You are on page 1of 26

x x

x x

x x

Ratio (percentage) of Projected

Projected available balance


- % of total demand in IO
plan
Carrying Cost value
(functional currency)
Carrying Cost value in IO
plan (functional currency)
Carrying Cost value
(reporting currency)
Carrying Cost value in IO
plan (reporting currency)

Inventory
Analysis

x x

x x

x x

x x

x x
x

Supplies pegged to excess

The quantity of supplies pegged to


excess demand

x x

Stock outs

Number of times projected available


balance is expected to be negative

x x

x x

Projected avalable balance - Projected Available Balance - quantity


measured as percentage of required
% of safety stock in IO plan safety stock.
Fill rate

Fill rate of the end demands based on


quantity satisfied on time (for ASCP,
SRP, DRP, SNO plans)

Service Level

Service Level (achieved) based on


quantity satisfied on time (only in case
of IO plans)

Inventory turns

Ratio of annualized cost of goods sold


to average projected available balance

x
x x

x x
x

x x

Collections

x
x

Carrying cost value in reporting


currency

Projected avalable balance - Projected Available Balance - quantity


measured as percentage of required
% of safety stock
safety stock.

SNO

x x
x

Carrying cost value in functional


currency
Carrying cost value in reporting
currency

x x
x

Ratio (percentage) of Projected


Available Balance (quantity) to total
demand in the plan
Carrying cost value in functional
currency

x x
x

Projected available balance


Available Balance (quantity) to
- days of cover in IO plan
average demand in the plan

Projected available balance Ratio (percentage) of Projected


Available Balance (quantity) to total
- % of total demand
demand in the plan

x x
x

Projected Available Balance - quantity

Projected available balance Ratio (percentage) of Projected


Available Balance (quantity) to
- days of cover
average demand in the plan

SRP

Projected Available Balance value in


reporting currency
Projected Available Balance - quantity

x x

Primary

Projected Available Balance value in


reporting currency

IO

x x

Organization, Item, Time)


Projected Available Balance value in
functional currency (Related
dimensions: Scenario, Plan,
Organization, Item, Time)

Calculated

Projected available balance


- value in IO plan
(functional currency)
Projected available balance
- value (reporting
currency)
Projected available balance
- value in IO plan
(reporting currency)
Projected available balance
- units
Projected available balance
- units in IO plan

DRP

Projected Available Balance value in

Projected available balance functional currency (Related


- value (functional currency) dimensions: Scenario, Plan,

ASCP

Measures

Relevant in Plan types

Demantra

Work area

Additional Measure
Description
Note: At the end of every
description add: "(Related
dimensions: a,b,c,d)" where
a,b,c,d are the conforming
dimensions from columns O
to AB where there is an "x"
mark for this measure. See
the example in the first row
below.

Overall Plan
Health

Inventory turns in IO plan

Ratio of annualized cost of goods sold


to average projected available balance

Total Supply

Sum of all supplies

Total Demand

Sum of all demands

Planned Orders

Recommended planned order quantity

x x
x x
x x

x x
x x
x

Scheduled Receipts

Scheduled Receipt quantity from


current open supplies

x x

Onhand

Beginning onhand

x x

Onhand in IO plan

Beginning onhand

Minimum Inventory Level

Minimum inventory level

Maximum Inventory Level

Maximum inventory level

Safety stock

Safety stock quantity

Safety stock in IO plan

Safety stock quantity

Order Quantity

Order quantity

Order Quantity in IO plan

Order quantity

Exceptions - Count

Exceptions - Count

x x

Exceptions - Value
(functional currency)
Exceptions - Value
(reporting currency)

Exceptions - Value in functional


currency

x x

Exceptions - Value in reporting


currency

x x

Exceptions - Days

Exceptions - Days

x x

Exceptions - Quantity

Exceptions - Quantity

x x

Exceptions - Ratio

Exceptions - Quantity

x x

Safety Stock violations

Number of times the inventory fell


below safety stock

x x

Use Alternate Sources


(count)
Use Alternate Suppliers
(count)
Planned Orders within
Planning Time Fence
Planned Orders exceeding
Order Modifiers
Planned Orders created
before work orders

Number of times alternate sources


were recommended

x x

Number of times alternate suppliers


were recommended

x x

Number of planned orders within the


planning time fence
Number of planned orders with
quantity more than order modifier
quantity
Number of planned orders created
before an existing work order

x x

x x

x x

Planned Orders

Planned order quantity

x x

Independent Dem Qty

End demand quantity

x x

Dependent Dem Qty

Intermediate demand quantity

x x

Items with no activity

Number of items with no activity

x x

x x

x x

x x

x x

x x

Avg Qty of supply pegged


to a demand
Avg Qty of supply pegged
to highest priority dem
Late Demand Satisfaction
factor
Production to plan
Shipments to plan

Demand lateness measured as


quantity of end demands unmet on
due date times the number of days
late
Percentage of actual production to
planned production
Percentage of actual shipments to
planned shipments

x x
x

x x

x
x x

Obsolete inventory - value

Obsolete inventory % of
total inventory

Excess inventory value

Excess inventory - % of
total inventory

Total Supply Chain costs


(functional currency)

Sum of manufacturing, purchasing,


transportation and carrying costs in
functional currency

Total Supply Chain costs


(functional currency) in IO
plan

Sum of manufacturing, purchasing,


transportation and carrying costs in
functional currency

Total Supply Chain costs


(reporting currency)

Sum of manufacturing, purchasing,


transportation and carrying costs in
reporting currency

Total Supply Chain costs


(reporting currency) in IO
plan

Sum of manufacturing, purchasing,


transportation and carrying costs in
reporting currency

Total Supply Chain costs % of revenue

Ratio (percentage) of the sum of


manufacturing, purchasing,
transportation and carrying costs to
the total revenue

Total Supply Chain costs % of revenue in IO plan

Ratio (percentage) of the sum of


manufacturing, purchasing,
transportation and carrying costs to
the total revenue

Carrying Cost (functional


currency)

Carrying cost value in functional


currency

Carrying Cost (functional


currency) in IO plan

Carrying cost value in functional


currency

Carrying Cost (reporting


currency)

Carrying cost value in reporting


currency

Carrying Cost (reporting


currency) in IO plan

Carrying cost value in reporting


currency

Excess,
Variance of PAB over mean
Obselescence
and risk
Manufacturing cost
management (functional currency)
Manufacturing cost
(functional currency) in IO
plan
Manufacturing cost
(reporting currency) in IO
plan

x x

x x
x

x x

x
x x

x
x x

x
x

x x
x

x x

x
x

x x
x

x x

x x
x
x

Manufacturing cost value in functional


currency

x x

Manufacturing cost value in functional


currency
Manufacturing cost value in reporting
currency

Manufacturing cost
(reporting currency)

