NEYVELI LIGNITE CORPORATION LIMITED, NEYVELI-607 801

STATEMENT SHOWING THE QUARTERLY PROGRESS OF SUPPLY/PURCHASE CONTRACTS


FOR THE QUARTER ENDING MARCH - 2016 - CATEGORY - I : 5 Crore and above
VALUE OF THE
SL.
NAME OF THE ORGANISATION
BRIEF DETAILS OF THE MATERIALS
MODE OF
CONTRACT NO.
CONTRACT
Date of completion
No.
WITH LOCATION
PROCURED
TENDER
(Rs. in Lakhs)
2
3
4
5
6
7
PO/10-11/005313/ENQ/10365 Days price agreement
1 BEML Limited
Price agreement for supply of BEML spares
1221.6
STE
11/002994/MM03(01)15.02.11
valid till 14.02.12
Spares for TATA HITACHI hydraulic
TELCO CONSTRUCTION EQPT CO
PO/11-12/003285/ENQ/112
excavotors and shovels as per company's price
529.03
LTE
365 days
LTD
12/001143/MM03(01) 20.10.2011
list
PO/11-12/005382/TC/ENQ/11BHARAT PETROLEUM
365 days delivery
3
12/003345/MM18(05)/10/11 PO DATE
High speed diesel oil
1429.89
LTE
CORPORATION LTD
completion date (09.03.13)
09.03.12
PO/11-12/005383/TC/ENQ/11M/s. Indian Oil Corporation Ltd
365 days. Delivery
4
12/003345/MM18(05)/10/11
PO Date
High speed diesel oil
3691.34
LTE
completion date (09.03.13)
:09/03/2012
M/s. Hindustan Petroleum Corporation
PO/11-12/005384/TC/ENQ/11365 days. Delivery
5 Limited
12/003345/MM18(05)/10/11
PO Date
High speed diesel oil
843.05
LTE
completion date (09.03.13)
:09/03/2012
PO/12-13/005124/TC/ENQ/12Cast Booster (100 gms), Cast Booster (250
1095 Days. Delivery
M/s. Vetrivel Explosives Pvt Ltd., Salem
LTE
6
13/001710/MM18(03)/36/21. PO date:
gms) Site Mixed Explosive High Strength. SME
2133.63
completion date:
08.01.2013
Nominal Strength.
08.01.2016
PO./12-13/006361/TC/ENQ/12365 Days. Delivery
Bharath Petroleum Corporation Ltd
7
13/003408/MM18(05)/10/11 PO
High speed diesel oil
1575.82
LTE
Completion Date
Chennai
Date:15.03.2013
(15.03.2014)
PO/12-13/006362/TC/ENQ/12M/s. Hindustan Petroleum Coporation Ltd.
365 days. Delivery
8
13/003408/MM18(05)/10/11. PO date:
High speed diesel oil
929.09
LTE
completion date (15.03.14)
15.03.2013
PO/12-13/006363/TC/ENQ/12M/s. Indian Oil Corporation Ltd
365 days. Delivery
9
13/003408/MM18(05)/10/11. PO date:
High speed diesel oil
3761.32
LTE
completion date (15.03.14)
15.03.2013
10

BHARAT PETROLEUM
CORPORATION LTD

PO/13-14/002922/TC/ENQ/13Light diesel oil IS:1460/2000


14/000902/MM18(05)/10/11. DT.03.09.2013

11

Hindustan Petroleum Corporation Limited

12

PRESENT STATUS
8
Part supply. Short closure proposal under porcess.
Part supply. Short closure proposal under porcess.

Part Supply. Under process for short closure.

Part Supply. Under process for short closure.

Part Supply. Under process for short closure.

Supply completed.

Part Supply.

Part Supply. Under process for short closure.

Part Supply. Under process for short closure.

596.8

LTE

365 Days

Part Supply. Under process for short closure.

PO/13-14/002925/TC/ENQ/13Furnace oil conforming to IS:1593/1982


14/000875/MM18(04)10/11 DT.03.09.2013

6650.68

LTE

365 Days

Part Supply. Under process for short closure.

BHARAT PETROLEUM
CORPORATION LTD

PO/13-14/002924/TC/ENQ/13Furnace oil conforming to IS:1593/1982


14/000875/MM18(04)/10/11 DT.03.09.2013

4433.78

LTE

365 Days

Part Supply. Under process for short closure.

13

Hindustan Petroleum Corporation Limited

PO/13-14/006453/TC/ENQ/1314/003841/MM18(05)/10/11 PO Dt.
24.03.2014

1340.97

LTE

365 Days. Delivery


Part Supply. Under process for short closure.
completion date 24.03.2015

14

Regenesis Industries Private Limited

PO/13-14/005167/TC/ENQ/13High Strength Catridge Type Explosives


14/002062/MM18(3)/36/21 PO Dt. 06.01.14 125MM DIA.

997.34

PTE

High speed diesel oil

5416.06

LTE

High speed diesel oil

2274.41

LTE

365 Days. Delivery


Part Supply.
completion date 24.03.2015

750 KV BW GB complete assembly for 700


BWE.

788.14

STE

450 Days. Delivery


Nil Supply. ( Material shipped on 16.03.16) Probable date of arival
completion date 13.02.2016 at Chennai port 20.04.2016.

Hydraulic crawler crane of 100 Ton

575.97

PTE

High speed diesel oil

1495.93

LTE

High speed diesel oil

3510.72

LTE

15

Indian Oil Corporation Limited

16

Bharath Petroleum Corporation Ltd


Chennai

17

Thyssenkrupp Industrial solutions

18

Tusker Cranes Private Limited

19

BHARAT PETROLEUM
CORPORATION LTD

20

Indian Oil Corporation Limited

PO/13-14/006454/TC/ENQ/1314/003841/MM18(05)/10/11 PO Dt.
24.03.2014
PO/13-14/006455/TC/ENQ/1314/003841/MM18(05)/10/11 PO Dt.
24.03.2014
PO/14-15/003747/TC/ENQ/1415/001860/MM01/(05)/46/1 PO
Dt.20.11.2014.
PO/14-15/005656/TC/ENQ/1314/002993/MM22(01)/23/1 PO Date
04.03.2015
PO/14-15/005431/TC/ENQ/1415/004090/MM18(05)/10/11 PO
Date19.03.15
PO/14-15/005655/TC/ENQ/1415/004090/MM18(05)/10/11 PO
Date19.03.15

High speed diesel oil

730 Days. Delivery


Completion Date (
18/09/2014)
365 Days. Delivery
Completion date
24.03.2015

455 Days. Delivey


completion Date (
01.06.2016)
365 Days. Delivery
Completion date
18.03.2016
365 Days. Delivery
Completion date
18.03.2016

Short closed.

