You are on page 1of 2

ROAD CLOSURES:

Saturday, September 24, 2016


Please plan to arrive/leave your home or busines prior to or after these times.
Thank you for your copperation and understanding. Enjoy your front row seats!

ALERT: Road Closures on Saturday, September 24, 2016.


Various closures between 6:30 am and 11:30 am.
Questions? Please call (208) 381-2243.
Thank you for your cooperation and understanding.
FitOne is grateful for the support and understanding Boise city businesses and residents have always shown the event.
We hope the following information will help the day of the event go as smoothly as possible for everyone.
Event Information: FitOnes mission is to build healthier communities through fun, active living. FitOnes focus is on families
and the event benefits St. Lukes Childrens Hospital. The FitOne 5K, 10K, Half Marathon and Expo will host an estimated
10,000 athletes from all over the United States.
Race Start Times: all races begin at the Idaho State Capitol (intersection of W. Bannock St. and S. Capitol Blvd.).
Half Marathon 7:15 am

10K 7:30 am

5K 9:30 am
(Staggered wave starts through 9:45am)

All races finish within Ann Morrison Park off of Americana Blvd.
Get Involved: If you do not plan on walking or running, we d love to have your help as a volunteer. An outstanding team of
approximately 1,000 volunteers are essential to the success of FitOne. Please consider joining our race morning volunteers as
they help at intersections and road closures, serve breakfast and distribute water to participants at designated aid stations.

Downtown Section (W. Front St. to W. State St.


and S. 6th St. to S. 9th St.)
will be closed from 7:00 am to 10:30 am

PLEASE EXPECT DELAYS AND TRY TO AVOID THE


AVE. B AND JEFFERSON ST. INTERSECTION
BETWEEN 7:00 AM AND 8:00 AM

S. Capitol Blvd.
from W. Front St. to W. River St.
will be closed from 9:15 am to 10:00 am

Marden St.
will be reduced to one lane from 7:30 am to 9:15 am

S. 9th St. from W. River St. to University Dr.


will be closed from 7:45 am to 11:00 am
S. Capitol Blvd. and Crescent Rim Dr.
will be closed from 7:45 am until the final
participant passes by at approximately 11:00 am
S. Americana Blvd from W. Shoreline Dr.
to W. Emerald at S. Roosevelt St.
& Latah at Morris Hill Rd.
will be closed from 7:00 am to 12:00 pm
W. Jefferson St. from S. 6th St. to N. Ave. C
will be closed from 6:30 am to 8:00 am

E. McKinley St. from Ave C. to Walnut St.


will be closed from 7:00 am to 8:15 am
Walnut St. from E. Franklin St.
to E. Kimberly Lane
will be reduced to one lane from 7:00 am to 8:30 am
E. Warm Springs Ave.
from Marden St. to Starview Dr.
will be reduced to one lane from 7:30 am to 9:15 am
River Run Dr. from E. Park Center Blvd.
to Cottonwood Apartments
will be reduced to one lane from
7:30 am to 10:00 am

ter

nk

lin

ROAD CLOSURES:

St.

Saturday, September 24, 2016

AM

kc

CL
OS
ED

-8

:0

St.

AM

E. McKinley St.
E.

REDUCED TO ONE LANE FROM


7:30 AM - 9:15 AM
RUN

0
1:0
-1

son

kc
Blvd .

Blvd .

E.
St .

Fr a

nk

lin

St.

7:4

AM

fer

ter

NER
SO
7:45 N GRE
E
AM
- 11: NBELT
00 A
M

Pa
r

Jef

en

ter

AM

en
ED

Pa

CL
OS

M
5A
7 :4
ED
OS
CL

-1
1:3
0A
M

Go

odm

an

AM

nS
t.

Pa
r

sto

d
ar
M

C
UNLOS
TI ED
L1 9
0: :15
00 A
AM M

en

CLOSED
7: 45 AM - 11
AM

F
Fe i n i
st sh
iv
al

St.

6:3

Co

7A
M

ED

N.
N.
Elm
Wa
DU
Av
lnu
C
e.
7:0 ED
tS
t
0
T
.
AM O O
8 NE
:30 LAN
AM E

d.

Y BRIDGE
COMPLETE.

PLEASE EXPECT DELAYS AND TRY TO AVOID THE AVE. B AND


JEFFERSON ST. INTERSECTION BETWEEN 7:00 AM AND 8:00 AM

CL
OS

RE

Blv

-1
0:
30

rk

Fr a

RE

Blvd .
Pa

E.

St .

nS
t.

en

GRE
EN
11:0 BELT
0 AM

son

sto

kc

fer

Co

Pa
r

Jef

N.
N.
Elm
Wa
DU
Av
l
nu
C
e.
7 :0 E D
tS
t
0
T
.
AM O O
8 NE
:30 LAN
AM E

E.

rk

Blv

d.

*AS OF PRINTING DATE, BROADWAY BRIDGE


PROJECT EXPECTED TO BE COMPLETE.

de

ar
M

St.

m
ood

an

St.

River
R

un D
riv

Pa
r


FitOne
10K and Half Marathon participants will be on the Boise River Greenbelt from approximately 7:15 am until approximately 11:00 am.
REDUCED TO ONE LANE FROM
Greenbelt will not be closed, but alternate routes are7:30
recommended
AM - 10:00 AM for the safety of all participants and non-participants.

REDUCED TO ONE LANE FROM


7:30 AM - 9:15 AM

kc
en

ter

Blvd .

EASTERN CONTINUATION OF MAP


BAGGELY PARK

NN

un D
rive

ie

St

Pa

O
N
TO GR
E. EE
P NB
7: ARK EL
45 C T
AM EN PAR
T
A
- 9 ER LLE
:4 BLV L
5
AM D.

D r.

ER
S

River

REDUCED TO ONE LANE FROM


7:30 AM - 9:00 AM

RU

rv

rk
ce
nt

Pa r

er
Bl

kce

vd

nte

rB
lv

REDUCED TO ONE LANE FROM


7:30 AM - 10:00 AM

d.

MARIANNE
WILLIAMS
PARK
BAGGELY PARK

You might also like