Manufacturing cost value in reporting


currency

Purchasing cost (functional


currency)

Purchasing cost value in functional


currency

Purchasing cost (functional


currency) in IO plan

Purchasing cost value in functional


currency

Purchasing cost (reporting


currency)

Purchasing cost value in reporting


currency

Purchasing cost (reporting


currency) in IO plan

Purchasing cost value in reporting


currency

Transportation cost
(functional currency)

Transportation cost value in functional


currency

Transportation cost
(functional currency) in IO
plan

Transportation cost value in functional


currency

x x
x

x x

x x
x

x x

x x
x

x x

x x
x

x x

x x
x

Transportation cost
(reporting currency)
Transportation cost
(reporting currency) in IO
plan
Resource cost in functional
currency
Resource cost in reporting
currency

Transportation cost value in reporting


currency

x x

Transportation cost value in reporting


currency

x x
x

Resource cost value in functional


currency

Resource cost value in reporting


currency

Revenues (functional
currency)

Revenues (in funcutional currency)

Revenues (functional
currency) in IO plan

Revenues (in funcutional currency)

Revenues (reporting
currency)

Revenues (in reporting currency)

Revenues (reporting
currency) in IO plan

Revenues (in reporting currency)

Revenues (functional
currency) - Cum

Cumulative Revenues (in funcutional


currency)

Revenues (functional
currency) in IO plan - Cum

Cumulative Revenues (in funcutional


currency)

Revenues (reporting
currency) - Cum

Cumulative Revenues (in reporting


currency)

Revenues (reporting
currency) in IO plan - Cum

Cumulative Revenues (in reporting


currency)

Gross Margin %

Gross margin (percentage)

Gross Margin % in IO plan

Gross margin (percentage)

Cum Gross Margin %

Cumulative Gross margin


(percentage)

Cum Gross Margin % in IO


plan
Gross Margin (functional
currency)
Gross Margin (functional
currency) in IO plan
Gross Margin (reporting
currency)
Gross Margin (reporting
currency) in IO plan
Gross Margin (functional
currency) - Cum
Gross Margin (functional
currency) in IO plan - Cum
Gross Margin (reporting
currency) - Cum
Gross Margin (reporting
currency) in IO plan - Cum

Cumulative Gross margin


(percentage)

Total Supply Chain costs


(functional currency)

Sum of manufacturing, resource,


purchasing, transportation and
carrying costs in functional currency

Total Supply Chain costs in


IO plan (functional
currency)

Sum of manufacturing, resource,


purchasing, transportation and
carrying costs in functional currency

Gross margin in functional currency

x x
x
x x

x x

x x

x x
x

x x

x x
x

x x

x x
x

x x

x x
x

x x

x x
x

x x

Cumulative Gross margin in functional


currency
Cumulative Gross margin in reporting
currency

x x
x

Gross margin in reporting currency


Cumulative Gross margin in functional
currency

x x
x

Gross margin in functional currency


Gross margin in reporting currency

x x

x x
x

x x

Cumulative Gross margin in reporting


currency

x x
x

x x

x x
x

x
x
x

x
x

Total Supply Chain costs


(reporting currency)

Sum of manufacturing, resource,


purchasing, transportation and
carrying costs in reporting currency

x x

Total Supply Chain costs in Sum of manufacturing, resource,


purchasing, transportation and
IO plan (reporting currency) carrying costs in reporting currency

x x
x

Cumulative Sum of manufacturing,

Total Supply Chain costs


resource, purchasing, transportation
(functional currency) - cum and carrying costs in functional

x x

currency
Total Supply Chain costs in Cumulative Sum of manufacturing,
resource, purchasing, transportation
IO plan (functional
and carrying costs in functional
currency) - cum
currency
Cumulative Sum of manufacturing,
Total Supply Chain costs
resource, purchasing, transportation
(reporting currency) - Cum and carrying costs in reporting
currency
Total Supply Chain costs in Cumulative Sum of manufacturing,
resource, purchasing, transportation
IO plan (reporting currency) and carrying costs in reporting
- Cum
currency

x x

Total Supply Chain costs % of revenue

x x

x x
x

Carrying Cost (functional


currency)

Carrying cost value in functional


currency

Carrying Cost (functional


currency) in IO plan

Carrying cost value in functional


currency

Carrying Cost (functional


currency) - Cum

x x
x

Total Supply Chain costs % of revenue in IO plan

Carrying Cost (reporting


Supply Chain currency)
costs &
profitability Carrying Cost (reporting
currency) in IO plan

x x

Carrying cost value in reporting


currency

x x
x
x x

Carrying cost value in reporting


currency
Cumulative Carrying cost value in
functional currency

Cumulative Carrying cost value in


reporting currency

Carrying Cost (reporting


currency) in IO plan - Cum

Cumulative Carrying cost value in


reporting currency

x x
x

x x

Carrying Cost (functional


Cumulative Carrying cost value in
currency) in IO plan - Cum functional currency
Carrying Cost (reporting
currency) - Cum

x x

x x
x

x x

x x
x

Variance of PAB over mean


Manufacturing cost
(functional currency)

Manufacturing cost value in functional


currency

Manufacturing cost
(functional currency) in IO
plan

Manufacturing cost value in functional


currency

Manufacturing cost
(reporting currency)

Manufacturing cost value in reporting


currency

Manufacturing cost
(reporting currency) in IO
plan

Manufacturing cost value in reporting


currency

Purchasing cost (functional


currency)

Purchasing cost value in functional


currency

Purchasing cost (functional


currency) in IO plan

Purchasing cost value in functional


currency

Purchasing cost (reporting


currency)

Purchasing cost value in reporting


currency

x x

x x
x

x x

x x
x

x x

x x
x

x x

x x

Purchasing cost (reporting


currency) in IO plan

Purchasing cost value in reporting


currency

Resource cost in functional


currency
Resource cost in reporting
currency

Resource cost value in functional


currency

Resource cost value in reporting


currency

Transportation cost
(functional currency)

Transportation cost value in functional


currency

Transportation cost
(functional currency) in IO
plan

Transportation cost value in functional


currency

Transportation cost
(reporting currency)

