Professional Documents
Culture Documents
SY 2016-2017
First Term
Submitted By:
IT1A
Isaiah Joshua C. Abia
Jayvee P. Rapayrapay
Mauro C. De leon
Paul Adrean
Submitted To:
Mr. Rolex A. Gatchalian
IT Instructor,SYNADT
9AM-12PM,Room 4C
Chapter 1
Introduction
Chapter 2
Methodology of the study
The proponents applied the RAD or Rapid Application Development method in
the study in order to have an organized output of the proponents study.
Prototyping
The prototyping methodology performs the analysis, design, and implementation
phases concurrently, and all three phases are performed repeatedly in a cycle until the
system is completed. In this case, the users of the system are an active participant of the
system development process. The prototype is handed to the users for testing and to
provide comments; which are the reanalyzed and redesigned, and a second prototype is
developed. The process continues in a cycle until the users and developers agree to a
final system.
Requirements Planning
Implementation
The implementation stage involves implementing the new system and managing
the change from the old system environment to the new one. This may include
implementing bridges between existing and new systems, converting data, and
training users. User acceptance is the end point of the implementation stage.
Chapter 3
Data gathering, procedures and output
To be specific about the said methodology of the study the proponents provide other
details associated with the step of the RAD.
INTERVIEW
QUESTION ASKED
1. What is the name of the school?
2.
3.
ANSWERS
United Methodist
(UMCVS)
1984
Church
Values
School
4.
5.
6.
7.
ACTIVITIES
Project
Orientation
Create Gant
Chart
Group Members
Meeting
Company
Interview
Submit Company
Background
Drafts
Create Chapters
1,2,3 Drafts
Submit Chapters
1,2,3 Drafts
Title and
Chapters 1-3
Defense
Modify errors
and receive
system problem
Create Drafts for
Chapter 4
Pre - Defense
Create Drafts for
Chapter 5
Start system
coding
System design
Create Drafts for
Chapter 7,8 and
9
System and
Documentation
Checking
Pre Defense
Final checking of
Documentation
W1
W2
W3
W4
W5
W6
W7
W8
W9
10
W11
W12
W13
W14
W15
and System
Finalization of
the system
Final Defense