Part Supply. Under process for short closure.

Nil Supply.

Part supply.

Part supply

SL.
No.

NAME OF THE ORGANISATION


WITH LOCATION

CONTRACT NO.
PO/14-15/005654/TC/ENQ/1415/004090/MM18(05)/10/11 PO
Date19.03.15
PO/14-15/005654/TC/ENQ/1415/002677/MM02(07)/49/1 PO Date.
107.05.2015
PO/14-15/001235/TC/ENQ/1415/003560/MM04(02)/82/5 PO
Date.16.06.2015
PO/15-16/001690/TC/ENQ/1415/003790/MM18(03)/36/21 PO dt.
03.07.15
PO/15-16/001691/TC/ENQ/1415/003790/MM18(03)/36/21 PO dt.
03.07.15

VALUE OF THE
CONTRACT
(Rs. in Lakhs)

MODE OF
TENDER

High speed diesel oil

881.99

LTE

Mechanical Spares

3039.45

STE

Beater wheel without beater plates and


armouring (CCW) Beater wheel withour beater
plates and armouring (CW)

767.16

STE

Cast Booster site mixed explosive high strength.

1489.39

PTE

1275 DAYS. Delivery


completion date
(29.12.2018)

Part supply.

Cast Booster site mixed explosive high strength.

2235.6

PTE

1275 Days. Delivery


completion dt. 29.12.18

Part Supply.

BRIEF DETAILS OF THE MATERIALS


PROCURED

Date of completion
365 Days. Delivery
Completion date
18.03.2016
270 days .Delivery
completion Date
13.01.2016

PRESENT STATUS

21

Hindustan Petroleum Corporation Limited

22

Ansaldo Energia SPA Genova

23

Tyazhmash , Syzran

24

Vetrivel Explosives Pvt Ltd.,

25

Premier Explosive Ltd.,

26

TNS Heavy Engineering Pvt ltd

PO/15-16/002561/TC/ENQ/141600mm conveyor standard frames


15/002496/MM02(08)/49/1 PO dt. 07.09.15

568.96

PTE

250 DAYS. Delivery


completion dt. 14.06.16

Part supply .

27

Steel Authority of India Ltd.

PO/15-16/002679/TC/ENQ/14UIC-60 Rails T12-2009


15/004651/MM02(03)/49/1 PO dt. 11.09.15

739.98

PTE

250 DAYS. Delivery


completion dt. 18.05.16

Part supply.

28

Forech India Ltd. Kolkata

Steel cord conveyor belt 2000MM wide ST


3150

791.08

GTE

180 Days. Delivery


Part supply.
completion date 18.05.2016

29

Phoenix conveyor belt India (P) Ltd.

Steel cord conveyor belt 2000MM wide ST


3150

2392.84

GTE

180 Days. Delivery


Supply completed.
completion date 18.05.2016

30

Phoenix conveyor belt India (P) Ltd.

Steel cord conveyor belt 2400MM wide .

6972.26

GTE

180 Days. Delivery


Part supply.
completion date 12.06.2016

31

Universal cable Limited

1. 6.35/11 kv, ( 3Cx95 Sqmm)+ ATCu, EPR,


Semi-con, EPR, HOFR PCP cable.
2.
PO/15-16/005071/TC/ENQ//146.35/11 kv ( 3x50)+3x50/3) SQ.MM AT.Cu,
15/004276/MM12(04)/40/11 DT. 27.01.2016
EPR 3.6.35/11kv, (3x185) + 3x95/3) SQ.MM,
ATCu, EPR, Trailing cable

544

GTE

32

BHARAT PETROLEUM
CORPORATION LTD

PO/15-16/005670/TC/ENQ//15High speed diesel oil


16/003295/MM18(05)/10/11 DT. 25.02.2016

752.06

LTE

365 Days. Delivery


Nil Supply. Delivery period startd from 01.04.2016
completion date 24.02.2017

33

Hindustan Petroleum Corporation Limited

PO/15-16/005671/TC/ENQ//15High speed diesel oil


16/003295/MM18(05)/10/11 DT. 25.02.2016

537.47

LTE

365 Days. Delivery


Nil Supply. Delivery period startd from 01.04.2016
completion date 24.02.2017

34

Indian Oil Corporation Limited

PO/15-16/005672/TC/ENQ//15High speed diesel oil


16/003295/MM18(05)/10/11 DT. 25.02.2016

1979.23

LTE

365 Days. Delivery


Nil Supply. Delivery period startd from 01.04.2016
completion date 24.02.2017

35

Salvo Explosives & Chemical Pvt Ltd.,

PO/15-16/005769/TC/ENQ//15High strength 125 mm


16/001271/MM18(03)/36/21 DT. 01.03.2016

557.02

PTE

36

Regenesis Industries Private Limited

PO/15-16/005770/TC/ENQ//15High strength 125 mm


16/001271/MM18(03)/36/21 DT. 01.03.2016

835.53

PTE

37

Thyssenkrupp Industrial solutions AG

PO/15-16/005860/TC/ENQ//1516/002431/MM01(07)/46/1 DT. 05.03.2016

1500 kv Bucket wheel gear box without


auxiliary gearbox

1373.6

STE

38

M/s.Mecon, Ranchi

LOA 0016H/TS II Ex./ A 02 /CT/04, Dt:


28.10.2005

Lignite Handling System

24398

PTE

28.06.08

39

M/s Mc Nally Bharat Engg. Co.