Transportation cost value in reporting


currency

Transportation cost
(reporting currency) in IO
plan

Transportation cost value in reporting


currency

Manufacturing cost
Cumulative Manufacturing cost value
(functional currency) - Cum in functional currency
Manufacturing cost
(functional currency) in IO
plan - Cum

x x
x
x x

x x
x

x x

Cumulative Manufacturing cost value


in functional currency

Manufacturing cost
Cumulative Manufacturing cost value
(reporting currency) - Cum in reporting currency

x x

x x
x

x x

x x

Manufacturing cost
(reporting currency) in IO
plan - Cum

Cumulative Manufacturing cost value


in reporting currency

Purchasing cost (functional


currency) - Cum

Cumulative Purchasing cost value in


functional currency

Purchasing cost (functional


currency) in IO plan - Cum

Cumulative Purchasing cost value in


functional currency

Purchasing cost (reporting


currency) - Cum

Cumulative Purchasing cost value in


reporting currency

Purchasing cost (reporting


currency) in IO plan - Cum

Cumulative Purchasing cost value in


reporting currency

Resource cost in functional


currency - Cum
Resource cost in reporting
currency - Cum

Cumulative Resource cost value in


functional currency

Cumulative Resource cost value in


reporting currency

Transportation cost
Cumulative Transportation cost value
(functional currency) - Cum in functional currency
Transportation cost
(functional currency) in IO
plan - Cum

x
x x
x
x x

x x
x

x x

Cumulative Transportation cost value


in functional currency

Transportation cost
Transportation cost value in reporting
(reporting currency) - Cum currency

x x

x x
x

x x

x x

Transportation cost
(reporting currency) in IO
plan - Cum

Transportation cost value in reporting


currency

VMI Inventory value


(functional currency)

Projected Available Balance value (in


functional currency) of vendor
managed items

x x

VMI Inventory value


(reporting currency)

Projected Available Balance value (in


reporting currency) of vendor
managed items

x x

Ratio (percentage) of projected


available balance value in {functional
currency} of vendor managed items to
the total projected available balance of
all items.

x x

Replenishment VMI Inventory - % of total


inventory
Planning

Replenishment
Planning

Demand
Satisfaction

VMI items stockout days

Sum of stock out days of vendor


managed items

x x

VMI items service level

Fill rate of the end demands of vendor


managed items based on quantity
satisfied on time

x x

Late orders ratio (count)

Demand lateness measured as the


percentage of number of end demand
lines unmet on due date

x x

Late Orders ratio (value)

Demand lateness measured as the


percentage of value of end demand
lines unmet on due date

x x

Late Sales Orders (count)

Number of sales order lines that are


satisfied late.

x x

Late Sales Orders (days)

Number of days late of the sales


orders lines that are satisfied late.

x x

Late Sales Orders (value) - Value of sales order lines that are
satisfied late.
functional currency

x x

Late Sales Orders (value) - Value (in reporting currrency) of sales


order lines that are satisfied late.
reporting currency

x x

Late Forecasts (count)

Number of forecasts that are satisfied


late.

x x

Target Service Level

Target Service level of the end


demands.

Target Service Level in IO


plan

Target Service level of the end


demands.

Service Level

Service Level (achieved) based on


quantity satisfied on time (only in case
of IO plans)

Line Fill rate (count)

Fill rate of the end demands measured


as a percentage of number of lines
atleast partially satisfied on time

x x

x x

Perfect Order Index

Fill rate of the end demands measured


as a multiple of two factors percentage of end demands met on
time (even partial quantity) and
percentage of end demands met in full
quantity (even late)

x x

x x

Unmet Demand history

Unmet Demand quantity for the past

Unmet Demand

Unmet Demand quantity - projected

Unmet Revenue (functional Value of sales orders not satisfied by


due date (in functional currency)
currency)

x
x

x
x

x
x

x
x

x x

Unmet Revenue (functional Value of sales orders not satisfied by


due date (in functional currency)
currency) in IO plan

x x

Unmet Revenue (reporting


currency)

Value of sales orders not satisfied by


due date (in reporting currency)

Unmet Revenue (reporting


currency) in IO plan

Value of sales orders not satisfied by


due date (in reporting currency)

Past Due Backlog quantity

Backlog of unmet sales orders


measured as quantity requested less
quantity satisfied (cumulative)

x x

x x

Sales Orders beyond


acceptable date (%)

Percentage of number of sales orders


scheduled beyond acceptable date

x x

x x

Resource availibility

Resource availability measured as


resource hours x capacity units

Resource requirements

Resource requirements measured as


required hours x assigned units

Net Resource Availibility

Net Resource availability after meeting


the requirements

Cum Net Resource


Availibility

Cum Net Resource availability till date

Resource utilization %

Resource utilization as a ratio


(percentage) of resource requirements
to resource availability

The average load ratio for the

Resource Overloaded (ratio) overloaded resources


Manufacturing
Efficiency

x x

x x

Manufacturing WIP start quantity


Efficiency

Quantity of make orders that start in


this bucket.

x x

Setup time - % of total


hours

Make order frequency - measured as a


ratio (percentage) average make order
quantity to the average daily demand
in the plan
Ratio (percentage) of setup resource
hours to the total resource
requirements

Cycletime

Average cycle time taken per order

Throughput rate

Average quantity per hour

Planned mfg lead time (%


of estimate)

Average planned lead time as


percentage of estimated lead time

Avg make order qty - % of


Avg daily demand

PO reschedules - % of total Number of purchase orders


rescheduled as a percentage of the
POs
total purchase orders

x x

x x

Rescheduled Orders (days)

Total days of all Purchase orders, work


orders that are recommended to be
rescheduled

x x

x x

PO cancellations - % of
total POs

Number of purchase orders cancelled


as a percentage of the total purchase
orders

x x

x x

Supplier spend (functional


currency)

New buy order value in functional


currency

Supplier spend (reporting


currency)

New buy order value in reporting


currency

Total buy orders count

Number of new buy orders

x x

x x

Supply volume

Order Quantity of all buy and transfer


orders

x x

x x

Supplier Capacity available


(gross) in units
Supplier Capacity required in
units
Supplier Capacity available (net)
in units

x x

x x

x x

x x

x x

x x

x x

x x

Sourcing
Effectiveness

Supplier Capacity Available


Supplier Capacity Required

Supplier capacity net


available (cum)
Supplier capacity utilization Ratio (percentage) of supplier capacity
required to availability
%

Returns

x x

x
x

Buys from a non-rank-1


supplier (%)

Number of new buy orders planced on


a non-rank-1 supplier as a percentage
of total new buy orders

x x

x x

Avg buy order qty - % of


Avg daily demand

Average new buy order quantity as a


perceentage of average daily demand

x x

x x

count of items single


sourced

count of items single sourced

x x

x x

Returns (% of total sales)

