You are on page 1of 76

Shut down job of Pyrosection- Raw Mill

Sr.no

Job description

Preheater down comer duct expansion joint false air leakage arresting
work
Preheater fan coating and casing sealing bolt tightening work
Preheater compressor and dryer maintenance work
Kiln third tier heat exchanger cooling fan repairing work
Preheater top fan impeller coating cleaning work
Coal mill tunion lubrication oil filter and strainer cleaning work
Blending silo inside fan impeller coating checking work
Coal mill FK pump kiln firing drive side bearing checking work
Cooler Drive chain tensioning arrangement alignment work
BOOSTER FAN impeller coating checking work
Clinker silo top pneumatic gate checking work and trail work
Burner pipe frame fabricated work
PC firing F K PUMP FR Replaced work
Kiln shell cooling fan duct modification work
Cooler exhaust duct stool fixing work expansion joint.

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Hot cyclone double flap valve replaced and rotary air lock erection
work
Kiln thrust roller oil seal replaced work
Clinker silo top all expansion joint replaced and new expansion joint
fabricated from ms plate
Kiln supporting roller oil sealing checking work
Coal crusher discharge skirt board increase 500mm work
Raw Mill
Bag Filter hopper end cone repaire work.
Inspection of all Rotary feeder Chain sprocket.
Raw Mill diaphgram bolts inspection and tightening.
Weigh feeder-3 vent line duct modification.
Lime stone crusher gap Checking.
Apron feeder conveyor Complete inspection.
Raw Mill inlet outlet Lubrication system filter cleaning.
Stone and bricks house keeping near lime stone areaMechanical housekeeping in above area.
L.S. Yard tunnel belt 100 BC3 take up weight trolly to be covered for
rain/Water
Yard trolly system to check at end with limit switch.
LS Crusherto yard trolly belt at takeup belt is not in centre 100 BC1
Belt 100 BC1 roller sound observed.
tipper belt 100 BC2 at tail end matarial spillage need to be plate
privision to self dust removals.
Cleaning on the gear box amchine/ Equipment.

16
17
18
19
20
21
22
23

Floor area cleaning/Housekeeping


100 BC1 belt discharge skirt to be adjusted
Weight feeder discharge hopper vent line to be modified & corrected
Lime Stone weight feeder scraper rubber to be checked & adjusted
Tunnel Belt 200 BC3 skirt to be modified for dust control
100 BC4 Belt discharge point chute modification In stopage
100 BC4 discharge chute area plarform ladder to be provided
Housekeeping in tunnel area

24

Tunnel water pump(100 BC3) foundation to be fixed on ground or on


wall

25

LS apron feeder discharge side to be covered by the rubber to control


the dust

26

Apron feeder discharge chute (Entrance to crusher) top plate bulge


required replace

ection- Raw Mill


men power

start

end

1F+2R
1F+2KH+1W
1F+2KH
1F+1KH
1F+1KH
1F+1KH
1F+1KH
1F+2KH
1F+2KH
1F+2KH
1F+2KH+1W
1F+2KH+1W
1F+2KH
1F+1W+2KH+1R
1F+2KH+1W+1R

4/9/2016
4/9/2016
4/9/2016
4/9/2016
4/9/2016
4/9/2016
4/9/2016
4/10/2016
4/10/2016
4/10/2016
4/10/2016
4/10/2016
4/11/2016
4/11/2016
4/12/2016

4/10/2016
4/9/2016
4/9/2016
4/9/2016
4/9/2016
4/9/2016
4/9/2016
4/10/2016
4/10/2016
4/10/2016
4/10/2016
4/12/2016
4/11/2016
4/13/2016
4/12/2016

1F+2KH
1F+2KH+1W

4/12/2016
4/12/2016

4/13/2016
4/13/2016

1F+2KH+1W
1F+1KH
1F+2KH+1W

4/13/2016
4/14/2016
4/15/2016

4/15/2016
4/15/2016
4/16/2016

1F+1KH+1W

4/10/2016

4/15/2016

Remarks