LOA 0024H/TSII Expn./A03/CT/2004,


Dt:31.5.06

TPS-II Expn. (2 x 250 MW) Ash Handling


system (A03) Package
PhaseI

3830.33 Lakhs

PTE

24 months from
the date of LOA
(31.05.08).

PO/15-16/003823/TC/ENQ/1516/000463/MM02(08)/49/1 PO Dt.
20.11.2015
PO/15-16/003824/TC/ENQ/1516/000463/MM02(08)/49/1 PO Dt.
20.11.2015
PO/15-16/004347/TC/ENQ/1516/000583/MM02(07)/49/1 PO Dt.
15.12.2015

Part supply
Nil supply. As per the firm's request for partial shipment
amendment in under approval of competent authority ( subcommittee)

300 DAYS . Delivey


Nil supply. LC opened on 30.03.16
completion date 11.04.2016

365 days . Delivery


completion date (
26.01.2017)

730 Days. Delivery


Completion Date (
01.03.2018)
730 Days. Delivery
Completion Date (
01.03.2018)

Nil supply.

Part Supply.

Part Supply.

540 Days. Delivery


Nil supply.
completion date 27.08.2017
Trial operation and PG test is to be conducted. To be conducted
after main plant package is made ready .
Unit I initial operation completed on 22.06.11. Unit II work initial
operation completed on 31.10.12 PG test to be taken up. EOT upto
22.06.11 & upto 31.10.12 for completion of initial operation for
Unit I & II respectively without LD granted. Trial operaion for Unit
I commenced on 13.11.12 and 25 days out of 30 days, have been
conducted Traial operation & PG test for Unit ii can be carried out
only after Unit II is put up into regualr operation . Resolution
obtained for EOT upto 29.02.2016 was granted for conducting trial
operation and PG test of Unit I and II of AHS as per terms and
condition of contract. EOT Note upto June 2016 is under
circulation.

SL.
No.

NAME OF THE ORGANISATION


WITH LOCATION

BRIEF DETAILS OF THE MATERIALS


PROCURED

CONTRACT NO.

40

M/s BHEL (Transmission Business Group), LOA 0011H/TS II Ex./ A08/CT/2004,


New Delhi
Dt.11.11.05

41

M/s Driplex Water Engg. Ltd.

LOA 0022H/TS II Ex./ WTP/ A05/CT/04, Dt: Supply, erection & commissioning of Water
29.12.2005
Treatment Plant & Effluent treatment Plant

42

M/s.BHEL, New Delhi

LOA No. 0006H/ A01/ CT/04, Dt: 19.8.05

400 KV Switchyard & Power transformer

TPS II Expn. (2 x 250 MW) Main Plant


Package (Boiler, Turbo Generators & their
auxiliaries)

43

M/s. Tecpro Ashtech Ltd., Pune.

LOA 0028H/BPP/RA2/CT/04, Dt:02.08.2006

BPP at Rajasthan (2 x 125 MW) Ash


Handling System (RA3 package)

44

M/s Subash Projects and Marketing Ltd,


(SPML) Kolkatta-16.

Cont No.053306/0017H/ TSII Expn./A04/


Conts. Thermal/04, Dt:04.12.06

Circulating Water System and Fire Protection


System A04

45

M/s BHEL, New Delhi

46

M/s BCL FGM Consortium, New Delhi

47

M/s.L&T Ltd

48

M/s.Kirloskar Brothers Ltd Pune

LOA Co CONTS/0038
K/NTPL/TYTPP/TA4/08,
31.10.09

49

M/s.Larsen & Toubro Ltd, Chennai

LOA NoCo Conts/0026K/NTPL/


TTPP/TA8/2007, Dt:29.01.10

400 KV SWGR SwitchYard & 220 KV


SWGR Switchyard

50

M/s.Energo Engg.Projects Ltd.,New Delhi

LOA No.0031M/HTSII Expn./A03/PhII/CT/08, Dt: 23.12.10

51

M/s ABB Ltd., Chennai

Contract No.
053398/Coconts/0028K/NTPL/TTPP/TA
9/07/DT. 23.02.2010

52

M/s.Energo Engg.Projects Ltd.,New Delhi

LOA No.Co.Cons/0023 M/NTPL/TTPP/TA- Ash Handling Plant & Auxillaries Package


3/2008, Dt:08.4.10
(TA3)

53

M/s.Gammon India Ltd., Mumbai

LOA No.CoConts/0029K/NTPL/
TTPPTA6/2007, Dt: 15.09.2010

54

M/s. Tecton Engineering & Construction


LLC Agman, UAE

55

M/s Takraf (I) India Pvt Ltd., Chennai

56

M/s Mahalakzhmi Infra Co Ltd.


Ahamedabad

57

M/s Sify Technology Ltd. Chennai

58

M/s Takraf India Pvt Ltd. Chennai

59

M/s BGR Mining & Infra Pvt Ltd.,


Hydrabad

60

M/s Mahalakshmi Infra Co. Ltd.,


Ahamedabad

VALUE OF THE
CONTRACT
(Rs. in Lakhs)

MODE OF
TENDER

Date of completion

8411

PTE

10.07.07

6272

PTE

Rs.151255.00
+US$21,016,000
Euro 40,000,000

Global

2447

PTE

Warranty period of PT & softening plant and RO DM plant was over


and the 2 systems were taken over. Trail operation of 3 systems
completed. Electro chlorination plant on 22.09.2015 CW chemcial
dosing system on 08.10.2015 and for effluent treatment plant on
08.02.2016.
Work in progress. EOT granted with right to levy LD upto 31.03.15
39 & 43 months from LOA
for trial operation and upto 30.06.15 for PG test. Commercial
for PG test of UNIT I & II
operation was declared on 21.04.15 for Unit II and on 04.07.15 for
respectively for PG tests
unit I. M/s BHEL has request for EOT upto 30.06.2016. Note is
LOA dt. 19.08.05
under circulation.
EOT without levy of LD granted upto 31.10.2014 to complete works
related to PG test activities and conduct PG test of both units I & II.
The firm vide letter dated 14.05.15 have agreed to conduct PG test in
26 months from the date of June 2015 and the same was informed to the competent authority.
LOA (01.10.08)
The firm has not turned up for completing the work as per contract.
Note Dt. 20.01.2015, Dt. 23.09.2015 and 05.11.2015 is under
process to terminate M/s Tecpro and to encash al their CPG and
APG. Note is under circulation to terminate the contract.
Note requesting EOT upto 31.03.2016 for completion of whole of
works in FPS & CWS ( without prejudice to the time extension
32 Months from the date
given for trail operation of U1 CWS & U 2 CWS upto 31.12.2011
date of LOA (14.11.08)
& 30.06.2012 respectively and FPS upto 30.06.2011 with levy of
LD )is under circulation.