Ratio (percentage) of returns to total


sales

Forecast accuracy %

Forecast Accuracy percentage

Demand priority

Demand Priority

Consensus forecast

Consensus forecast quantity

x
x

Consensus forecast - value


(functional currency)
Consensus forecast - value
(reporting currency)

Consensus forecast value in functional


currency

Consensus forecast value in reporting


currency

Cumulative consensus forecast


quantity
Sales forecast quantity

x
x

Sales Forecast - value


(functional currency)
Sales Forecast - value
(reporting currency)

Sales forecast value in {functional


currency}

Sales forecast value in reporting


currency

Sales forecast - cum

Cumulative sales forecast quantity

Marketing Forecast

Marketing forecast quantity

x
x

Marketing Forecast - value


(functional currency)
Marketing Forecast - value
(reporting currency)

Marketing forecast value in functional


currency

Marketing forecast value in reporting


currency
Cumulative marketing forecast
quantity

Consensus forecast - cum


Sales Forecast

Forecasting

Marketing forecast - cum


Budget (functional
Budget value in functional currency
currency)
Budget (reporting currency) Budget value in reporting currency
Budget (functional
Cumulative Budget value in functional
currency
currency) - Cum
Budget (reporting currency) Cumulative Budget value in reporting
currency
- Cum

x
x
x

Bookings forecast

Bookings forecast quantity

Bookings forecast - value


(functional currency)
Bookings forecast - value
(reporting currency)

Bookings forecast value in functional


currency

Bookings forecast value in reporting


currency

Final forecast

Final forecast quantity

Final forecast - value


(functional currency)
Final forecast - value
(reporting currency)

Final forecast value in functional


currency

Final forecast value in reporting


currency

Final forecast - cum

Cumulative final forecast quantity

Bookings forecast accuracy %

Booking forecast accuracy as a


percentage

Bookings forecast - cum

Cumulative booking forecast quantity

Shipment forecast

Shipment forecast quantity

x
x

Shipment forecast - value


(functional currency)
Shipment forecast - value
(reporting currency)
Shipment forecast accuracy
%

Shipment forecast value in functional


currency

Shipment forecast value in reporting


currency

Shipment forecast accuracy as a


percentage

Shipment forecast - cum

Cumulative shipment forecast quantity

Projected Backlog

Projected backlog quantity measured


as difference between shipments and
bookings forecasts

Actual Backlog

Actual backlog quantity measured as


difference between actual shipments
and bookings

Backlog

Sum of actual backlog and the


projected backlog

x
x
x

Shipment history

Actual Production history


quantity
Shipment history quantity

Shipment history - value


(functional currency)
Shipment history - value
(reporting currency)

Shipment history value in


functional currency
Shipment history value in
reporting currency

Bookings history

Bookings history - value


(functional currency)
Bookings history - value
(reporting currency)

Booking history quantity


Attained Bookings as a
percentage of Consensus
forecast
Booking history value in
functional currency
Booking history value in
reporting currency

Consensus Forecast
accuracy - MAPE - 4week

Consensus forecast accuracy measured


as Mean Absolute Percentage Error
(MAPE) over 4 weeks

Production history

Attained Bookings %

x
x
x
x
x
x
x

Consensus forecast accuracy measured


as Mean Absolute Percentage Error
(MAPE) over 8 weekss

Consensus forecast accuracy measured


Consensus Forecast
as Mean Absolute Percentage Error
accuracy - MAPE - 13 week (MAPE) over 13 weeks

Consensus Forecast
accuracy - MAPE - 8 week

Net Demand

Net effective demand measured as


maximum of actual sales order
quantity or forecast quantity

Constrained Forecast

Constrained or satisfied forecast


quantity

Constrained or satisfied forecast value


in functional currency

Constrained or satisfied forecast value


in reporting currency

Constrained Forecast value (functional currency)


Constrained Forecast value (reporting currency)

Network
Design

Cumulative constrained or satisfied


Constrained Forecast - cum forecast quantity

Constrained Forecast - Cum


value (functional currency)
Constrained Forecast - Cum
value (reporting currency)

Cumulative Constrained or satisfied


forecast value in functional currency

Cumulative Constrained or satisfied


forecast value in reporting currency

Budget Shortfall - functional Shortfall from Budget based on


constrained forecast
currency

Budget Shortfall - reporting Shortfall from Budget based on


constrained forecast
currency

Budget Shortfall %

Percent Shortfall from Budget based


on constrained forecast

Inventory Build Target

Target Inventory quantity

Manufacturing forecast

Intermediate forecast demand


including component demand and
inter-organization transfer demand

Fill rate

Fill rate of the end demands based on


quantity satisfied on time

Exception Type

Sum Last

Sum Last

Sum Last

Sum Last

Sum Last

Sum Last

Sum Last

n/a

n/a

n/a

n/a

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

n/a

n/a

n/a

n/a

Qty satisfied by due date * 100 / Total


Qty

Avg

Avg

((Qty satisfied by due date * probability)


* 100) / Total Qty

Avg

Avg

Annualized COGS / Avg PAB where


Annualized COGS = (item std cost x sum
of Indep dem qty in plan x 365) /
number of days in plan
Avg PAB = average of beginning value
and ending value of each bkt

Avg

Avg

Time Dim

Project

Order Type

Ship method

Sum Last

Source

Supplier

Customer

Item

Priority

Organization

Time

Plan

Net cum supply - demand (as per the


formula used in ASCP) [qty x standard
cost]
Net cum supply - demand (as per the
formula used in ASCP) [qty x standard
cost]
Net cum supply - demand (as per the
formula used in ASCP) [qty x standard
cost]
Net cum supply - demand (as per the
formula used in ASCP) [qty x standard
cost]
Net cum supply - demand (as per the
formula used in ASCP) [qty ]
Net cum supply - demand (as per the
formula used in ASCP) [qty ]
Net cum supply - demand (as per the
formula used in ASCP) [qty / Avg Daily
Demand for the item in the plan]
Net cum supply - demand (as per the
formula used in ASCP) [qty / Avg Daily
Demand for the item in the plan]
Net cum supply - demand (as per the
formula used in ASCP) [qty / Total
Demand in the bucket]
Net cum supply - demand (as per the
formula used in ASCP) [qty / Total
Demand in the bucket]
Avg PAB [average of beginning value and
ending value of each bkt] x Item carrying
cost
Avg PAB [average of beginning value and
ending value of each bkt] x Item carrying
cost
Avg PAB [average of beginning value and
ending value of each bkt] x Item carrying
cost
Avg PAB [average of beginning value and
ending value of each bkt] x Item carrying
cost
Sum [pegged qty of all supplies pegged to
excess]
Exceptions - Count where exception type
= "Items with a shortage"
Net cum supply - demand (as per the
formula used in ASCP) [qty / Beginning
safety stock in the bucket]
Net cum supply - demand (as per the
formula used in ASCP) [qty / Beginning
safety stock in the bucket]

