You are on page 1of 7
qeLE Boe BH aA, SSivuctoral Engineering Vol. No.1, March 1989 pp 23~29 THM CHR A A D H BR Ar RY —. ns EBEA AEP HR RARE A » FET SAE ON + + MZ | BGR BIRLA ZIRE WOAH SHEBRBRD LDR ZEA, SAE CHE MES I 2» OPPS BAULBS RMERSHRZE > HRB ABR RGA 27 > MARAE > CE a- FEBS Ath DORE th © lt > SE RS Pw AM > RM ROMS 2 Mat RK RERAA ZH > DAGRBE BR ZTE » DL PEL RRS IAT 2 YS FA ° ARSC SHB ASURGS EPR ZZ BABS RSH GA ZAM > HEMBEARAKZE > EN PHOS ZR ° =: DRS Bale EAH 2 EMER» Fi} =| SMEAR ATU © MARAT E PERE EREMA RZ bBo Tob HB RE RCW EZ + TUS AR Soi Fie » Ty— MATZ A eth ( Free Field ) © BLSARRERAAD RIOR > SBS FAA 2 FEET QC Pde — Se ISS TIS O17 SS 777 SSN YL AR LIE HOE AE BR 2 LA OU B Soil "PZ A BiBMEASA] ) + BRA RR Mth > bia ZS Rib 2 FER YS ( Pio Sh BEAR MEA I) » SUPRA ERS i 2 IE PRET AAR ° U-RBCER WB SI 2H ACID > Ad th BRCS » FEESLUTH ANA > FD BPR ARAL ZRRy ART LE RARE > BR RAR EMD ( Maximum Base Shear) BASE KZ 7NAl ( toll BRM) > BU-AAE FRR AMR A AR ARRAS A > 27S +e RR > HAAKBEID SERB Bt DL CMBARA ) ° AU-AA CEB ARES SOBA Ol C1) > ZERE BEBE SR 35 WAS Caracas Th» SR Sy BE ZA EB ZN Bt ZR RBIS WR o Ic Wee He RR RORZ TL RES RRRORZ HL SCORES wR» ARO RZ RRR ONES +L BUR IEZ ASHE > RZ tL + RUE SSE RS © LL RAOULT » tmp BON 2 TAA SRR Re 10 story building Weight +14,300 kips Fund, period *1.2 sec, T T Son Fronciseo Eorthqucke i857 Bosed on recorded motions of 200 x Depth of Soil ~ feet ‘400 BUHL rtence or sone oer on pri ASE saa FR to.stoRr BUILDING 1N SAW FRANCISCO CARTIQUEE OF 1957 Moximum Base Sheor ~ tons 3000 2500 2000 1500 1000 800 aE Weight of Building = 8000 Natural Paried = 4 sec, 20 30. 40 60. 60 Depth to Hard Loyer ~ meters 70 RO BI 25 20 (EA put aase saan FoR TeICN. 20-STOT HOTLOG 1 ELC CLTY IN EARTIUKE OF SPT 195 1985 109) Domoge Intensity = percent 10 10} «ol Ine3i05, 5109, Ins5109 f fusstes: oo 80200; 280-800; 350 ‘Deptn of Soit ~ meters : G 4; ReaTionsnte aerveen sTaUCTURAL DAMAGE INTENSITIES 20 EDIPLTED FUNORKENTAL PERIODS OF SOIL DEPOSITS 26 LA BU BA BAM ES & =. BASE BF FEL SL A MP9 Z ME te PS HUD 5 ERE ARAB RAE AD PRA ZB AS BEARER LAB > ARR 3 + EMER AEB) ( Input Motion ) > ‘SAM AY 05 tHe RIAE ( Surface Structure ) + ‘ni AT AR > FURIE ASHE ( Embedded Stru- cture ) » ANI PUTAS > MRM 2 ABE + HY 5p FS EAS PAE HE ABE © AEH YB SCAR RE HAAR EEA BRE + BLA LTR ATK (Solid Element ) #32503 ( Beam Element ) Fo LBA EEL > AT Be 5% ( Continuum Model ) A pmeHeBE ( Di- scretized Model ) » #22 BE PS AIMEAERE » fll LAE PEP > Fis FY 5 SB BH a — BAL JAC Spring-Dashpot ) K GL » 4 ABER A te SARBS + HERA DL AAR TE RARE » IER AE HY BAR 5 AE EA A Bb > TA