PTE

LOA No. Co/Conts./ 0014K & 0015K/NTPL/


Steam Generator unit ESP package (TA1-SG) &
TTPP/07, Dt.28.01.09 (Both tenders
Steam Turbine Generator Package (TA1-TG)
combined in to single order)

319600

ICB

27.12.2012

Lignite Excavation. Hiring of Crawler Mounted


Contract No. 053367 CoConts/007M/BLMP/
Shovels / Hyd Exe Backhoes, Dumpers at
Lig./OS/2008, Dt.11.06.09
Barsingsar Lignite Mines

9086

PTE

7 years

Rs. 45351
(7361035 ) USD

GTE

39 Months from LOA

8456.67

PTE

34 months
from LOA

2117.40
(USD
8677224)
(Euro 70348)

24 months
from LOA

Ash Handling System (A03) Phase-II, TPS-II


Expn

1609.5

PTE

15 months
from LOA

Power Transformer package (TA9) for TTPP


(2x500MW) Project at Tuticorin.

10252

PTE

34 months from LOA (


LOA DT. 23.07.2010)

5994.1

GTE

Dt:

Coal Handling System for NTPL

Circulating Water systems

2 Nos Draft Cooling Tower for NTPL Project

Desalination Plant and Water Treatment Plant


Co. Conts/ 0014M/NTPL/TTPP/ TA5/
Package (TA 5) for Tuticorin Thermal Power
2008, Dt:23-7-10
Project.
LOA.NO. Co.Conts/0003B/MIA/ MTC/2014 Procurement of 1 no of MTC of capacity 994
dt. 18.09.15
M3/hr for MIA
LOA No. Co.Conts/0004C/MII/ OBR/CM/ 15 Hiring of equipment for removel of 80 L on OB
Dt. 05.09.15
in Mine II
Supply, installation and commissioning of Multi
LOA No. Co.Conts/0032C/CS/ MDVES/15
print HDVES at Chennai, Neyveli Tuticorin
Dt. 28.09.15
and Barsingsar including 5 year AMC.
LOA No. Co. Conts/0016B/MI/ BWE/2014
Procurement of 1 no BWE of 700L Capacity.
Dt. 17.07.15
LOA No. Co.conts/0001C/ MIA/OBR/15 dt. Removal of overburden excavation of 65.6
05.09.15
MM3 at MIA
LOA.No.
OBR - Rs. 53 Lakhs M3 and trinker of lignite
Co.conts/0046C/MII/OBR/Lig/2015 Dt.
/Mine II- Rs. 15 Lakhs
23.12.2015

12705

PTE

Rs.16551.18
USD
2011718

GTE

3680.92

GTE

9549.46

PTE

315.02

PTE

9338.29

PTE

45191.74

PTE

2629.74

PTE

EOT given upto 30.06.15 for PG test. PG test completed . Report


submitted by M/s BHEL approval awaited from consultant.

28-02-09

3324.7

LOA No Co/Conts/0022K/NTPL
/TTPP/TA2/2007, 31.07.09

PRESENT STATUS

22 & 27 months from date


of LOA for unit-I & II
Resply.
33 months
from LOA
19 months from LOA
22.02.2012

EOT given with a right to levy LD upto 30.09.15 and 31.10.15 for
Unit 1 and II trial operation respectively. Unit -I &II commercial
operation declared on 06.06.15 and 08.08.15 respectively.
47.72 . Lignite excavation under progress. Board in its meeting held
on 16.09.15 accorded approval for extension of contract two years
upto 12.01.18 under same terms and condtions.
EOT given upto 09.03.15 & 20.07.15 for stream A & Stream B with
right to levy LD and the initial operation has been completed for
both stream. PG tests are due for both streams.
99.49% work completed as on 31.12.15. EOT for completion of PG
test for Unit I on 15.10.15 Unit II upto 15.06.16 was granted as per
the terms and conditions of the contract. Further extension sought by
KBL upto 15.07.2016..
EOT granted upto 31.05.15 for commissioning of 400 KV GIS &
220 KV GIS switch yard of Unit I & II without prejudice to the time
extension already granted upto 31.12.13 with a right to levy LD for
mechanical completion.
EOT granted upto 31.12.15 with right to levy LD to complete initial
operation of AHS . Time extension is requested by the firm upto six
months.
Work is in progress. EOT granted upto 16.04.2015 with a wight to
levy LD for mechanical completion and testing , upto 25.10.2015
for commissioning upto 31.12.2015 for completion of PG test. Note
for further EOT upto june 2016 has been initiated by site.
Work in progress. EOT given upto 10.09.2015 for unit I & upto
30.11.15 for Unit II with right to levy LD.
Work is in progress. EOT given upto 31.03.2016 for both cooling
tower - 1 and 2.
Work is under progress. EOT given upto 30.04.2016 with right to
levy LD.

36 Months from date of


Work under progress.
LOA 18.09.15
24 moths from the date of
Work under progress.
LOA ( 05.09.15)
90 days from the date of
LOA (28.09.15)

Work completed.

36 Months from the date of


work under progress.
LOA (17.07.15)
48 months from the date of
work under progress
LOA
18 Months from the date of
work under progress
LOA

SL.
No.