Resource

Scenario

Demand class

Meaning

All Dims except Time

Aggreg
rules

Conforming Dimensions

Avg

Sum of all supplies qty

Sum Sum

Sum of all demands qty

Sum Sum

Sum of all Planned Order qty

Sum Sum

Sum of (work orders, purchase orders,


purchase requisitions, intransit shipment,
intransit receipt and PO in receiving)

Sum Sum

Onhand order quantity

Sum Sum

Onhand order quantity

Sum Sum

Sum Last

Sum Last

Safety stock qty for the bucket

Sum Last

Safety stock qty for the bucket

Sum Last

x Sum Sum

x Sum Sum

Refer the "exceptions" worksheet

x Sum Sum

Refer the "exceptions" worksheet

x Sum Sum

Refer the "exceptions" worksheet

x Sum Sum

Refer the "exceptions" worksheet

x Sum Sum

Refer the "exceptions" worksheet

x Sum Sum

Refer the "exceptions" worksheet

x Avg

Sum Sum

Sum Sum

Sum Sum

Sum Sum

x Sum Sum

x Sum Sum

Minimum Inventory Level IF mrp planned


- (NVL(IO output, item attrib) else user
entered SS
Maximum Inventory Level (NVL(level,
item attrib)

Sum of order quantity of individual order


types
Sum of order quantity of individual order
types

Exceptions - Count where exception type


= "Items below safety stock"
Exceptions - count where exception type
= "Order sourced from alternate facility")
Exceptions - count where exception type
= "Order sourced from alternate
supplier")
Planned Orders count where order date <
Planning Time Fence of the item
Planned Orders count where order qty >
Order Modifiers
Planned Orders count where order date <
earliest work order date
Order qty of planned orders
Qty of independent demands (use the
current formula in ASCP)
Qty of dependent demands (use the
current formula in ASCP)
Count of items with the exception "Items
with no activity"
Out of scope. Needed only for internal QA
use.
Out of scope. Needed only for internal QA
use.
For all late replenishment for SO/Fcst
exceptions sum (qty not satisfied by due
date x days late)
(production history qty / Total Make order
quantity) * 100
(shipment history qty / Total Independent
Demand qty scheduled to be shipped ) *
100

Annualized COGS / Avg PAB where


Annualized COGS = (item std cost x sum
of Indep dem qty in plan x 365) /
number of days in plan
Avg PAB = average of beginning value
and ending value of each bkt

Avg

Avg

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

n/a

n/a

n/a

n/a

Sum Sum

Future use
project.
Future use
project.
Future use
project.
Future use
project.

. Out of scope for current

Sum Sum

n/a

Sum Sum

Sum Sum

Manufacturing cost + Purchasing cost +


Transportation cost + Carrying cost

Sum Sum

Manufacturing cost + Purchasing cost +


Transportation cost + Carrying cost

Sum Sum

Manufacturing cost + Purchasing cost +


Transportation cost + Carrying cost

Sum Sum

Manufacturing cost + Purchasing cost +


Transportation cost + Carrying cost

Sum Sum

[Manufacturing cost + Purchasing cost +


Transportation cost + Carrying
cost]*100 / Revenue

n/a

n/a

[Manufacturing cost + Purchasing cost +


Transportation cost + Carrying
cost]*100 / Revenue

n/a

n/a

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

. Out of scope for current


. Out of scope for current
. Out of scope for current

No change. Use the current formula used


in ASCP (applying the item attribute as a
% on the cost of average inventory).
No change. Use the current formula used
in ASCP (applying the item attribute as a
% on the cost of average inventory).
No change. Use the current formula used
in ASCP (applying the item attribute as a
% on the cost of average inventory).
No change. Use the current formula used
in ASCP (applying the item attribute as a
% on the cost of average inventory).
Out of scope. Sum [(each value - mean
for the level)^2] / Number of level values
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory)
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory)
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory)
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory)
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).

n/a

No change. Use the current formula used


in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
SNO output. This represents the resource
cost.
SNO output. This represents the resource
cost.
Revenues from expected sales = Sum of
(Independent demand qty * (list price discount)) [Currently already calculated in KPIs
by engine]

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Revenues from expected sales = Sum of


(Independent demand qty * (list price discount)) [Currently already calculated in KPIs
by engine]

Sum Sum

Revenues from expected sales = Sum of


(Independent demand qty * (list price discount)) [Currently already calculated in KPIs
by engine]

Sum Sum

Revenues from expected sales = Sum of


(Independent demand qty * (list price discount)) [Currently already calculated in KPIs
by engine]

Sum Sum

Revenues from expected sales = Sum of


(Independent demand qty * (list price discount)) [Currently already calculated in KPIs
by engine]

Sum Sum

Revenues from expected sales = Sum of


(Independent demand qty * (list price discount)) [Currently already calculated in KPIs
by engine]

Sum Sum

Revenues from expected sales = Sum of


(Independent demand qty * (list price discount)) [Currently already calculated in KPIs
by engine]

Sum Sum

Revenues from expected sales = Sum of


(Independent demand qty * (list price discount)) [Currently already calculated in KPIs
by engine]

Sum Sum

(Revenue - Total cost)*100 / Revenue

Sum Sum

(Revenue - Total cost)*100 / Revenue

Sum Sum

Sum Sum

Sum Sum

Revenue - Total cost

Sum Sum

Revenue - Total cost

Sum Sum

Revenue - Total cost

Sum Sum

Revenue - Total cost

Sum Sum

Cum Revenue - Cum Total cost

Sum Sum

Cum Revenue - Cum Total cost

Sum Sum

Cum Revenue - Cum Total cost

Sum Sum

Cum Revenue - Cum Total cost

Sum Sum

Sum Sum

Sum Sum

(Cum Revenue - Cum Total cost)*100 /


Cum Revenue
(Cum Revenue - Cum Total cost)*100 /
Cum Revenue

Manufacturing cost + Purchasing cost +


Resource cost + Transportation cost +
Carrying cost
Manufacturing cost + Purchasing cost +
Resource cost + Transportation cost +
Carrying cost

