, lay blocks
Wood Block Flooring, sand and polish
Carpeting, Underlay & Gripper
Carpeting, Adhesive Fixing
Carpeting, Fully Fitted
Hardboard Sheeting Coverings, small areas
Hardboard Sheeting Coverings, large areas
Floor Sheeting Coverings, Lay Lino

Slow Ave Fast Units


- 3.1
- m2/hr
- 3.6
- m2/hr
- 4.6
5.1 m2/hr
- 1.5
2.2 m2/hr
- 0.8
1.1 m2/hr
- 2.2
2.8 m2/hr
- 2.6
- m2/hr
- 3.1
5.0 m2/hr
- 3.3
5.6 m2/hr
- 1.5
2.1 m2/hr
- 3.1
- m2/hr
- 5.6
6.1 m2/hr
- 3.5
4.2 m2/hr
- 2.0
2.8 m2/hr
- 3.7
4.1 m2/hr
- 6.6
7.2 m2/hr
- 9.5 10.5 m2/hr

Painting & Decorations


Posted Mon, 2009-07-13 08:56 by Oliver Melling

Painting
Task / Description
Prepare Walls
Prepare Doors
Prepare Door Frames
Burn Off / Heat Strip Paintwork
Internal Timber, 1 coat primer before fixing, generally
Internal Timber, 1 coat primer before fixing, timber lengths
Internal Timber, knot, 1 primer, stop, 1 undercoat, 1 gloss
Internal Timber, touchup primer, 1 undercoat, 1 coat gloss
Internal Timber, polyurethane varnish, 2 coats
Internal Timber, polyurethane varnish, 3 coats
Internal Timber, linseed oil to hardwood, 2 coats
External Timber, windows and frames
External Timber, knot, 1 primer, 2 undercoats, 1 coat gloss,
External Timber, touchup primer, 2 undercoats, 1 coat gloss,
External Timber, 2 coats wood preservative
External Timber, 3 coats polyurethane varnish
Internal Walls, 2 coats emulsion to plaster
Internal Walls, 2 coats emulsion to brick/blockwork
Internal Walls, 1 mist, 2 coats emulsion to plaster
Internal Walls, 1 mist, 2 coats emulsion to brick/blockwork
Internal Walls, 1 primer, 1 undercoat, 1 gloss to plaster
Internal Walls, undercoat to door frame
Internal Walls, gloss to door frame
Internal Walls, undercoat to door
Internal Walls, gloss to door
External Walls, 2 coats sandtex to render/concrete
External Walls, 2 coats sandtex to brick/blockwork
External Walls, 1 sealer, 2 emulsion to render/concrete
External Walls, 1 sealer, 2 emulsion to brick/blockwork
Floors, epoxy paint
Ceilings, emulsion paint, 2 coats
Ceilings, emulsion paint, 3 coats
Ceilings, textured paint
Ceilings, artex finish
Internal Steelwork, 1 primer, 1 undercoat, 1 gloss
External Steelwork, 1 primer, 2 undercoats, 1 gloss
Guttering Steelwork, 1 coat primer, 2 undercoats, 1 gloss

Ceilings

Posted Mon, 2009-07-13 09:20 by Oliver Melling

Emulsion paint
- 2 coat 6.05 m2/hr
- 3 coats 5.02 m2/hr
Textured paint 4.20 m2/hr
Artex 4.10 m2/hr

Externally
Posted Mon, 2009-07-13 09:23 by Oliver Melling

One coat primer, 2 undercoats, 1 gloss 1.70 m2/hr


As above to steel stanchions and beams 0.90 m2/hr
As above to balustrades, railings etc 1.00 m2/hr
As above to gutter and downpipes etc 2.50 m/hr

Internally
Posted Mon, 2009-07-13 09:22 by Oliver Melling

One coat primer, 1 undercoat, 1 gloss 2.40 m2/hr


As above to steel stanchions and beams 1.30 m2/hr
As above to balustrades, railings etc 1.40 m2/hr

Internally
Posted Mon, 2009-07-13 09:05 by Oliver Melling

(Rates per coat unless stated otherwise)


One coat primer, before fixing generally 6.70 m2/hr
One coat primer, before fixing lengths 20.0 m/hr
Knot, 1 primer, stop, 1 undercoat, 1 gloss 1.75 m2/hr
Touchup primer, 1 undercoat, 1 coat gloss 3.10 m2/hr
Polyurethane varnish - 2 coats 3.30 m2/hr, - 3 coats 2.20 m2/hr
Linseed Oil to Hardwood, 2 coats 3.30 m2/hr