NAME OF THE ORGANISATION


WITH LOCATION

CONTRACT NO.
LOA NO. Co.
Conts/0030C/NTPL/TTPP/CISF Qtrs/2015
dt. 05.03.2016
LOA. No. Co. Conts/0001D/MI,IA & MII/
Dozers/FMC/ 2016 Dt. 29.03.16
LOA. No. Co. Conts/0002D/MI,IA & MII/
Wheel Dozers/FMC/ 2016 Dt. 29.03.16
LOA No. Co.Conts/002c/NTPL/TTPP/TC4A1/2015 DT. 05.03.16

VALUE OF THE
CONTRACT
(Rs. in Lakhs)

MODE OF
TENDER

Date of completion

1496.04

PTE

18 months from the date


handing over of site.

1748.37 Supplies &


3950 Commissioning

GTE

Procurement of 3 nos of WheelDozers

772.32

GTE

General civil works Phase II road and Drains (


TC4A1) for NTPL.

2159.49

PTE

15 months from the date of


LOA issued on 05.03.16.
LOA

962.07

PTE

Six months from the date of


Contract signed on 25.03.16.
LOA. LOA dt. 08.01.16

US $ 44400000

GTE

4 months from the date of


Contract signed on 07.03.16
LOA. LOA dt. 14.01.16

960.36

PTE

15 months from the date of


LOA issued on 04.03.16
handing over of site.

3493.9

PTE

18 months from the date of


LOA issued on 05.03.16
handing over of site.

1192

PTE

672.14

PTE

3855

PTE

6039.48

PTE

8622

ICB

1599.99

PTE

BRIEF DETAILS OF THE MATERIALS


PROCURED
Construction of CISF quarters for NTPL

PRESENT STATUS

61

M/s Sirco Projects Pvt Ltd, Hydrabad

62

M/s BEML Ltd, Neyveli

63

M/s BEML Ltd, Neyveli

64

M/s RPP Infra Project Ltd. Erode

65

M/s CMS computers Ltd. Chennai

66

M/s Knowledge Infrastructure systems Pvt C.No. 053557/Co.Conts/0052c/NTPL/IMP


Ltd., New Delhi
Coal/e-proc/2015 dt. 07.03.16

67

M/s Motherland Builders engineers &


Contractors.

Co/CONTS/0019B/NTPL/TTPP/MTCE
BLDGS/2014 DT. 04.03.16

68

M/s RPP Infra Project Ltd.

LOA. CO.CONTS/ 0023c/


Construction of 154 Nos. various types of
NTPL/TTPP/RESI.QTRS/2015, dt. 05.03.16 residential quarters for NTPL township phase II

69

M/s. DEE Tech Projects Pvt. Ltd

LOA.No. CoConts/042P/ NTPL/


TTPP/GWC/ SWP/TC/3B dt.07.12.11

Storm water pumping Arrangements for NTPL

70

M/s Abiram Infra projects, Hydrabad

LOA NoCo Conts/0010RNTPL/ NRB/2011


DT.06.02.2012

Construction of non- residential buildings for


NTPL township at Tuticorin

71

M/s. Jyothi Limited, Vadodara

LOA No.CoConts/0041P/ NTPL/TC2A/2010


Circulating water System and outfall system
Dt..17.03.12

72

M/s Mather & Platt Pumps Ltd, Mumbai

LOA No.Coconts/ 0026P/NTPL/ TTPP/


TD1/2010, DT 19.03.12

73

M/s. TRF Limited

LOA.No. CoConts/0004R/ NTPL/ TTPP/Sh


Shore Unloader 2 Nos. 2000 TPH
Unloader/2011 dt.19.05.12

74

M/s.Wipro Limited

LOA No.CoConts/0007T/ CO/DC&DR/2012, Establishing Data Centre & Data recovery


dt.29.10.12
centre along with SAP-ERP

75

M/s BHEL, Bangalore

DCS (Distribution control system )


CO/Conts/0010T/TS-II-ST-II/DCS/IMP/2012
implementation in state II units (4x210 MW) of
Dt. 13.06.2013
TS-II at Neyveli

3990

...

76

M/s. Sical Logistics Ltd, Chennai

LOA No.CoConts/0017P/NTPL/ CWALCont. Transportation of Coal from MCL to Tuticorin


Thermal/10 dt.21.09.12
Port via Port Praradip

90674.67

PTE

54 months from LOA or 36


months from supply of Coal
Supply of Coal by NTPL is likely to be started in April 2016.
by M/s.NTPL, whichever is
earlier

77

M/s Leitwind shriram Mfn. Chennai

LOA CO CONTS/0006T/Wind Farm/2012


Dt. 26.08.2013

Procurement of Land Design, Manufacture,


supply, erection, testing commissioning,
synchronization with grid, Handing over,
Guaranteeing, of 51Mw wind farm complete at
Kaluneerkulam Tamil Nadu and O&M

33252+O&M 1462

PTE

10 Months from LOA and 5 So far 68% work completed. Nine No. of Wind Mill commissioned,
years from commissioning. time extension given upto 31.03.16 with right to levy LD.

78

M/s L&T Chennai

LOA NO. CO CONTS/0001A/ MIA&MI


IBWE/2013 Dt. 31.10.13

Procurement of 2 nos 700 Lit BWEs for Mine I


& Mien-II and maintenance.

10417.6 + O&M
1276.1 Euro
99,65,642.00

GTE

79

M/s BHEL

LOA No. CoConts/0014T/ NNTPP/NTA1SG/2012 Dt. 31.10.2013

Steam Generator & auxiliaries package TA1 for 208908 Euro 56.350
NNTPP (2x500 MW)
Million

80

M/s BHEL

LOA No. CoConts/0015R/ NNTPS/MTA2TG


Turbo Genrator (NTA2)NNTPS
Dt. 23.12.2013

81

NSK Builders, Trichy

LOA .No.COCONTS/0014A/
TA/ROADS/CM/2013 dt. 20.01.2014

Alternate road form Neyveli Township to


Mandarakuppam

82

M/s N.S.K Builders (P) Limited, Trichy.