Manufacturing cost + Resource cost +


Purchasing cost + Transportation cost +
Carrying cost
Manufacturing cost + Resource cost +
Purchasing cost + Transportation cost +
Carrying cost
Manufacturing cost + Resource cost +
Purchasing cost + Transportation cost +
Carrying cost
Manufacturing cost + Resource cost +
Purchasing cost + Transportation cost +
Carrying cost
Manufacturing cost + Resource cost +
Purchasing cost + Transportation cost +
Carrying cost
Manufacturing cost + Resource cost +
Purchasing cost + Transportation cost +
Carrying cost
[Manufacturing cost + Purchasing cost +
Transportation cost + Carrying
cost]*100 / Revenue
[Manufacturing cost + Purchasing cost +
Transportation cost + Carrying
cost]*100 / Revenue
No change. Use the current formula used
in ASCP (applying the item attribute as a
% on the cost of average inventory).
No change. Use the current formula used
in ASCP (applying the item attribute as a
% on the cost of average inventory).
No change. Use the current formula used
in ASCP (applying the item attribute as a
% on the cost of average inventory).
No change. Use the current formula used
in ASCP (applying the item attribute as a
% on the cost of average inventory).
No change. Use the current formula used
in ASCP (applying the item attribute as a
% on the cost of average inventory).
No change. Use the current formula used
in ASCP (applying the item attribute as a
% on the cost of average inventory).
No change. Use the current formula used
in ASCP (applying the item attribute as a
% on the cost of average inventory).
No change. Use the current formula used
in ASCP (applying the item attribute as a
% on the cost of average inventory).
Out of scope. Sum [(each value - mean
for the level)^2] / Number of level values
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory)
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory)
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory)
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory)
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

No change. Use the current formula used


in ASCP (apply the item attribute as a %
on the cost of average inventory).
SNO output. This represents the resource
cost.
SNO output. This represents the resource
cost.
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory)
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory)
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory)
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory)
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
SNO output. This represents the resource
cost.
SNO output. This represents the resource
cost.
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).
No change. Use the current formula used
in ASCP (apply the item attribute as a %
on the cost of average inventory).

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Projected Available Balance of VMI items

Sum Last

Projected Available Balance of VMI items

Sum Last

Projected Available Balance of VMI items


* 100 / Projected Available Balance of all
items

Sum Last

Sum of number of days (exception to-date


- from-date) for which the exceptions
x
"Items with a shortage" exist for all VMI
items
For VMI items - ((Qty satisfied by due
x
date * probability) * 100) / Total Qty

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Target Service Level of the end demands

min

min

Target Service Level of the end demands

min

min

((Qty satisfied by due date * probability)


* 100) / Total Qty

n/a

n/a

Count of independent demands where


atleast part qty is met by due date /
Count of all independent demands

n/a

n/a

% of independent demands met on time


*
% of independent demands met in-fullqty

Sum Sum

Consensus forecast - Shipment history

Sum Sum

Consensus forecast - Constrained forecast

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Total hours available [hours x units]

Sum Sum

Total hours required [hours x units]

Sum Sum

Sum Sum

Sum Last

Resource requirements * 100 / Resource


availability

n/a

n/a

Exceptions - ratio where exception type =


"Resource Overloaded"

Avg

Avg

Number of demand lines with Late


replenishment exceptions / Total number
of Independent demand lines
Value (qty * price) of demand lines with
Late replenishment exceptions / Total
value of Independent demand lines
Exceptions - Count where exception type
= "Late replenishment for sales order"
Exceptions - days where exception type =
"Late replenishment for sales order"
Exceptions - value where exception type
= "Late replenishment for sales order"
Exceptions - value (in reporting currency)
where exception type = "Late
replenishment for sales order"
Exceptions - Count where exception type
= "Late replenishment for forecast"

Sum (Qty * (list price - discount)) of


unmet sales order quantity (total quantity
- satisfied by due date)
Sum (Qty * (list price - discount)) of
unmet sales order quantity (total quantity
- satisfied by due date)
Sum (Qty * (list price - discount)) of
unmet sales order quantity (total quantity
- satisfied by due date)
Sum (Qty * (list price - discount)) of
unmet sales order quantity (total quantity
- satisfied by due date)
Cum Qty of open sales orders where
scheduled ship date < sysdate (date of
current bucket)
(Count of sales orders with scheduled
date > latest acceptable date *100) /
Count of sales orders

Resource Availability - Resource


Requirements
Cumulative total of net resource
availability

Sum Sum

Avg

Avg

n/a

n/a

n/a

n/a

Sum of all make order qty (all types of


workorders and make planned orders)
based on WIP start date
(Sum of all make orders (all types of
workorders and make planned orders)
quantity)/Number of Orders)*100) / Avg
Daily Demand
Resource hours (setup) * units * 100 /
Total resource hours * units
Time taken in hours (start time to end
time) for all work orders and make
planned orders / Number of orders
Qty of work orders and make planned
orders / Number of hours of resource
requirements
Actual leadtime (due - start) of all make
orders (all work orders, planned make
orders) * 100 / Estimate of item leadtime

Avg

Avg

Avg

Avg

Avg

Avg

Avg

Avg

Avg

Avg

Sum Sum

Count of rescheduled POs * 100 / Total


number of POs (exclude Requisitions?)

Exceptions - days where exception types


in ("Orders to be rescheduled in" and
"Orders to be rescheduled out")

Count of cancelled POs * 100 / Total


number of POs (exclude Requisitions?)

Sum Sum

Value of buy orders, incl external POs,


external Reqs, New buy planned orders
(using order date) = qty * price [For price
use NVL(ASL price, (List-pricediscount) ] . Out of Scope

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum Sum

Sum First

Avg

Avg

n/a

n/a

Avg

Avg

Avg

Avg

Avg

Avg

Consensus forecast

sum sum

Consensus forecast - value

sum sum

Consensus forecast - value

sum sum

Value of buy orders, incl external POs,


external Reqs, New buy planned orders
(using order date) = qty * price [For price x
use NVL(ASL price, (List-price-discount) ].
Out of Scope
Count of buy orders, incl external POs,
External Reqs, New buy planned orders
x
(using order date)
Order Quantity of all buy & transfer
orders, incl all POs, all Reqs, New buy
x
planned orders (using order date) and
transfer planned orders (using order date)
Units of available capacity
Required capacity in units based on
detailed supplier requirements
Cum of (Supplier Capacity Available Supplier Capacity Required)
Supplier Capacity Required * 100 /
Supplier Capacity Available
(Count of buy planned orders with the
exception "Order sourced from alternate
supplier" * 100) / Total number of buy
planned orders
Qty of all buy orders (POs, Reqs, buy
planned orders) quantity * 100 / Avg
Daily Demand
Count of items with not more than one
supplier (based on sourcing rules for the
current assignment set)
Value of return orders (qty * price) * 100
/ Value of Sales Orders (by order date)
(Shipment history / Consensus Forecast)
* 100