AE a SE Sp SA + RY PRS — BFS Bo LE SEZERDREML DfEE » Fe AUER MaRS AE 2 Pb» HBT A (Shear Modulus ) 9208 JE LtJ9 bi + 382 Nes TDRSS > IE ARE 2 ME DR Ah SD BRE LRG o A HRLRRREB—P SST)» AD-Hezk AE MERLE GA) » SRE HEAR BER + ATLA TEAL EAA » De AU CP aR FER ZER ELA A + ROBT ASV PZ 9 EAB RA 2 RG > SANE BR AT AS 7 CREE tS HARE ZR E C2) © RAE T SEIN » PUAN Ry RE RR SUES ZS + Le Be EAE PRA ZY » HRD ALL — eM EN DTN BUSHY ARSE AR + He ARS AS ZT A a 4838) ( Free-Field Motion ) A BRE 9 UBS C3) + RRA AY DAT LER HB 2 A BG 2 ee + EAS i@ (Wave Propagation ) 2 ia » AWM 2 LHR ELAR T ERA + HABA eS BE cy AK ZEAE LIT AR» TITS BED ERHEESRZ P RRNA RMAR As SHAK SAGE ABE 2 TERE TID + DAI LEFT ‘FS MEEK HEE (Complete method ) AFH #UE (Substructure method ) » # LUMA BETRED » SAR; (Time domain ) ® ERE + HT GRAD He ( Direct integra- tion ) RieiGAbinzk ° (modal superposi- tion) (4) > KOE SBHD BPO ASME » MAN EME RU» ite Biba ( Fre- quency Domain ) R/#RY + SUA FR BLA RE (Complex Response Method ) (3) RB#K iH: (Green's Function Method ) » 8 PRRERR AE ARH RD BRAR ie (EMR ABTA » Be aT A ‘BaAS ) HER) IRS ARES + RTH BRE > (RS ME AR LRA » ABR TREK » RTS > LAF HH fle: ( Pseudo-inte- raction method ) 5a(4 Hilt ( True- inte- raction method ) » EAH #dh + RUE PHI» BRA 2 RG + AER ee FMA » TAT AE ME He Hal Dees» Fie ee Hs wR AY TEAR + (abe FS 7 AS A BY OTE Be ME + PABRALARA WE REL MAAR HAM AT & AREAS ABD 7518 MEK ZAR — BH IED PRN ZEA + WER HBF Ot ey FEA FAREED > — TTS» OE Ue LAF DA LH EHP EG (half - space » ACESS HE)» EAE ME FLAS ZF ZORE 9 PRE TED ATS (7H LA) WR > SER AG MES BOS TE BT A EE ALM + BS ER LE BA ws » MON AURIS > SE Fe WE BM? CNA ERES SM ARA RD SURE REG > RA TAB RT Hire Rw BM 27 LA “BOON N3W3T3 BLINIS ONISN SISATWNY NOLLOVYSINI SHALONULS-T10S JO NOLLVANSSSYd3Y OUVWSHOS VE waishs eunforuis- wos Jo POW AMOR aH (a Kouanbass epow ysodag yos (0) kouanbasg ‘vouON 506, jurujoods oy WOH OI8|e30y kouanbass H WOHOT SITY iS 40 e808 unupeds way ToHSTpIERY t I\ -\_/ ous 0015 3 vayon 1109 eee eee ¥ Ly 2 BRIE BG HH rigid and assis] @R FA f Pe 1 T i i Ea ( canta os Kee Kes] [U ‘, aie heals a specified ‘motions Kos sa} [Us] [Ps (a) Scattering (b) Impedance (c) Structural Problem Problem Analysis BA 3-STEP METHOD FOR INTERACTION ANALYSIS SD aH FA Se AS» PUNE 2 ATS AM > PTDL eT A MBM + RICE RH AE ES» AR RY LPR — BERS 2 HS RK ARR» TA BEBER AE RB + BRE TA TRB THE ABA heme REARS 2AM + REARS TART TE > BRE ME NE ZA C5) MLK KATRAR SH» H—-B BSS tE# RYE (Rigid Boundary Method ) + SE Hy HELE HS EAR HL US > HADBIAR + OR BDA BER RIE RBS A RE CAD 8H ° HO MHKARABRE ( Flexible Boundary Method ) > Bf #858 M32 R88 eeane BRS ACR» MD LUA DR TESA Re » to REBT A ° = HATES Ae MB ( Fle- xible Volume Method )» Bil (ii #658 1: bi ZEA RS AE RSI R + IL RRS BOB —R HS > i LAR CR > ooh HOT AR © UR 8B + LASHER EBT OR FAIA ME Re REORDER » PATA HENS BT EAA ROS BH» ATM LR FTIR FS MOE 2 © B+ SoM MOH > $M BBRMLRARAL ON SE RE MEK + BR 1 LEZ RE TAS > BUA Re RRP RES H > B= RZ Ste EW A tm EB ( Acceleration. Time History)» 41M (Tim Increment BERL—B > GAS PBL ZR EA + RAMA 2 ART HK » PATIL 539 A BK eM > Se AS ‘iH 77 ( Fast Fourier Transfo- rm ) > RR TERA TT ES 2 EF Fe ABR RMD Pit DR + RR EB BAF BAZ RE > TEU ATT Be aR OBA BAB BAZ BRE > PRL LA Se ISR ( Inverse Fast Fourier Transfo~ rom) (SVE #5 6H Be HEE Ae IRL ZS Be ME C Re- sponse Time Histories ) © BAEZ Se A » Ch Cah 7 1 RE wae eS A HT SEAR + TET LANG Z EHP PAS > EE Wit ABZ eK VEE ‘EME 2 ET > AA FZ PSEMLE ( Rayleigh Damping ) + #£d66 EG o RNA >» LEO RA MA Sip a2 MOM BE (Material Damping) 5 EAE Sy a PR GE AE 2 RT BJ, C Ra diation Damping ) » (Mi MAR MELE » RT HY HE PLR BALE A SA A BER BY BER C Co~ mplex Shear Modulus ) > BAG ATA IGE 2 ABH ( Energy-Absorbing Bou- ndary ) » Dime WG ADA JEZ i B ° BAR MEL AS > THAT SR #2 (Equivalent Linear Method) » bi mt#! LAE ZIPAREETT 930 3) > RARER 7) — ETE 2% ( Iteration Method) » 37S ARIEIGE FAM EO CLHAGLLMER ZB ORRR SEH: SRN ZR» Ae Fe BASE IF DARE TERE OR Pk + TUR HEAR FY BLP FERRE AR SE LAE Be tai ABLERSUZLORRAMT » RI MCE BIG BM 29 ZORA L R-AZ EMTR ABMS HA KitRREE SM NMR HZ Bat > Bie Le eZ EH > Bo A MRE RRA ZED SER DUE ZR + TODA LAS WB HH Pe AZ SEERCEE » BD TE Zp > ME TERY Sa FRG HEE > FIRE PTE SE A 2 PTs RM — ZF A TREK 2» EAR AB I a RDM 2 Ds AL FANS 2 QR UME EZ HERTZ RSIS » AMOR ZR >» BRU EH (DS es IEE SEE + RA RR # (Energy-Absorbing Boundary) LA 4 -L SUSLENZ TLE IR > OBUTTIBEL + TSB TZ © Ky SER LSeed , H. Bolton , “Site Effects in Ea- rthquake-Resistant Design , ” Proce - dings , First Venezuelan Conference on Seismology and Earthquake Engine- ering , Oct. 1974. 2Waas ,G., “Analysis Method for Foo- ting Vibrations through Layered Me- dia , ” Ph. D. Dissertation , U.C. Be- rkeley , Dec. 1972. 3.Lysmer , J. , Udaka ,T., Tsai , C.F. » and Seed ,H.B. , “ FLUSH-A Co- mputer Program for Approximate 3-D Analysis of Soil-Structure Interaction Problems , ” Report No. EERC 75-30 » Earthquake Engineering Research Ce- nter , U-C, Berbeley , Nov. 1975. 4.Clough , R.W. and J. Penzien , “Dyna- mics of Structures” , McGraw-Hill , New York , 1975. 5.Ostadan , F. , “Dynamic Analysis of Soil-Pile-Structure Systems ” , Ph.D. Dissertation , U.C, Berkeley , 1983.

You might also like