LOA.No. COCONTS/0019A/TSII
EXPN/C02 Gr.II/2013 Dt. 20.02.14

General Civil works Phase II, Group II roads &


Drains in TPS II Expn.

83

M/s Durga Construction Co. Vadodara

LOA.No.Coconts/0020A/BP/C/M/OBR/2013
OB removal work at Barsingsar
DT. 11.02.14

Procurement of 10 Nos. Dozers & FMC for 10


Nos Dozers.

C.No. 053557/Co.Conts/0033c/CS/VSS/2015 IP based video surveillance systems for


dt. 25.03.16
township area, all TPS, Library and Card.
Procurement of 0.8 MMT of imported non
coaking ( streaming ) coal for NLC TN/NTPL
Tuticorin.
Construction of Boiler, Turbine , coal handling
Maintenance sheds for NTPL

Fire protection system package (TD1) for NTPL


Power Project

PTE (ICB)

102268

PTE (ICB)

2628

PTE

893.38

PTE

31595.28

PTE

LOA issued on 05.03.16

26.06.16 for supplies & 9


LOA issued on 29.03.16
years for commissioning.
28.06.16

LOA issued on 29.03.16

12 months from the date of


Work in progress EOT given upto 31.11.2016 with right to levy LD.
LOA
The work front is handed over to the firm on 07.03.2012. Work is
18 months from the date of
in progress. EOT given upto 30.09.2016 with right to levy LD.
handing over of site
CEO/NTPL was addressed for action for EOT.
12 months from the date of EOT upto 30.06.2016 was granted with a right to levy LD as per
LOA
provision of the contract. 91% work completed as on 31.03.16.
20 & 25 months for
Work in progress. EOT given upto 31.12.15 with right to levy LD
completion of PG test of
for trial operation of Unit I & II and upto 31.01.2016 for PG test.
Unit I & II respectively
Note for EOT upto 31.05.2016 is under circulation.
from date of LOA

18 months from LOA

EOT granted upto 30.10.15 for initial operation of SUL -2 with


right to levy LD and upto 30.09.15 for SUL -1 to complete pending
works without prejudice to the time extension granted upto 28.02.15
with right to levy LD for completion of initial operaion.

Work in progress. EOT given upto 30.11.15, with right to levy LD.
12 months from the date of lLetter addressed on 07.12.2015 to DGM/ Computer Services for
LOA
necessary action and reminder letter dt 07.03.2016 for extension of
time.
40 months from the date of Phase - I Unit 5 DCS completed. Works for other units are under
LOA
progress.

within 36 months (i.e.


31.07.16)

100% Mechanical ( Imported) and 100% ( Indigenous) supplies


completed. Erection completed on 18.12.2015. TOT to be
conducted.

48 months for unit I and 54


months for unit II from the
Work under progress.
date of LOA for trial
operation.
42 months for Unit I and 48
months for Unit II from Work in progress
LOA date.
Work under progress. EOT upto 31.08.15 granted with right to levy
of LD . 30% of work had been completed. The contractor
12 Months from handing
completed only 42% of agreement value even after EOT. Hence
over site
further EOT upto 28.02.2016 was granted as requested by the
contractor . Further extension upto may 2016 was sought by the
contractorand approval process is under way.
As on December 15.20% work is completed. EOT upto 19.12.15 is
19.06.2015
granted with right to levy of LD. Further extension upto May 2016
was sought by the contractor.
7 Years

30.17. Work under progress.

SL.
No.

NAME OF THE ORGANISATION


WITH LOCATION

CONTRACT NO.

BRIEF DETAILS OF THE MATERIALS


PROCURED

VALUE OF THE
CONTRACT
(Rs. in Lakhs)

MODE OF
TENDER

Date of completion

Within 12 months from


LOA (i.e. 06.01.15)

84

M/s Takraf GMBH Germany & Takraf


India, Chennai

Contract No. 053485/Coconts/ 0024A/Man


spr.I&II/Modification /2013 dt. 11.02.14

Modification supply and supervision of


replacement of components for Mine II MAN
spr. I & II

3656.57

STE

85

M/s Essar Projects India Ltd, Mumbai

Co Conts/0031P/NNTPP/NTA3-BOP/2010
Dt. 30.04.14

Balance of Plant Package (nta3) for NNTPP


(2x500MW)

115907

GTE

86

M/s BHEL, Chennai

LOA No. Coconts/0025A/PV solar


Power/CM/13, Dt. 03.04.14

10MW (AC) Solar Power Plant

7460

PTE

87

M/s Mahalaxmi Infra Contract Pvt Ltd.,


Ahmedabad

LOA No. CoConts/0021A/ Mine I/OBR/2013 OverBurden Augmentation & debris removal
Dt. 09.05.14
Mine I

11008

PTE

88

M/s Mining Associates Pvt.Ltd., West


Bengal

Contract No. 053492/Coconts/


0023A/Geology0Drilling /CM/13, Dt.
12.06.14

Detailed exploration of 16000 mts. At 400 mts.


Grid interval

555.68

PTE

89

M/s MSTC Ltd.

Cont.No. 053499/COConts/ 0004B/


LTE/NTPL-Coal/2014 Dt. 12.09.2014

Supply of 0.864 MMT of Imported Coal NonCooking (Steaming ) coal of TWO quantities (
Indegenous origin)

41859.71

LTE

Rejuvn of BWEs 1571 & 1572 ( for indign


Mech Portion)

1090.06

STE

Upto end of 29th month


from the date of LOA

Rejuvn of BWEs 1571 & 1572 ( for imp.


Mechl. Portion)

Euro 5,219,964

STE

Upto end of 29th month


from the date of LOA

Rejuvn of BWEs 1571 & 1572 ( for Elecl.