Sum Sum
Sum Sum

Sum Sum

Demand Priority

n/a

Sales forecast

sum sum

Sales forecast - value

sum sum

Sales forecast - value

sum sum

Sales forecast - cum

n/a

Marketing Forecast

sum sum

Marketing Forecast - value

sum sum

Marketing Forecast - value

sum sum

Mktg forecast - cum

n/a

Budget value

sum sum

Budget value

sum sum

Budget value

sum sum

Budget value

sum sum

Bookings forecast

sum sum

Bookings forecast - value

sum sum

Bookings forecast - value

sum sum

Final forecast

sum sum

Final forecast - value

sum sum

Final forecast - value

sum sum

Final forecast - cum

n/a

n/a

(Booking forecast * 100) / Booking


history

avg

avg

Bookings forecast - cum

n/a

n/a

Shipment forecast

sum sum

Shipment forecast - value

sum sum

Shipment forecast - value

sum sum

(Shipment forecast * 100) / Shipment


history

avg

avg

Shipment forecast - cum

n/a

n/a

Projected backlog (difference between


shipments and bookings)

sum sum

Actual backlog (difference between


shipments and bookings)

sum sum

Actual backlog + Projected backlog

sum sum

Actual Production history

Shipment history

sum sum

Shipment history - value

sum sum

Shipment history - value

sum sum

Bookings history

sum sum

(Bookings history * 100) / Consensus


Forecast

sum sum

Bookings history - value

sum sum

Bookings history - value

sum sum

Consensus forecast - cum

Mean Absolute Percent Error - Demantra


Output

n/a

n/a

n/a

sum sum

avg

avg

Mean Absolute Percent Error - Demantra


Output

avg

avg

Mean Absolute Percent Error - Demantra


Output

avg

avg

Max of (Sales Order Quantity, forecast


qty)

Sum Sum

satisfied demand (constrained forecast)

Sum Sum

Sum Sum

Sum Sum

n/a

Cum Cum

Cum Cum

Cum Constrained Forecast - Cum Budget

Sum Sum

Cum Constrained Forecast - Cum Budget

Sum Sum

[ (Cum Constrained Forecast - Cum


Budget) / Cum Budget ] * 100

Sum Sum

Sum Sum

Sum Sum

n/a

satisfied demand (constrained forecast) value


satisfied demand (constrained forecast) value
Constrained Forecast - cum
satisfied demand (constrained forecast) value
satisfied demand (constrained forecast) value

Target Inventory quantity


Planned Order Demand (component
demand, transfer demand) - Planned in
v2
Qty satisfied by due date * 100 / Total
Qty

n/a

n/a

Id Exception

Exceptions - Count

1 Items that are over-committed

Count of Exceptions

2 Items with a shortage

Count of Exceptions

3 Items with excess inventory

Count of Exceptions

4 Items with repetitive variance


5 Items with no activity
6 Orders to be rescheduled in
7 Orders to be rescheduled out
8 Orders to be cancelled
9 Orders with compression days
10 Past due orders
11 Items with negative starting on hand
12 Items with expired lot
13 Past due sales orders
14 Past due forecast
15 Late supply pegged to sales order
16 Late supply pegged to forecast

Count
Count
Count
Count
Count
Count
Count
Count
Count
Count
Count
Count
Count

17 Items with a shortage in a project/task

Count of Exceptions

Items with excess inventory in a


project/task
19 Items allocated across projects/tasks
20 Items below safety stock
21 Resource overloaded
22 Resource underloaded
Sales Order/Forecast at risk due to
23
resource shortage
24 Late replenishment for sales order
25 Early replenishment for sales order
26 Late replenishment for forecast
27 Early replenishment for forecast
18

of
of
of
of
of
of
of
of
of
of
of
of
of

Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions

Count of Exceptions
Count
Count
Count
Count

of
of
of
of

of
of
of
of

Exceptions
Exceptions
Exceptions
Exceptions

28 Supplier capacity overloaded

Count of Exceptions

29 Replenishment before need date


30 Replenishment after need date
31 Planned order uses alternate BOM/Routing
32 Planned order uses alternate routing
33 Planned order uses substitute components
34 Planned order uses alternate resources
35 Demand affected by resource constraint

Count
Count
Count
Count
Count
Count
Count

36 Resource constraint

Count of Exceptions

37 Material constraint

Count of Exceptions

Transportation resource's weight


38
overloaded
Transportation resource's volume
39
overloaded
40 Transportation resource weight constraint
41 Demand affected by material constraint
Sales Order/Forecast at risk due to
42
material shortage
43 Order sourced from alternate facility
44 Order sourced from alternate supplier
Batch was started with less than minimum
45
capacity
Batch was started with more than
46
maximum capacity
47 Orders scheduled to next inventory point
48 Sourcing split percentage violated
Demand satisfied using end item
49
substitution
Transportation resource's weight
50
underloaded
Transportation resource's volume
51
underloaded
52 Sales Order/Forecast at Risk
53 Requirement causes resource overload

of
of
of
of
of
of
of

Exceptions - Value
(reporting currency)

Value of shortage (qty *


standard cost)
Value of excess (qty *
standard cost)

Value of shortage (qty *


standard cost)
Value of excess (qty *
standard cost)

Value of order (qty *


price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price) (qty * standard
value
cost)
Value of order (qty *
price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price)
Value of shortage (qty *
standard cost)
Value of excess (qty *
standard cost)

Value of order (qty *


price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price) (qty * standard
value
cost)
Value of order (qty *
price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price)
Value of shortage (qty *
standard cost)
Value of excess (qty *
standard cost)

Value of
price)
Value of
price) of
Value
price) of
Value
price) of
Value
price)

order (qty *

order (qty *

order
order
order
order

(qty
(qty
(qty
(qty

*
*
*
*

Value of
price)
Value of
price) of
Value
price) of
Value
price) of
Value
price)

order
order
order
order

(qty
(qty
(qty
(qty

*
*
*
*

Value of
price) of
Value
price) of
Value
price) of
Value
price)

order
order
order
order

(qty
(qty
(qty
(qty

*
*
*
*

Value of
price) of
Value
price) of
Value
price) of
Value
price)

order
order
order
order

(qty
(qty
(qty
(qty

*
*
*
*

Exceptions
Exceptions
Exceptions
Exceptions

Count of Exceptions
Count
Count
Count
Count

Exceptions - Value
(functional currency)

Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions

Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions

Value of order (qty *


price)
Value of order (qty *
price) of order (qty *
Value
price)