Externally
Posted Mon, 2009-07-13 09:13 by Oliver Melling

2 coats sandtex etc


- to render/concrete 2.50 m2/hr
- to brick/blockwork 2.00 m2/hr
1 sealer, 2 emulsion
- to render/concrete 2.00 m2/hr
- to brick/blockwork 1.70 m2/hr

Slow
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1.3
0.9
-

Ave
14.2
12.5
25.0
1.1
6.7
20.0
1.7
3.1
3.3
2.2
3.6
2.4
1.5
2.0
4.0
2.0
8.0
6.0
6.0
4.5
2.3
20.0
16.5
7.1
6.2
2.5
2.0
2.0
1.7
2.9
6.1
5.0
4.2
4.1
2.4
1.7
2.5

Fast Units
- m2/hr
- m2/hr
- m/hr
- m2/hr
- m2/hr
- m/hr
2.1 m2/hr
3.8 m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m/hr
- m/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m2/hr
- m/hr

Soft Landscaping
Posted Sun, 2009-02-08 11:57 by Technical Develop...

Soil
Spread topsoil, prepare for turf/seeding = 2.5 m2/hr Spread fertilizer and rake in = 25.0
m2/hr
Planting
Hedges or Shrubs, ne 750 mm high = 4.0 no/hr Hedges or Shrubs, exc 750 m high = 1.5
no/hr Saplings, ne 3.0 m high = 1.7 hrs/no
Turfing
Typical rate including minor preparations = 135 m2/day
Landscaping
Task / Description
Top Soil, spread, level and prepare for turf or seeding
Top Soil, rake in fertilizer for seeding
Planting, Shrubs and Hedges, under 750mm high
Planting, Shrubs and Hedges, over 750mm high
Planting, Saplings, under 3.0m high
Turfing, including for minor preparations

Slow
-
-
-
-
-
-

Ave
2.5
25.0
4.0
1.5
1.7
16.8

Fast Units
- m2/hr
- m2/hr
- no/hr
- no/hr
- no/hr
- m2/hr

Stone Cladding
Posted Sat, 2009-02-07 16:28 by Technical Develop...
External Stone Walls Various stone finishes are available...

Polished / Tooled= Highly reflective finish. The full colour and grain of the stone becomes visible
good weather and chemical protection.
Honed= Very smooth finish without reflections to show the full colour of the stone.

Flamed= Produced by applying a high-temperature flame to the surface ofthe stone. This flame f
textured finish.
Sequence of operations...

Each wall stone is individually numberd to correspond to theshop drawings. The setting out line is es
installed in accordance with the initial setting out line. Prior to drilling a cover meter is employed to c
Each stone is individually supported and restrained.
Typical wall panel size 0.75 m2/stone.
Stones 0.5 m2 and under = 14 no/day
Stones 0.75 m2 and under = 12 no/day
Stones 0.75 - 1.00 m2 = 10 no/day
Flat Stone walls - Simple = 9.0 m2/day
Flat Stone walls - Average = 5.1 m2/day
Flat Stone Walls - V. Complex = 1.8 m2/day
Curved Wall cladding = 8.0 m2/day
Edge Beams/Window edges = 2.3 m2/day
Stone soffits = 4.0 m2/day
A cladding team consists of 1 fixer and 1 mate.
Task / Description
Fix 0.5m2 Stones to Metal Support Frame
Fix 0.5-0.75m2 Stones to Metal Support Frame
Fix 0.75-1.0m2 Stones to Metal Support Frame
Fix Complex Stonework to Metal Support Frame
Fix Curved Stone Cladding
Fix Stone Edge Beams/Window Reveals
Fix Stone Soffits
Stone Floors
Granite Wall Panels, First Fix
Granite Wall Panels, Second Fix

Slow
5.6
7.2
6.9
-
6.9
-
-
6.9
-
-

Ave
7.0
9.0
8.7
1.8
8.0
2.3
4.0
10.4
1.3
1.1

Fast Units
7.8 m2/day
10.1 m2/day
9.7 m2/day
- m2/day
9.2 m2/day
3.2 m2/day
- m2/day
12.2 m2/day
- m2/hr
- m2/hr