Portion)

1335.91

LTE

Upto end of 29th month


from the date of LOA

LOA No. Co Conts.0027A/MII


BWEs/1571/&1572/ Mech/Rejuvn/13 Dt.
01.09.2014
LOA No. Co Conts.0027A/MII
BWEs/1571/&1572/ Mech/Rejuvn/13 Dt.
01.09.2014
LOA No. Co Conts.0028A/MII
BWEs/1571/&1572/ Elecl/Rejuvn/13 Dt.
01.09.2014
053533/Co/Conts/0035B/MII/OB/Lig/2014
Dt. 24.06.2015 MI and M II

90

M/s Thyssen Krupp Idustries India Ltd.,


Pune

91

M/s Thyssen Krupp Idustries India Ltd.,


Pune

92

M/s Siemens Mumbai

93

M/s Mahalakshmi Infra Co. Ltd.,


Ahamedabad

94

M/s.Mecon, Ranchi

LOA No.CoConts/0008N/ Bithnok PP/Proj.


Cons./09, dt.17.03.10

Project Consultancy services for Bitnok Power


project (1 x 250 MW)

95

M/S. TCE Consulting Engg., Bangalore

Con.No.069/10E/HTS II Expn./Cons/2002,
dt: 01.09.04

Consultancy services for TPS- II

96

M/s. Lahmeyer International India, Gurgaon

97

M/s Desien Private Ltd., New Delhi

LOA No.Coconts/0020P/
NTPL/2010,
dt.09.02.11
LOA No. CoConts/0010A/ NUPPL/
Proj.consy/2013 dt. 31.12.2013

Consultancy Services for New Thermal Power


Project
Project Consultancy services NUPPL for New
Thermal Power Project.
Project Consultancy services
Maintenance of 3 Nos. of 1400Ltr BWE (L&T1,2,3), 1 no of 700 Ltr BWE (L&T) and 3 Nos.
of MTC's (7,8,9) in MII for three years.

98

M/s. Mecon Ltd, Ranchi

LOA.No.0033J/NTPL (2X500MW)/CT/06
dt.31.03.07

99

M/s. L&T

ST-33/A-79

100 M/s TAKRAF India Pvt Ltd.

053461/Co. Conts.0022R/ Cont . IV/VWE


/MII

101 M/s TAKRAF

EST-88/A-45

102 M/s Thyssenkrupp

LOI (121)/EST-90/A-14

103 M/s. Telcon. Co., Chennai


104 M/s. Telcon. Co., Chennai

105 M/s.Sushee Infra Pvt. Ltd.

106 M/s.NSK Builders Pvt. Ltd.

107 M/s Sandeep Enterprises, Gujarat


108 M/S. TCE Consulting Engg., Bangalore

053364/0017/M/M-I,M-II&M-II
Expn/Backhoe/2008 dt. 06.04.2009.
053364/0017M/M-I,M-II & M-II
Expn./Backhoe/2008 dt.06.04.09
GM/C/37/11-12

(Rs.751.38 lakhs)

GM/C/04/12-13 (Rs.663.76 lakhs) I Suppl


GM/C/42/12-13 Rs.2.97 lakhs , 2nd Suppl.
Proposal for a value of Rs. 47.10 lakhs
approved.
LOA No. 138/NLC/BTPP/T
140/S1/PTE/BM/LLHS/2014-15 Dt.
25.03.2015
076/001G/HTS/PR-CONS/2013

PRESENT STATUS
Engineering completed supplies completed. EOT upto 21.01.15
without levy of LD issued on 04.06.15 for imported supplies and
releasing of second machine after March 2016 with approval of
competent authority.

45 months from the date of


Work under progress.
LOA
Work under Progress. EOT given upto 25.10.15 with right to levy
9 months from the date of LD. Further BHEL requested extension upto 25.02.2016. User
LOA
department was requested vide lr.dt. 02.03.2016 for further
extension if required.
The agreement quantity of 110 LM3 was enhanced to 128 LM3 with
the approval of Competent Authority unde the same tems and
24 months from the date of
conditions including rates. Due to this the contact valu enhanced
LOA i.e. 09.05.2014
from Rs. 96.29 crores to 110.08 crore . The additional quantity has
to be carried out within the agreement period already in force.
Final survey report not submitted. The extension upto 10.11.15 with
18 months from the date of
right to levy LD and 2 nd EOT given upto 25.11.15 with right to
LOA ( i.e. from 11.04.14)
levy LD.
Enhancement of quantity by 0.432 MMT approved and amendment
210 Days from LOA
No. 1, dt. 09.10.2015 issued . Note for extension upto 31.03.2016
under approval . Supply under progress.

1571 - Three shipment cleared. 1572 - 1st shipment cleared.

Out sourcing of removal of 32LM3 and 8CT


Lignite in Mine II

365 days from the date of


LOA
1. 58 months from LOA 2.
As per amendment Dt.
18.8.15, contract period is
upto 52 months from
18.08.15.

Supply have started.


Work under progress. Lignite excavation quantity is enhanced from
8LT to 9.2 LT.

2700.9

PTE

INR 2006 + EURO


184680

889.16
Euro135436

PTE

18.05.2009

EOT granted upto 31.03.2016 for a revised value of Rs. 93838684/+ EURO 135436/- excluding service Tax with all other terms and
conditions being unaltered.

1298.00

Lakhs

1091.07 USD
222976
1049.24 (Euro
339000+ Taxes &
duties at actuals.
11400

Maintenance contract during warranty period for


544.39
2 nos of 1400Lit BWE
Maintenance of one no,of 4420 Cu M/hr MTC10 and on no of 20000 TPH SPR(SPR -IV) in
1526
Mine II for three years
Maintenance of two nos of 700ltr BWE 1649 &
4050
1650 for three years
MII Expansion - Full maintenance contract for 7
692.05
years for 7 Nos. of Backhoes.
MII Expansion - Full maintenance contract for 7
889.78
years for 9 Nos. of Backhoes.
Site grading, deepening of lake, diversion of
drain, construction of bridges, surplus weir,
827.28
(updated)
check dams etc. for 2x500 MW NNTPS at
Neyveli.