Value of order (qty *


price)
Value of order (qty *
price) of order (qty *
Value
price)

Value of order (qty *


price) of order (qty *
Value
price)
Value of order (qty *
price)

Value of order (qty *


price) of order (qty *
Value
price)
Value of order (qty *
price)

Value of order (qty *


price)

Value of order (qty *


price)

Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions

54 Order causes Supplier Capacity overload


Order causes Transportation Weight
55
Capacity overload
Order causes Transportation Volume
56
Capacity overload
57 Order with insufficient lead time
58 Requirement with insufficient lead time
59 Order lead time constraint
60 Requirement lead time constraint
61 Transportation resource volume constraint
62 Order is firmed late
63 Requirement is firmed late
64 Order is firmed early
65 Requirement is firmed early
66 Shared supply scheduled late
67 Demand quantity is not satisfied
68 Over commitment for sales order
Late Replenishment for MPP/MPS
69
Demands
70 Changes recommended for sales orders
Alternate Ship method used/ Ship method
71
changed
72 Order Violates Business Calendar
73 Items below Target
74 Items above Target
75 Items above Maximum
76 Order Quantity Change
Planned Order uses Inventory Rebalance
77
Source
78 Organization Capacity Exceeded
79 Trip Over Utilized
80 Trip Under Utilized
Item Shipment Consolidated to a Later
81
Date
82 Allocation Constraint
Internal Transfer Alternate / Changed
83
Ship Method
84 Items with Overconsumption
85 Service level violation
86 Budget Violated
87 Late Supply
88 Early Supply
89 Operation Hard Link Violation
90 Resource Performing Excessive Setups
Resource utilization Change Exceeds
91
Threshold
92 Late Maintenance Work Orders
93 Early Maintenance Work Orders
Manual Allocation causes Projected
94
Stockout
95 Sales Order Line Allocation Split
96 Sales Order Cancellations
97 End Item Supply Shelf Life Voilation
Resource charge was started with less
98
than minimum capacity
Resource charge was started with more
99
than maximum capacity
105 Insufficient Remaining Shelf Life
111 Forecast Expiration
112 Repair Supplier Capacity Overloaded
113 Past Due Returns Forecast
Demand satisfied using Supercession
114
Items
115 Inventory exists for Superceded Items
sno Exception - demand short
sno Exception - demand over

Count of Exceptions

sno

Count of Exceptions

sno
sno
sno
sno
sno
sno

Exception
Exception
Exception
Exception
Exception
Exception
Exception

backorder
Inventory minimum
Inventory maximum
Inventory safety
Resource minimum
Resource maximum
supply minimum

Count of Exceptions
Count of Exceptions
Count
Count
Count
Count
Count
Count
Count
Count
Count
Count
Count
Count

of
of
of
of
of
of
of
of
of
of
of
of

Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions

Count of Exceptions
Count of Exceptions
Count of Exceptions
Count
Count
Count
Count
Count

of
of
of
of
of

Exceptions
Exceptions
Exceptions
Exceptions
Exceptions

Count of Exceptions
Count
Count
Count
Count
Count

of
of
of
of
of

Value of order (qty *


price)
Value of order (qty *
price)
Value of order (qty *
price)
Value of order (qty *
price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price)
Value of order (qty *
price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price)
Value of order (qty *
price)
Value of order (qty *
price)
Value of order (qty *
price)
Value of order (qty *
price) (qty * standard
value
cost) (qty * standard
value
cost) (qty * standard
value
cost) of order (qty *
Value
price)
Value of order (qty *
price)

Value of order (qty *


price)
Value of order (qty *
price)
Value of order (qty *
price)
Value of order (qty *
price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price)
Value of order (qty *
price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price) of order (qty *
Value
price)
Value of order (qty *
price)
Value of order (qty *
price)
Value of order (qty *
price)
Value of order (qty *
price) (qty * standard
value
cost) (qty * standard
value
cost) (qty * standard
value
cost) of order (qty *
Value
price)
Value of order (qty *
price)

Value of order (qty *


price)
Value of order (qty *
price) of order (qty *
Value
price)
Value of backorder (qty *
price)
value (qty * standard
cost) (qty * standard
value
cost) (qty * standard
value
cost)

Value of order (qty *


price)
Value of order (qty *
price) of order (qty *
Value
price)
Value of backorder (qty *
price)
value (qty * standard
cost) (qty * standard
value
cost) (qty * standard
value
cost)

value (qty * standard


cost)

value (qty * standard


cost)

Exceptions
Exceptions
Exceptions
Exceptions
Exceptions

Count of Exceptions
Count
Count
Count
Count
Count
Count
Count

of
of
of
of
of
of
of

Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions

Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions
Count of Exceptions
Count
Count
Count
Count
Count
Count
Count
Count

Count
Count
Count
Count
Count
Count

of
of
of
of
of
of
of
of

of
of
of
of
of
of

Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions

Exceptions
Exceptions
Exceptions
Exceptions
Exceptions
Exceptions

sno Exception - supply maximum


Exception - transportation capacity
sno
underutilized
sno overload

Count of Exceptions
Count of Exceptions
Count of Exceptions

value (qty * standard


cost)

value (qty * standard


cost)

Exceptions - Days
Days of duration of the
exception
Days of duration of the
exception

Exceptions - Quantity

Exceptions - Ratio

Shortage quantity
Excess quantity

Reschedule days
Reschedule days
Compression ratio
Days in the past
Quantity
Days
Days
Days
Days

in the past
in the past
late of the supply
late of the supply
Shortage quantity
Excess quantity
Quantity below safety
stock

Resource Load ratio


Resource Load ratio
Resource Load ratio

Days
Days
Days
Days

late
early
late
early
Overload Quantity on the
exception

Order Quantity
Slack quantity [currently
shown as overload for the
exception]
Overload Quantity on the
exception
Load ratio
Load ratio
Load ratio
Shortage quantity

Load ratio on the exception


Load ratio on the exception
Percent variation

Load ratio
Load ratio
Constraint ratio

Load ratio
Load ratio
Load ratio
Compression
Compression
Compression
Compression
Load ratio
Days
Days
Days
Days
Days

Late
Late
Early
Early
Late
Quantity mismatch

Quantity mismatch
Quantity mismatch
Quantity mismatch

Load ratio
Load ratio

Shortage quantity
Violation amount

Days past due

Shortage quantity
Excess quantity
Backordered quantity
Shortage quantity
Excess quantity
Shortage quantity
Load ratio
Load ratio
Shortage quantity

ratio
ratio
ratio
ratio

Excess quantity
Load ratio
Load ratio

You might also like