Board has accorded approval to extend the contract beyond 17.01.15


and to combine the consultancy services for Barsingsar Thermal
Power expansion project with this contract, by issuing an amendment
to the contracts. Amendment has been issued on 18.08.15

PTE

08.08.2016

Work In progress.

PTE (ICB)

30.01.2020

Work In Progress.

PTE

66 months from LOA

Note requesting EOT upto 30.09.15 with levy of LD for Module 'B'
for a value of Rs. 133139462/- plus EURO 339000 excluding
Service Tax under circulation.

....

Three years (06.09.15) EOT


99.22%. EOT upto 30.04.16
06.12.2015

TKF-I : 19.03.16
TKF 58.23%
II: 12.04.16

...

29.02.2016

94.44%. EOT upto 30.04.16

31.012.16

69.44%. This agreement value includes both BWE 1649 of Mine I


and BWE 1650 of Mine II.

PTE

22.06.16

90.70%

PTE

22.06.16

92.19%

.....

6 months

66.66 %. The rock toe work is in progress and there is no


significance progress so far.

92%. Extension of time upto 30.06.2016 under process.

Formation of internal roads - Phase-I for 2x500


MW NNTPS at Neyveli.

620 (ori) 687.58

......

6 months

Biennial contract for O&M works of Lignite &


Lime Handling system.

767

2 years

Consultancy services for BTPP 2x 125 MW),


Rajasthan

695

PTE

30.09.2014

50%. Works is under progress.


100%. TCE contract is over on 30.09.14. further no extension is
required. Contract closure activities is under progress.

SL.
No.

NAME OF THE ORGANISATION


WITH LOCATION

CONTRACT NO.

BRIEF DETAILS OF THE MATERIALS


PROCURED

VALUE OF THE
CONTRACT
(Rs. in Lakhs)

109 M/s BHEL, New Delhi

053282 & 053283/ 0026H/BPP/


RA1/CONT.Thermal/04, Dt: 10.08.06

607,86,52,530
Main Plant
US$8727310 Euro
(Supply Erection & Commissioning of Steam
12995510 (Rs.911.44
Generator Turbo Generator & Auxiliaries RAI)
Crores)

110 M/s Mc Nally Bharat Engg. Co.

LOA 0027H/BPP/RA2/CT/04, Dt:17.06.06

Lignite and lime stone handling sytem package


(RA2) for Barsingsar Power project

111 M/s Kirloskar Brothers Ltd., Pune.


112 M/s Thermax Ltd., Pune

Cont. No.53310/ 0029 H/ BPP/(2x 125 MW)/ Circulating Water System and Fire Protection
RA4/CT/04,
Dt:20.12.06
System
Water Pre-treatment Plant and D.M. Plant
LOA No. 0030H/BPP/RA5/conts. Thermal/04
Package (RA5) for Barsingsar Project,
Dt. 13.03.2006
Rajasthan.

2506

Lakhs

Date of completion

PRESENT STATUS

Global

100%.Unit 1&2 PG test approved on 25.03.14 and Warranty


35&29 months from LOA commenced on 26.03.14 and completed on 25.03.15. Issue of final
(29.12.05) for PG test of taken over certificate is pending due to incompletion of supply of
unit I & II respectively certain mandatory spares, tools & tackles documentation and
pending works.

PTE

99%. Guarantee period is completed on 03.04.2014 and No demand


31 months from the date of
certificate from NLC side was issued. Arbitration is in progress.
LOA (16.1.09)
M/s MBE appealed for settlement Advisory committee (SAC).

PTE

Unit I: 16.02.2008 Unit II:


100%. Contract closure certificate issued to the firm.
16.06.2008

2113

PTE

3888

PTE

32 months from LOA


dt.11.12.08

100% . Contract closure certificate issued to the firm.

100%. PG test successfully completed and Final Take over done on


24.12.2013 for IDCTs and 09.04.2013 for CHIMNEY. DLP period
completed. Finalisation of package is in progress.
99%. No demand certificate was issued on 19.08.2014 and No claim
20 months from the date of certificate is yet to be issued by the contractor. Financial
LOA i.e., upto 15.12.2008 reconciliation and no claim certificate are being pursued with M/s
BHEL TBG.
100% Contract value was finalized to Rs. 78.89 Crs and got
approved. Appeal has been filed by NLC against arbitration award.
29.06.2007
Approval of Note for contract closure is pending due to arbitration.
Finalisation not is under circulation for approval.

113 M/s Gammon India Ltd., Mumbai

LOA No. 0031H/BPP/RA6/CT/04 Dt.


31.05.2006

114 M/s BHEL, New Delhi

Cont No. 053284 & 053285/ 0032


220 KV switch yard & Power Transformers
H/BPP/RA7/CT/04, dt.18.08.06 for supply & Package (RA7) for BTPP (2 x 125 MW)
services respectively
Rajasthan

7128

PTE

115 M/S IVRCL, I&P LTD Hyderabad

053273/0033H/BPP/RA8/cont/thermal/04 dt.
Water Carrier system
22.05.2006

7997

PTE

1497.06

PTE

08.12.2016

762.83

11.06.15 EOT snanction


upto 30.04.2016

56.38% ( EOT sanctioned upto 30.04.16)

852.54

EPT

15.10.2016

Work is in progress. 38%

116

M/s Diamond Infra Construction (P) Ltd.,


Chennai.

117 Shri. C. Vadivelu Contractor


118 Shri. M. Sivasubramaniam, Oomangalam

GM/MI/NAMC/MSU/A34/70001226/Agt.
01/15-16
Agt.No. CGM/M-II/SMD/PT-58/A-153/201314
GM/MIA/NA/SMD/A074/90600652/AGT
.32/15-16

Induced draft cooling towers and RCC Bi-flue


Chimney for Barsingsar project, Rajasthan

17689

MODE OF
TENDER

Construction of Belt Reconditioning Plant


including internal electrification in Mine II area
Permanent diversion of Paravanar along LA
boundary including formation of bund.
Transportation of lignite from Mine-IA bunker to
Mine-I Bunker and Mine-II Bunker.

30.11.2008

46% of agreement Value completed